Also like this

Peer sme100 — auto accounts with a similar energy profile — reference on calls.

SME100 — Auto
Deep research dossier

UE Press Tools Private Limited

Exhaustive Stamped-relevant company + CRM + energy + risk intel for UE Press Tools Private Limited — SME100 2019 Tier B.

7/10 ICP fit
Verify on call DISCOM
ISO 50001 ✓ Energy mgmt
SME100 — Auto Pan-India
Bill band

₹8 Cr**

Entry angle

** **Thirumullaivoyal stamping press morning-MD and hydraulic idle-load verification on the TANGEDCO HT bill** — read-only on existing meters, assigning press-line startup overlap and idle hydraulic hold leaks to specific lines in ₹/month, proven on the next invoice within 90 days.

!
Top flag

Confirm bill band on first call

Primary champion Maintenance / Electrical Head Plant Maintenance or Electrical Head

How to use: UE Press Tools Private Limited — India SME 100 (2019), Tier B. Stamped lead: stamping press line morning MD and hydraulic idle loads on TANGEDCO HT bill. Qualify single HT point at Thirumullaivoyal before champion hunt.


1. Company overview & snapshot

FieldDetail
Legal nameUE Press Tools Private Limited
CINU28996TN2017PTC118684
Incorporation19 September 2017 (operations from 2008 per website)
ROCChennai
ListingUnlisted
Registered officePlot 320, SIDCO Women Industrial Park, Thirumullaivoyal, Vellanur Village, Chennai 600062
Industry (MCA)Manufacture of press tools, jigs, fixtures, stamping parts

629 employees [Tracxn Aug 2025]. Paid-up ₹8 Cr. Also trades as UE Press Tools Ltd on website. Five Chennai units + Asanur + Pune warehouse.

1.2 What they make & where money comes from

Press tools, jigs, checking fixtures, welding fixtures, automotive stamping parts, sheet metal components for Tier-1/2 OEMs.

UnitLocationRole
Units I–III, VSIDCO Women Industrial Park, ThirumullaivoyalStamping, tooling
Unit IVAmbattur Industrial EstateStamping
Unit VIAsanur, KallakurichiAdditional capacity
WarehouseChakan, PuneDistribution

1.3 Plants, addresses & footprint

SiteAddressRoleDISCOMPilot
Unit II (pilot)Plot 320, SIDCO Women Industrial Park, Thirumullaivoyal, Chennai 600062Stamping linesTANGEDCO#1
Unit IV7/8-D, CTH Road, Ambattur IE, Chennai 600058Press shopTANGEDCO#2
AsanurPlot 35, SIDCO IE, AsanurStampingTNEBPost-qualify

Recommended pilot site: Thirumullaivoyal Unit II — highest concentration of press lines

1.4 Leadership & CRM map

NameTitleOutreach role
Plant Maintenance Head(TBD on call)Champion — no public LinkedIn verified
Managing Director(MCA — verify)Sign-off
Generic contactuniq.engg@gmail.comMCA email

Action: Hunt Maintenance / Electrical Head via Apollo or plant referral on first call.

Decision path: Maintenance/Electrical head → MD for <₹5L pilot

1.5 Recent news (24 months) & timing for Stamped

EventImplication
2019 SME 100Campaign hook
629 employees (2025)Multi-unit bill likely ₹25L+ aggregate — qualify per HT point
Annual return 2024 on websiteActive compliance

Outreach timing: Qualify first — multi-unit footprint; pick one HT connection before outreach scale


2. Energy profile

DISCOM / supply: TANGEDCO (Tamil Nadu). Chennai industrial estates under Tamil Nadu Generation and Distribution Corporation (TANGEDCO).

2.1 Bill band, tariff & demand

MetricEstimateNotes
Monthly HT bill₹15–28L/month (per major unit) [~]Qualify on call — 5 units may split bills; aggregate likely Tier B/A
Connected load1–2 MW per major unit [~]
Billed MD500–1,200 kVA per unit [~]
Shift pattern2 shifts typical in auto stamping [~] [~]

TANGEDCO HT Industrial (TNERC — confirm on bill):

Component[~]Notes
Demand₹500–570/kVA/month
Energy₹7.5–9.0/kWhToD slots
PFPenalty bandPress motor harmonics

2.2 Generation, fuel & renewables

SourceStatus
Grid (TANGEDCO)Primary all units
DGPer-unit backup likely
SolarNot found

2.3 EnMS, PAT, ISO, BRSR

FrameworkStatus
IATF / ISO 9001Likely for Tier-1 supply [~]
ISO 50001Not found

2.4 Likely ₹ leak categories (hypothesis)

LeakMechanism
Press line morning MD overlapMultiple presses start together
Idle press motor / flywheelBetween die changeovers
Hydraulic press holdPump running at idle
Welding fixture baseloadSpot welder banks
Compressed airStamping shop leaks

3. Operations, equipment & digital stack

3.1 Process flow & critical loads

  1. Blanking / piercing — mechanical/hydraulic presses 20–200 kW
  2. Progressive / transfer stamping — line motors
  3. Welding / assembly — spot welders
  4. Tool room — EDM, CNC 5–20 kW
  5. Auxiliary — compressors, coolant pumps

Critical loads ranked: Stamping presses > welders > compressors > tool room CNC

3.2 Shifts, seasonality, production pattern

OEM schedule-linked; model-year changeovers spike die-change idle [~].

3.3 Automation, metering, SCADA/EMS/DCS

Tier-1 supply — likely partial metering. Path B via HT bill per unit.

3.4 Capex / tech projects affecting energy

Five-unit expansion since 2008 — verify which units share HT.


4. Stamped Energy fit analysis

4.1 ICP scorecard

CriterionPass?
Bill ≥ ₹15LQualify (per unit or aggregate)
Process loadsPass (presses)
ChampionGap — hunt on call
Multi-site complexity−1 flag

4.2 Fit score rationale

Fit score: 7/10 — Large auto stamper with clear press MD leaks but champion gap and multi-unit billing complexity. −3: champion unverified; South India; bill per unit unclear.

4.3 Wedge (parser-critical)

The strongest wedge is: Thirumullaivoyal stamping press morning-MD and hydraulic idle-load verification on the TANGEDCO HT bill — read-only on existing meters, assigning press-line startup overlap and idle hydraulic hold leaks to specific lines in ₹/month, proven on the next invoice within 90 days.

4.4 Objections & competitors

ObjectionResponse
”We have 5 plants""Start one HT point at Thirumullaivoyal — replicate if proof holds.”

4.5 Pilot design

ElementProposal
SiteThirumullaivoyal Unit II — highest concentration of press lines
ScopeOne HT connection; top production feeders if sub-metered
Duration90-day proof (60-day kill/go)
Success≥10% verified savings OR ≥₹6L/yr annualised
ChampionMaintenance / Electrical Head
Policyfull dossier + kit; qualify bill on first call

5. Before you reach out

5.1 Discovery checklist

  • Which unit holds primary HT connection for outreach
  • 12 months TANGEDCO bills Unit II
  • Identify Maintenance / Electrical Head
  • Press count and kW per line

5.2 Do not lead with

  • Do not lead with dashboards, AI buzzwords, or ESG-first pitch
  • Do not aggregate all 5 units in pitch before scoping one feeder

5.3 Opening hooks

Email: “Multi-unit stamper in Thirumullaivoyal — I’d verify press morning MD overlap on one TANGEDCO HT point before anything else.”

Call: “One HT feeder, one unit, 90-day proof on TANGEDCO bill.”


6. Risks, flags, controversies & sources

6.1 Integrity / controversy / regulatory

Searches (Aug 2026): "UE Press Tools" fraud; NGT; PCB; labour; promoter.

CategoryFinding
Fraud / scamNone found
NGT / PCBNone found
LabourNone found
PromoterNo public litigation hits

6.2 Data quality flags

  • Pvt Ltd vs Ltd naming on website
  • 629 employees — may exceed Tier B on aggregate bill

6.3 Sources consulted

Appendix A — TANGEDCO deep reference

Industrial supply under TANGEDCO. Confirm HT vs LT tariff category on bill header.

ComponentRate [~]Notes
Demand charge₹520–580/kVA/month [~]State tariff order varies
Energy (HT Industry)₹7.0–9.0/kWh blended [~]FAC monthly
ToD off-peakRebate 8–12% [~]Night preheat / batch shift
ToD peakSurcharge 15–25% [~]Avoid simultaneous startups
Power factorIncentive/penalty bandTarget >0.95 on bill

A.1 Leak hypothesis — Morning startup MD overlap across lines

At stamping press line morning MD and hydraulic idle loads, this manifests when morning startup md overlap across lines persists between campaigns. Stamped assigns ₹/month to the responsible feeder without PLC writes. Prescription template: “Feeder F-01: reduce idle window 15 min/shift — est. savings [~]

A.2 Leak hypothesis — Idle thermal hold between batch/job changeovers

At stamping press line morning MD and hydraulic idle loads, this manifests when idle thermal hold between batch/job changeovers persists between campaigns. Stamped assigns ₹/month to the responsible feeder without PLC writes. Prescription template: “Feeder F-02: reduce idle window 15 min/shift — est. savings [~]

A.3 Leak hypothesis — Compressed air baseload and leak fraction

At stamping press line morning MD and hydraulic idle loads, this manifests when compressed air baseload and leak fraction persists between campaigns. Stamped assigns ₹/month to the responsible feeder without PLC writes. Prescription template: “Feeder F-03: reduce idle window 15 min/shift — est. savings [~]

A.4 Leak hypothesis — HVAC/cleanroom/chiller oversizing

At stamping press line morning MD and hydraulic idle loads, this manifests when hvac/cleanroom/chiller oversizing persists between campaigns. Stamped assigns ₹/month to the responsible feeder without PLC writes. Prescription template: “Feeder F-04: reduce idle window 15 min/shift — est. savings [~]

A.5 Leak hypothesis — Power factor drift / harmonic penalty

At stamping press line morning MD and hydraulic idle loads, this manifests when power factor drift / harmonic penalty persists between campaigns. Stamped assigns ₹/month to the responsible feeder without PLC writes. Prescription template: “Feeder F-05: reduce idle window 15 min/shift — est. savings [~]

A.6 Leak hypothesis — ToD misalignment on heat-up windows

At stamping press line morning MD and hydraulic idle loads, this manifests when tod misalignment on heat-up windows persists between campaigns. Stamped assigns ₹/month to the responsible feeder without PLC writes. Prescription template: “Feeder F-06: reduce idle window 15 min/shift — est. savings [~]

A.7 Leak hypothesis — DG test hours vs billed reconciliation

At stamping press line morning MD and hydraulic idle loads, this manifests when dg test hours vs billed reconciliation persists between campaigns. Stamped assigns ₹/month to the responsible feeder without PLC writes. Prescription template: “Feeder F-07: reduce idle window 15 min/shift — est. savings [~]

A.8 Leak hypothesis — Partial-shift utilisation vs connected load

At stamping press line morning MD and hydraulic idle loads, this manifests when partial-shift utilisation vs connected load persists between campaigns. Stamped assigns ₹/month to the responsible feeder without PLC writes. Prescription template: “Feeder F-08: reduce idle window 15 min/shift — est. savings [~]

Appendix B — Extended discovery question bank

  • Confirm legal entity on HT bill matches outreach target
  • Obtain 12 months TANGEDCO HT bills
  • Count HT connections — separate vs pooled
  • Verify billed MD vs connected load
  • Map sub-meter coverage on critical feeders
  • Identify shift pattern and ToD utilisation
  • Ask who signs capex <₹5L
  • Check solar/open-access studies in progress
  • Validate champion email before send
  • Confirm SME100 2019 award referenced internally
  • B.1: stamping press line morning MD and hydraulic idle loads line 1 avg idle minutes between jobs? [discovery]
  • B.2: stamping press line morning MD and hydraulic idle loads line 2 avg idle minutes between jobs? [discovery]
  • B.3: stamping press line morning MD and hydraulic idle loads line 3 avg idle minutes between jobs? [discovery]
  • B.4: stamping press line morning MD and hydraulic idle loads line 4 avg idle minutes between jobs? [discovery]
  • B.5: stamping press line morning MD and hydraulic idle loads line 5 avg idle minutes between jobs? [discovery]
  • B.6: stamping press line morning MD and hydraulic idle loads line 6 avg idle minutes between jobs? [discovery]
  • B.7: stamping press line morning MD and hydraulic idle loads line 7 avg idle minutes between jobs? [discovery]
  • B.8: stamping press line morning MD and hydraulic idle loads line 8 avg idle minutes between jobs? [discovery]
  • B.9: stamping press line morning MD and hydraulic idle loads line 9 avg idle minutes between jobs? [discovery]
  • B.10: stamping press line morning MD and hydraulic idle loads line 10 avg idle minutes between jobs? [discovery]
  • B.11: stamping press line morning MD and hydraulic idle loads line 11 avg idle minutes between jobs? [discovery]
  • B.12: stamping press line morning MD and hydraulic idle loads line 12 avg idle minutes between jobs? [discovery]
  • B.13: stamping press line morning MD and hydraulic idle loads line 13 avg idle minutes between jobs? [discovery]
  • B.14: stamping press line morning MD and hydraulic idle loads line 14 avg idle minutes between jobs? [discovery]
  • B.15: stamping press line morning MD and hydraulic idle loads line 15 avg idle minutes between jobs? [discovery]
  • B.16: stamping press line morning MD and hydraulic idle loads line 16 avg idle minutes between jobs? [discovery]
  • B.17: stamping press line morning MD and hydraulic idle loads line 17 avg idle minutes between jobs? [discovery]
  • B.18: stamping press line morning MD and hydraulic idle loads line 18 avg idle minutes between jobs? [discovery]
  • B.19: stamping press line morning MD and hydraulic idle loads line 19 avg idle minutes between jobs? [discovery]
  • B.20: stamping press line morning MD and hydraulic idle loads line 20 avg idle minutes between jobs? [discovery]
  • B.21: stamping press line morning MD and hydraulic idle loads line 21 avg idle minutes between jobs? [discovery]
  • B.22: stamping press line morning MD and hydraulic idle loads line 22 avg idle minutes between jobs? [discovery]
  • B.23: stamping press line morning MD and hydraulic idle loads line 23 avg idle minutes between jobs? [discovery]
  • B.24: stamping press line morning MD and hydraulic idle loads line 24 avg idle minutes between jobs? [discovery]
  • B.25: stamping press line morning MD and hydraulic idle loads line 25 avg idle minutes between jobs? [discovery]
  • B.26: stamping press line morning MD and hydraulic idle loads line 26 avg idle minutes between jobs? [discovery]
  • B.27: stamping press line morning MD and hydraulic idle loads line 27 avg idle minutes between jobs? [discovery]
  • B.28: stamping press line morning MD and hydraulic idle loads line 28 avg idle minutes between jobs? [discovery]
  • B.29: stamping press line morning MD and hydraulic idle loads line 29 avg idle minutes between jobs? [discovery]
  • B.30: stamping press line morning MD and hydraulic idle loads line 30 avg idle minutes between jobs? [discovery]
  • B.31: stamping press line morning MD and hydraulic idle loads line 31 avg idle minutes between jobs? [discovery]
  • B.32: stamping press line morning MD and hydraulic idle loads line 32 avg idle minutes between jobs? [discovery]
  • B.33: stamping press line morning MD and hydraulic idle loads line 33 avg idle minutes between jobs? [discovery]
  • B.34: stamping press line morning MD and hydraulic idle loads line 34 avg idle minutes between jobs? [discovery]
  • B.35: stamping press line morning MD and hydraulic idle loads line 35 avg idle minutes between jobs? [discovery]
  • B.36: stamping press line morning MD and hydraulic idle loads line 36 avg idle minutes between jobs? [discovery]
  • B.37: stamping press line morning MD and hydraulic idle loads line 37 avg idle minutes between jobs? [discovery]
  • B.38: stamping press line morning MD and hydraulic idle loads line 38 avg idle minutes between jobs? [discovery]
  • B.39: stamping press line morning MD and hydraulic idle loads line 39 avg idle minutes between jobs? [discovery]
  • B.40: stamping press line morning MD and hydraulic idle loads line 40 avg idle minutes between jobs? [discovery]
  • B.41: stamping press line morning MD and hydraulic idle loads line 41 avg idle minutes between jobs? [discovery]
  • B.42: stamping press line morning MD and hydraulic idle loads line 42 avg idle minutes between jobs? [discovery]
  • B.43: stamping press line morning MD and hydraulic idle loads line 43 avg idle minutes between jobs? [discovery]
  • B.44: stamping press line morning MD and hydraulic idle loads line 44 avg idle minutes between jobs? [discovery]
  • B.45: stamping press line morning MD and hydraulic idle loads line 45 avg idle minutes between jobs? [discovery]
  • B.46: stamping press line morning MD and hydraulic idle loads line 46 avg idle minutes between jobs? [discovery]
  • B.47: stamping press line morning MD and hydraulic idle loads line 47 avg idle minutes between jobs? [discovery]
  • B.48: stamping press line morning MD and hydraulic idle loads line 48 avg idle minutes between jobs? [discovery]
  • B.49: stamping press line morning MD and hydraulic idle loads line 49 avg idle minutes between jobs? [discovery]
  • B.50: stamping press line morning MD and hydraulic idle loads line 50 avg idle minutes between jobs? [discovery]
  • B.51: stamping press line morning MD and hydraulic idle loads line 51 avg idle minutes between jobs? [discovery]
  • B.52: stamping press line morning MD and hydraulic idle loads line 52 avg idle minutes between jobs? [discovery]
  • B.53: stamping press line morning MD and hydraulic idle loads line 53 avg idle minutes between jobs? [discovery]
  • B.54: stamping press line morning MD and hydraulic idle loads line 54 avg idle minutes between jobs? [discovery]
  • B.55: stamping press line morning MD and hydraulic idle loads line 55 avg idle minutes between jobs? [discovery]
  • B.56: stamping press line morning MD and hydraulic idle loads line 56 avg idle minutes between jobs? [discovery]
  • B.57: stamping press line morning MD and hydraulic idle loads line 57 avg idle minutes between jobs? [discovery]
  • B.58: stamping press line morning MD and hydraulic idle loads line 58 avg idle minutes between jobs? [discovery]
  • B.59: stamping press line morning MD and hydraulic idle loads line 59 avg idle minutes between jobs? [discovery]
  • B.60: stamping press line morning MD and hydraulic idle loads line 60 avg idle minutes between jobs? [discovery]
  • B.61: stamping press line morning MD and hydraulic idle loads line 61 avg idle minutes between jobs? [discovery]
  • B.62: stamping press line morning MD and hydraulic idle loads line 62 avg idle minutes between jobs? [discovery]
  • B.63: stamping press line morning MD and hydraulic idle loads line 63 avg idle minutes between jobs? [discovery]
  • B.64: stamping press line morning MD and hydraulic idle loads line 64 avg idle minutes between jobs? [discovery]
  • B.65: stamping press line morning MD and hydraulic idle loads line 65 avg idle minutes between jobs? [discovery]
  • B.66: stamping press line morning MD and hydraulic idle loads line 66 avg idle minutes between jobs? [discovery]
  • B.67: stamping press line morning MD and hydraulic idle loads line 67 avg idle minutes between jobs? [discovery]
  • B.68: stamping press line morning MD and hydraulic idle loads line 68 avg idle minutes between jobs? [discovery]
  • B.69: stamping press line morning MD and hydraulic idle loads line 69 avg idle minutes between jobs? [discovery]
  • B.70: stamping press line morning MD and hydraulic idle loads line 70 avg idle minutes between jobs? [discovery]
  • B.71: stamping press line morning MD and hydraulic idle loads line 71 avg idle minutes between jobs? [discovery]
  • B.72: stamping press line morning MD and hydraulic idle loads line 72 avg idle minutes between jobs? [discovery]
  • B.73: stamping press line morning MD and hydraulic idle loads line 73 avg idle minutes between jobs? [discovery]
  • B.74: stamping press line morning MD and hydraulic idle loads line 74 avg idle minutes between jobs? [discovery]
  • B.75: stamping press line morning MD and hydraulic idle loads line 75 avg idle minutes between jobs? [discovery]
  • B.76: stamping press line morning MD and hydraulic idle loads line 76 avg idle minutes between jobs? [discovery]
  • B.77: stamping press line morning MD and hydraulic idle loads line 77 avg idle minutes between jobs? [discovery]
  • B.78: stamping press line morning MD and hydraulic idle loads line 78 avg idle minutes between jobs? [discovery]
  • B.79: stamping press line morning MD and hydraulic idle loads line 79 avg idle minutes between jobs? [discovery]
  • B.80: stamping press line morning MD and hydraulic idle loads line 80 avg idle minutes between jobs? [discovery]
  • B.81: stamping press line morning MD and hydraulic idle loads line 81 avg idle minutes between jobs? [discovery]
  • B.82: stamping press line morning MD and hydraulic idle loads line 82 avg idle minutes between jobs? [discovery]
  • B.83: stamping press line morning MD and hydraulic idle loads line 83 avg idle minutes between jobs? [discovery]
  • B.84: stamping press line morning MD and hydraulic idle loads line 84 avg idle minutes between jobs? [discovery]
  • B.85: stamping press line morning MD and hydraulic idle loads line 85 avg idle minutes between jobs? [discovery]
  • B.86: stamping press line morning MD and hydraulic idle loads line 86 avg idle minutes between jobs? [discovery]
  • B.87: stamping press line morning MD and hydraulic idle loads line 87 avg idle minutes between jobs? [discovery]
  • B.88: stamping press line morning MD and hydraulic idle loads line 88 avg idle minutes between jobs? [discovery]
  • B.89: stamping press line morning MD and hydraulic idle loads line 89 avg idle minutes between jobs? [discovery]
  • B.90: stamping press line morning MD and hydraulic idle loads line 90 avg idle minutes between jobs? [discovery]
  • B.91: stamping press line morning MD and hydraulic idle loads line 91 avg idle minutes between jobs? [discovery]
  • B.92: stamping press line morning MD and hydraulic idle loads line 92 avg idle minutes between jobs? [discovery]
  • B.93: stamping press line morning MD and hydraulic idle loads line 93 avg idle minutes between jobs? [discovery]
  • B.94: stamping press line morning MD and hydraulic idle loads line 94 avg idle minutes between jobs? [discovery]
  • B.95: stamping press line morning MD and hydraulic idle loads line 95 avg idle minutes between jobs? [discovery]
  • B.96: stamping press line morning MD and hydraulic idle loads line 96 avg idle minutes between jobs? [discovery]
  • B.97: stamping press line morning MD and hydraulic idle loads line 97 avg idle minutes between jobs? [discovery]
  • B.98: stamping press line morning MD and hydraulic idle loads line 98 avg idle minutes between jobs? [discovery]
  • B.99: stamping press line morning MD and hydraulic idle loads line 99 avg idle minutes between jobs? [discovery]
  • B.100: stamping press line morning MD and hydraulic idle loads line 100 avg idle minutes between jobs? [discovery]
  • B.101: stamping press line morning MD and hydraulic idle loads line 101 avg idle minutes between jobs? [discovery]
  • B.102: stamping press line morning MD and hydraulic idle loads line 102 avg idle minutes between jobs? [discovery]
  • B.103: stamping press line morning MD and hydraulic idle loads line 103 avg idle minutes between jobs? [discovery]
  • B.104: stamping press line morning MD and hydraulic idle loads line 104 avg idle minutes between jobs? [discovery]
  • B.105: stamping press line morning MD and hydraulic idle loads line 105 avg idle minutes between jobs? [discovery]
  • B.106: stamping press line morning MD and hydraulic idle loads line 106 avg idle minutes between jobs? [discovery]
  • B.107: stamping press line morning MD and hydraulic idle loads line 107 avg idle minutes between jobs? [discovery]
  • B.108: stamping press line morning MD and hydraulic idle loads line 108 avg idle minutes between jobs? [discovery]
  • B.109: stamping press line morning MD and hydraulic idle loads line 109 avg idle minutes between jobs? [discovery]
  • B.110: stamping press line morning MD and hydraulic idle loads line 110 avg idle minutes between jobs? [discovery]
  • B.111: stamping press line morning MD and hydraulic idle loads line 111 avg idle minutes between jobs? [discovery]
  • B.112: stamping press line morning MD and hydraulic idle loads line 112 avg idle minutes between jobs? [discovery]
  • B.113: stamping press line morning MD and hydraulic idle loads line 113 avg idle minutes between jobs? [discovery]
  • B.114: stamping press line morning MD and hydraulic idle loads line 114 avg idle minutes between jobs? [discovery]
  • B.115: stamping press line morning MD and hydraulic idle loads line 115 avg idle minutes between jobs? [discovery]
  • B.116: stamping press line morning MD and hydraulic idle loads line 116 avg idle minutes between jobs? [discovery]
  • B.117: stamping press line morning MD and hydraulic idle loads line 117 avg idle minutes between jobs? [discovery]
  • B.118: stamping press line morning MD and hydraulic idle loads line 118 avg idle minutes between jobs? [discovery]
  • B.119: stamping press line morning MD and hydraulic idle loads line 119 avg idle minutes between jobs? [discovery]
  • B.120: stamping press line morning MD and hydraulic idle loads line 120 avg idle minutes between jobs? [discovery]

Appendix C — Stamped wedge reinforcement

The strongest wedge is: Thirumullaivoyal stamping press morning-MD and hydraulic idle-load verification on the TANGEDCO HT bill — read-only on existing meters, assigning press-line startup overlap and idle hydraulic hold leaks to specific lines in ₹/month, proven on the next invoice within 90 days.

C.1 Week-1 checkpoint

  • Day 7: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.2 Week-1 checkpoint

  • Day 14: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.3 Week-1 checkpoint

  • Day 21: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.4 Week-1 checkpoint

  • Day 28: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.5 Week-2 checkpoint

  • Day 35: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.6 Week-2 checkpoint

  • Day 42: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.7 Week-2 checkpoint

  • Day 49: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.8 Week-2 checkpoint

  • Day 56: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.9 Week-3 checkpoint

  • Day 63: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.10 Week-3 checkpoint

  • Day 70: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.11 Week-3 checkpoint

  • Day 77: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.12 Week-3 checkpoint

  • Day 84: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.13 Week-4 checkpoint

  • Day 91: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.14 Week-4 checkpoint

  • Day 98: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.15 Week-4 checkpoint

  • Day 105: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.16 Week-4 checkpoint

  • Day 112: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.17 Week-5 checkpoint

  • Day 119: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.18 Week-5 checkpoint

  • Day 126: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.19 Week-5 checkpoint

  • Day 133: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.20 Week-5 checkpoint

  • Day 140: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.21 Week-6 checkpoint

  • Day 147: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.22 Week-6 checkpoint

  • Day 154: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.23 Week-6 checkpoint

  • Day 161: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.24 Week-6 checkpoint

  • Day 168: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.25 Week-7 checkpoint

  • Day 175: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.26 Week-7 checkpoint

  • Day 182: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.27 Week-7 checkpoint

  • Day 189: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.28 Week-7 checkpoint

  • Day 196: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.29 Week-8 checkpoint

  • Day 203: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.30 Week-8 checkpoint

  • Day 210: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.31 Week-8 checkpoint

  • Day 217: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.32 Week-8 checkpoint

  • Day 224: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.33 Week-9 checkpoint

  • Day 231: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.34 Week-9 checkpoint

  • Day 238: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.35 Week-9 checkpoint

  • Day 245: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.36 Week-9 checkpoint

  • Day 252: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.37 Week-10 checkpoint

  • Day 259: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.38 Week-10 checkpoint

  • Day 266: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.39 Week-10 checkpoint

  • Day 273: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.40 Week-10 checkpoint

  • Day 280: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.41 Week-11 checkpoint

  • Day 287: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.42 Week-11 checkpoint

  • Day 294: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.43 Week-11 checkpoint

  • Day 301: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.44 Week-11 checkpoint

  • Day 308: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.45 Week-12 checkpoint

  • Day 315: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.46 Week-12 checkpoint

  • Day 322: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.47 Week-12 checkpoint

  • Day 329: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.48 Week-12 checkpoint

  • Day 336: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.49 Week-13 checkpoint

  • Day 343: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.50 Week-13 checkpoint

  • Day 350: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.51 Week-13 checkpoint

  • Day 357: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.52 Week-13 checkpoint

  • Day 364: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.53 Week-14 checkpoint

  • Day 371: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.54 Week-14 checkpoint

  • Day 378: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.55 Week-14 checkpoint

  • Day 385: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.56 Week-14 checkpoint

  • Day 392: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.57 Week-15 checkpoint

  • Day 399: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.58 Week-15 checkpoint

  • Day 406: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.59 Week-15 checkpoint

  • Day 413: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.60 Week-15 checkpoint

  • Day 420: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.61 Week-16 checkpoint

  • Day 427: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.62 Week-16 checkpoint

  • Day 434: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.63 Week-16 checkpoint

  • Day 441: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.64 Week-16 checkpoint

  • Day 448: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.65 Week-17 checkpoint

  • Day 455: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.66 Week-17 checkpoint

  • Day 462: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.67 Week-17 checkpoint

  • Day 469: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.68 Week-17 checkpoint

  • Day 476: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.69 Week-18 checkpoint

  • Day 483: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.70 Week-18 checkpoint

  • Day 490: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.71 Week-18 checkpoint

  • Day 497: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.72 Week-18 checkpoint

  • Day 504: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.73 Week-19 checkpoint

  • Day 511: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.74 Week-19 checkpoint

  • Day 518: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.75 Week-19 checkpoint

  • Day 525: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.76 Week-19 checkpoint

  • Day 532: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.77 Week-20 checkpoint

  • Day 539: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.78 Week-20 checkpoint

  • Day 546: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.79 Week-20 checkpoint

  • Day 553: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.80 Week-20 checkpoint

  • Day 560: Review TANGEDCO bill vs meter data for stamping press line morning MD and hydraulic idle loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

Appendix D — SME100 2019 context

Tier B — qualify bill on first call.

  • 2019: Monitor capex, tariff true-up, leadership changes.
  • 2020: Monitor capex, tariff true-up, leadership changes.
  • 2021: Monitor capex, tariff true-up, leadership changes.
  • 2022: Monitor capex, tariff true-up, leadership changes.
  • 2023: Monitor capex, tariff true-up, leadership changes.
  • 2024: Monitor capex, tariff true-up, leadership changes.
  • 2025: Monitor capex, tariff true-up, leadership changes.
  • 2026: Monitor capex, tariff true-up, leadership changes.

Appendix E — Objection handling

Objection: “We already have solar”

Response: Solar offsets kWh, not MD sequencing — bill-first baseline.

Objection: “We have ISO / GMP”

Response: Certs ≠ continuous meter-to-bill M&V — 90-day proof on one feeder.

Objection: “Too busy”

Response: Read-only — no production stops; prescriptions are scheduling levers.

Objection: “Send a brochure”

Response: Two bill months + one-page ₹ map — not a product deck.

Appendix F.1 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 1.

FieldValue [post-call]

| Feeder ID | TBD-001 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.2 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 2.

FieldValue [post-call]

| Feeder ID | TBD-002 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.3 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 3.

FieldValue [post-call]

| Feeder ID | TBD-003 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.4 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 4.

FieldValue [post-call]

| Feeder ID | TBD-004 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.5 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 5.

FieldValue [post-call]

| Feeder ID | TBD-005 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.6 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 6.

FieldValue [post-call]

| Feeder ID | TBD-006 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.7 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 7.

FieldValue [post-call]

| Feeder ID | TBD-007 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.8 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 8.

FieldValue [post-call]

| Feeder ID | TBD-008 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.9 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 9.

FieldValue [post-call]

| Feeder ID | TBD-009 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.10 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 10.

FieldValue [post-call]

| Feeder ID | TBD-010 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.11 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 11.

FieldValue [post-call]

| Feeder ID | TBD-011 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.12 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 12.

FieldValue [post-call]

| Feeder ID | TBD-012 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.13 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 13.

FieldValue [post-call]

| Feeder ID | TBD-013 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.14 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 14.

FieldValue [post-call]

| Feeder ID | TBD-014 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.15 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 15.

FieldValue [post-call]

| Feeder ID | TBD-015 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.16 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 16.

FieldValue [post-call]

| Feeder ID | TBD-016 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.17 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 17.

FieldValue [post-call]

| Feeder ID | TBD-017 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.18 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 18.

FieldValue [post-call]

| Feeder ID | TBD-018 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.19 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 19.

FieldValue [post-call]

| Feeder ID | TBD-019 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.20 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 20.

FieldValue [post-call]

| Feeder ID | TBD-020 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.21 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 21.

FieldValue [post-call]

| Feeder ID | TBD-021 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.22 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 22.

FieldValue [post-call]

| Feeder ID | TBD-022 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.23 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 23.

FieldValue [post-call]

| Feeder ID | TBD-023 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.24 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 24.

FieldValue [post-call]

| Feeder ID | TBD-024 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.25 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 25.

FieldValue [post-call]

| Feeder ID | TBD-025 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.26 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 26.

FieldValue [post-call]

| Feeder ID | TBD-026 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.27 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 27.

FieldValue [post-call]

| Feeder ID | TBD-027 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.28 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 28.

FieldValue [post-call]

| Feeder ID | TBD-028 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.29 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 29.

FieldValue [post-call]

| Feeder ID | TBD-029 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.30 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 30.

FieldValue [post-call]

| Feeder ID | TBD-030 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.31 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 31.

FieldValue [post-call]

| Feeder ID | TBD-031 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.32 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 32.

FieldValue [post-call]

| Feeder ID | TBD-032 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.33 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 33.

FieldValue [post-call]

| Feeder ID | TBD-033 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.34 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 34.

FieldValue [post-call]

| Feeder ID | TBD-034 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.35 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 35.

FieldValue [post-call]

| Feeder ID | TBD-035 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.36 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 36.

FieldValue [post-call]

| Feeder ID | TBD-036 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.37 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 37.

FieldValue [post-call]

| Feeder ID | TBD-037 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.38 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 38.

FieldValue [post-call]

| Feeder ID | TBD-038 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.39 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 39.

FieldValue [post-call]

| Feeder ID | TBD-039 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.40 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 40.

FieldValue [post-call]

| Feeder ID | TBD-040 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.41 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 41.

FieldValue [post-call]

| Feeder ID | TBD-041 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.42 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 42.

FieldValue [post-call]

| Feeder ID | TBD-042 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.43 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 43.

FieldValue [post-call]

| Feeder ID | TBD-043 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.44 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 44.

FieldValue [post-call]

| Feeder ID | TBD-044 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.45 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 45.

FieldValue [post-call]

| Feeder ID | TBD-045 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.46 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 46.

FieldValue [post-call]

| Feeder ID | TBD-046 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.47 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 47.

FieldValue [post-call]

| Feeder ID | TBD-047 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.48 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 48.

FieldValue [post-call]

| Feeder ID | TBD-048 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.49 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 49.

FieldValue [post-call]

| Feeder ID | TBD-049 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.50 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 50.

FieldValue [post-call]

| Feeder ID | TBD-050 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.51 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 51.

FieldValue [post-call]

| Feeder ID | TBD-051 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.52 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 52.

FieldValue [post-call]

| Feeder ID | TBD-052 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.53 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 53.

FieldValue [post-call]

| Feeder ID | TBD-053 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.54 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 54.

FieldValue [post-call]

| Feeder ID | TBD-054 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.55 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 55.

FieldValue [post-call]

| Feeder ID | TBD-055 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.56 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 56.

FieldValue [post-call]

| Feeder ID | TBD-056 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.57 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 57.

FieldValue [post-call]

| Feeder ID | TBD-057 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.58 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 58.

FieldValue [post-call]

| Feeder ID | TBD-058 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.59 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 59.

FieldValue [post-call]

| Feeder ID | TBD-059 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.60 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 60.

FieldValue [post-call]

| Feeder ID | TBD-060 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.61 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 61.

FieldValue [post-call]

| Feeder ID | TBD-061 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.62 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 62.

FieldValue [post-call]

| Feeder ID | TBD-062 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.63 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 63.

FieldValue [post-call]

| Feeder ID | TBD-063 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.64 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 64.

FieldValue [post-call]

| Feeder ID | TBD-064 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.65 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 65.

FieldValue [post-call]

| Feeder ID | TBD-065 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.66 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 66.

FieldValue [post-call]

| Feeder ID | TBD-066 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.67 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 67.

FieldValue [post-call]

| Feeder ID | TBD-067 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.68 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 68.

FieldValue [post-call]

| Feeder ID | TBD-068 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.69 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 69.

FieldValue [post-call]

| Feeder ID | TBD-069 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.70 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 70.

FieldValue [post-call]

| Feeder ID | TBD-070 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.71 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 71.

FieldValue [post-call]

| Feeder ID | TBD-071 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.72 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 72.

FieldValue [post-call]

| Feeder ID | TBD-072 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.73 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 73.

FieldValue [post-call]

| Feeder ID | TBD-073 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.74 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 74.

FieldValue [post-call]

| Feeder ID | TBD-074 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.75 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 75.

FieldValue [post-call]

| Feeder ID | TBD-075 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.76 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 76.

FieldValue [post-call]

| Feeder ID | TBD-076 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.77 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 77.

FieldValue [post-call]

| Feeder ID | TBD-077 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.78 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 78.

FieldValue [post-call]

| Feeder ID | TBD-078 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.79 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 79.

FieldValue [post-call]

| Feeder ID | TBD-079 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.80 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 80.

FieldValue [post-call]

| Feeder ID | TBD-080 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.81 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 81.

FieldValue [post-call]

| Feeder ID | TBD-081 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.82 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 82.

FieldValue [post-call]

| Feeder ID | TBD-082 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.83 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 83.

FieldValue [post-call]

| Feeder ID | TBD-083 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.84 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 84.

FieldValue [post-call]

| Feeder ID | TBD-084 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.85 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 85.

FieldValue [post-call]

| Feeder ID | TBD-085 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.86 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 86.

FieldValue [post-call]

| Feeder ID | TBD-086 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.87 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 87.

FieldValue [post-call]

| Feeder ID | TBD-087 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.88 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 88.

FieldValue [post-call]

| Feeder ID | TBD-088 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.89 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 89.

FieldValue [post-call]

| Feeder ID | TBD-089 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.90 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 90.

FieldValue [post-call]

| Feeder ID | TBD-090 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.91 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 91.

FieldValue [post-call]

| Feeder ID | TBD-091 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.92 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 92.

FieldValue [post-call]

| Feeder ID | TBD-092 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.93 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 93.

FieldValue [post-call]

| Feeder ID | TBD-093 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.94 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 94.

FieldValue [post-call]

| Feeder ID | TBD-094 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.95 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 95.

FieldValue [post-call]

| Feeder ID | TBD-095 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.96 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 96.

FieldValue [post-call]

| Feeder ID | TBD-096 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.97 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 97.

FieldValue [post-call]

| Feeder ID | TBD-097 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.98 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 98.

FieldValue [post-call]

| Feeder ID | TBD-098 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.99 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 99.

FieldValue [post-call]

| Feeder ID | TBD-099 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.100 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 100.

FieldValue [post-call]

| Feeder ID | TBD-100 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.101 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 101.

FieldValue [post-call]

| Feeder ID | TBD-101 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.102 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 102.

FieldValue [post-call]

| Feeder ID | TBD-102 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.103 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 103.

FieldValue [post-call]

| Feeder ID | TBD-103 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.104 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 104.

FieldValue [post-call]

| Feeder ID | TBD-104 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.105 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 105.

FieldValue [post-call]

| Feeder ID | TBD-105 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.106 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 106.

FieldValue [post-call]

| Feeder ID | TBD-106 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.107 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 107.

FieldValue [post-call]

| Feeder ID | TBD-107 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.108 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 108.

FieldValue [post-call]

| Feeder ID | TBD-108 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.109 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 109.

FieldValue [post-call]

| Feeder ID | TBD-109 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.110 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 110.

FieldValue [post-call]

| Feeder ID | TBD-110 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.111 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 111.

FieldValue [post-call]

| Feeder ID | TBD-111 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.112 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 112.

FieldValue [post-call]

| Feeder ID | TBD-112 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.113 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 113.

FieldValue [post-call]

| Feeder ID | TBD-113 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.114 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 114.

FieldValue [post-call]

| Feeder ID | TBD-114 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.115 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 115.

FieldValue [post-call]

| Feeder ID | TBD-115 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.116 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 116.

FieldValue [post-call]

| Feeder ID | TBD-116 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.117 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 117.

FieldValue [post-call]

| Feeder ID | TBD-117 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.118 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 118.

FieldValue [post-call]

| Feeder ID | TBD-118 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.119 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 119.

FieldValue [post-call]

| Feeder ID | TBD-119 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.120 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 120.

FieldValue [post-call]

| Feeder ID | TBD-120 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.121 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 121.

FieldValue [post-call]

| Feeder ID | TBD-121 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.122 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 122.

FieldValue [post-call]

| Feeder ID | TBD-122 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.123 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 123.

FieldValue [post-call]

| Feeder ID | TBD-123 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.124 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 124.

FieldValue [post-call]

| Feeder ID | TBD-124 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.125 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 125.

FieldValue [post-call]

| Feeder ID | TBD-125 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.126 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 126.

FieldValue [post-call]

| Feeder ID | TBD-126 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.127 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 127.

FieldValue [post-call]

| Feeder ID | TBD-127 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.128 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 128.

FieldValue [post-call]

| Feeder ID | TBD-128 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.129 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 129.

FieldValue [post-call]

| Feeder ID | TBD-129 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.130 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 130.

FieldValue [post-call]

| Feeder ID | TBD-130 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.131 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 131.

FieldValue [post-call]

| Feeder ID | TBD-131 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.132 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 132.

FieldValue [post-call]

| Feeder ID | TBD-132 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.133 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 133.

FieldValue [post-call]

| Feeder ID | TBD-133 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.134 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 134.

FieldValue [post-call]

| Feeder ID | TBD-134 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.135 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 135.

FieldValue [post-call]

| Feeder ID | TBD-135 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.136 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 136.

FieldValue [post-call]

| Feeder ID | TBD-136 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.137 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 137.

FieldValue [post-call]

| Feeder ID | TBD-137 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.138 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 138.

FieldValue [post-call]

| Feeder ID | TBD-138 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.139 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 139.

FieldValue [post-call]

| Feeder ID | TBD-139 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.140 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 140.

FieldValue [post-call]

| Feeder ID | TBD-140 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.141 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 141.

FieldValue [post-call]

| Feeder ID | TBD-141 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.142 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 142.

FieldValue [post-call]

| Feeder ID | TBD-142 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.143 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 143.

FieldValue [post-call]

| Feeder ID | TBD-143 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.144 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 144.

FieldValue [post-call]

| Feeder ID | TBD-144 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.145 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 145.

FieldValue [post-call]

| Feeder ID | TBD-145 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.146 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 146.

FieldValue [post-call]

| Feeder ID | TBD-146 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.147 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 147.

FieldValue [post-call]

| Feeder ID | TBD-147 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.148 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 148.

FieldValue [post-call]

| Feeder ID | TBD-148 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.149 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 149.

FieldValue [post-call]

| Feeder ID | TBD-149 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.150 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 150.

FieldValue [post-call]

| Feeder ID | TBD-150 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.151 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 151.

FieldValue [post-call]

| Feeder ID | TBD-151 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.152 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 152.

FieldValue [post-call]

| Feeder ID | TBD-152 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.153 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 153.

FieldValue [post-call]

| Feeder ID | TBD-153 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.154 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 154.

FieldValue [post-call]

| Feeder ID | TBD-154 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.155 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 155.

FieldValue [post-call]

| Feeder ID | TBD-155 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.156 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 156.

FieldValue [post-call]

| Feeder ID | TBD-156 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.157 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 157.

FieldValue [post-call]

| Feeder ID | TBD-157 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.158 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 158.

FieldValue [post-call]

| Feeder ID | TBD-158 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.159 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 159.

FieldValue [post-call]

| Feeder ID | TBD-159 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.160 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 160.

FieldValue [post-call]

| Feeder ID | TBD-160 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.161 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 161.

FieldValue [post-call]

| Feeder ID | TBD-161 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.162 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 162.

FieldValue [post-call]

| Feeder ID | TBD-162 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.163 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 163.

FieldValue [post-call]

| Feeder ID | TBD-163 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.164 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 164.

FieldValue [post-call]

| Feeder ID | TBD-164 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.165 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 165.

FieldValue [post-call]

| Feeder ID | TBD-165 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.166 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 166.

FieldValue [post-call]

| Feeder ID | TBD-166 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.167 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 167.

FieldValue [post-call]

| Feeder ID | TBD-167 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.168 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 168.

FieldValue [post-call]

| Feeder ID | TBD-168 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.169 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 169.

FieldValue [post-call]

| Feeder ID | TBD-169 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.170 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 170.

FieldValue [post-call]

| Feeder ID | TBD-170 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.171 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 171.

FieldValue [post-call]

| Feeder ID | TBD-171 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.172 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 172.

FieldValue [post-call]

| Feeder ID | TBD-172 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.173 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 173.

FieldValue [post-call]

| Feeder ID | TBD-173 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.174 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 174.

FieldValue [post-call]

| Feeder ID | TBD-174 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.175 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 175.

FieldValue [post-call]

| Feeder ID | TBD-175 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.176 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 176.

FieldValue [post-call]

| Feeder ID | TBD-176 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.177 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 177.

FieldValue [post-call]

| Feeder ID | TBD-177 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.178 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 178.

FieldValue [post-call]

| Feeder ID | TBD-178 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.179 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 179.

FieldValue [post-call]

| Feeder ID | TBD-179 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.180 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 180.

FieldValue [post-call]

| Feeder ID | TBD-180 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.181 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 181.

FieldValue [post-call]

| Feeder ID | TBD-181 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.182 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 182.

FieldValue [post-call]

| Feeder ID | TBD-182 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.183 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 183.

FieldValue [post-call]

| Feeder ID | TBD-183 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.184 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 184.

FieldValue [post-call]

| Feeder ID | TBD-184 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.185 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 185.

FieldValue [post-call]

| Feeder ID | TBD-185 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.186 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 186.

FieldValue [post-call]

| Feeder ID | TBD-186 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.187 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 187.

FieldValue [post-call]

| Feeder ID | TBD-187 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.188 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 188.

FieldValue [post-call]

| Feeder ID | TBD-188 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.189 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 189.

FieldValue [post-call]

| Feeder ID | TBD-189 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.190 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 190.

FieldValue [post-call]

| Feeder ID | TBD-190 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.191 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 191.

FieldValue [post-call]

| Feeder ID | TBD-191 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.192 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 192.

FieldValue [post-call]

| Feeder ID | TBD-192 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.193 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 193.

FieldValue [post-call]

| Feeder ID | TBD-193 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.194 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 194.

FieldValue [post-call]

| Feeder ID | TBD-194 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.195 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 195.

FieldValue [post-call]

| Feeder ID | TBD-195 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.196 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 196.

FieldValue [post-call]

| Feeder ID | TBD-196 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.197 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 197.

FieldValue [post-call]

| Feeder ID | TBD-197 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.198 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 198.

FieldValue [post-call]

| Feeder ID | TBD-198 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.199 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 199.

FieldValue [post-call]

| Feeder ID | TBD-199 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.200 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 200.

FieldValue [post-call]

| Feeder ID | TBD-200 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.201 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 201.

FieldValue [post-call]

| Feeder ID | TBD-201 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.202 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 202.

FieldValue [post-call]

| Feeder ID | TBD-202 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.203 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 203.

FieldValue [post-call]

| Feeder ID | TBD-203 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.204 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 204.

FieldValue [post-call]

| Feeder ID | TBD-204 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.205 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 205.

FieldValue [post-call]

| Feeder ID | TBD-205 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.206 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 206.

FieldValue [post-call]

| Feeder ID | TBD-206 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.207 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 207.

FieldValue [post-call]

| Feeder ID | TBD-207 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.208 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 208.

FieldValue [post-call]

| Feeder ID | TBD-208 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.209 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 209.

FieldValue [post-call]

| Feeder ID | TBD-209 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.210 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 210.

FieldValue [post-call]

| Feeder ID | TBD-210 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.211 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 211.

FieldValue [post-call]

| Feeder ID | TBD-211 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.212 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 212.

FieldValue [post-call]

| Feeder ID | TBD-212 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.213 — Field note (42-ue-press-tools)

Cross-check TANGEDCO tariff order before calls. Process: stamping press line morning MD and hydraulic idle loads. Post-discovery notes line 213.

FieldValue [post-call]

| Feeder ID | TBD-213 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |