JCB India Limited — Rohidas Kale

JCB India Jaipur plant: CRISIL-verified revenue, six-factory footprint, Jaipur utility stack (33 kV JVVNL, 4x1250 kVA DG, 6x750 CFM compressors), named site head and BEE-certified utility manager, and how to use Rohidas Kale (Head Quality, Access Products) as the warm route.

6/10 ICP fit
JVVNL DISCOM
ISO 50001 ✓ Energy mgmt
Faridabad Plant
LinkedIn network — MEDIUM (intro path) Connection → plant sponsor
₹
Bill band

₹610 Cr; paid-up ₹8

→
Entry angle

**one Jaipur meter boundary (paint shop plus compressor house, or the whole 33 kV incomer) for a 60-Day Proof, framed as cost per machine for the access and backhoe lines, with Amit Goyal executing and every saving verified with evidence on our ledger.** Lead with shift-start demand and compressed air, not with…

!
Top flag

Confirm bill band on first call

Primary champion Rohidas Kale Head Quality, Access Products, JCB India Ltd (Jaipur)

Depth note: MEDIUM profile. Facts are sourced in §6.3. [~] = estimate, [!] = unverified. No bill, email or person has been invented; inferred emails are labelled.

1. Company overview & snapshot

1.0 The connection — Rohidas Kale

  • Current title: Head Quality, Access Products, JCB India Ltd, based in Jaipur. LinkedIn shows the role at a little over two years (since late 2023 or 2024).
  • Prior JCB roles: Operations Quality / Business Command Centre / NPIP Quality (~3 years), and DGM NPIP Quality, Business Command Centre, JCB Production System governance and IMS (~5.5 years). Total JCB tenure is roughly ten years.
  • Before JCB: Head of Quality Management at CLAAS India (reported to the President & MD), supplier quality at John Deere India, and earlier roles at Sauer-Danfoss, Tata AutoComp, Divgi Warner and Kirloskar Oil Engines. About 29.5 years total experience. VDA 6.3 process auditor; John Deere “train the trainer”.
  • Function and authority: Quality for the access-products line (articulated and telescopic booms, scissor lifts, MEWPs). He does not own the electricity bill, the utility budget or capex for the plant. He does have standing with the site leadership because of his command-centre and production-system governance history, and his public posts are about “connecting dots between top management and bottom line”, which is the language Stamped speaks.
  • Connection status: 1st-degree LinkedIn connection of Utso.
  • How to use him: as a warm forwarder, not a buyer. Ask him one question: who owns the Jaipur JVVNL bill and utilities, and would he introduce us to Ramkishor Aggarwal (site head) and Amit Goyal (utility manager). A secondary angle that fits his remit is energy per good machine on the access line: rework and repaint cycles cost both quality and kWh.
  • Legal name: JCB India Limited. CIN U74899DL1979PLC009431. Incorporated 1 February 1979, unlisted public company.
  • Registered office: B-1/I-1, 2nd Floor, Mohan Co-operative Industrial Estate, Mathura Road, New Delhi 110044. Corporate HQ and largest plant at Ballabgarh, Faridabad.
  • Parent: wholly owned subsidiary of J.C. Bamford Excavators Ltd (UK). Started as a JV in 1979. Board includes Lord Anthony Bamford and Graeme Macdonald (Tofler).
  • Capital: authorised ₹610 Cr; paid-up ₹8.5 Cr (Tofler, FY25). Debt-free per CRISIL.
  • AGM: the 47th AGM was called for 25 September 2026, with an interim dividend of ₹7,724 per share for FY26, which is a sign of the cash the parent extracts.

1.2 What they make & where money comes from

Nine product lines and about 60 variants: backhoe loaders (market leader), tracked excavators (15%+ share), wheeled loaders, compactors, skid steers, telehandlers, access platforms (MEWPs), diesel generators and engines. JCB claims Ballabgarh is the world’s largest backhoe-loader factory. Exports were about 22–23% of FY26 revenue (CRISIL) to 135+ countries; Deepak Shetty told Equipment India (Sept 2026) that exports should be 15–20% higher this year and production should exceed 70,000 machines. Group contract manufacturing for the parent supports volume. Backhoe loaders are 95%+ indigenised through ~380 suppliers.

1.2a Scale, MSME status & trade

FieldValueConfidence
Revenue (latest FY)₹19,710 Cr operating income FY26 (provisional)CRISIL rationale, Jul 2026
MSME classnot MSME (large)turnover
EmployeesLinkedIn band 2,000–3,000 white-collar; Jaipur site head manages “1500+” at his plant; shop-floor contract labour not countedLinkedIn [~]
Import intensityLow for backhoes (95% local); engines/hydraulics partly from parentcompany site
Export share~22–23% of revenueCRISIL

Revenue range (all figures found)

FYFigureBasisSourceNote
FY26₹19,710 Cr operating incomeStandalone, CRISIL-adjusted, provisionalCRISIL rationale 22 Jul 2026Down 2.4% YoY
FY26₹2,157 Cr PAT (10.9%)Standalone, provisionalCRISIL / UnlistedCart
FY25₹20,201 Cr operating incomeStandalone, CRISIL-adjustedCRISIL
FY25₹20,250.5 Cr total revenue; ₹1,985 Cr PAT; EBITDA ₹2,674 CrStandaloneTofler (MCA filings)
FY25”>₹5,000 Cr” bandStandaloneTofler summary bandconsistent

Working revenue range: ₹19,700–20,250 Cr (FY25–FY26). Confidence: high. The user’s brief figure (₹19,710 Cr FY26 provisional, CRISIL) is confirmed.

1.3 Plants, addresses & footprint

SiteAddressWhat it doesDISCOM
Ballabgarh (HQ + main plant)Mathura Road, Ballabgarh, Faridabad, Haryana (exact plot [!]; HQ phone +91 129 429 9000)Backhoe loaders, skid steers, telehandlers, DG sets, engines; HQDHBVN
Pune, Talegaon (Excavators unit)Plot A & B, Talegaon Floriculture & Industrial Park, Navlakh Umbre, Maval, Pune 410507Tracked excavators, wheeled loaders, compaction, group fabricationMSEDCL
Pune, second unit / design centreTalegaon / Mhalunge (Chakan) GST addressesHeavyline fabrication; engineering centre (770+ engineers per CEO)MSEDCL
JaipurPlot DTA 006/001/002, Mahindra World City, Jaipur 302037 (SEZ Narsinghpura, Dadiya)Backhoe loaders, mini excavators, skid steers, telehandlers, access platforms, fabrications; 114 acres; ~34% women on shop floorJVVNL
Vadodara (Halol)44-acre campus, inaugurated April 2022Cabs / fabrication / newer lines [!] exact scopeMGVCL

The company describes “six factories”. Public material names Ballabgarh, two at Pune, Jaipur and Vadodara; the sixth is likely a second Ballabgarh unit [!].

Recommended pilot site: Jaipur. It is the connection’s own plant, it has a named utility manager who already treats energy as part of the job, it runs on a single 33 kV JVVNL supply, and it is a modern (2014) campus where meter data is likely available. Ballabgarh (DHBVN, Faridabad) is the second choice because it sits next to our LNM reference.

1.4 Leadership & CRM map — champion types

TypeNameRole / plantLinkedInEmailWhy they matter
ConnectionRohidas KaleHead Quality, Access Products, Jaipurhttps://www.linkedin.com/in/rohidas-kale-64566610rohidas.kale@jcb.com (inferred)Warm forwarder to site head
Economic sponsorDeepak ShettyCEO & MD, JCB Indiahttps://www.linkedin.com/search/results/people/?keywords=Deepak%20Shetty%20JCB%20Indiadeepak.shetty@jcb.com (inferred)Escalation only; public focus on hydrogen and fuel efficiency
P&L / plantRamkishor AggarwalSVP Operations & Site Head, Jaipur (headline also says Ballabgarh)https://www.linkedin.com/in/ramkishor-aggarwal-70081713ramkishor.aggarwal@jcb.com (inferred)Owns plant P&L; ex-Caterpillar China plant head; ex-DGM Mfg Engg & Projects
Maintenance / utilitiesAmit GoyalUtility Manager, Jaipur, since Oct 2014https://www.linkedin.com/in/amit-goyal-88820595amit.goyal@jcb.com (inferred)Runs 33/11 kV, DGs, compressors, HVAC, DISCOM liaison, plant energy management; BEE energy manager; ex-Bosch Jaipur facility manager
Utilities / projectsManas SamalSenior Manager (Plant Utility Manager 2017–2022), Jaipurhttps://www.linkedin.com/in/manas-samal-b9889817manas.samal@jcb.com (inferred)Utility and project execution
Production / businessChirag ShahAVP, Access Business Head, Jaipurhttps://www.linkedin.com/in/chirag-shah-1b808b10unknownRohidas’s business counterpart
Quality / digitalPadarabinda MaharanaAGM Process/Product/Customer Quality; “digital project lead for site”https://www.linkedin.com/in/padarabinda-maharana-250b699unknownSite digital projects
Maintenance (Vadodara)Manoj RohillaSenior Manager Maintenance, Vadodara (IIoT maintenance digitalisation)https://www.linkedin.com/in/manoj-rohilla-0b19b4308unknownVadodara route if Jaipur stalls
HR (Ballabgarh)Anil GoyatAVP Human Resourcessearchanil.goyat@jcb.com (verified, FIA directory)Confirms the first.last pattern
FinanceCFOname TBD — searchhttps://www.linkedin.com/search/results/people/?keywords=JCB%20India%20CFOunknownCapex/opex sign-off for multi-plant
SustainabilityHead of EHS / sustainabilityname TBD — searchhttps://www.linkedin.com/search/results/people/?keywords=JCB%20India%20sustainability%20headunknownBallabgarh GreenCo history

Email pattern: LeadIQ reports first.last@jcb.com at 97%; Prospeo shows 56% first.last and 42% initial.last. The FIA directory lists anil.goyat@jcb.com, which confirms first.last for at least one India employee. Treat every personal address above as inferred.

Decision path: Rohidas forwards → Amit Goyal (utility) qualifies data access and bill → Ramkishor Aggarwal (site head) approves a one-boundary 60-Day Proof → IT/OT security and procurement (likely central at Ballabgarh, possibly UK-influenced) → CEO only if multi-plant.

1.5 Recent news (24 months) & timing for Stamped

  • Jul 2026: CRISIL reaffirms AAA/Stable; FY26 revenue down 2.4% on weak construction-equipment demand and the West Asia crisis, offset by exports and price increases. A flat top line with rising PAT means management is in cost-discipline mode, which helps an opex-saving pitch.
  • Sept 2026: CEO says exports up 15–20% this year and production >70,000 machines. More shifts at Jaipur raise both kWh and demand peaks.
  • Apr 2026: Deepak Shetty met MNRE on green hydrogen. The public sustainability story is about machines (hydrogen engines, 45% fuel-efficiency improvement over 15 years), not factory power.
  • Jun 2026: dealers and visitors posting Jaipur plant tours; the plant is a showcase site, so a credible pilot there carries reference value.
  • Timing: Q3 FY27 (now) is budgeting season for FY28 opex. A proof run that finishes before March gives the plant a number to carry into next year’s plan.

2. Energy profile

DISCOM / supply (name early): JVVNL (Jaipur Vidyut Vitran Nigam Ltd) for the Jaipur plant at Mahindra World City; SEZ units in MWC are JVVNL consumers (Times of India 2021 report on electricity-duty exemptions). The utility manager’s profile confirms a 33/11/0.415 kV installation and “liaising with Electricity Board”. Ballabgarh is DHBVN; Pune units are MSEDCL; Vadodara/Halol is MGVCL.

2.1 Bill band, tariff & demand

No JCB invoice or sanctioned demand is public. Working estimate for Jaipur: ₹80 lakh–₹1.6 Cr/month [~].

Reasoning: a 33 kV connection with 4×1,250 kVA + 1×320 kVA DG backup implies a contract demand around 4–6 MVA [~]; a two-shift fabrication-plus-paint plant at 50–60% load factor would draw roughly 1.2–2.2 million kWh a month [~]; at JVVNL large-industrial rates (energy plus demand charges, electricity duty possibly exempt for SEZ units) the all-in cost lands in the band above. MWC Jaipur also has a developer-run 10 MW solar plant and a wind PPA, so part of the plant’s energy may be green-sourced [!], which lowers ₹/kWh but not demand charges. This passes the ₹30 lakh/month ICP floor comfortably.

Demand risk points: shift start (robotic welding lines, paint oven heat-up, six compressors and AHUs coming up together), and production pushes when export orders spike.

2.2 Generation, fuel & renewables

  • DG: 4×1,250 kVA + 1×320 kVA at Jaipur (utility manager’s profile). DG hours are a hidden cost line worth asking about.
  • Solar: Ballabgarh documented 35 kW → 450 kW rooftop solar by 2018 (GreenCo case study). Jaipur rooftop or MWC solar share unknown [!].
  • Fuel: paint ovens likely on LPG/PNG or diesel [!].

2.3 EnMS, PAT, ISO, BRSR

  • Ballabgarh: ISO 14001 since 2006; CII GreenCo journey; BEE National Energy Conservation Award (first prize, general category) noted in the 2016 GreenCo case study; projects on AHUs, LED, efficient compressors and paint-shop optimisation.
  • Jaipur: IMS audits referenced by the utility manager; ISO 50001 not found publicly [!].
  • Not a PAT designated consumer (engineering assembly). JCB India is unlisted, so no BRSR.

2.4 Likely ₹ leak categories (hypothesis)

  1. Shift-start demand overlap: welding robots, paint oven, compressors and HVAC all start inside the same 15-minute window.
  2. Compressed air: 6×750 CFM compressors; leaks and unloaded running during breaks and the third shift are typical in fabrication plants.
  3. Paint oven hold: oven kept at temperature between batches when the line is starved.
  4. HVAC / AHU in partially used bays.
  5. DG run-hours when grid is available (sync and changeover habits).
  6. Power factor and ToD: check JVVNL ToD surcharges vs production timing.
  7. Rework energy on the access line: repaint and re-test cycles, which is where Rohidas’s quality data connects.

3. Operations, equipment & digital stack

3.1 Process flow & critical loads

Steel receipt → laser/plasma cutting → robotic and manual welding (booms, chassis, loader arms) → machining → shot blast → pretreatment and paint → assembly (engine, hydraulics, cab) → testing (hydraulic, functional, PDI) → dispatch. A Google review describes “a fully automatic welding line”. Major loads: welding power sources, cutting, compressors, paint booth fans and oven, HVAC, test rigs.

3.1a Machine inventory

ClassPresent?Count / size if publicOEM / brand if namedNotes
CNC turning / latheLikelyunknownunknownBallabgarh has powertrain/CNC shop (maintenance profiles)
VMC / HMCLikelyunknownunknown
HPDC / LPDC / GDCNo evidence——
ForgeNo evidence——
Heat treatmentUnknown——
Press / stamping / cuttingYes [~]unknownunknownfabrication
Robotic weldingYes”fully automatic welding line”unknownJaipur
Paint lineYes [~]unknownunknown
CompressorsYes6 × 750 CFMunknownJaipur utility profile
DG setsYes4 × 1,250 kVA + 1 × 320 kVAunknownJaipur
HVAC / AHUYesunknownunknown

3.2 Shifts, seasonality, production pattern

Plant hours on Maps show 8:30–17:00, Monday–Saturday for visitors; production almost certainly runs two shifts with a third in peak months [~]. Construction-equipment demand dips in monsoon (Q2) and peaks Q4. Export growth smooths this.

3.3 Automation, metering, SCADA/EMS/DCS

The utility manager lists “energy management in plant” and his Bosch history includes an EMS rollout, so sub-metering at feeder level is likely [~]. Vadodara maintenance lists IIoT-enabled digital maintenance. JCB has a “Business Command Centre” (Rohidas’s former remit) that tracks productivity KPIs. Path A: read-only export from the existing EMS/meters. Path B: monthly JVVNL bills plus 15-minute data from the main meter while IT approval runs.

3.4 Capex / tech projects affecting energy

Export growth, new products (52-tonne excavator at Pune; electric and hybrid booms at Jaipur), and possible line additions. Electric MEWPs need battery charging and test bays, which adds new load at Jaipur.

4. Stamped Energy fit analysis

4.1 ICP scorecard

  • Bill ≥ ₹30 lakh/month: very likely pass [~].
  • Geography: pass (Rajasthan and Haryana are North India).
  • Vertical: pass (engineering / auto-adjacent fabrication and paint).
  • Revenue band ₹300–5,000 Cr: fail (₹19,700 Cr, multinational subsidiary).
  • Decision speed: risk (UK parent, central procurement and IT security).
  • Data maturity: likely good (33 kV, EMS experience, command centre).
  • Champion: partial (warm 1st-degree connection, but in quality, not utilities).

4.2 Fit score rationale

6/10. Strong plant economics, North India location and a named energy-literate utility manager push it up. Size, foreign parent and the fact that our connection is not the bill owner pull it down. It is MEDIUM: worth a warm intro now, not worth a heavy push.

4.3 Wedge (parser-critical)

The strongest wedge is: one Jaipur meter boundary (paint shop plus compressor house, or the whole 33 kV incomer) for a 60-Day Proof, framed as cost per machine for the access and backhoe lines, with Amit Goyal executing and every saving verified with evidence on our ledger. Lead with shift-start demand and compressed air, not with “energy management”, which Jaipur already practises.

4.4 Objections & competitors

  • “We already have energy management and a BEE energy manager.” Response: we make his work continuous and give him a rupee number per action for the site head.
  • “Corporate IT won’t allow a new vendor.” Response: Path B with bills and exports, no plant network access.
  • “We do this with Ballabgarh’s GreenCo team.” Response: fine, then the pilot benchmarks Jaipur against Ballabgarh.
  • Likely incumbents: Schneider/Siemens EMS, energy auditors, CII GreenCo consultants.

4.5 Pilot design

Boundary: Jaipur 33 kV incomer plus compressor house sub-meter. Weeks 1–2: bills, 15-minute data, compressor and DG logs. Weeks 3–6: prescriptions on start sequencing, compressor pressure/unload, DG run rules. Weeks 7–8: verification. Success: one assigned action with a rupee value verified with evidence and no production complaint. Kill: no data access within three weeks, or no residual opportunity after existing EnMS.

4.6 Concern scores (1–10)

ConcernScoreWho owns itWhy this score
Energy / electricity bill5Amit Goyal / Ramkishor AggarwalBig absolute bill but small vs ₹19,700 Cr revenue
Maintenance / uptime / utilities6Amit Goyal, Manas SamalCompressors and DGs are daily work
Production line / OEE / dispatch8Ramkishor AggarwalExport ramp and 70,000-machine target
Overall plant efficiency7Site head; Rohidas via qualityCommand-centre culture

4.7 Pitch sketches

  1. P&L / bill (Ramkishor): Jaipur’s 33 kV bill is likely ₹1 Cr a month. Read-only software, one boundary, 60 days, rupee savings verified with evidence. No hardware, no IT project.
  2. Maintenance (Amit): You already do energy management. We turn your compressor and DG logs into specific actions with a rupee value and track whether they stuck, so the site head sees your savings.
  3. Production (Chirag / Rohidas): We never touch takt. We stagger non-critical starts and cut idle loads; cost per machine drops without any line change.

5. Before you reach out

5.1 Discovery checklist

  • Confirm Rohidas’s willingness to forward and who he thinks owns the bill.
  • Confirm Jaipur bill band in ₹ lakh and contract demand (kVA) on the 33 kV JVVNL connection.
  • Ask whether the SEZ portion and DTA portion are on separate meters.
  • Is there an EMS with feeder meters? Vendor? Data export possible?
  • Compressor controls: sequencer present? Pressure setpoint?
  • DG run-hours per month and why.
  • Paint oven fuel and hold practice between batches.
  • Is ISO 50001 in place at Jaipur or Ballabgarh?
  • Does procurement for software sit at Ballabgarh HQ or with the UK parent?
  • Any rooftop solar or MWC green power share?
  • Which line is ramping for exports (access vs backhoe)?

5.2 Do not lead with

  • Do not lead with “energy audit” or “energy management”; the utility manager is BEE-certified.
  • Do not lead with hydrogen, ESG or carbon; JCB’s public sustainability story is about machines.
  • Do not pitch Rohidas as if he owns the bill; ask for the intro.
  • Do not quote a bill figure as fact.
  • Do not mention the Krishna Auto dealership dispute.

5.3 Opening hooks

“At a fabrication and paint plant like Jaipur, the bill usually leaks at shift start when welding, paint and compressors come up together. We find that from your existing meters, read-only, and put a rupee value on it.”

6. Risks, flags, controversies & sources

6.1 Integrity / controversy / regulatory

  • Size and parent risk: JCB India is a ₹19,700 Cr subsidiary of a UK multinational. Software procurement, data residency and IT security may need UK sign-off, which can stretch a pilot by months.
  • Dealer dispute (2026): Krishna Auto Riders alleged wrongful dealership termination; an FIR was registered against certain JCB India officials in Korba, Chhattisgarh on a magistrate’s order, and the Delhi High Court referred the commercial dispute to arbitration. The allegations are disputed and unproven. Not related to plants.
  • Tax: Supreme Court (Aug 2025) dismissed the excise department’s appeal on spare-parts duty (2006–10), in JCB’s favour. ITAT Delhi (Feb 2025) allowed JCB’s appeal on transfer-pricing royalty adjustments.
  • Labour: a 2015 Punjab & Haryana HC matter on 33 housekeeping workers at Ballabgarh (contract vs direct employment); nothing recent found.
  • Environmental: none found (searched: “JCB India” pollution notice, NGT, RSPCB, HSPCB, 2024–2026).

6.2 Data quality flags

  • Jaipur bill band is an estimate from DG and compressor sizing, not from a bill.
  • “Six factories”: only five sites are clearly named publicly.
  • Ramkishor Aggarwal’s headline says site head for both Jaipur and Ballabgarh; confirm current scope.
  • Personal emails are pattern-inferred; only anil.goyat@jcb.com and contact.india@jcb.com are seen in public sources.
  • Rohidas’s exact start date in the current role is approximate (~2024).
  • The 2021 SEZ electricity-duty report is old; current exemption status unknown.

6.3 Sources consulted