Depth bar: LOW / network profile. Use
[~]for estimates and[!]for unverified claims.
1. Company overview & snapshot
1.0 The connection — Amar Kumar
- Current title: Assistant Manager (Sales), Jakson Limited / Jakson Group, Patna, Bihar (LinkedIn: ~1 yr 4 mo as AM as of Dec 2025; 11+ yrs total experience).
- History: 5 yrs 3 mo as Sr. Sales Executive posted in Nepal (western and eastern Nepal), selling silent diesel generator sets through dealers and direct to factories, hotels, hospitals and petrol pumps. Earlier: BDM at GSP Group, intern at Aircel.
- Authority: none over plant energy or capex. He is a territory salesperson in the Distributed Energy (genset) business.
- Connection status: 1st-degree.
- How to use him: (1) internal forward to the Phaltan plant head, who sits in the same business unit; (2) market intel on Bihar/Nepal factories that buy big DG sets because grid power is unreliable or expensive. Do not pitch him.
- Name-collision note: an unrelated “Amar Kumar Singh” is a Manager at Jakson Infra in Bihar (civil/hydro, ex-KEC). Do not confuse the two.
1.1 Legal identity & corporate structure
- Jakson Limited, CIN U74899DL1997PLC088808, unlisted public company, incorporated 13 Jul 1997, registered office 626, 6th Floor, DLF Tower-A, Jasola, New Delhi 110025. HQ A-43, Phase II Extn., Noida 201305.
- Group entities: Jakson Engineers Ltd (solar modules/cells; MD Ivan Saha from Aug 2026), Jakson Green Pvt Ltd (66% subsidiary of Jakson Ltd; renewable EPC/IPP; CRISIL A+/Stable), Jakson Infra, Jakson Biofuels.
- Restructuring in progress: NCLT Delhi allowed first motions in 2026 for (a) demerger of businesses into Jakson Infra Projects Ltd and (b) demerger into Jakson Powergen Ltd (board approvals 18 May / 2 Jun 2026; appointed date 1 Apr 2026). Jakson Ltd has 8 equity shareholders, 10 secured and 4,282 unsecured creditors. Expect the genset business to sit in a new legal entity during FY27.
- Promoters: Gupta family. Sameer Gupta (Chairman), Sundeep Gupta (Vice Chairman), fourth generation Raghav Gupta (MD Jakson Infra), Siddhant Gupta (Director, Biofuels), Bharat Gupta (Director, Solar Modules & Cells). Bikesh Ogra is Vice-Chairman & CEO, Jakson Green (professional, ex-Sterling & Wilson Solar), not a promoter.
- Credit: CRISIL AA-/Stable / A1+ on Jakson Ltd (Feb 2025).
1.2 What they make & where money comes from
Gensets 5–3,750 kVA (Cummins GOEM since 1982), solar PV modules (TOPCon/PERC, up to ~23% efficiency), BESS (3 kW to MW), alkaline/PEM electrolysers, 1G ethanol, plus EPC (T&D up to 765 kV, metro electrification, water, civil, solar EPC 6.5+ GWp). Distributed Energy contributed ~₹2,300 Cr of FY26 group revenue (Business Standard). CRISIL put DG segment turnover at ₹1,800–1,900 Cr in FY25.
1.2a Scale, MSME status & trade
| Field | Value | Confidence |
|---|---|---|
| Revenue (latest FY) | Group ₹9,000+ Cr FY26 (self-reported); Jakson Ltd ₹7,150 Cr FY25 | FY26 PR / FY25 MCA |
| MSME class | not MSME (large) | high |
| Employees | ~3,500 (group, 2026) | company |
| Import intensity | High for modules (cells, glass, frames) | [~] |
| Export share | International offices in 12 countries; Cummins distributor in Bangladesh | company |
Revenue table
| FY | Entity / basis | Figure | Source |
|---|---|---|---|
| FY26 | Jakson Group, self-reported | ₹9,000+ Cr (+13%) | Jakson press release 13 Apr 2026; Business Standard |
| FY25 | Jakson Group, self-reported | ₹8,000 Cr | Jakson CSR Annual Report 2025 |
| FY25 | Jakson Limited, filed | ₹7,150 Cr (+43%); PAT ₹194 Cr; EBITDA ₹424 Cr | MCA via TheCompanyCheck |
| FY25 | Jakson Ltd, rating estimate | ₹6,000–6,500 Cr | CRISIL rationale, Feb 2025 |
| FY25 | Jakson Green Pvt Ltd | ₹3,022 Cr (FY26 est. ₹4,300–4,500 Cr) | CRISIL, Aug 2025 |
| FY25 | DG segment | ₹1,800–1,900 Cr est. | CRISIL |
Working revenue range: ₹7,000–9,000 Cr group, FY25–FY26 · confidence medium. The user’s “₹9,000+ cr” matches the self-reported FY26 number; FY26 audited accounts not yet seen. Note Jakson Green is a subsidiary, so do not add its revenue on top of Jakson Ltd.
1.3 Plants, addresses & footprint
| Site | Role | Notes |
|---|---|---|
| Greater Noida, UP | 1.2 GW solar module plant, ~10 acres, fully automated, 2 × 600 MW lines | Street address not confirmed. A directory lists “A-43, Phase II, Surajpur, Greater Noida”, which looks like a mash-up with the Noida HQ address [!] |
| Noida, UP | BESS (250 sets/yr) + 300 MW electrolyser plant | Near HQ, A-43 Phase II Extn. |
| Phaltan, Maharashtra | Genset plant: 12,500 gensets + 35,000 enclosures/yr, 17 acres | Largest genset site |
| Kalsar, Gujarat | Genset plant: 2,500 gensets + 4,400 enclosures/yr, 7 acres | Older decks labelled this as Phaltan; treat Kalsar as the 2,500-unit site |
| Balaghat, MP | 150 KLPD grain ethanol, 27+ acres (2024) | Steam/boiler heavy |
| Maksi, MP | 3 GW modules + 3 GW cells, under construction | Cell lines are very power-intensive |
The user listed five plants; the group says six manufacturing plants and names the five above plus Maksi as upcoming. Recommended pilot site if this ever opens: Phaltan (one MSEDCL meter, fabrication + paint + load test) or the Greater Noida module plant.
1.4 Leadership & CRM map
| Name | Role | Plant | Why they matter | ||
|---|---|---|---|---|---|
| Amar Kumar | AM Sales | Patna | /in/amar-kumar-06219288 | amar.kumar@jakson.com (inferred) | Connection; forwarder |
| Sameer Gupta | Chairman | Group | search | unknown | Promoter |
| Sundeep Gupta | Vice Chairman | Group | search | unknown | Promoter |
| Bahadur Dastoor | ED & CFO | Group | search | inferred first.last | Commercial sign-off on group-wide tools |
| Sudhanshu Pokhriyal | CEO, Distributed Energy | Gensets/BESS | search | inferred | BU owner of Phaltan/Kalsar |
| Saurabh Garg | COO, Distributed Energy | Gensets/BESS | search | inferred | Lean/TPM background; ops sponsor |
| Vinayak Lakare | Plant Head, Phaltan | Phaltan | /in/vinayak-lakare-74954113 | inferred | Full site P&L (ex-Mahindra Powerol) |
| Sachin Mahalle | Head of Production | Phaltan | /in/sachin-mahalle-a1a69b24a | inferred | Line owner, load-test schedule |
| Ivan Saha | MD, Jakson Engineers | Solar mfg | search | inferred | Owner of module + Maksi cell capex |
| Sai Kumar Vallampati | EVP Operations, Solar | Noida/Gr. Noida | /in/sai-kumar-vallampati-74a826312 | inferred | Ex-Subros, Sumitomo; ops sponsor |
| Durgesh Verma | Head of Production, modules | Greater Noida | /in/durgesh-verma-0721b567 | inferred | Line owner |
| Gagan Deep Chanana | CEO / MEO Growth Projects | Group | search | inferred | Built BESS and solar rooftop businesses |
| Maintenance / E&I head (each plant) | — | — | name TBD — search | — | Would execute any Rx |
| Energy / utilities manager | — | — | name TBD — search | — | Likely not a named role |
Decision path: Plant head (Lakare at Phaltan) or Solar EVP Ops proposes → BU CEO approves a small proof → group CFO only for multi-site. Amar has no place on this path.
1.5 Recent news & timing
- Apr 2026: FY26 ₹9,000 Cr claim; five product launches (Genset Xtra, BESS, Solar Kit, mobile light tower, e-3W).
- Aug 2026: Ivan Saha appointed MD, Jakson Engineers. New leaders often look for quick cost wins.
- 2026: two demerger schemes at NCLT. Org charts will move; wait until the genset entity settles before pitching group-level.
2. Energy profile
DISCOM / supply: Phaltan → MSEDCL (HT industrial). Noida HQ / BESS / electrolyser plant → PVVNL. Greater Noida module plant → Noida Power Company Ltd (NPCL), the private licensee for Greater Noida [~] (confirm on bill).
2.1 Bill band, tariff & demand
- Greater Noida module plant: ₹50 lakh–1.5 Cr/month
[~]. Reasoning: two automated 600 MW lines (stringers, laminators, cleanroom HVAC, compressed air) at partial utilisation; wide band because utilisation is unknown. - Phaltan genset plant: ₹15–35 lakh/month
[~]grid power. Fabrication, powder coating ovens, compressors; genset load testing burns diesel, not grid power. - Maksi cell plant (future): could exceed ₹5 Cr/month once cells run
[~].
2.2 Generation, fuel & renewables
Own rooftop solar likely on module plant [~]; group has ~1.3 GWp IPP portfolio. Load-test diesel at genset plants. Ethanol plant needs a steam boiler.
2.3 EnMS, PAT, ISO, BRSR
ISO 9001/14001/45001 (OHSAS 18000 cited) on module plant. No ISO 50001 found. Unlisted, so no BRSR. Group ESG page lists “Energy Management” generically.
2.4 Likely ₹ leak categories
Module plant: laminator heat-up stacking at shift start, compressed air leakage, cleanroom HVAC running through idle shifts. Phaltan: powder-coat oven idle hold, welding/compressor stacking, contract demand set above actual peak.
3. Operations, equipment & digital stack
3.1 Process flow & critical loads
Modules: cell stringing → layup → lamination → framing → IV test. Gensets: sheet-metal canopy and base-plate fabrication → paint/powder coat → engine-alternator assembly (Cummins engines) → load test → PDI → pack.
3.1a Machine inventory
| Class | Present? | Count / size if public | OEM / brand if named | Notes |
|---|---|---|---|---|
| Press / stamping, sheet metal | Yes | 35,000 enclosures/yr at Phaltan | unknown | canopy fab |
| Paint / powder coat | Likely [~] | unknown | unknown | Phaltan |
| Module lines (stringer/laminator) | Yes | 2 × 600 MW | Jinchen team referenced on Durgesh Verma profile [!] | Greater Noida |
| Load-test banks | Yes | unknown | unknown | diesel |
| Compressors / HVAC | Yes | unknown | unknown | utility |
3.2 Shifts & pattern
Gensets: two-shift fabrication, seasonal demand peaks before monsoon and with CPCB IV+ transitions. Modules: continuous where orders allow.
3.3 Automation, metering, SCADA/EMS
Group CIO Tarun Anand (SAP background). No public EMS vendor. Module lines will have line PLC/MES data; Path A (existing meters + MES) likely workable.
3.4 Capex
6 GW Maksi plant; 300 MW electrolyser line; new genset products. Energy proof could ride on Maksi commissioning later.
4. Stamped Energy fit analysis
4.1 ICP scorecard
| Gate | Result |
|---|---|
| Bill ≥ ₹30L/mo | Likely pass at Greater Noida; borderline at Phaltan |
| Geography | Greater Noida passes (North India); Phaltan outside core belt |
| Vertical | Electrical equipment / solar manufacturing: adjacent |
| Champion via connection | Fail: junior sales, wrong function |
| Conflict | Jakson sells solar, BESS and DG sets to the same factories Stamped targets. Partly a competitor for “energy cost” mindshare, partly a channel |
4.2 Fit score rationale
3/10. Real plant loads exist, but the connection has no path to them except a polite internal forward, and Jakson’s own energy businesses make it a mixed partner/competitor.
4.3 Wedge
The strongest wedge is: a warm internal forward from Amar to Vinayak Lakare at Phaltan, pitched as press-shop and powder-coat demand stacking on the MSEDCL meter, with no mention of solar or BESS (Jakson sells those).
4.4 Objections & competitors
“We sell energy solutions ourselves” → Stamped is decision software on top of meters; it can make Jakson’s BESS/solar sizing more credible for their customers (partner angle). “Group IT handles software” → plant-level proof first.
4.5 Pilot design
One Phaltan HT meter, 60-Day Proof, success = one evidence-verified ₹ line on demand or oven idle. Kill if no interval data.
4.6 Concern scores
| Concern | Score | Who owns it | Why this score |
|---|---|---|---|
| Energy / electricity bill | 4 | Plant Head Phaltan | Assembly-led site; bill moderate |
| Maintenance / uptime / utilities | 5 | Maintenance (TBD) | Compressors, ovens |
| Production line / OEE / dispatch | 7 | Sachin Mahalle | Seasonal genset volume |
| Overall plant efficiency | 6 | Vinayak Lakare | Six Sigma push visible on LinkedIn |
4.7 Pitch sketches
- P&L: One Phaltan meter, rupee value of demand stacking at shift start, 60-Day Proof, verified with evidence.
- Maintenance: Oven idle and compressor leaks as WhatsApp tasks, not another dashboard.
- Production: Never touch the load-test schedule; only shift non-critical loads.
5. Before you reach out
5.1 Discovery checklist
- Which legal entity will own Phaltan after the Jakson Powergen demerger?
- Phaltan sanctioned load, MSEDCL consumer type, recent MD vs contract demand
- Does the Greater Noida module plant sit on NPCL or a captive feeder?
- Is there any plant energy manager at either site?
- Does Amar’s Bihar customer list include large HT factories (rice mills, cement grinding, steel re-rolling)?
- Would Jakson want a channel partnership (Stamped as Rx layer bundled with their BESS sales)?
- Status of Maksi cell plant commissioning date
5.2 Do not lead with
- Do not lead with solar, BESS or DG replacement; Jakson sells all three.
- Do not ask Amar for a meeting with the Chairman.
5.3 Opening hooks
“Your Phaltan press shop and paint line probably set the month’s MSEDCL peak in the first hour of the shift. We can show which machine, read-only.”
6. Risks, flags, controversies & sources
6.1 Integrity / controversy / regulatory
- Two NCLT demerger schemes (2026) will reshuffle legal entities and possibly leadership; outreach targets may change roles.
- Jakson Ltd was the operational creditor that pushed Three C Universal Developers into insolvency (2019); related NCLT orders discuss a ₹413 Cr loan claim and alleged fraudulent land deals by Three C’s suspended directors. Jakson is the claimant there, not the accused.
- Customer review (Dec 2025) complains of slow service on Jakson poly modules; one-off, low weight.
- Searched “Jakson Limited controversy / raid / penalty / lawsuit / NCLT 2025 2026”: no regulatory penalties or raids found.
6.2 Data quality flags
- Greater Noida plant street address unverified.
- Kalsar vs Phaltan capacity labels swapped across deck versions.
- FY26 ₹9,000 Cr is self-reported; FY25 ₹7,150 Cr is the only filed figure seen.
6.3 Sources consulted
- https://www.jakson.com/wp-content/uploads/2026/09/JAKSON-Group-Presentation.pdf
- https://www.jakson.com/leadership-team/
- https://www.jakson.com/contact/
- https://www.jakson.com/wp-content/uploads/2026/04/Press-Release_JAKSON-Group-with-FY26-Revenue-of-Over-INR-9000-Crore-Unveils-Five-New-Energy-Solutions.pdf
- https://www.business-standard.com/companies/quarterly-results/jakson-group-reports-13-increase-in-fy26-revenue-to-9-000-crore-126041301076_1.html
- https://www.jakson.com/wp-content/uploads/2025/11/CSR-Annual-Report-2025.pdf
- https://www.thecompanycheck.com/company/jakson-limited/U74899DL1997PLC088808
- https://www.crisilratings.com/mnt/winshare/Ratings/RatingList/RatingDocs/JaksonLimited_February%2010_%202025_RR_362966.html
- https://www.crisilratings.com/mnt/winshare/Ratings/RatingList/RatingDocs/JaksonGreenPrivateLimited_August%2011_%202025_RR_375988.html
- https://www.jakson.com/wp-content/uploads/2026/08/Press_Release_JAKSON_Appoints_Solar_Manufacturing_Veteran_Ivan_Saha.pdf
- https://jakson-solar.com/wp-content/uploads/2025/09/Jakson-Solar-Presentation-Jaksonsolar.pdf
- https://vemgram.com/m/jakson-solar-afIJaPrMdklr
- https://www.livelawbiz.com/company-law/nclt-allows-jakson-limiteds-demerger-into-jakson-powergen-orders-creditor-meetings-545951
- https://www.livelawbiz.com/company-law/nclt-delhi-allows-first-motion-in-jakson-limiteds-demerger-scheme-541747
- https://taxguru.in/company-law/person-sold-land-corporate-debtor-doesnt-fall-section-66-ibc.html
- https://leadiq.com/c/jakson-group/5a1d96422300005e0084e8a6/email-format
- https://linkedin.com/in/amar-kumar-06219288 · https://linkedin.com/in/vinayak-lakare-74954113 · https://linkedin.com/in/sachin-mahalle-a1a69b24a · https://linkedin.com/in/durgesh-verma-0721b567 · https://linkedin.com/in/sai-kumar-vallampati-74a826312