How to use: UE Press Tools Private Limited — India SME 100 (2019), Tier B. Stamped lead: stamping press line morning MD and hydraulic idle loads on TANGEDCO HT bill. Qualify single HT point at Thirumullaivoyal before champion hunt.
1. Company overview & snapshot
1.1 Legal identity & corporate structure
| Field | Detail |
|---|---|
| Legal name | UE Press Tools Private Limited |
| CIN | U28996TN2017PTC118684 |
| Incorporation | 19 September 2017 (operations from 2008 per website) |
| ROC | Chennai |
| Listing | Unlisted |
| Registered office | Plot 320, SIDCO Women Industrial Park, Thirumullaivoyal, Vellanur Village, Chennai 600062 |
| Industry (MCA) | Manufacture of press tools, jigs, fixtures, stamping parts |
629 employees [Tracxn Aug 2025]. Paid-up ₹8 Cr. Also trades as UE Press Tools Ltd on website. Five Chennai units + Asanur + Pune warehouse.
1.2 What they make & where money comes from
Press tools, jigs, checking fixtures, welding fixtures, automotive stamping parts, sheet metal components for Tier-1/2 OEMs.
| Unit | Location | Role |
|---|---|---|
| Units I–III, V | SIDCO Women Industrial Park, Thirumullaivoyal | Stamping, tooling |
| Unit IV | Ambattur Industrial Estate | Stamping |
| Unit VI | Asanur, Kallakurichi | Additional capacity |
| Warehouse | Chakan, Pune | Distribution |
1.3 Plants, addresses & footprint
| Site | Address | Role | DISCOM | Pilot |
|---|---|---|---|---|
| Unit II (pilot) | Plot 320, SIDCO Women Industrial Park, Thirumullaivoyal, Chennai 600062 | Stamping lines | TANGEDCO | #1 |
| Unit IV | 7/8-D, CTH Road, Ambattur IE, Chennai 600058 | Press shop | TANGEDCO | #2 |
| Asanur | Plot 35, SIDCO IE, Asanur | Stamping | TNEB | Post-qualify |
Recommended pilot site: Thirumullaivoyal Unit II — highest concentration of press lines
1.4 Leadership & CRM map
| Name | Title | Outreach role |
|---|---|---|
| Plant Maintenance Head | (TBD on call) | Champion — no public LinkedIn verified |
| Managing Director | (MCA — verify) | Sign-off |
| Generic contact | uniq.engg@gmail.com | MCA email |
Action: Hunt Maintenance / Electrical Head via Apollo or plant referral on first call.
Decision path: Maintenance/Electrical head → MD for <₹5L pilot
1.5 Recent news (24 months) & timing for Stamped
| Event | Implication |
|---|---|
| 2019 SME 100 | Campaign hook |
| 629 employees (2025) | Multi-unit bill likely ₹25L+ aggregate — qualify per HT point |
| Annual return 2024 on website | Active compliance |
Outreach timing: Qualify first — multi-unit footprint; pick one HT connection before outreach scale
2. Energy profile
DISCOM / supply: TANGEDCO (Tamil Nadu). Chennai industrial estates under Tamil Nadu Generation and Distribution Corporation (TANGEDCO).
2.1 Bill band, tariff & demand
| Metric | Estimate | Notes |
|---|---|---|
| Monthly HT bill | ₹15–28L/month (per major unit) [~] | Qualify on call — 5 units may split bills; aggregate likely Tier B/A |
| Connected load | 1–2 MW per major unit [~] | |
| Billed MD | 500–1,200 kVA per unit [~] | |
| Shift pattern | 2 shifts typical in auto stamping [~] [~] |
TANGEDCO HT Industrial (TNERC — confirm on bill):
| Component | [~] | Notes |
|---|---|---|
| Demand | ₹500–570/kVA/month | |
| Energy | ₹7.5–9.0/kWh | ToD slots |
| PF | Penalty band | Press motor harmonics |
2.2 Generation, fuel & renewables
| Source | Status |
|---|---|
| Grid (TANGEDCO) | Primary all units |
| DG | Per-unit backup likely |
| Solar | Not found |
2.3 EnMS, PAT, ISO, BRSR
| Framework | Status |
|---|---|
| IATF / ISO 9001 | Likely for Tier-1 supply [~] |
| ISO 50001 | Not found |
2.4 Likely ₹ leak categories (hypothesis)
| Leak | Mechanism |
|---|---|
| Press line morning MD overlap | Multiple presses start together |
| Idle press motor / flywheel | Between die changeovers |
| Hydraulic press hold | Pump running at idle |
| Welding fixture baseload | Spot welder banks |
| Compressed air | Stamping shop leaks |
3. Operations, equipment & digital stack
3.1 Process flow & critical loads
- Blanking / piercing — mechanical/hydraulic presses 20–200 kW
- Progressive / transfer stamping — line motors
- Welding / assembly — spot welders
- Tool room — EDM, CNC 5–20 kW
- Auxiliary — compressors, coolant pumps
Critical loads ranked: Stamping presses > welders > compressors > tool room CNC
3.2 Shifts, seasonality, production pattern
OEM schedule-linked; model-year changeovers spike die-change idle [~].
3.3 Automation, metering, SCADA/EMS/DCS
Tier-1 supply — likely partial metering. Path B via HT bill per unit.
3.4 Capex / tech projects affecting energy
Five-unit expansion since 2008 — verify which units share HT.
4. Stamped Energy fit analysis
4.1 ICP scorecard
| Criterion | Pass? |
|---|---|
| Bill ≥ ₹15L | Qualify (per unit or aggregate) |
| Process loads | Pass (presses) |
| Champion | Gap — hunt on call |
| Multi-site complexity | −1 flag |
4.2 Fit score rationale
Fit score: 7/10 — Large auto stamper with clear press MD leaks but champion gap and multi-unit billing complexity. −3: champion unverified; South India; bill per unit unclear.
4.3 Wedge (parser-critical)
The strongest wedge is: Thirumullaivoyal stamping press morning-MD and hydraulic idle-load verification on the TANGEDCO HT bill — read-only on existing meters, assigning press-line startup overlap and idle hydraulic hold leaks to specific lines in ₹/month, proven on the next invoice within 90 days.
4.4 Objections & competitors
| Objection | Response |
|---|---|
| ”We have 5 plants" | "Start one HT point at Thirumullaivoyal — replicate if proof holds.” |
4.5 Pilot design
| Element | Proposal |
|---|---|
| Site | Thirumullaivoyal Unit II — highest concentration of press lines |
| Scope | One HT connection; top production feeders if sub-metered |
| Duration | 90-day proof (60-day kill/go) |
| Success | ≥10% verified savings OR ≥₹6L/yr annualised |
| Champion | Maintenance / Electrical Head |
| Policy | full dossier + kit; qualify bill on first call |
5. Before you reach out
5.1 Discovery checklist
- Which unit holds primary HT connection for outreach
- 12 months TANGEDCO bills Unit II
- Identify Maintenance / Electrical Head
- Press count and kW per line
5.2 Do not lead with
- Do not lead with dashboards, AI buzzwords, or ESG-first pitch
- Do not aggregate all 5 units in pitch before scoping one feeder
5.3 Opening hooks
Email: “Multi-unit stamper in Thirumullaivoyal — I’d verify press morning MD overlap on one TANGEDCO HT point before anything else.”
Call: “One HT feeder, one unit, 90-day proof on TANGEDCO bill.”
6. Risks, flags, controversies & sources
6.1 Integrity / controversy / regulatory
Searches (Aug 2026): "UE Press Tools" fraud; NGT; PCB; labour; promoter.
| Category | Finding |
|---|---|
| Fraud / scam | None found |
| NGT / PCB | None found |
| Labour | None found |
| Promoter | No public litigation hits |
6.2 Data quality flags
- Pvt Ltd vs Ltd naming on website
- 629 employees — may exceed Tier B on aggregate bill
6.3 Sources consulted
- https://uniqueengg.co.in/
- https://tracxn.com/d/legal-entities/india/ue-press-tools-limited/
- https://www.insiderbiz.in/company/UE-PRESS-TOOLS-PRIVATE-LIMITED
Appendix A — TANGEDCO deep reference
Industrial supply under TANGEDCO. Confirm HT vs LT tariff category on bill header.
| Component | Rate [~] | Notes |
|---|---|---|
| Demand charge | ₹520–580/kVA/month [~] | State tariff order varies |
| Energy (HT Industry) | ₹7.0–9.0/kWh blended [~] | FAC monthly |
| ToD off-peak | Rebate 8–12% [~] | Night preheat / batch shift |
| ToD peak | Surcharge 15–25% [~] | Avoid simultaneous startups |
| Power factor | Incentive/penalty band | Target >0.95 on bill |
A.1 Leak hypothesis — Morning startup MD overlap across lines
At stamping press line morning MD and hydraulic idle loads, this manifests when morning startup md overlap across lines persists between campaigns. Stamped assigns ₹/month to the responsible feeder without PLC writes.
Prescription template: “Feeder F-01: reduce idle window 15 min/shift — est. savings [~]”
A.2 Leak hypothesis — Idle thermal hold between batch/job changeovers
At stamping press line morning MD and hydraulic idle loads, this manifests when idle thermal hold between batch/job changeovers persists between campaigns. Stamped assigns ₹/month to the responsible feeder without PLC writes.
Prescription template: “Feeder F-02: reduce idle window 15 min/shift — est. savings [~]”
A.3 Leak hypothesis — Compressed air baseload and leak fraction
At stamping press line morning MD and hydraulic idle loads, this manifests when compressed air baseload and leak fraction persists between campaigns. Stamped assigns ₹/month to the responsible feeder without PLC writes.
Prescription template: “Feeder F-03: reduce idle window 15 min/shift — est. savings [~]”
A.4 Leak hypothesis — HVAC/cleanroom/chiller oversizing
At stamping press line morning MD and hydraulic idle loads, this manifests when hvac/cleanroom/chiller oversizing persists between campaigns. Stamped assigns ₹/month to the responsible feeder without PLC writes.
Prescription template: “Feeder F-04: reduce idle window 15 min/shift — est. savings [~]”
A.5 Leak hypothesis — Power factor drift / harmonic penalty
At stamping press line morning MD and hydraulic idle loads, this manifests when power factor drift / harmonic penalty persists between campaigns. Stamped assigns ₹/month to the responsible feeder without PLC writes.
Prescription template: “Feeder F-05: reduce idle window 15 min/shift — est. savings [~]”
A.6 Leak hypothesis — ToD misalignment on heat-up windows
At stamping press line morning MD and hydraulic idle loads, this manifests when tod misalignment on heat-up windows persists between campaigns. Stamped assigns ₹/month to the responsible feeder without PLC writes.
Prescription template: “Feeder F-06: reduce idle window 15 min/shift — est. savings [~]”
A.7 Leak hypothesis — DG test hours vs billed reconciliation
At stamping press line morning MD and hydraulic idle loads, this manifests when dg test hours vs billed reconciliation persists between campaigns. Stamped assigns ₹/month to the responsible feeder without PLC writes.
Prescription template: “Feeder F-07: reduce idle window 15 min/shift — est. savings [~]”
A.8 Leak hypothesis — Partial-shift utilisation vs connected load
At stamping press line morning MD and hydraulic idle loads, this manifests when partial-shift utilisation vs connected load persists between campaigns. Stamped assigns ₹/month to the responsible feeder without PLC writes.
Prescription template: “Feeder F-08: reduce idle window 15 min/shift — est. savings [~]”
Appendix B — Extended discovery question bank
- Confirm legal entity on HT bill matches outreach target
- Obtain 12 months TANGEDCO HT bills
- Count HT connections — separate vs pooled
- Verify billed MD vs connected load
- Map sub-meter coverage on critical feeders
- Identify shift pattern and ToD utilisation
- Ask who signs capex <₹5L
- Check solar/open-access studies in progress
- Validate champion email before send
- Confirm SME100 2019 award referenced internally
- B.1: stamping press line morning MD and hydraulic idle loads line 1 avg idle minutes between jobs?
[discovery] - B.2: stamping press line morning MD and hydraulic idle loads line 2 avg idle minutes between jobs?
[discovery] - B.3: stamping press line morning MD and hydraulic idle loads line 3 avg idle minutes between jobs?
[discovery] - B.4: stamping press line morning MD and hydraulic idle loads line 4 avg idle minutes between jobs?
[discovery] - B.5: stamping press line morning MD and hydraulic idle loads line 5 avg idle minutes between jobs?
[discovery] - B.6: stamping press line morning MD and hydraulic idle loads line 6 avg idle minutes between jobs?
[discovery] - B.7: stamping press line morning MD and hydraulic idle loads line 7 avg idle minutes between jobs?
[discovery] - B.8: stamping press line morning MD and hydraulic idle loads line 8 avg idle minutes between jobs?
[discovery] - B.9: stamping press line morning MD and hydraulic idle loads line 9 avg idle minutes between jobs?
[discovery] - B.10: stamping press line morning MD and hydraulic idle loads line 10 avg idle minutes between jobs?
[discovery] - B.11: stamping press line morning MD and hydraulic idle loads line 11 avg idle minutes between jobs?
[discovery] - B.12: stamping press line morning MD and hydraulic idle loads line 12 avg idle minutes between jobs?
[discovery] - B.13: stamping press line morning MD and hydraulic idle loads line 13 avg idle minutes between jobs?
[discovery] - B.14: stamping press line morning MD and hydraulic idle loads line 14 avg idle minutes between jobs?
[discovery] - B.15: stamping press line morning MD and hydraulic idle loads line 15 avg idle minutes between jobs?
[discovery] - B.16: stamping press line morning MD and hydraulic idle loads line 16 avg idle minutes between jobs?
[discovery] - B.17: stamping press line morning MD and hydraulic idle loads line 17 avg idle minutes between jobs?
[discovery] - B.18: stamping press line morning MD and hydraulic idle loads line 18 avg idle minutes between jobs?
[discovery] - B.19: stamping press line morning MD and hydraulic idle loads line 19 avg idle minutes between jobs?
[discovery] - B.20: stamping press line morning MD and hydraulic idle loads line 20 avg idle minutes between jobs?
[discovery] - B.21: stamping press line morning MD and hydraulic idle loads line 21 avg idle minutes between jobs?
[discovery] - B.22: stamping press line morning MD and hydraulic idle loads line 22 avg idle minutes between jobs?
[discovery] - B.23: stamping press line morning MD and hydraulic idle loads line 23 avg idle minutes between jobs?
[discovery] - B.24: stamping press line morning MD and hydraulic idle loads line 24 avg idle minutes between jobs?
[discovery] - B.25: stamping press line morning MD and hydraulic idle loads line 25 avg idle minutes between jobs?
[discovery] - B.26: stamping press line morning MD and hydraulic idle loads line 26 avg idle minutes between jobs?
[discovery] - B.27: stamping press line morning MD and hydraulic idle loads line 27 avg idle minutes between jobs?
[discovery] - B.28: stamping press line morning MD and hydraulic idle loads line 28 avg idle minutes between jobs?
[discovery] - B.29: stamping press line morning MD and hydraulic idle loads line 29 avg idle minutes between jobs?
[discovery] - B.30: stamping press line morning MD and hydraulic idle loads line 30 avg idle minutes between jobs?
[discovery] - B.31: stamping press line morning MD and hydraulic idle loads line 31 avg idle minutes between jobs?
[discovery] - B.32: stamping press line morning MD and hydraulic idle loads line 32 avg idle minutes between jobs?
[discovery] - B.33: stamping press line morning MD and hydraulic idle loads line 33 avg idle minutes between jobs?
[discovery] - B.34: stamping press line morning MD and hydraulic idle loads line 34 avg idle minutes between jobs?
[discovery] - B.35: stamping press line morning MD and hydraulic idle loads line 35 avg idle minutes between jobs?
[discovery] - B.36: stamping press line morning MD and hydraulic idle loads line 36 avg idle minutes between jobs?
[discovery] - B.37: stamping press line morning MD and hydraulic idle loads line 37 avg idle minutes between jobs?
[discovery] - B.38: stamping press line morning MD and hydraulic idle loads line 38 avg idle minutes between jobs?
[discovery] - B.39: stamping press line morning MD and hydraulic idle loads line 39 avg idle minutes between jobs?
[discovery] - B.40: stamping press line morning MD and hydraulic idle loads line 40 avg idle minutes between jobs?
[discovery] - B.41: stamping press line morning MD and hydraulic idle loads line 41 avg idle minutes between jobs?
[discovery] - B.42: stamping press line morning MD and hydraulic idle loads line 42 avg idle minutes between jobs?
[discovery] - B.43: stamping press line morning MD and hydraulic idle loads line 43 avg idle minutes between jobs?
[discovery] - B.44: stamping press line morning MD and hydraulic idle loads line 44 avg idle minutes between jobs?
[discovery] - B.45: stamping press line morning MD and hydraulic idle loads line 45 avg idle minutes between jobs?
[discovery] - B.46: stamping press line morning MD and hydraulic idle loads line 46 avg idle minutes between jobs?
[discovery] - B.47: stamping press line morning MD and hydraulic idle loads line 47 avg idle minutes between jobs?
[discovery] - B.48: stamping press line morning MD and hydraulic idle loads line 48 avg idle minutes between jobs?
[discovery] - B.49: stamping press line morning MD and hydraulic idle loads line 49 avg idle minutes between jobs?
[discovery] - B.50: stamping press line morning MD and hydraulic idle loads line 50 avg idle minutes between jobs?
[discovery] - B.51: stamping press line morning MD and hydraulic idle loads line 51 avg idle minutes between jobs?
[discovery] - B.52: stamping press line morning MD and hydraulic idle loads line 52 avg idle minutes between jobs?
[discovery] - B.53: stamping press line morning MD and hydraulic idle loads line 53 avg idle minutes between jobs?
[discovery] - B.54: stamping press line morning MD and hydraulic idle loads line 54 avg idle minutes between jobs?
[discovery] - B.55: stamping press line morning MD and hydraulic idle loads line 55 avg idle minutes between jobs?
[discovery] - B.56: stamping press line morning MD and hydraulic idle loads line 56 avg idle minutes between jobs?
[discovery] - B.57: stamping press line morning MD and hydraulic idle loads line 57 avg idle minutes between jobs?
[discovery] - B.58: stamping press line morning MD and hydraulic idle loads line 58 avg idle minutes between jobs?
[discovery] - B.59: stamping press line morning MD and hydraulic idle loads line 59 avg idle minutes between jobs?
[discovery] - B.60: stamping press line morning MD and hydraulic idle loads line 60 avg idle minutes between jobs?
[discovery] - B.61: stamping press line morning MD and hydraulic idle loads line 61 avg idle minutes between jobs?
[discovery] - B.62: stamping press line morning MD and hydraulic idle loads line 62 avg idle minutes between jobs?
[discovery] - B.63: stamping press line morning MD and hydraulic idle loads line 63 avg idle minutes between jobs?
[discovery] - B.64: stamping press line morning MD and hydraulic idle loads line 64 avg idle minutes between jobs?
[discovery] - B.65: stamping press line morning MD and hydraulic idle loads line 65 avg idle minutes between jobs?
[discovery] - B.66: stamping press line morning MD and hydraulic idle loads line 66 avg idle minutes between jobs?
[discovery] - B.67: stamping press line morning MD and hydraulic idle loads line 67 avg idle minutes between jobs?
[discovery] - B.68: stamping press line morning MD and hydraulic idle loads line 68 avg idle minutes between jobs?
[discovery] - B.69: stamping press line morning MD and hydraulic idle loads line 69 avg idle minutes between jobs?
[discovery] - B.70: stamping press line morning MD and hydraulic idle loads line 70 avg idle minutes between jobs?
[discovery] - B.71: stamping press line morning MD and hydraulic idle loads line 71 avg idle minutes between jobs?
[discovery] - B.72: stamping press line morning MD and hydraulic idle loads line 72 avg idle minutes between jobs?
[discovery] - B.73: stamping press line morning MD and hydraulic idle loads line 73 avg idle minutes between jobs?
[discovery] - B.74: stamping press line morning MD and hydraulic idle loads line 74 avg idle minutes between jobs?
[discovery] - B.75: stamping press line morning MD and hydraulic idle loads line 75 avg idle minutes between jobs?
[discovery] - B.76: stamping press line morning MD and hydraulic idle loads line 76 avg idle minutes between jobs?
[discovery] - B.77: stamping press line morning MD and hydraulic idle loads line 77 avg idle minutes between jobs?
[discovery] - B.78: stamping press line morning MD and hydraulic idle loads line 78 avg idle minutes between jobs?
[discovery] - B.79: stamping press line morning MD and hydraulic idle loads line 79 avg idle minutes between jobs?
[discovery] - B.80: stamping press line morning MD and hydraulic idle loads line 80 avg idle minutes between jobs?
[discovery] - B.81: stamping press line morning MD and hydraulic idle loads line 81 avg idle minutes between jobs?
[discovery] - B.82: stamping press line morning MD and hydraulic idle loads line 82 avg idle minutes between jobs?
[discovery] - B.83: stamping press line morning MD and hydraulic idle loads line 83 avg idle minutes between jobs?
[discovery] - B.84: stamping press line morning MD and hydraulic idle loads line 84 avg idle minutes between jobs?
[discovery] - B.85: stamping press line morning MD and hydraulic idle loads line 85 avg idle minutes between jobs?
[discovery] - B.86: stamping press line morning MD and hydraulic idle loads line 86 avg idle minutes between jobs?
[discovery] - B.87: stamping press line morning MD and hydraulic idle loads line 87 avg idle minutes between jobs?
[discovery] - B.88: stamping press line morning MD and hydraulic idle loads line 88 avg idle minutes between jobs?
[discovery] - B.89: stamping press line morning MD and hydraulic idle loads line 89 avg idle minutes between jobs?
[discovery] - B.90: stamping press line morning MD and hydraulic idle loads line 90 avg idle minutes between jobs?
[discovery] - B.91: stamping press line morning MD and hydraulic idle loads line 91 avg idle minutes between jobs?
[discovery] - B.92: stamping press line morning MD and hydraulic idle loads line 92 avg idle minutes between jobs?
[discovery] - B.93: stamping press line morning MD and hydraulic idle loads line 93 avg idle minutes between jobs?
[discovery] - B.94: stamping press line morning MD and hydraulic idle loads line 94 avg idle minutes between jobs?
[discovery] - B.95: stamping press line morning MD and hydraulic idle loads line 95 avg idle minutes between jobs?
[discovery] - B.96: stamping press line morning MD and hydraulic idle loads line 96 avg idle minutes between jobs?
[discovery] - B.97: stamping press line morning MD and hydraulic idle loads line 97 avg idle minutes between jobs?
[discovery] - B.98: stamping press line morning MD and hydraulic idle loads line 98 avg idle minutes between jobs?
[discovery] - B.99: stamping press line morning MD and hydraulic idle loads line 99 avg idle minutes between jobs?
[discovery] - B.100: stamping press line morning MD and hydraulic idle loads line 100 avg idle minutes between jobs?
[discovery] - B.101: stamping press line morning MD and hydraulic idle loads line 101 avg idle minutes between jobs?
[discovery] - B.102: stamping press line morning MD and hydraulic idle loads line 102 avg idle minutes between jobs?
[discovery] - B.103: stamping press line morning MD and hydraulic idle loads line 103 avg idle minutes between jobs?
[discovery] - B.104: stamping press line morning MD and hydraulic idle loads line 104 avg idle minutes between jobs?
[discovery] - B.105: stamping press line morning MD and hydraulic idle loads line 105 avg idle minutes between jobs?
[discovery] - B.106: stamping press line morning MD and hydraulic idle loads line 106 avg idle minutes between jobs?
[discovery] - B.107: stamping press line morning MD and hydraulic idle loads line 107 avg idle minutes between jobs?
[discovery] - B.108: stamping press line morning MD and hydraulic idle loads line 108 avg idle minutes between jobs?
[discovery] - B.109: stamping press line morning MD and hydraulic idle loads line 109 avg idle minutes between jobs?
[discovery] - B.110: stamping press line morning MD and hydraulic idle loads line 110 avg idle minutes between jobs?
[discovery] - B.111: stamping press line morning MD and hydraulic idle loads line 111 avg idle minutes between jobs?
[discovery] - B.112: stamping press line morning MD and hydraulic idle loads line 112 avg idle minutes between jobs?
[discovery] - B.113: stamping press line morning MD and hydraulic idle loads line 113 avg idle minutes between jobs?
[discovery] - B.114: stamping press line morning MD and hydraulic idle loads line 114 avg idle minutes between jobs?
[discovery] - B.115: stamping press line morning MD and hydraulic idle loads line 115 avg idle minutes between jobs?
[discovery] - B.116: stamping press line morning MD and hydraulic idle loads line 116 avg idle minutes between jobs?
[discovery] - B.117: stamping press line morning MD and hydraulic idle loads line 117 avg idle minutes between jobs?
[discovery] - B.118: stamping press line morning MD and hydraulic idle loads line 118 avg idle minutes between jobs?
[discovery] - B.119: stamping press line morning MD and hydraulic idle loads line 119 avg idle minutes between jobs?
[discovery] - B.120: stamping press line morning MD and hydraulic idle loads line 120 avg idle minutes between jobs?
[discovery]
Appendix C — Stamped wedge reinforcement
The strongest wedge is: Thirumullaivoyal stamping press morning-MD and hydraulic idle-load verification on the TANGEDCO HT bill — read-only on existing meters, assigning press-line startup overlap and idle hydraulic hold leaks to specific lines in ₹/month, proven on the next invoice within 90 days.
C.1 Week-1 checkpoint
- Day 7: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.2 Week-1 checkpoint
- Day 14: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.3 Week-1 checkpoint
- Day 21: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.4 Week-1 checkpoint
- Day 28: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.5 Week-2 checkpoint
- Day 35: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.6 Week-2 checkpoint
- Day 42: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.7 Week-2 checkpoint
- Day 49: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.8 Week-2 checkpoint
- Day 56: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.9 Week-3 checkpoint
- Day 63: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.10 Week-3 checkpoint
- Day 70: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.11 Week-3 checkpoint
- Day 77: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.12 Week-3 checkpoint
- Day 84: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.13 Week-4 checkpoint
- Day 91: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.14 Week-4 checkpoint
- Day 98: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.15 Week-4 checkpoint
- Day 105: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.16 Week-4 checkpoint
- Day 112: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.17 Week-5 checkpoint
- Day 119: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.18 Week-5 checkpoint
- Day 126: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.19 Week-5 checkpoint
- Day 133: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.20 Week-5 checkpoint
- Day 140: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.21 Week-6 checkpoint
- Day 147: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.22 Week-6 checkpoint
- Day 154: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.23 Week-6 checkpoint
- Day 161: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.24 Week-6 checkpoint
- Day 168: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.25 Week-7 checkpoint
- Day 175: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.26 Week-7 checkpoint
- Day 182: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.27 Week-7 checkpoint
- Day 189: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.28 Week-7 checkpoint
- Day 196: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.29 Week-8 checkpoint
- Day 203: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.30 Week-8 checkpoint
- Day 210: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.31 Week-8 checkpoint
- Day 217: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.32 Week-8 checkpoint
- Day 224: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.33 Week-9 checkpoint
- Day 231: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.34 Week-9 checkpoint
- Day 238: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.35 Week-9 checkpoint
- Day 245: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.36 Week-9 checkpoint
- Day 252: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.37 Week-10 checkpoint
- Day 259: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.38 Week-10 checkpoint
- Day 266: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.39 Week-10 checkpoint
- Day 273: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.40 Week-10 checkpoint
- Day 280: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.41 Week-11 checkpoint
- Day 287: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.42 Week-11 checkpoint
- Day 294: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.43 Week-11 checkpoint
- Day 301: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.44 Week-11 checkpoint
- Day 308: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.45 Week-12 checkpoint
- Day 315: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.46 Week-12 checkpoint
- Day 322: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.47 Week-12 checkpoint
- Day 329: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.48 Week-12 checkpoint
- Day 336: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.49 Week-13 checkpoint
- Day 343: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.50 Week-13 checkpoint
- Day 350: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.51 Week-13 checkpoint
- Day 357: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.52 Week-13 checkpoint
- Day 364: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.53 Week-14 checkpoint
- Day 371: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.54 Week-14 checkpoint
- Day 378: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.55 Week-14 checkpoint
- Day 385: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.56 Week-14 checkpoint
- Day 392: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.57 Week-15 checkpoint
- Day 399: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.58 Week-15 checkpoint
- Day 406: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.59 Week-15 checkpoint
- Day 413: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.60 Week-15 checkpoint
- Day 420: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.61 Week-16 checkpoint
- Day 427: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.62 Week-16 checkpoint
- Day 434: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.63 Week-16 checkpoint
- Day 441: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.64 Week-16 checkpoint
- Day 448: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.65 Week-17 checkpoint
- Day 455: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.66 Week-17 checkpoint
- Day 462: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.67 Week-17 checkpoint
- Day 469: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.68 Week-17 checkpoint
- Day 476: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.69 Week-18 checkpoint
- Day 483: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.70 Week-18 checkpoint
- Day 490: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.71 Week-18 checkpoint
- Day 497: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.72 Week-18 checkpoint
- Day 504: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.73 Week-19 checkpoint
- Day 511: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.74 Week-19 checkpoint
- Day 518: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.75 Week-19 checkpoint
- Day 525: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.76 Week-19 checkpoint
- Day 532: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.77 Week-20 checkpoint
- Day 539: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.78 Week-20 checkpoint
- Day 546: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.79 Week-20 checkpoint
- Day 553: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
C.80 Week-20 checkpoint
- Day 560: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
- Kill at day 60 if verified savings <5% with full data access.
Appendix D — SME100 2019 context
Tier B — qualify bill on first call.
- 2019: Monitor capex, tariff true-up, leadership changes.
- 2020: Monitor capex, tariff true-up, leadership changes.
- 2021: Monitor capex, tariff true-up, leadership changes.
- 2022: Monitor capex, tariff true-up, leadership changes.
- 2023: Monitor capex, tariff true-up, leadership changes.
- 2024: Monitor capex, tariff true-up, leadership changes.
- 2025: Monitor capex, tariff true-up, leadership changes.
- 2026: Monitor capex, tariff true-up, leadership changes.
Appendix E — Objection handling
Objection: “We already have solar”
Response: Solar offsets kWh, not MD sequencing — bill-first baseline.
Objection: “We have ISO / GMP”
Response: Certs ≠ continuous meter-to-bill M&V — 90-day proof on one feeder.
Objection: “Too busy”
Response: Read-only — no production stops; prescriptions are scheduling levers.
Objection: “Send a brochure”
Response: Two bill months + one-page ₹ map — not a product deck.
Appendix F.1 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 1.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-001 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.2 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 2.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-002 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.3 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 3.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-003 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.4 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 4.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-004 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.5 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 5.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-005 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.6 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 6.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-006 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.7 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 7.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-007 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.8 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 8.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-008 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.9 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 9.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-009 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.10 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 10.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-010 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.11 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 11.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-011 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.12 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 12.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-012 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.13 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 13.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-013 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.14 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 14.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-014 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.15 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 15.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-015 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.16 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 16.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-016 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.17 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 17.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-017 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.18 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 18.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-018 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.19 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 19.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-019 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.20 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 20.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-020 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.21 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 21.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-021 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.22 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 22.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-022 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.23 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 23.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-023 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.24 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 24.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-024 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.25 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 25.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-025 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.26 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 26.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-026 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.27 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 27.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-027 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.28 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 28.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-028 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.29 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 29.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-029 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.30 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 30.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-030 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.31 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 31.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-031 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.32 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 32.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-032 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.33 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 33.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-033 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.34 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 34.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-034 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.35 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 35.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-035 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.36 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 36.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-036 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.37 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 37.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-037 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.38 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 38.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-038 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.39 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 39.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-039 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.40 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 40.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-040 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.41 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 41.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-041 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.42 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 42.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-042 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.43 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 43.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-043 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.44 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 44.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-044 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.45 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 45.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-045 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.46 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 46.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-046 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.47 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 47.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-047 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.48 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 48.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-048 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.49 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 49.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-049 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.50 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 50.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-050 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.51 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 51.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-051 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.52 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 52.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-052 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.53 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 53.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-053 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.54 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 54.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-054 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.55 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 55.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-055 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.56 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 56.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-056 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.57 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 57.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-057 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.58 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 58.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-058 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.59 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 59.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-059 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.60 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 60.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-060 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.61 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 61.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-061 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.62 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 62.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-062 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.63 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 63.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-063 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.64 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 64.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-064 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.65 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 65.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-065 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.66 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 66.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-066 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.67 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 67.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-067 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.68 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 68.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-068 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.69 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 69.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-069 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.70 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 70.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-070 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.71 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 71.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-071 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.72 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 72.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-072 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.73 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 73.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-073 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.74 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 74.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-074 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.75 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 75.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-075 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.76 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 76.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-076 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.77 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 77.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-077 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.78 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 78.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-078 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.79 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 79.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-079 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.80 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 80.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-080 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.81 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 81.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-081 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.82 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 82.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-082 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.83 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 83.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-083 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.84 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 84.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-084 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.85 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 85.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-085 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.86 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 86.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-086 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.87 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 87.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-087 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.88 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 88.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-088 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.89 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 89.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-089 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.90 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 90.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-090 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.91 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 91.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-091 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.92 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 92.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-092 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.93 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 93.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-093 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.94 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 94.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-094 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.95 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 95.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-095 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.96 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 96.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-096 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.97 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 97.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-097 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.98 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 98.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-098 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.99 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 99.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-099 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.100 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 100.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-100 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.101 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 101.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-101 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.102 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 102.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-102 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.103 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 103.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-103 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.104 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 104.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-104 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.105 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 105.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-105 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.106 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 106.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-106 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.107 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 107.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-107 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.108 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 108.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-108 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.109 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 109.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-109 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.110 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 110.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-110 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.111 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 111.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-111 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.112 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 112.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-112 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.113 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 113.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-113 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.114 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 114.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-114 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.115 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 115.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-115 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.116 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 116.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-116 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.117 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 117.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-117 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.118 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 118.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-118 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.119 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 119.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-119 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.120 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 120.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-120 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.121 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 121.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-121 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.122 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 122.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-122 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.123 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 123.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-123 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.124 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 124.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-124 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.125 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 125.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-125 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.126 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 126.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-126 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.127 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 127.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-127 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.128 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 128.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-128 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.129 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 129.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-129 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.130 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 130.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-130 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.131 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 131.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-131 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.132 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 132.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-132 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.133 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 133.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-133 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.134 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 134.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-134 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.135 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 135.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-135 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.136 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 136.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-136 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.137 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 137.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-137 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.138 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 138.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-138 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.139 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 139.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-139 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.140 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 140.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-140 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.141 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 141.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-141 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.142 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 142.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-142 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.143 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 143.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-143 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.144 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 144.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-144 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.145 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 145.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-145 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.146 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 146.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-146 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.147 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 147.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-147 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.148 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 148.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-148 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.149 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 149.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-149 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.150 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 150.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-150 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.151 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 151.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-151 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.152 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 152.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-152 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.153 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 153.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-153 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.154 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 154.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-154 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.155 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 155.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-155 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.156 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 156.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-156 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.157 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 157.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-157 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.158 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 158.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-158 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.159 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 159.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-159 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.160 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 160.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-160 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.161 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 161.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-161 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.162 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 162.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-162 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.163 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 163.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-163 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.164 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 164.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-164 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.165 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 165.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-165 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.166 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 166.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-166 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.167 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 167.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-167 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.168 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 168.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-168 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.169 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 169.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-169 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.170 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 170.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-170 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.171 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 171.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-171 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.172 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 172.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-172 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.173 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 173.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-173 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.174 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 174.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-174 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.175 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 175.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-175 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.176 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 176.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-176 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.177 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 177.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-177 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.178 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 178.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-178 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.179 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 179.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-179 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.180 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 180.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-180 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.181 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 181.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-181 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.182 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 182.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-182 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.183 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 183.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-183 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.184 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 184.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-184 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.185 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 185.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-185 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.186 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 186.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-186 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.187 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 187.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-187 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.188 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 188.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-188 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.189 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 189.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-189 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.190 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 190.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-190 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.191 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 191.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-191 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.192 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 192.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-192 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.193 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 193.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-193 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.194 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 194.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-194 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.195 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 195.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-195 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.196 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 196.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-196 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.197 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 197.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-197 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.198 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 198.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-198 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.199 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 199.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-199 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.200 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 200.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-200 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.201 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 201.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-201 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.202 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 202.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-202 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.203 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 203.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-203 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.204 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 204.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-204 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.205 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 205.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-205 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.206 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 206.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-206 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.207 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 207.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-207 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.208 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 208.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-208 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.209 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 209.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-209 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.210 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 210.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-210 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.211 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 211.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-211 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.212 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 212.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-212 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.213 — Field note (42-ue-press-tools)
Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 213.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-213 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |