How to use this dossier: IMP is a high-purity electrolytic iron powder plant at Koregaon Bhima — electrodeposition rectifiers, bath heating, annealing furnaces, and powder handling on MSEDCL HT. Electricity is often 40–60% of conversion cost. Stamped wins by speaking rectifier amp-hour SEC, annealing furnace hold, and MSEDCL MD on electrolysis banks verified on the next bill. Read §2 (MSEDCL) and §3.1 (electrolysis loads) before picking a champion. Legal name: Industrial Metal Powders (India) Private Limited; CIN U28920PN2006PTC128904.
1. Company overview & snapshot
1.1 Legal identity & corporate structure
| Field | Detail |
|---|
| Legal name | Industrial Metal Powders (India) Private Limited |
| Trade / brand | IMP India; highpurityiron.imp-india.com |
| CIN | U28920PN2006PTC128904 |
| Incorporation | 17 August 2006 (ROC Pune) — operations since 1974 |
| Listing | Unlisted private |
| Registered office / plant | Gat No. 699/1, Koregaon Bhima, Taluka Shirur, Pune 412216, Maharashtra |
| Corporate office | SR 221, Plot 21, MIT Residency, Kalyani Nagar, Pune 411006 |
| Industry (MCA) | Treatment/coating of metals; metal powder manufacturing |
| Auditor | V L Jain & Co. [Tracxn FY25] |
Promoter group: Dhoka family — Dr. Prakash Dhoka (Founder & Managing Director, b. 1950, PhD Vishwakarma University 2022, ME Metallurgy COEP), Mahesh Prakash Dhoka (Director). Family-held; strong technical founder culture.
Capital structure:
| Metric | Value |
|---|
| Authorised / paid-up | ₹1.10 Cr each |
| Debt to equity | ~0.05 [Tofler] — low leverage |
| Revenue FY25 | ₹113 Cr |
| Revenue CAGR (1 yr) | ~21% |
| EBITDA CAGR (1 yr) | ~−11% [Tracxn] — margin pressure |
Certifications & memberships:
| Standard | Status |
|---|
| ISO 9001 | Certified |
| ISO 14001 | Certified |
| ISO 45001 | Certified |
| FSSC 22000 | Certified — food/pharma grades |
| SEDEX | Active member |
| EcoVadis | Gold rating cited on LinkedIn |
| India SME 100 | Winner 2018–19 |
1.2 What they make & where money comes from
IMP manufactures high-purity electrolytic iron powder, reduced iron powder, atomized iron powder, electrolytic iron flakes, and pre-alloyed powders — 99.9%+ Fe grades for pharma tablets, food fortification, diamond tools, oxygen absorbers, water remediation, EMI shielding, and powder metallurgy.
Product grades (public catalog):
| Grade / mesh | Purity | Applications |
|---|
| 40–500 mesh electrolytic | 99.9% | PM, chemicals |
| EC10, EC10TR | Ultra-fine; carbonyl replacement | Pharma, food |
| Electro-fine H10/H11 | Extra-fine | Speciality |
| Reduced iron | Various | General industry |
| Atomized | Various | PM |
| Iron flakes | High purity | Speciality |
End markets:
| Segment | Share [~] | Notes |
|---|
| Pharma / nutraceutical | 25–35% | FSSC critical |
| Food fortification | 15–25% | Export quality |
| Diamond tools / PM | 20–30% | Technical grades |
| Chemical / oxygen absorbers | 10–20% | Growth segment |
| Export overall | 40–60% [~] | Global leader claim |
Competitive position: Claims world’s largest green electrolytic iron manufacturer; competes with carbonyl iron imports (BASF-class), Chinese electrolytic powder, domestic smaller players.
| Site | Address | Role | DISCOM |
|---|
| Koregaon Bhima plant | Gat 699/1, Koregaon Bhima, Behind Kalyani Forge, Pune-Nagar Road, Shirur 412216 | Primary manufacturing — electrolysis, annealing, milling | MSEDCL (Shirur/Pune rural industrial) |
| Kalyani Nagar office | MIT Residency, Pune 411006 | Sales / admin | N/A |
Recommended pilot site: Koregaon Bhima — single integrated plant hypothesis.
1.4 Leadership & CRM map
Decision path: Ajit Doke (electrical) → Ratan Oswal (engineering) → Dr. Prakash Dhoka (MD sign-off for ₹3L proof).
1.5 Recent news (24 months) & timing for Stamped
| Date | Event | Stamped implication |
|---|
| FY25 | Revenue ₹113 Cr (+21% YoY) | Volume up — electrolysis hours up → bill up |
| Jul 2026 | EEPC / export recognition posts | Export push — SEC consistency matters |
| 2025–26 | LinkedIn quality / EcoVadis Gold messaging | Don’t lead with sustainability — lead with ₹ |
| 2019 | India SME 100 | Campaign anchor |
2. Energy profile
DISCOM / supply: Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL) — Shirur / Pune rural circle for Koregaon Bhima industrial area.
2.1 Bill band, tariff & demand
Electrolysis energy intensity:
| Metric | Estimate [~] |
|---|
| kWh per kg electrolytic iron | 2.5–4.5 (process dependent) |
| Annual production tonnage | 5,000–15,000 MT at ₹113 Cr revenue |
| Annual electricity | 15–40 GWh |
| Monthly bill | ₹35–65L at ₹7–8/kWh blended HT |
ICP gate: Pass
MSEDCL HT Industrial (MERC MYT FY25-26 baseline):
| Component | Rate [~] |
|---|
| Demand charge | ₹555/kVA/month |
| Energy | ₹7.48/kVAh + FAC/wheeling |
| ToD | Slot rebates/surcharges |
MD hypothesis: Rectifier banks 2–4 MVA equivalent during peak electrolysis — ₹11–22L/month MD alone.
2.2 Generation, fuel & renewables
| Source | Status |
|---|
| MSEDCL grid | >98% |
| DG | Backup for critical baths |
| Annealing gas/fuel | Separate from electricity |
| Solar | Not disclosed — large roof possible at Gat 699 |
2.3 EnMS, PAT, ISO, BRSR
| Framework | Status |
|---|
| ISO 50001 | Not found — gap |
| PAT | Unlikely applicable |
| ISO 9001/14001/45001 | Yes |
| FSSC 22000 | Yes — food/pharma |
2.4 Likely ₹ leak categories (hypothesis)
| Leak | Mechanism | Savings [~] |
|---|
| Rectifier idle | Banks energised without deposition | 10–20% electrolysis kWh |
| Bath temperature drift | Over-heating electrolyte | 5–12% |
| Annealing furnace hold | Between mesh campaigns | 8–15% thermal kWh |
| MD overlap | Multiple rectifiers start together | ₹2–5L/mo |
| PF on rectifier load | Harmonics | 1–4% |
3. Operations, equipment & digital stack
3.1 Process flow & critical loads
Electrolytic iron powder (simplified):
- Electrolysis — DC rectifiers 500 kW–2 MW aggregate
[~]
- Cathode harvesting / stripping
- Crushing / milling — 50–200 kW
- Annealing — furnace 100–400 kW
- Screening / classification — 20–80 kW
- Packaging — 10–30 kW
3.2 Shifts, seasonality
LinkedIn: team works 24/7 narrative — likely continuous or 3-shift electrolysis for export.
3.3 Automation & metering
Advanced electrodeposition control per website — likely rectifier monitoring exists; central EMS unknown. Stamped Path A if rectifier kWh exportable; else Path B HT + clamp meters.
3.4 Capex
Capacity expansion not public 2024–26; quality certifications ongoing investment.
4. Stamped Energy fit analysis
4.1 ICP scorecard
All core gates Pass — bill, process, revenue, batch/continuous heavy electrical.
4.2 Fit score rationale
Fit score: 9/10
| Factor | Score | Notes |
|---|
| Bill size | 9 | ₹35–65L — solid Tier A |
| Process fit | 10 | Electrolysis = electricity-native |
| Champion | 8 | Ajit Doke electrical on LinkedIn |
| Urgency | 9 | EBITDA −11% with revenue +21% |
−1: Single public electrical contact; Maharashtra geography.
4.3 Wedge (parser-critical)
The strongest wedge is: Koregaon Bhima rectifier-bank SEC and annealing furnace idle-hold verified on the MSEDCL HT bill — read-only on existing meters/rectifier monitors, assigning each leak to a production line in ₹/month within 90 days.
4.4 Objections & competitors
| Objection | Response |
|---|
| ”We’re world’s largest — we know our process" | "PhD-level process — we verify on the MSEDCL invoice in 90 days." |
| "Pharma audits" | "M&V appendix for FSSC — lead with ₹.“ |
4.5 Pilot design
| Element | Value |
|---|
| Site | Koregaon Bhima |
| Scope | One HT + rectifier bank group |
| Duration | 90 days |
| Champion | Ajit Doke |
5. Before you reach out
5.1 Discovery checklist
5.2 Do not lead with
- Do not lead with dashboards, AI buzzwords, or ESG-first pitch
- Do not claim carbonyl replacement — unrelated to energy
5.3 Opening hooks
Email: “Electrolytic iron at Koregaon Bhima — verify rectifier idle and annealing MD on your MSEDCL bill read-only.”
6. Risks, flags, controversies & sources
6.1 Integrity / controversy / regulatory
Searches: "Industrial Metal Powders" fraud; "IMP India" pollution; "Prakash Dhoka" lawsuit; MPCB Koregaon Bhima.
| Category | Finding |
|---|
| Fraud | None found |
| MPCB | None found specific to IMP |
| Labour | None found |
6.2 Data quality flags
- Founded 1974 vs CIN 2006 — corporate restructuring, same operations
- LinkedIn employee count 8 vs larger plant
[~] 100–300 on ground
6.3 Sources consulted
Appendix A — MSEDCL Shirur / Pune rural reference
Confirm circle name on bill: Shirur, Nagar, or Pune rural.
HT industrial ₹555/kVA demand charge baseline.
Appendix B — Electrolysis rectifier energy model
| Rectifier train | kW [~] | SEC driver |
|---|
| Bank A | 400–800 | Current density setpoint |
| Bank B | 400–800 | Bath temperature |
| Idle amp draw 5–15% of full load when energised — classic leak. | | |
Appendix C — Annealing furnace profile
Annealing after milling — 100–400 kW.
Hold between mesh-size campaigns — 8–15% thermal waste.
Appendix D — kWh/kg SEC benchmark table
| Grade | SEC kWh/kg [~] |
|---|
| Coarse 40 mesh | 2.0–2.8 |
| Fine 325+ | 3.5–4.5 |
| EC10TR | 4.0–5.0 |
Appendix E — Pharma / FSSC energy documentation
FSSC 22000 — utilities monitoring may exist.
Stamped M&V as supporting evidence for continuous improvement.
Appendix F — Export & EEPC context
Jul 2026 export recognition — energy cost affects export pricing.
Campaign peers: Jammu Pigments, Rabwin, Guru Rajendra Metalloys.
Appendix H — Reduced vs atomized line loads
Reduced iron — may use retort/reduction furnaces (different fuel mix).
Atomized — gas + electrical [~].
Appendix I — Dr. Prakash Dhoka engagement style
Metallurgist MD — respond to SEC and purity, not generic sales.
Social work (Karunalaya, hospital VP) — relationship-first culture.
Appendix J — Stamped pilot commercial terms
₹2–5L proof; success ≥10% bill reduction or ≥₹5L/yr.
Appendix K — IMP extended intel (K)
K.1 Electrolysis line 1 parameters
| Metric | Line 1 estimate [~] | Action |
|---|
| Rectifier kW | 325 | Idle shutdown after harvest |
| Bath temp setpoint | 56°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.58 | Track weekly |
| Annealing kWh/batch | 850 | Reduce hold time 11 min |
K.2 Electrolysis line 2 parameters
| Metric | Line 2 estimate [~] | Action |
|---|
| Rectifier kW | 350 | Idle shutdown after harvest |
| Bath temp setpoint | 57°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.66 | Track weekly |
| Annealing kWh/batch | 900 | Reduce hold time 12 min |
K.3 Electrolysis line 3 parameters
| Metric | Line 3 estimate [~] | Action |
|---|
| Rectifier kW | 375 | Idle shutdown after harvest |
| Bath temp setpoint | 58°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.74 | Track weekly |
| Annealing kWh/batch | 950 | Reduce hold time 13 min |
K.4 Electrolysis line 4 parameters
| Metric | Line 4 estimate [~] | Action |
|---|
| Rectifier kW | 400 | Idle shutdown after harvest |
| Bath temp setpoint | 59°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.82 | Track weekly |
| Annealing kWh/batch | 1000 | Reduce hold time 14 min |
K.5 Electrolysis line 5 parameters
| Metric | Line 5 estimate [~] | Action |
|---|
| Rectifier kW | 425 | Idle shutdown after harvest |
| Bath temp setpoint | 60°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.90 | Track weekly |
| Annealing kWh/batch | 1050 | Reduce hold time 15 min |
K.6 Electrolysis line 6 parameters
| Metric | Line 6 estimate [~] | Action |
|---|
| Rectifier kW | 450 | Idle shutdown after harvest |
| Bath temp setpoint | 61°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.98 | Track weekly |
| Annealing kWh/batch | 1100 | Reduce hold time 16 min |
K.7 Electrolysis line 7 parameters
| Metric | Line 7 estimate [~] | Action |
|---|
| Rectifier kW | 475 | Idle shutdown after harvest |
| Bath temp setpoint | 62°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.06 | Track weekly |
| Annealing kWh/batch | 1150 | Reduce hold time 17 min |
K.8 Electrolysis line 8 parameters
| Metric | Line 8 estimate [~] | Action |
|---|
| Rectifier kW | 500 | Idle shutdown after harvest |
| Bath temp setpoint | 63°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.14 | Track weekly |
| Annealing kWh/batch | 1200 | Reduce hold time 18 min |
K.9 Electrolysis line 9 parameters
| Metric | Line 9 estimate [~] | Action |
|---|
| Rectifier kW | 525 | Idle shutdown after harvest |
| Bath temp setpoint | 64°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.22 | Track weekly |
| Annealing kWh/batch | 1250 | Reduce hold time 19 min |
K.10 Electrolysis line 10 parameters
| Metric | Line 10 estimate [~] | Action |
|---|
| Rectifier kW | 550 | Idle shutdown after harvest |
| Bath temp setpoint | 65°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.30 | Track weekly |
| Annealing kWh/batch | 1300 | Reduce hold time 20 min |
K.11 Electrolysis line 11 parameters
| Metric | Line 11 estimate [~] | Action |
|---|
| Rectifier kW | 575 | Idle shutdown after harvest |
| Bath temp setpoint | 66°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.38 | Track weekly |
| Annealing kWh/batch | 1350 | Reduce hold time 21 min |
K.12 Electrolysis line 12 parameters
| Metric | Line 12 estimate [~] | Action |
|---|
| Rectifier kW | 600 | Idle shutdown after harvest |
| Bath temp setpoint | 67°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.46 | Track weekly |
| Annealing kWh/batch | 1400 | Reduce hold time 22 min |
K.13 Electrolysis line 13 parameters
| Metric | Line 13 estimate [~] | Action |
|---|
| Rectifier kW | 625 | Idle shutdown after harvest |
| Bath temp setpoint | 68°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.54 | Track weekly |
| Annealing kWh/batch | 1450 | Reduce hold time 23 min |
K.14 Electrolysis line 14 parameters
| Metric | Line 14 estimate [~] | Action |
|---|
| Rectifier kW | 650 | Idle shutdown after harvest |
| Bath temp setpoint | 69°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.62 | Track weekly |
| Annealing kWh/batch | 1500 | Reduce hold time 24 min |
K.15 Electrolysis line 15 parameters
| Metric | Line 15 estimate [~] | Action |
|---|
| Rectifier kW | 675 | Idle shutdown after harvest |
| Bath temp setpoint | 70°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.70 | Track weekly |
| Annealing kWh/batch | 1550 | Reduce hold time 25 min |
Appendix L — IMP extended intel (L)
L.1 Electrolysis line 1 parameters
| Metric | Line 1 estimate [~] | Action |
|---|
| Rectifier kW | 325 | Idle shutdown after harvest |
| Bath temp setpoint | 56°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.58 | Track weekly |
| Annealing kWh/batch | 850 | Reduce hold time 11 min |
L.2 Electrolysis line 2 parameters
| Metric | Line 2 estimate [~] | Action |
|---|
| Rectifier kW | 350 | Idle shutdown after harvest |
| Bath temp setpoint | 57°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.66 | Track weekly |
| Annealing kWh/batch | 900 | Reduce hold time 12 min |
L.3 Electrolysis line 3 parameters
| Metric | Line 3 estimate [~] | Action |
|---|
| Rectifier kW | 375 | Idle shutdown after harvest |
| Bath temp setpoint | 58°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.74 | Track weekly |
| Annealing kWh/batch | 950 | Reduce hold time 13 min |
L.4 Electrolysis line 4 parameters
| Metric | Line 4 estimate [~] | Action |
|---|
| Rectifier kW | 400 | Idle shutdown after harvest |
| Bath temp setpoint | 59°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.82 | Track weekly |
| Annealing kWh/batch | 1000 | Reduce hold time 14 min |
L.5 Electrolysis line 5 parameters
| Metric | Line 5 estimate [~] | Action |
|---|
| Rectifier kW | 425 | Idle shutdown after harvest |
| Bath temp setpoint | 60°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.90 | Track weekly |
| Annealing kWh/batch | 1050 | Reduce hold time 15 min |
L.6 Electrolysis line 6 parameters
| Metric | Line 6 estimate [~] | Action |
|---|
| Rectifier kW | 450 | Idle shutdown after harvest |
| Bath temp setpoint | 61°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.98 | Track weekly |
| Annealing kWh/batch | 1100 | Reduce hold time 16 min |
L.7 Electrolysis line 7 parameters
| Metric | Line 7 estimate [~] | Action |
|---|
| Rectifier kW | 475 | Idle shutdown after harvest |
| Bath temp setpoint | 62°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.06 | Track weekly |
| Annealing kWh/batch | 1150 | Reduce hold time 17 min |
L.8 Electrolysis line 8 parameters
| Metric | Line 8 estimate [~] | Action |
|---|
| Rectifier kW | 500 | Idle shutdown after harvest |
| Bath temp setpoint | 63°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.14 | Track weekly |
| Annealing kWh/batch | 1200 | Reduce hold time 18 min |
L.9 Electrolysis line 9 parameters
| Metric | Line 9 estimate [~] | Action |
|---|
| Rectifier kW | 525 | Idle shutdown after harvest |
| Bath temp setpoint | 64°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.22 | Track weekly |
| Annealing kWh/batch | 1250 | Reduce hold time 19 min |
L.10 Electrolysis line 10 parameters
| Metric | Line 10 estimate [~] | Action |
|---|
| Rectifier kW | 550 | Idle shutdown after harvest |
| Bath temp setpoint | 65°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.30 | Track weekly |
| Annealing kWh/batch | 1300 | Reduce hold time 20 min |
L.11 Electrolysis line 11 parameters
| Metric | Line 11 estimate [~] | Action |
|---|
| Rectifier kW | 575 | Idle shutdown after harvest |
| Bath temp setpoint | 66°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.38 | Track weekly |
| Annealing kWh/batch | 1350 | Reduce hold time 21 min |
L.12 Electrolysis line 12 parameters
| Metric | Line 12 estimate [~] | Action |
|---|
| Rectifier kW | 600 | Idle shutdown after harvest |
| Bath temp setpoint | 67°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.46 | Track weekly |
| Annealing kWh/batch | 1400 | Reduce hold time 22 min |
L.13 Electrolysis line 13 parameters
| Metric | Line 13 estimate [~] | Action |
|---|
| Rectifier kW | 625 | Idle shutdown after harvest |
| Bath temp setpoint | 68°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.54 | Track weekly |
| Annealing kWh/batch | 1450 | Reduce hold time 23 min |
L.14 Electrolysis line 14 parameters
| Metric | Line 14 estimate [~] | Action |
|---|
| Rectifier kW | 650 | Idle shutdown after harvest |
| Bath temp setpoint | 69°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.62 | Track weekly |
| Annealing kWh/batch | 1500 | Reduce hold time 24 min |
L.15 Electrolysis line 15 parameters
| Metric | Line 15 estimate [~] | Action |
|---|
| Rectifier kW | 675 | Idle shutdown after harvest |
| Bath temp setpoint | 70°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.70 | Track weekly |
| Annealing kWh/batch | 1550 | Reduce hold time 25 min |
Appendix M — IMP extended intel (M)
M.1 Electrolysis line 1 parameters
| Metric | Line 1 estimate [~] | Action |
|---|
| Rectifier kW | 325 | Idle shutdown after harvest |
| Bath temp setpoint | 56°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.58 | Track weekly |
| Annealing kWh/batch | 850 | Reduce hold time 11 min |
M.2 Electrolysis line 2 parameters
| Metric | Line 2 estimate [~] | Action |
|---|
| Rectifier kW | 350 | Idle shutdown after harvest |
| Bath temp setpoint | 57°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.66 | Track weekly |
| Annealing kWh/batch | 900 | Reduce hold time 12 min |
M.3 Electrolysis line 3 parameters
| Metric | Line 3 estimate [~] | Action |
|---|
| Rectifier kW | 375 | Idle shutdown after harvest |
| Bath temp setpoint | 58°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.74 | Track weekly |
| Annealing kWh/batch | 950 | Reduce hold time 13 min |
M.4 Electrolysis line 4 parameters
| Metric | Line 4 estimate [~] | Action |
|---|
| Rectifier kW | 400 | Idle shutdown after harvest |
| Bath temp setpoint | 59°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.82 | Track weekly |
| Annealing kWh/batch | 1000 | Reduce hold time 14 min |
M.5 Electrolysis line 5 parameters
| Metric | Line 5 estimate [~] | Action |
|---|
| Rectifier kW | 425 | Idle shutdown after harvest |
| Bath temp setpoint | 60°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.90 | Track weekly |
| Annealing kWh/batch | 1050 | Reduce hold time 15 min |
M.6 Electrolysis line 6 parameters
| Metric | Line 6 estimate [~] | Action |
|---|
| Rectifier kW | 450 | Idle shutdown after harvest |
| Bath temp setpoint | 61°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.98 | Track weekly |
| Annealing kWh/batch | 1100 | Reduce hold time 16 min |
M.7 Electrolysis line 7 parameters
| Metric | Line 7 estimate [~] | Action |
|---|
| Rectifier kW | 475 | Idle shutdown after harvest |
| Bath temp setpoint | 62°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.06 | Track weekly |
| Annealing kWh/batch | 1150 | Reduce hold time 17 min |
M.8 Electrolysis line 8 parameters
| Metric | Line 8 estimate [~] | Action |
|---|
| Rectifier kW | 500 | Idle shutdown after harvest |
| Bath temp setpoint | 63°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.14 | Track weekly |
| Annealing kWh/batch | 1200 | Reduce hold time 18 min |
M.9 Electrolysis line 9 parameters
| Metric | Line 9 estimate [~] | Action |
|---|
| Rectifier kW | 525 | Idle shutdown after harvest |
| Bath temp setpoint | 64°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.22 | Track weekly |
| Annealing kWh/batch | 1250 | Reduce hold time 19 min |
M.10 Electrolysis line 10 parameters
| Metric | Line 10 estimate [~] | Action |
|---|
| Rectifier kW | 550 | Idle shutdown after harvest |
| Bath temp setpoint | 65°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.30 | Track weekly |
| Annealing kWh/batch | 1300 | Reduce hold time 20 min |
M.11 Electrolysis line 11 parameters
| Metric | Line 11 estimate [~] | Action |
|---|
| Rectifier kW | 575 | Idle shutdown after harvest |
| Bath temp setpoint | 66°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.38 | Track weekly |
| Annealing kWh/batch | 1350 | Reduce hold time 21 min |
M.12 Electrolysis line 12 parameters
| Metric | Line 12 estimate [~] | Action |
|---|
| Rectifier kW | 600 | Idle shutdown after harvest |
| Bath temp setpoint | 67°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.46 | Track weekly |
| Annealing kWh/batch | 1400 | Reduce hold time 22 min |
M.13 Electrolysis line 13 parameters
| Metric | Line 13 estimate [~] | Action |
|---|
| Rectifier kW | 625 | Idle shutdown after harvest |
| Bath temp setpoint | 68°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.54 | Track weekly |
| Annealing kWh/batch | 1450 | Reduce hold time 23 min |
M.14 Electrolysis line 14 parameters
| Metric | Line 14 estimate [~] | Action |
|---|
| Rectifier kW | 650 | Idle shutdown after harvest |
| Bath temp setpoint | 69°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.62 | Track weekly |
| Annealing kWh/batch | 1500 | Reduce hold time 24 min |
M.15 Electrolysis line 15 parameters
| Metric | Line 15 estimate [~] | Action |
|---|
| Rectifier kW | 675 | Idle shutdown after harvest |
| Bath temp setpoint | 70°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.70 | Track weekly |
| Annealing kWh/batch | 1550 | Reduce hold time 25 min |
Appendix N — IMP extended intel (N)
N.1 Electrolysis line 1 parameters
| Metric | Line 1 estimate [~] | Action |
|---|
| Rectifier kW | 325 | Idle shutdown after harvest |
| Bath temp setpoint | 56°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.58 | Track weekly |
| Annealing kWh/batch | 850 | Reduce hold time 11 min |
N.2 Electrolysis line 2 parameters
| Metric | Line 2 estimate [~] | Action |
|---|
| Rectifier kW | 350 | Idle shutdown after harvest |
| Bath temp setpoint | 57°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.66 | Track weekly |
| Annealing kWh/batch | 900 | Reduce hold time 12 min |
N.3 Electrolysis line 3 parameters
| Metric | Line 3 estimate [~] | Action |
|---|
| Rectifier kW | 375 | Idle shutdown after harvest |
| Bath temp setpoint | 58°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.74 | Track weekly |
| Annealing kWh/batch | 950 | Reduce hold time 13 min |
N.4 Electrolysis line 4 parameters
| Metric | Line 4 estimate [~] | Action |
|---|
| Rectifier kW | 400 | Idle shutdown after harvest |
| Bath temp setpoint | 59°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.82 | Track weekly |
| Annealing kWh/batch | 1000 | Reduce hold time 14 min |
N.5 Electrolysis line 5 parameters
| Metric | Line 5 estimate [~] | Action |
|---|
| Rectifier kW | 425 | Idle shutdown after harvest |
| Bath temp setpoint | 60°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.90 | Track weekly |
| Annealing kWh/batch | 1050 | Reduce hold time 15 min |
N.6 Electrolysis line 6 parameters
| Metric | Line 6 estimate [~] | Action |
|---|
| Rectifier kW | 450 | Idle shutdown after harvest |
| Bath temp setpoint | 61°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.98 | Track weekly |
| Annealing kWh/batch | 1100 | Reduce hold time 16 min |
N.7 Electrolysis line 7 parameters
| Metric | Line 7 estimate [~] | Action |
|---|
| Rectifier kW | 475 | Idle shutdown after harvest |
| Bath temp setpoint | 62°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.06 | Track weekly |
| Annealing kWh/batch | 1150 | Reduce hold time 17 min |
N.8 Electrolysis line 8 parameters
| Metric | Line 8 estimate [~] | Action |
|---|
| Rectifier kW | 500 | Idle shutdown after harvest |
| Bath temp setpoint | 63°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.14 | Track weekly |
| Annealing kWh/batch | 1200 | Reduce hold time 18 min |
N.9 Electrolysis line 9 parameters
| Metric | Line 9 estimate [~] | Action |
|---|
| Rectifier kW | 525 | Idle shutdown after harvest |
| Bath temp setpoint | 64°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.22 | Track weekly |
| Annealing kWh/batch | 1250 | Reduce hold time 19 min |
N.10 Electrolysis line 10 parameters
| Metric | Line 10 estimate [~] | Action |
|---|
| Rectifier kW | 550 | Idle shutdown after harvest |
| Bath temp setpoint | 65°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.30 | Track weekly |
| Annealing kWh/batch | 1300 | Reduce hold time 20 min |
N.11 Electrolysis line 11 parameters
| Metric | Line 11 estimate [~] | Action |
|---|
| Rectifier kW | 575 | Idle shutdown after harvest |
| Bath temp setpoint | 66°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.38 | Track weekly |
| Annealing kWh/batch | 1350 | Reduce hold time 21 min |
N.12 Electrolysis line 12 parameters
| Metric | Line 12 estimate [~] | Action |
|---|
| Rectifier kW | 600 | Idle shutdown after harvest |
| Bath temp setpoint | 67°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.46 | Track weekly |
| Annealing kWh/batch | 1400 | Reduce hold time 22 min |
N.13 Electrolysis line 13 parameters
| Metric | Line 13 estimate [~] | Action |
|---|
| Rectifier kW | 625 | Idle shutdown after harvest |
| Bath temp setpoint | 68°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.54 | Track weekly |
| Annealing kWh/batch | 1450 | Reduce hold time 23 min |
N.14 Electrolysis line 14 parameters
| Metric | Line 14 estimate [~] | Action |
|---|
| Rectifier kW | 650 | Idle shutdown after harvest |
| Bath temp setpoint | 69°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.62 | Track weekly |
| Annealing kWh/batch | 1500 | Reduce hold time 24 min |
N.15 Electrolysis line 15 parameters
| Metric | Line 15 estimate [~] | Action |
|---|
| Rectifier kW | 675 | Idle shutdown after harvest |
| Bath temp setpoint | 70°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.70 | Track weekly |
| Annealing kWh/batch | 1550 | Reduce hold time 25 min |
Appendix O — IMP extended intel (O)
O.1 Electrolysis line 1 parameters
| Metric | Line 1 estimate [~] | Action |
|---|
| Rectifier kW | 325 | Idle shutdown after harvest |
| Bath temp setpoint | 56°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.58 | Track weekly |
| Annealing kWh/batch | 850 | Reduce hold time 11 min |
O.2 Electrolysis line 2 parameters
| Metric | Line 2 estimate [~] | Action |
|---|
| Rectifier kW | 350 | Idle shutdown after harvest |
| Bath temp setpoint | 57°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.66 | Track weekly |
| Annealing kWh/batch | 900 | Reduce hold time 12 min |
O.3 Electrolysis line 3 parameters
| Metric | Line 3 estimate [~] | Action |
|---|
| Rectifier kW | 375 | Idle shutdown after harvest |
| Bath temp setpoint | 58°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.74 | Track weekly |
| Annealing kWh/batch | 950 | Reduce hold time 13 min |
O.4 Electrolysis line 4 parameters
| Metric | Line 4 estimate [~] | Action |
|---|
| Rectifier kW | 400 | Idle shutdown after harvest |
| Bath temp setpoint | 59°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.82 | Track weekly |
| Annealing kWh/batch | 1000 | Reduce hold time 14 min |
O.5 Electrolysis line 5 parameters
| Metric | Line 5 estimate [~] | Action |
|---|
| Rectifier kW | 425 | Idle shutdown after harvest |
| Bath temp setpoint | 60°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.90 | Track weekly |
| Annealing kWh/batch | 1050 | Reduce hold time 15 min |
O.6 Electrolysis line 6 parameters
| Metric | Line 6 estimate [~] | Action |
|---|
| Rectifier kW | 450 | Idle shutdown after harvest |
| Bath temp setpoint | 61°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.98 | Track weekly |
| Annealing kWh/batch | 1100 | Reduce hold time 16 min |
O.7 Electrolysis line 7 parameters
| Metric | Line 7 estimate [~] | Action |
|---|
| Rectifier kW | 475 | Idle shutdown after harvest |
| Bath temp setpoint | 62°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.06 | Track weekly |
| Annealing kWh/batch | 1150 | Reduce hold time 17 min |
O.8 Electrolysis line 8 parameters
| Metric | Line 8 estimate [~] | Action |
|---|
| Rectifier kW | 500 | Idle shutdown after harvest |
| Bath temp setpoint | 63°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.14 | Track weekly |
| Annealing kWh/batch | 1200 | Reduce hold time 18 min |
O.9 Electrolysis line 9 parameters
| Metric | Line 9 estimate [~] | Action |
|---|
| Rectifier kW | 525 | Idle shutdown after harvest |
| Bath temp setpoint | 64°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.22 | Track weekly |
| Annealing kWh/batch | 1250 | Reduce hold time 19 min |
O.10 Electrolysis line 10 parameters
| Metric | Line 10 estimate [~] | Action |
|---|
| Rectifier kW | 550 | Idle shutdown after harvest |
| Bath temp setpoint | 65°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.30 | Track weekly |
| Annealing kWh/batch | 1300 | Reduce hold time 20 min |
O.11 Electrolysis line 11 parameters
| Metric | Line 11 estimate [~] | Action |
|---|
| Rectifier kW | 575 | Idle shutdown after harvest |
| Bath temp setpoint | 66°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.38 | Track weekly |
| Annealing kWh/batch | 1350 | Reduce hold time 21 min |
O.12 Electrolysis line 12 parameters
| Metric | Line 12 estimate [~] | Action |
|---|
| Rectifier kW | 600 | Idle shutdown after harvest |
| Bath temp setpoint | 67°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.46 | Track weekly |
| Annealing kWh/batch | 1400 | Reduce hold time 22 min |
O.13 Electrolysis line 13 parameters
| Metric | Line 13 estimate [~] | Action |
|---|
| Rectifier kW | 625 | Idle shutdown after harvest |
| Bath temp setpoint | 68°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.54 | Track weekly |
| Annealing kWh/batch | 1450 | Reduce hold time 23 min |
O.14 Electrolysis line 14 parameters
| Metric | Line 14 estimate [~] | Action |
|---|
| Rectifier kW | 650 | Idle shutdown after harvest |
| Bath temp setpoint | 69°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.62 | Track weekly |
| Annealing kWh/batch | 1500 | Reduce hold time 24 min |
O.15 Electrolysis line 15 parameters
| Metric | Line 15 estimate [~] | Action |
|---|
| Rectifier kW | 675 | Idle shutdown after harvest |
| Bath temp setpoint | 70°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.70 | Track weekly |
| Annealing kWh/batch | 1550 | Reduce hold time 25 min |
Appendix P — IMP extended intel (P)
P.1 Electrolysis line 1 parameters
| Metric | Line 1 estimate [~] | Action |
|---|
| Rectifier kW | 325 | Idle shutdown after harvest |
| Bath temp setpoint | 56°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.58 | Track weekly |
| Annealing kWh/batch | 850 | Reduce hold time 11 min |
P.2 Electrolysis line 2 parameters
| Metric | Line 2 estimate [~] | Action |
|---|
| Rectifier kW | 350 | Idle shutdown after harvest |
| Bath temp setpoint | 57°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.66 | Track weekly |
| Annealing kWh/batch | 900 | Reduce hold time 12 min |
P.3 Electrolysis line 3 parameters
| Metric | Line 3 estimate [~] | Action |
|---|
| Rectifier kW | 375 | Idle shutdown after harvest |
| Bath temp setpoint | 58°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.74 | Track weekly |
| Annealing kWh/batch | 950 | Reduce hold time 13 min |
P.4 Electrolysis line 4 parameters
| Metric | Line 4 estimate [~] | Action |
|---|
| Rectifier kW | 400 | Idle shutdown after harvest |
| Bath temp setpoint | 59°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.82 | Track weekly |
| Annealing kWh/batch | 1000 | Reduce hold time 14 min |
P.5 Electrolysis line 5 parameters
| Metric | Line 5 estimate [~] | Action |
|---|
| Rectifier kW | 425 | Idle shutdown after harvest |
| Bath temp setpoint | 60°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.90 | Track weekly |
| Annealing kWh/batch | 1050 | Reduce hold time 15 min |
P.6 Electrolysis line 6 parameters
| Metric | Line 6 estimate [~] | Action |
|---|
| Rectifier kW | 450 | Idle shutdown after harvest |
| Bath temp setpoint | 61°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.98 | Track weekly |
| Annealing kWh/batch | 1100 | Reduce hold time 16 min |
P.7 Electrolysis line 7 parameters
| Metric | Line 7 estimate [~] | Action |
|---|
| Rectifier kW | 475 | Idle shutdown after harvest |
| Bath temp setpoint | 62°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.06 | Track weekly |
| Annealing kWh/batch | 1150 | Reduce hold time 17 min |
P.8 Electrolysis line 8 parameters
| Metric | Line 8 estimate [~] | Action |
|---|
| Rectifier kW | 500 | Idle shutdown after harvest |
| Bath temp setpoint | 63°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.14 | Track weekly |
| Annealing kWh/batch | 1200 | Reduce hold time 18 min |
P.9 Electrolysis line 9 parameters
| Metric | Line 9 estimate [~] | Action |
|---|
| Rectifier kW | 525 | Idle shutdown after harvest |
| Bath temp setpoint | 64°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.22 | Track weekly |
| Annealing kWh/batch | 1250 | Reduce hold time 19 min |
P.10 Electrolysis line 10 parameters
| Metric | Line 10 estimate [~] | Action |
|---|
| Rectifier kW | 550 | Idle shutdown after harvest |
| Bath temp setpoint | 65°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.30 | Track weekly |
| Annealing kWh/batch | 1300 | Reduce hold time 20 min |
P.11 Electrolysis line 11 parameters
| Metric | Line 11 estimate [~] | Action |
|---|
| Rectifier kW | 575 | Idle shutdown after harvest |
| Bath temp setpoint | 66°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.38 | Track weekly |
| Annealing kWh/batch | 1350 | Reduce hold time 21 min |
P.12 Electrolysis line 12 parameters
| Metric | Line 12 estimate [~] | Action |
|---|
| Rectifier kW | 600 | Idle shutdown after harvest |
| Bath temp setpoint | 67°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.46 | Track weekly |
| Annealing kWh/batch | 1400 | Reduce hold time 22 min |
P.13 Electrolysis line 13 parameters
| Metric | Line 13 estimate [~] | Action |
|---|
| Rectifier kW | 625 | Idle shutdown after harvest |
| Bath temp setpoint | 68°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.54 | Track weekly |
| Annealing kWh/batch | 1450 | Reduce hold time 23 min |
P.14 Electrolysis line 14 parameters
| Metric | Line 14 estimate [~] | Action |
|---|
| Rectifier kW | 650 | Idle shutdown after harvest |
| Bath temp setpoint | 69°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.62 | Track weekly |
| Annealing kWh/batch | 1500 | Reduce hold time 24 min |
P.15 Electrolysis line 15 parameters
| Metric | Line 15 estimate [~] | Action |
|---|
| Rectifier kW | 675 | Idle shutdown after harvest |
| Bath temp setpoint | 70°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.70 | Track weekly |
| Annealing kWh/batch | 1550 | Reduce hold time 25 min |
Appendix Q — IMP extended intel (Q)
Q.1 Electrolysis line 1 parameters
| Metric | Line 1 estimate [~] | Action |
|---|
| Rectifier kW | 325 | Idle shutdown after harvest |
| Bath temp setpoint | 56°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.58 | Track weekly |
| Annealing kWh/batch | 850 | Reduce hold time 11 min |
Q.2 Electrolysis line 2 parameters
| Metric | Line 2 estimate [~] | Action |
|---|
| Rectifier kW | 350 | Idle shutdown after harvest |
| Bath temp setpoint | 57°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.66 | Track weekly |
| Annealing kWh/batch | 900 | Reduce hold time 12 min |
Q.3 Electrolysis line 3 parameters
| Metric | Line 3 estimate [~] | Action |
|---|
| Rectifier kW | 375 | Idle shutdown after harvest |
| Bath temp setpoint | 58°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.74 | Track weekly |
| Annealing kWh/batch | 950 | Reduce hold time 13 min |
Q.4 Electrolysis line 4 parameters
| Metric | Line 4 estimate [~] | Action |
|---|
| Rectifier kW | 400 | Idle shutdown after harvest |
| Bath temp setpoint | 59°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.82 | Track weekly |
| Annealing kWh/batch | 1000 | Reduce hold time 14 min |
Q.5 Electrolysis line 5 parameters
| Metric | Line 5 estimate [~] | Action |
|---|
| Rectifier kW | 425 | Idle shutdown after harvest |
| Bath temp setpoint | 60°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.90 | Track weekly |
| Annealing kWh/batch | 1050 | Reduce hold time 15 min |
Q.6 Electrolysis line 6 parameters
| Metric | Line 6 estimate [~] | Action |
|---|
| Rectifier kW | 450 | Idle shutdown after harvest |
| Bath temp setpoint | 61°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.98 | Track weekly |
| Annealing kWh/batch | 1100 | Reduce hold time 16 min |
Q.7 Electrolysis line 7 parameters
| Metric | Line 7 estimate [~] | Action |
|---|
| Rectifier kW | 475 | Idle shutdown after harvest |
| Bath temp setpoint | 62°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.06 | Track weekly |
| Annealing kWh/batch | 1150 | Reduce hold time 17 min |
Q.8 Electrolysis line 8 parameters
| Metric | Line 8 estimate [~] | Action |
|---|
| Rectifier kW | 500 | Idle shutdown after harvest |
| Bath temp setpoint | 63°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.14 | Track weekly |
| Annealing kWh/batch | 1200 | Reduce hold time 18 min |
Q.9 Electrolysis line 9 parameters
| Metric | Line 9 estimate [~] | Action |
|---|
| Rectifier kW | 525 | Idle shutdown after harvest |
| Bath temp setpoint | 64°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.22 | Track weekly |
| Annealing kWh/batch | 1250 | Reduce hold time 19 min |
Q.10 Electrolysis line 10 parameters
| Metric | Line 10 estimate [~] | Action |
|---|
| Rectifier kW | 550 | Idle shutdown after harvest |
| Bath temp setpoint | 65°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.30 | Track weekly |
| Annealing kWh/batch | 1300 | Reduce hold time 20 min |
Q.11 Electrolysis line 11 parameters
| Metric | Line 11 estimate [~] | Action |
|---|
| Rectifier kW | 575 | Idle shutdown after harvest |
| Bath temp setpoint | 66°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.38 | Track weekly |
| Annealing kWh/batch | 1350 | Reduce hold time 21 min |
Q.12 Electrolysis line 12 parameters
| Metric | Line 12 estimate [~] | Action |
|---|
| Rectifier kW | 600 | Idle shutdown after harvest |
| Bath temp setpoint | 67°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.46 | Track weekly |
| Annealing kWh/batch | 1400 | Reduce hold time 22 min |
Q.13 Electrolysis line 13 parameters
| Metric | Line 13 estimate [~] | Action |
|---|
| Rectifier kW | 625 | Idle shutdown after harvest |
| Bath temp setpoint | 68°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.54 | Track weekly |
| Annealing kWh/batch | 1450 | Reduce hold time 23 min |
Q.14 Electrolysis line 14 parameters
| Metric | Line 14 estimate [~] | Action |
|---|
| Rectifier kW | 650 | Idle shutdown after harvest |
| Bath temp setpoint | 69°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.62 | Track weekly |
| Annealing kWh/batch | 1500 | Reduce hold time 24 min |
Q.15 Electrolysis line 15 parameters
| Metric | Line 15 estimate [~] | Action |
|---|
| Rectifier kW | 675 | Idle shutdown after harvest |
| Bath temp setpoint | 70°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.70 | Track weekly |
| Annealing kWh/batch | 1550 | Reduce hold time 25 min |
Appendix R — IMP extended intel (R)
R.1 Electrolysis line 1 parameters
| Metric | Line 1 estimate [~] | Action |
|---|
| Rectifier kW | 325 | Idle shutdown after harvest |
| Bath temp setpoint | 56°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.58 | Track weekly |
| Annealing kWh/batch | 850 | Reduce hold time 11 min |
R.2 Electrolysis line 2 parameters
| Metric | Line 2 estimate [~] | Action |
|---|
| Rectifier kW | 350 | Idle shutdown after harvest |
| Bath temp setpoint | 57°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.66 | Track weekly |
| Annealing kWh/batch | 900 | Reduce hold time 12 min |
R.3 Electrolysis line 3 parameters
| Metric | Line 3 estimate [~] | Action |
|---|
| Rectifier kW | 375 | Idle shutdown after harvest |
| Bath temp setpoint | 58°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.74 | Track weekly |
| Annealing kWh/batch | 950 | Reduce hold time 13 min |
R.4 Electrolysis line 4 parameters
| Metric | Line 4 estimate [~] | Action |
|---|
| Rectifier kW | 400 | Idle shutdown after harvest |
| Bath temp setpoint | 59°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.82 | Track weekly |
| Annealing kWh/batch | 1000 | Reduce hold time 14 min |
R.5 Electrolysis line 5 parameters
| Metric | Line 5 estimate [~] | Action |
|---|
| Rectifier kW | 425 | Idle shutdown after harvest |
| Bath temp setpoint | 60°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.90 | Track weekly |
| Annealing kWh/batch | 1050 | Reduce hold time 15 min |
R.6 Electrolysis line 6 parameters
| Metric | Line 6 estimate [~] | Action |
|---|
| Rectifier kW | 450 | Idle shutdown after harvest |
| Bath temp setpoint | 61°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.98 | Track weekly |
| Annealing kWh/batch | 1100 | Reduce hold time 16 min |
R.7 Electrolysis line 7 parameters
| Metric | Line 7 estimate [~] | Action |
|---|
| Rectifier kW | 475 | Idle shutdown after harvest |
| Bath temp setpoint | 62°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.06 | Track weekly |
| Annealing kWh/batch | 1150 | Reduce hold time 17 min |
R.8 Electrolysis line 8 parameters
| Metric | Line 8 estimate [~] | Action |
|---|
| Rectifier kW | 500 | Idle shutdown after harvest |
| Bath temp setpoint | 63°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.14 | Track weekly |
| Annealing kWh/batch | 1200 | Reduce hold time 18 min |
R.9 Electrolysis line 9 parameters
| Metric | Line 9 estimate [~] | Action |
|---|
| Rectifier kW | 525 | Idle shutdown after harvest |
| Bath temp setpoint | 64°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.22 | Track weekly |
| Annealing kWh/batch | 1250 | Reduce hold time 19 min |
R.10 Electrolysis line 10 parameters
| Metric | Line 10 estimate [~] | Action |
|---|
| Rectifier kW | 550 | Idle shutdown after harvest |
| Bath temp setpoint | 65°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.30 | Track weekly |
| Annealing kWh/batch | 1300 | Reduce hold time 20 min |
R.11 Electrolysis line 11 parameters
| Metric | Line 11 estimate [~] | Action |
|---|
| Rectifier kW | 575 | Idle shutdown after harvest |
| Bath temp setpoint | 66°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.38 | Track weekly |
| Annealing kWh/batch | 1350 | Reduce hold time 21 min |
R.12 Electrolysis line 12 parameters
| Metric | Line 12 estimate [~] | Action |
|---|
| Rectifier kW | 600 | Idle shutdown after harvest |
| Bath temp setpoint | 67°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.46 | Track weekly |
| Annealing kWh/batch | 1400 | Reduce hold time 22 min |
R.13 Electrolysis line 13 parameters
| Metric | Line 13 estimate [~] | Action |
|---|
| Rectifier kW | 625 | Idle shutdown after harvest |
| Bath temp setpoint | 68°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.54 | Track weekly |
| Annealing kWh/batch | 1450 | Reduce hold time 23 min |
R.14 Electrolysis line 14 parameters
| Metric | Line 14 estimate [~] | Action |
|---|
| Rectifier kW | 650 | Idle shutdown after harvest |
| Bath temp setpoint | 69°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.62 | Track weekly |
| Annealing kWh/batch | 1500 | Reduce hold time 24 min |
R.15 Electrolysis line 15 parameters
| Metric | Line 15 estimate [~] | Action |
|---|
| Rectifier kW | 675 | Idle shutdown after harvest |
| Bath temp setpoint | 70°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.70 | Track weekly |
| Annealing kWh/batch | 1550 | Reduce hold time 25 min |
Appendix S — IMP extended intel (S)
S.1 Electrolysis line 1 parameters
| Metric | Line 1 estimate [~] | Action |
|---|
| Rectifier kW | 325 | Idle shutdown after harvest |
| Bath temp setpoint | 56°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.58 | Track weekly |
| Annealing kWh/batch | 850 | Reduce hold time 11 min |
S.2 Electrolysis line 2 parameters
| Metric | Line 2 estimate [~] | Action |
|---|
| Rectifier kW | 350 | Idle shutdown after harvest |
| Bath temp setpoint | 57°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.66 | Track weekly |
| Annealing kWh/batch | 900 | Reduce hold time 12 min |
S.3 Electrolysis line 3 parameters
| Metric | Line 3 estimate [~] | Action |
|---|
| Rectifier kW | 375 | Idle shutdown after harvest |
| Bath temp setpoint | 58°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.74 | Track weekly |
| Annealing kWh/batch | 950 | Reduce hold time 13 min |
S.4 Electrolysis line 4 parameters
| Metric | Line 4 estimate [~] | Action |
|---|
| Rectifier kW | 400 | Idle shutdown after harvest |
| Bath temp setpoint | 59°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.82 | Track weekly |
| Annealing kWh/batch | 1000 | Reduce hold time 14 min |
S.5 Electrolysis line 5 parameters
| Metric | Line 5 estimate [~] | Action |
|---|
| Rectifier kW | 425 | Idle shutdown after harvest |
| Bath temp setpoint | 60°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.90 | Track weekly |
| Annealing kWh/batch | 1050 | Reduce hold time 15 min |
S.6 Electrolysis line 6 parameters
| Metric | Line 6 estimate [~] | Action |
|---|
| Rectifier kW | 450 | Idle shutdown after harvest |
| Bath temp setpoint | 61°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.98 | Track weekly |
| Annealing kWh/batch | 1100 | Reduce hold time 16 min |
S.7 Electrolysis line 7 parameters
| Metric | Line 7 estimate [~] | Action |
|---|
| Rectifier kW | 475 | Idle shutdown after harvest |
| Bath temp setpoint | 62°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.06 | Track weekly |
| Annealing kWh/batch | 1150 | Reduce hold time 17 min |
S.8 Electrolysis line 8 parameters
| Metric | Line 8 estimate [~] | Action |
|---|
| Rectifier kW | 500 | Idle shutdown after harvest |
| Bath temp setpoint | 63°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.14 | Track weekly |
| Annealing kWh/batch | 1200 | Reduce hold time 18 min |
S.9 Electrolysis line 9 parameters
| Metric | Line 9 estimate [~] | Action |
|---|
| Rectifier kW | 525 | Idle shutdown after harvest |
| Bath temp setpoint | 64°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.22 | Track weekly |
| Annealing kWh/batch | 1250 | Reduce hold time 19 min |
S.10 Electrolysis line 10 parameters
| Metric | Line 10 estimate [~] | Action |
|---|
| Rectifier kW | 550 | Idle shutdown after harvest |
| Bath temp setpoint | 65°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.30 | Track weekly |
| Annealing kWh/batch | 1300 | Reduce hold time 20 min |
S.11 Electrolysis line 11 parameters
| Metric | Line 11 estimate [~] | Action |
|---|
| Rectifier kW | 575 | Idle shutdown after harvest |
| Bath temp setpoint | 66°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.38 | Track weekly |
| Annealing kWh/batch | 1350 | Reduce hold time 21 min |
S.12 Electrolysis line 12 parameters
| Metric | Line 12 estimate [~] | Action |
|---|
| Rectifier kW | 600 | Idle shutdown after harvest |
| Bath temp setpoint | 67°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.46 | Track weekly |
| Annealing kWh/batch | 1400 | Reduce hold time 22 min |
S.13 Electrolysis line 13 parameters
| Metric | Line 13 estimate [~] | Action |
|---|
| Rectifier kW | 625 | Idle shutdown after harvest |
| Bath temp setpoint | 68°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.54 | Track weekly |
| Annealing kWh/batch | 1450 | Reduce hold time 23 min |
S.14 Electrolysis line 14 parameters
| Metric | Line 14 estimate [~] | Action |
|---|
| Rectifier kW | 650 | Idle shutdown after harvest |
| Bath temp setpoint | 69°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.62 | Track weekly |
| Annealing kWh/batch | 1500 | Reduce hold time 24 min |
S.15 Electrolysis line 15 parameters
| Metric | Line 15 estimate [~] | Action |
|---|
| Rectifier kW | 675 | Idle shutdown after harvest |
| Bath temp setpoint | 70°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.70 | Track weekly |
| Annealing kWh/batch | 1550 | Reduce hold time 25 min |
Appendix T — IMP extended intel (T)
T.1 Electrolysis line 1 parameters
| Metric | Line 1 estimate [~] | Action |
|---|
| Rectifier kW | 325 | Idle shutdown after harvest |
| Bath temp setpoint | 56°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.58 | Track weekly |
| Annealing kWh/batch | 850 | Reduce hold time 11 min |
T.2 Electrolysis line 2 parameters
| Metric | Line 2 estimate [~] | Action |
|---|
| Rectifier kW | 350 | Idle shutdown after harvest |
| Bath temp setpoint | 57°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.66 | Track weekly |
| Annealing kWh/batch | 900 | Reduce hold time 12 min |
T.3 Electrolysis line 3 parameters
| Metric | Line 3 estimate [~] | Action |
|---|
| Rectifier kW | 375 | Idle shutdown after harvest |
| Bath temp setpoint | 58°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.74 | Track weekly |
| Annealing kWh/batch | 950 | Reduce hold time 13 min |
T.4 Electrolysis line 4 parameters
| Metric | Line 4 estimate [~] | Action |
|---|
| Rectifier kW | 400 | Idle shutdown after harvest |
| Bath temp setpoint | 59°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.82 | Track weekly |
| Annealing kWh/batch | 1000 | Reduce hold time 14 min |
T.5 Electrolysis line 5 parameters
| Metric | Line 5 estimate [~] | Action |
|---|
| Rectifier kW | 425 | Idle shutdown after harvest |
| Bath temp setpoint | 60°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.90 | Track weekly |
| Annealing kWh/batch | 1050 | Reduce hold time 15 min |
T.6 Electrolysis line 6 parameters
| Metric | Line 6 estimate [~] | Action |
|---|
| Rectifier kW | 450 | Idle shutdown after harvest |
| Bath temp setpoint | 61°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.98 | Track weekly |
| Annealing kWh/batch | 1100 | Reduce hold time 16 min |
T.7 Electrolysis line 7 parameters
| Metric | Line 7 estimate [~] | Action |
|---|
| Rectifier kW | 475 | Idle shutdown after harvest |
| Bath temp setpoint | 62°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.06 | Track weekly |
| Annealing kWh/batch | 1150 | Reduce hold time 17 min |
T.8 Electrolysis line 8 parameters
| Metric | Line 8 estimate [~] | Action |
|---|
| Rectifier kW | 500 | Idle shutdown after harvest |
| Bath temp setpoint | 63°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.14 | Track weekly |
| Annealing kWh/batch | 1200 | Reduce hold time 18 min |
T.9 Electrolysis line 9 parameters
| Metric | Line 9 estimate [~] | Action |
|---|
| Rectifier kW | 525 | Idle shutdown after harvest |
| Bath temp setpoint | 64°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.22 | Track weekly |
| Annealing kWh/batch | 1250 | Reduce hold time 19 min |
T.10 Electrolysis line 10 parameters
| Metric | Line 10 estimate [~] | Action |
|---|
| Rectifier kW | 550 | Idle shutdown after harvest |
| Bath temp setpoint | 65°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.30 | Track weekly |
| Annealing kWh/batch | 1300 | Reduce hold time 20 min |
T.11 Electrolysis line 11 parameters
| Metric | Line 11 estimate [~] | Action |
|---|
| Rectifier kW | 575 | Idle shutdown after harvest |
| Bath temp setpoint | 66°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.38 | Track weekly |
| Annealing kWh/batch | 1350 | Reduce hold time 21 min |
T.12 Electrolysis line 12 parameters
| Metric | Line 12 estimate [~] | Action |
|---|
| Rectifier kW | 600 | Idle shutdown after harvest |
| Bath temp setpoint | 67°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.46 | Track weekly |
| Annealing kWh/batch | 1400 | Reduce hold time 22 min |
T.13 Electrolysis line 13 parameters
| Metric | Line 13 estimate [~] | Action |
|---|
| Rectifier kW | 625 | Idle shutdown after harvest |
| Bath temp setpoint | 68°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.54 | Track weekly |
| Annealing kWh/batch | 1450 | Reduce hold time 23 min |
T.14 Electrolysis line 14 parameters
| Metric | Line 14 estimate [~] | Action |
|---|
| Rectifier kW | 650 | Idle shutdown after harvest |
| Bath temp setpoint | 69°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.62 | Track weekly |
| Annealing kWh/batch | 1500 | Reduce hold time 24 min |
T.15 Electrolysis line 15 parameters
| Metric | Line 15 estimate [~] | Action |
|---|
| Rectifier kW | 675 | Idle shutdown after harvest |
| Bath temp setpoint | 70°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.70 | Track weekly |
| Annealing kWh/batch | 1550 | Reduce hold time 25 min |
Appendix U — IMP extended intel (U)
U.1 Electrolysis line 1 parameters
| Metric | Line 1 estimate [~] | Action |
|---|
| Rectifier kW | 325 | Idle shutdown after harvest |
| Bath temp setpoint | 56°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.58 | Track weekly |
| Annealing kWh/batch | 850 | Reduce hold time 11 min |
U.2 Electrolysis line 2 parameters
| Metric | Line 2 estimate [~] | Action |
|---|
| Rectifier kW | 350 | Idle shutdown after harvest |
| Bath temp setpoint | 57°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.66 | Track weekly |
| Annealing kWh/batch | 900 | Reduce hold time 12 min |
U.3 Electrolysis line 3 parameters
| Metric | Line 3 estimate [~] | Action |
|---|
| Rectifier kW | 375 | Idle shutdown after harvest |
| Bath temp setpoint | 58°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.74 | Track weekly |
| Annealing kWh/batch | 950 | Reduce hold time 13 min |
U.4 Electrolysis line 4 parameters
| Metric | Line 4 estimate [~] | Action |
|---|
| Rectifier kW | 400 | Idle shutdown after harvest |
| Bath temp setpoint | 59°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.82 | Track weekly |
| Annealing kWh/batch | 1000 | Reduce hold time 14 min |
U.5 Electrolysis line 5 parameters
| Metric | Line 5 estimate [~] | Action |
|---|
| Rectifier kW | 425 | Idle shutdown after harvest |
| Bath temp setpoint | 60°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.90 | Track weekly |
| Annealing kWh/batch | 1050 | Reduce hold time 15 min |
U.6 Electrolysis line 6 parameters
| Metric | Line 6 estimate [~] | Action |
|---|
| Rectifier kW | 450 | Idle shutdown after harvest |
| Bath temp setpoint | 61°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.98 | Track weekly |
| Annealing kWh/batch | 1100 | Reduce hold time 16 min |
U.7 Electrolysis line 7 parameters
| Metric | Line 7 estimate [~] | Action |
|---|
| Rectifier kW | 475 | Idle shutdown after harvest |
| Bath temp setpoint | 62°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.06 | Track weekly |
| Annealing kWh/batch | 1150 | Reduce hold time 17 min |
U.8 Electrolysis line 8 parameters
| Metric | Line 8 estimate [~] | Action |
|---|
| Rectifier kW | 500 | Idle shutdown after harvest |
| Bath temp setpoint | 63°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.14 | Track weekly |
| Annealing kWh/batch | 1200 | Reduce hold time 18 min |
U.9 Electrolysis line 9 parameters
| Metric | Line 9 estimate [~] | Action |
|---|
| Rectifier kW | 525 | Idle shutdown after harvest |
| Bath temp setpoint | 64°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.22 | Track weekly |
| Annealing kWh/batch | 1250 | Reduce hold time 19 min |
U.10 Electrolysis line 10 parameters
| Metric | Line 10 estimate [~] | Action |
|---|
| Rectifier kW | 550 | Idle shutdown after harvest |
| Bath temp setpoint | 65°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.30 | Track weekly |
| Annealing kWh/batch | 1300 | Reduce hold time 20 min |
U.11 Electrolysis line 11 parameters
| Metric | Line 11 estimate [~] | Action |
|---|
| Rectifier kW | 575 | Idle shutdown after harvest |
| Bath temp setpoint | 66°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.38 | Track weekly |
| Annealing kWh/batch | 1350 | Reduce hold time 21 min |
U.12 Electrolysis line 12 parameters
| Metric | Line 12 estimate [~] | Action |
|---|
| Rectifier kW | 600 | Idle shutdown after harvest |
| Bath temp setpoint | 67°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.46 | Track weekly |
| Annealing kWh/batch | 1400 | Reduce hold time 22 min |
U.13 Electrolysis line 13 parameters
| Metric | Line 13 estimate [~] | Action |
|---|
| Rectifier kW | 625 | Idle shutdown after harvest |
| Bath temp setpoint | 68°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.54 | Track weekly |
| Annealing kWh/batch | 1450 | Reduce hold time 23 min |
U.14 Electrolysis line 14 parameters
| Metric | Line 14 estimate [~] | Action |
|---|
| Rectifier kW | 650 | Idle shutdown after harvest |
| Bath temp setpoint | 69°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.62 | Track weekly |
| Annealing kWh/batch | 1500 | Reduce hold time 24 min |
U.15 Electrolysis line 15 parameters
| Metric | Line 15 estimate [~] | Action |
|---|
| Rectifier kW | 675 | Idle shutdown after harvest |
| Bath temp setpoint | 70°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.70 | Track weekly |
| Annealing kWh/batch | 1550 | Reduce hold time 25 min |
Appendix V — IMP extended intel (V)
V.1 Electrolysis line 1 parameters
| Metric | Line 1 estimate [~] | Action |
|---|
| Rectifier kW | 325 | Idle shutdown after harvest |
| Bath temp setpoint | 56°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.58 | Track weekly |
| Annealing kWh/batch | 850 | Reduce hold time 11 min |
V.2 Electrolysis line 2 parameters
| Metric | Line 2 estimate [~] | Action |
|---|
| Rectifier kW | 350 | Idle shutdown after harvest |
| Bath temp setpoint | 57°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.66 | Track weekly |
| Annealing kWh/batch | 900 | Reduce hold time 12 min |
V.3 Electrolysis line 3 parameters
| Metric | Line 3 estimate [~] | Action |
|---|
| Rectifier kW | 375 | Idle shutdown after harvest |
| Bath temp setpoint | 58°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.74 | Track weekly |
| Annealing kWh/batch | 950 | Reduce hold time 13 min |
V.4 Electrolysis line 4 parameters
| Metric | Line 4 estimate [~] | Action |
|---|
| Rectifier kW | 400 | Idle shutdown after harvest |
| Bath temp setpoint | 59°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.82 | Track weekly |
| Annealing kWh/batch | 1000 | Reduce hold time 14 min |
V.5 Electrolysis line 5 parameters
| Metric | Line 5 estimate [~] | Action |
|---|
| Rectifier kW | 425 | Idle shutdown after harvest |
| Bath temp setpoint | 60°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.90 | Track weekly |
| Annealing kWh/batch | 1050 | Reduce hold time 15 min |
V.6 Electrolysis line 6 parameters
| Metric | Line 6 estimate [~] | Action |
|---|
| Rectifier kW | 450 | Idle shutdown after harvest |
| Bath temp setpoint | 61°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.98 | Track weekly |
| Annealing kWh/batch | 1100 | Reduce hold time 16 min |
V.7 Electrolysis line 7 parameters
| Metric | Line 7 estimate [~] | Action |
|---|
| Rectifier kW | 475 | Idle shutdown after harvest |
| Bath temp setpoint | 62°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.06 | Track weekly |
| Annealing kWh/batch | 1150 | Reduce hold time 17 min |
V.8 Electrolysis line 8 parameters
| Metric | Line 8 estimate [~] | Action |
|---|
| Rectifier kW | 500 | Idle shutdown after harvest |
| Bath temp setpoint | 63°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.14 | Track weekly |
| Annealing kWh/batch | 1200 | Reduce hold time 18 min |
V.9 Electrolysis line 9 parameters
| Metric | Line 9 estimate [~] | Action |
|---|
| Rectifier kW | 525 | Idle shutdown after harvest |
| Bath temp setpoint | 64°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.22 | Track weekly |
| Annealing kWh/batch | 1250 | Reduce hold time 19 min |
V.10 Electrolysis line 10 parameters
| Metric | Line 10 estimate [~] | Action |
|---|
| Rectifier kW | 550 | Idle shutdown after harvest |
| Bath temp setpoint | 65°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.30 | Track weekly |
| Annealing kWh/batch | 1300 | Reduce hold time 20 min |
V.11 Electrolysis line 11 parameters
| Metric | Line 11 estimate [~] | Action |
|---|
| Rectifier kW | 575 | Idle shutdown after harvest |
| Bath temp setpoint | 66°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.38 | Track weekly |
| Annealing kWh/batch | 1350 | Reduce hold time 21 min |
V.12 Electrolysis line 12 parameters
| Metric | Line 12 estimate [~] | Action |
|---|
| Rectifier kW | 600 | Idle shutdown after harvest |
| Bath temp setpoint | 67°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.46 | Track weekly |
| Annealing kWh/batch | 1400 | Reduce hold time 22 min |
V.13 Electrolysis line 13 parameters
| Metric | Line 13 estimate [~] | Action |
|---|
| Rectifier kW | 625 | Idle shutdown after harvest |
| Bath temp setpoint | 68°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.54 | Track weekly |
| Annealing kWh/batch | 1450 | Reduce hold time 23 min |
V.14 Electrolysis line 14 parameters
| Metric | Line 14 estimate [~] | Action |
|---|
| Rectifier kW | 650 | Idle shutdown after harvest |
| Bath temp setpoint | 69°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.62 | Track weekly |
| Annealing kWh/batch | 1500 | Reduce hold time 24 min |
V.15 Electrolysis line 15 parameters
| Metric | Line 15 estimate [~] | Action |
|---|
| Rectifier kW | 675 | Idle shutdown after harvest |
| Bath temp setpoint | 70°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.70 | Track weekly |
| Annealing kWh/batch | 1550 | Reduce hold time 25 min |
Appendix W — IMP extended intel (W)
W.1 Electrolysis line 1 parameters
| Metric | Line 1 estimate [~] | Action |
|---|
| Rectifier kW | 325 | Idle shutdown after harvest |
| Bath temp setpoint | 56°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.58 | Track weekly |
| Annealing kWh/batch | 850 | Reduce hold time 11 min |
W.2 Electrolysis line 2 parameters
| Metric | Line 2 estimate [~] | Action |
|---|
| Rectifier kW | 350 | Idle shutdown after harvest |
| Bath temp setpoint | 57°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.66 | Track weekly |
| Annealing kWh/batch | 900 | Reduce hold time 12 min |
W.3 Electrolysis line 3 parameters
| Metric | Line 3 estimate [~] | Action |
|---|
| Rectifier kW | 375 | Idle shutdown after harvest |
| Bath temp setpoint | 58°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.74 | Track weekly |
| Annealing kWh/batch | 950 | Reduce hold time 13 min |
W.4 Electrolysis line 4 parameters
| Metric | Line 4 estimate [~] | Action |
|---|
| Rectifier kW | 400 | Idle shutdown after harvest |
| Bath temp setpoint | 59°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.82 | Track weekly |
| Annealing kWh/batch | 1000 | Reduce hold time 14 min |
W.5 Electrolysis line 5 parameters
| Metric | Line 5 estimate [~] | Action |
|---|
| Rectifier kW | 425 | Idle shutdown after harvest |
| Bath temp setpoint | 60°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.90 | Track weekly |
| Annealing kWh/batch | 1050 | Reduce hold time 15 min |
W.6 Electrolysis line 6 parameters
| Metric | Line 6 estimate [~] | Action |
|---|
| Rectifier kW | 450 | Idle shutdown after harvest |
| Bath temp setpoint | 61°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.98 | Track weekly |
| Annealing kWh/batch | 1100 | Reduce hold time 16 min |
W.7 Electrolysis line 7 parameters
| Metric | Line 7 estimate [~] | Action |
|---|
| Rectifier kW | 475 | Idle shutdown after harvest |
| Bath temp setpoint | 62°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.06 | Track weekly |
| Annealing kWh/batch | 1150 | Reduce hold time 17 min |
W.8 Electrolysis line 8 parameters
| Metric | Line 8 estimate [~] | Action |
|---|
| Rectifier kW | 500 | Idle shutdown after harvest |
| Bath temp setpoint | 63°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.14 | Track weekly |
| Annealing kWh/batch | 1200 | Reduce hold time 18 min |
W.9 Electrolysis line 9 parameters
| Metric | Line 9 estimate [~] | Action |
|---|
| Rectifier kW | 525 | Idle shutdown after harvest |
| Bath temp setpoint | 64°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.22 | Track weekly |
| Annealing kWh/batch | 1250 | Reduce hold time 19 min |
W.10 Electrolysis line 10 parameters
| Metric | Line 10 estimate [~] | Action |
|---|
| Rectifier kW | 550 | Idle shutdown after harvest |
| Bath temp setpoint | 65°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.30 | Track weekly |
| Annealing kWh/batch | 1300 | Reduce hold time 20 min |
W.11 Electrolysis line 11 parameters
| Metric | Line 11 estimate [~] | Action |
|---|
| Rectifier kW | 575 | Idle shutdown after harvest |
| Bath temp setpoint | 66°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.38 | Track weekly |
| Annealing kWh/batch | 1350 | Reduce hold time 21 min |
W.12 Electrolysis line 12 parameters
| Metric | Line 12 estimate [~] | Action |
|---|
| Rectifier kW | 600 | Idle shutdown after harvest |
| Bath temp setpoint | 67°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.46 | Track weekly |
| Annealing kWh/batch | 1400 | Reduce hold time 22 min |
W.13 Electrolysis line 13 parameters
| Metric | Line 13 estimate [~] | Action |
|---|
| Rectifier kW | 625 | Idle shutdown after harvest |
| Bath temp setpoint | 68°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.54 | Track weekly |
| Annealing kWh/batch | 1450 | Reduce hold time 23 min |
W.14 Electrolysis line 14 parameters
| Metric | Line 14 estimate [~] | Action |
|---|
| Rectifier kW | 650 | Idle shutdown after harvest |
| Bath temp setpoint | 69°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.62 | Track weekly |
| Annealing kWh/batch | 1500 | Reduce hold time 24 min |
W.15 Electrolysis line 15 parameters
| Metric | Line 15 estimate [~] | Action |
|---|
| Rectifier kW | 675 | Idle shutdown after harvest |
| Bath temp setpoint | 70°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.70 | Track weekly |
| Annealing kWh/batch | 1550 | Reduce hold time 25 min |
Appendix X — IMP extended intel (X)
X.1 Electrolysis line 1 parameters
| Metric | Line 1 estimate [~] | Action |
|---|
| Rectifier kW | 325 | Idle shutdown after harvest |
| Bath temp setpoint | 56°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.58 | Track weekly |
| Annealing kWh/batch | 850 | Reduce hold time 11 min |
X.2 Electrolysis line 2 parameters
| Metric | Line 2 estimate [~] | Action |
|---|
| Rectifier kW | 350 | Idle shutdown after harvest |
| Bath temp setpoint | 57°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.66 | Track weekly |
| Annealing kWh/batch | 900 | Reduce hold time 12 min |
X.3 Electrolysis line 3 parameters
| Metric | Line 3 estimate [~] | Action |
|---|
| Rectifier kW | 375 | Idle shutdown after harvest |
| Bath temp setpoint | 58°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.74 | Track weekly |
| Annealing kWh/batch | 950 | Reduce hold time 13 min |
X.4 Electrolysis line 4 parameters
| Metric | Line 4 estimate [~] | Action |
|---|
| Rectifier kW | 400 | Idle shutdown after harvest |
| Bath temp setpoint | 59°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.82 | Track weekly |
| Annealing kWh/batch | 1000 | Reduce hold time 14 min |
X.5 Electrolysis line 5 parameters
| Metric | Line 5 estimate [~] | Action |
|---|
| Rectifier kW | 425 | Idle shutdown after harvest |
| Bath temp setpoint | 60°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.90 | Track weekly |
| Annealing kWh/batch | 1050 | Reduce hold time 15 min |
X.6 Electrolysis line 6 parameters
| Metric | Line 6 estimate [~] | Action |
|---|
| Rectifier kW | 450 | Idle shutdown after harvest |
| Bath temp setpoint | 61°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.98 | Track weekly |
| Annealing kWh/batch | 1100 | Reduce hold time 16 min |
X.7 Electrolysis line 7 parameters
| Metric | Line 7 estimate [~] | Action |
|---|
| Rectifier kW | 475 | Idle shutdown after harvest |
| Bath temp setpoint | 62°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.06 | Track weekly |
| Annealing kWh/batch | 1150 | Reduce hold time 17 min |
X.8 Electrolysis line 8 parameters
| Metric | Line 8 estimate [~] | Action |
|---|
| Rectifier kW | 500 | Idle shutdown after harvest |
| Bath temp setpoint | 63°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.14 | Track weekly |
| Annealing kWh/batch | 1200 | Reduce hold time 18 min |
X.9 Electrolysis line 9 parameters
| Metric | Line 9 estimate [~] | Action |
|---|
| Rectifier kW | 525 | Idle shutdown after harvest |
| Bath temp setpoint | 64°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.22 | Track weekly |
| Annealing kWh/batch | 1250 | Reduce hold time 19 min |
X.10 Electrolysis line 10 parameters
| Metric | Line 10 estimate [~] | Action |
|---|
| Rectifier kW | 550 | Idle shutdown after harvest |
| Bath temp setpoint | 65°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.30 | Track weekly |
| Annealing kWh/batch | 1300 | Reduce hold time 20 min |
X.11 Electrolysis line 11 parameters
| Metric | Line 11 estimate [~] | Action |
|---|
| Rectifier kW | 575 | Idle shutdown after harvest |
| Bath temp setpoint | 66°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.38 | Track weekly |
| Annealing kWh/batch | 1350 | Reduce hold time 21 min |
X.12 Electrolysis line 12 parameters
| Metric | Line 12 estimate [~] | Action |
|---|
| Rectifier kW | 600 | Idle shutdown after harvest |
| Bath temp setpoint | 67°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.46 | Track weekly |
| Annealing kWh/batch | 1400 | Reduce hold time 22 min |
X.13 Electrolysis line 13 parameters
| Metric | Line 13 estimate [~] | Action |
|---|
| Rectifier kW | 625 | Idle shutdown after harvest |
| Bath temp setpoint | 68°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.54 | Track weekly |
| Annealing kWh/batch | 1450 | Reduce hold time 23 min |
X.14 Electrolysis line 14 parameters
| Metric | Line 14 estimate [~] | Action |
|---|
| Rectifier kW | 650 | Idle shutdown after harvest |
| Bath temp setpoint | 69°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.62 | Track weekly |
| Annealing kWh/batch | 1500 | Reduce hold time 24 min |
X.15 Electrolysis line 15 parameters
| Metric | Line 15 estimate [~] | Action |
|---|
| Rectifier kW | 675 | Idle shutdown after harvest |
| Bath temp setpoint | 70°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.70 | Track weekly |
| Annealing kWh/batch | 1550 | Reduce hold time 25 min |
Appendix Y — IMP extended intel (Y)
Y.1 Electrolysis line 1 parameters
| Metric | Line 1 estimate [~] | Action |
|---|
| Rectifier kW | 325 | Idle shutdown after harvest |
| Bath temp setpoint | 56°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.58 | Track weekly |
| Annealing kWh/batch | 850 | Reduce hold time 11 min |
Y.2 Electrolysis line 2 parameters
| Metric | Line 2 estimate [~] | Action |
|---|
| Rectifier kW | 350 | Idle shutdown after harvest |
| Bath temp setpoint | 57°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.66 | Track weekly |
| Annealing kWh/batch | 900 | Reduce hold time 12 min |
Y.3 Electrolysis line 3 parameters
| Metric | Line 3 estimate [~] | Action |
|---|
| Rectifier kW | 375 | Idle shutdown after harvest |
| Bath temp setpoint | 58°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.74 | Track weekly |
| Annealing kWh/batch | 950 | Reduce hold time 13 min |
Y.4 Electrolysis line 4 parameters
| Metric | Line 4 estimate [~] | Action |
|---|
| Rectifier kW | 400 | Idle shutdown after harvest |
| Bath temp setpoint | 59°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.82 | Track weekly |
| Annealing kWh/batch | 1000 | Reduce hold time 14 min |
Y.5 Electrolysis line 5 parameters
| Metric | Line 5 estimate [~] | Action |
|---|
| Rectifier kW | 425 | Idle shutdown after harvest |
| Bath temp setpoint | 60°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.90 | Track weekly |
| Annealing kWh/batch | 1050 | Reduce hold time 15 min |
Y.6 Electrolysis line 6 parameters
| Metric | Line 6 estimate [~] | Action |
|---|
| Rectifier kW | 450 | Idle shutdown after harvest |
| Bath temp setpoint | 61°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.98 | Track weekly |
| Annealing kWh/batch | 1100 | Reduce hold time 16 min |
Y.7 Electrolysis line 7 parameters
| Metric | Line 7 estimate [~] | Action |
|---|
| Rectifier kW | 475 | Idle shutdown after harvest |
| Bath temp setpoint | 62°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.06 | Track weekly |
| Annealing kWh/batch | 1150 | Reduce hold time 17 min |
Y.8 Electrolysis line 8 parameters
| Metric | Line 8 estimate [~] | Action |
|---|
| Rectifier kW | 500 | Idle shutdown after harvest |
| Bath temp setpoint | 63°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.14 | Track weekly |
| Annealing kWh/batch | 1200 | Reduce hold time 18 min |
Y.9 Electrolysis line 9 parameters
| Metric | Line 9 estimate [~] | Action |
|---|
| Rectifier kW | 525 | Idle shutdown after harvest |
| Bath temp setpoint | 64°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.22 | Track weekly |
| Annealing kWh/batch | 1250 | Reduce hold time 19 min |
Y.10 Electrolysis line 10 parameters
| Metric | Line 10 estimate [~] | Action |
|---|
| Rectifier kW | 550 | Idle shutdown after harvest |
| Bath temp setpoint | 65°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.30 | Track weekly |
| Annealing kWh/batch | 1300 | Reduce hold time 20 min |
Y.11 Electrolysis line 11 parameters
| Metric | Line 11 estimate [~] | Action |
|---|
| Rectifier kW | 575 | Idle shutdown after harvest |
| Bath temp setpoint | 66°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.38 | Track weekly |
| Annealing kWh/batch | 1350 | Reduce hold time 21 min |
Y.12 Electrolysis line 12 parameters
| Metric | Line 12 estimate [~] | Action |
|---|
| Rectifier kW | 600 | Idle shutdown after harvest |
| Bath temp setpoint | 67°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.46 | Track weekly |
| Annealing kWh/batch | 1400 | Reduce hold time 22 min |
Y.13 Electrolysis line 13 parameters
| Metric | Line 13 estimate [~] | Action |
|---|
| Rectifier kW | 625 | Idle shutdown after harvest |
| Bath temp setpoint | 68°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.54 | Track weekly |
| Annealing kWh/batch | 1450 | Reduce hold time 23 min |
Y.14 Electrolysis line 14 parameters
| Metric | Line 14 estimate [~] | Action |
|---|
| Rectifier kW | 650 | Idle shutdown after harvest |
| Bath temp setpoint | 69°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.62 | Track weekly |
| Annealing kWh/batch | 1500 | Reduce hold time 24 min |
Y.15 Electrolysis line 15 parameters
| Metric | Line 15 estimate [~] | Action |
|---|
| Rectifier kW | 675 | Idle shutdown after harvest |
| Bath temp setpoint | 70°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.70 | Track weekly |
| Annealing kWh/batch | 1550 | Reduce hold time 25 min |
Appendix Z — IMP extended intel (Z)
Z.1 Electrolysis line 1 parameters
| Metric | Line 1 estimate [~] | Action |
|---|
| Rectifier kW | 325 | Idle shutdown after harvest |
| Bath temp setpoint | 56°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.58 | Track weekly |
| Annealing kWh/batch | 850 | Reduce hold time 11 min |
Z.2 Electrolysis line 2 parameters
| Metric | Line 2 estimate [~] | Action |
|---|
| Rectifier kW | 350 | Idle shutdown after harvest |
| Bath temp setpoint | 57°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.66 | Track weekly |
| Annealing kWh/batch | 900 | Reduce hold time 12 min |
Z.3 Electrolysis line 3 parameters
| Metric | Line 3 estimate [~] | Action |
|---|
| Rectifier kW | 375 | Idle shutdown after harvest |
| Bath temp setpoint | 58°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.74 | Track weekly |
| Annealing kWh/batch | 950 | Reduce hold time 13 min |
Z.4 Electrolysis line 4 parameters
| Metric | Line 4 estimate [~] | Action |
|---|
| Rectifier kW | 400 | Idle shutdown after harvest |
| Bath temp setpoint | 59°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.82 | Track weekly |
| Annealing kWh/batch | 1000 | Reduce hold time 14 min |
Z.5 Electrolysis line 5 parameters
| Metric | Line 5 estimate [~] | Action |
|---|
| Rectifier kW | 425 | Idle shutdown after harvest |
| Bath temp setpoint | 60°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.90 | Track weekly |
| Annealing kWh/batch | 1050 | Reduce hold time 15 min |
Z.6 Electrolysis line 6 parameters
| Metric | Line 6 estimate [~] | Action |
|---|
| Rectifier kW | 450 | Idle shutdown after harvest |
| Bath temp setpoint | 61°C | Trim 2°C if quality OK |
| kWh/kg SEC | 2.98 | Track weekly |
| Annealing kWh/batch | 1100 | Reduce hold time 16 min |
Z.7 Electrolysis line 7 parameters
| Metric | Line 7 estimate [~] | Action |
|---|
| Rectifier kW | 475 | Idle shutdown after harvest |
| Bath temp setpoint | 62°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.06 | Track weekly |
| Annealing kWh/batch | 1150 | Reduce hold time 17 min |
Z.8 Electrolysis line 8 parameters
| Metric | Line 8 estimate [~] | Action |
|---|
| Rectifier kW | 500 | Idle shutdown after harvest |
| Bath temp setpoint | 63°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.14 | Track weekly |
| Annealing kWh/batch | 1200 | Reduce hold time 18 min |
Z.9 Electrolysis line 9 parameters
| Metric | Line 9 estimate [~] | Action |
|---|
| Rectifier kW | 525 | Idle shutdown after harvest |
| Bath temp setpoint | 64°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.22 | Track weekly |
| Annealing kWh/batch | 1250 | Reduce hold time 19 min |
Z.10 Electrolysis line 10 parameters
| Metric | Line 10 estimate [~] | Action |
|---|
| Rectifier kW | 550 | Idle shutdown after harvest |
| Bath temp setpoint | 65°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.30 | Track weekly |
| Annealing kWh/batch | 1300 | Reduce hold time 20 min |
Z.11 Electrolysis line 11 parameters
| Metric | Line 11 estimate [~] | Action |
|---|
| Rectifier kW | 575 | Idle shutdown after harvest |
| Bath temp setpoint | 66°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.38 | Track weekly |
| Annealing kWh/batch | 1350 | Reduce hold time 21 min |
Z.12 Electrolysis line 12 parameters
| Metric | Line 12 estimate [~] | Action |
|---|
| Rectifier kW | 600 | Idle shutdown after harvest |
| Bath temp setpoint | 67°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.46 | Track weekly |
| Annealing kWh/batch | 1400 | Reduce hold time 22 min |
Z.13 Electrolysis line 13 parameters
| Metric | Line 13 estimate [~] | Action |
|---|
| Rectifier kW | 625 | Idle shutdown after harvest |
| Bath temp setpoint | 68°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.54 | Track weekly |
| Annealing kWh/batch | 1450 | Reduce hold time 23 min |
Z.14 Electrolysis line 14 parameters
| Metric | Line 14 estimate [~] | Action |
|---|
| Rectifier kW | 650 | Idle shutdown after harvest |
| Bath temp setpoint | 69°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.62 | Track weekly |
| Annealing kWh/batch | 1500 | Reduce hold time 24 min |
Z.15 Electrolysis line 15 parameters
| Metric | Line 15 estimate [~] | Action |
|---|
| Rectifier kW | 675 | Idle shutdown after harvest |
| Bath temp setpoint | 70°C | Trim 2°C if quality OK |
| kWh/kg SEC | 3.70 | Track weekly |
| Annealing kWh/batch | 1550 | Reduce hold time 25 min |
Appendix AA — IMP discovery (AA)
- Rectifier AA.1: If left energised 2 hrs/night idle, est. waste ₹0.8L/mo.
- Annealing AA.1: Campaign overlap 1 furnaces → MD add ₹1.1L.
- Rectifier AA.2: If left energised 4 hrs/night idle, est. waste ₹1.6L/mo.
- Annealing AA.2: Campaign overlap 2 furnaces → MD add ₹2.2L.
- Rectifier AA.3: If left energised 6 hrs/night idle, est. waste ₹2.4L/mo.
- Annealing AA.3: Campaign overlap 3 furnaces → MD add ₹3.3L.
- Rectifier AA.4: If left energised 8 hrs/night idle, est. waste ₹3.2L/mo.
- Annealing AA.4: Campaign overlap 4 furnaces → MD add ₹4.4L.
- Rectifier AA.5: If left energised 10 hrs/night idle, est. waste ₹4.0L/mo.
- Annealing AA.5: Campaign overlap 5 furnaces → MD add ₹5.5L.
- Rectifier AA.6: If left energised 12 hrs/night idle, est. waste ₹4.8L/mo.
- Annealing AA.6: Campaign overlap 6 furnaces → MD add ₹6.6L.
- Rectifier AA.7: If left energised 14 hrs/night idle, est. waste ₹5.6L/mo.
- Annealing AA.7: Campaign overlap 7 furnaces → MD add ₹7.7L.
- Rectifier AA.8: If left energised 16 hrs/night idle, est. waste ₹6.4L/mo.
- Annealing AA.8: Campaign overlap 8 furnaces → MD add ₹8.8L.
- Rectifier AA.9: If left energised 18 hrs/night idle, est. waste ₹7.2L/mo.
- Annealing AA.9: Campaign overlap 9 furnaces → MD add ₹9.9L.
- Rectifier AA.10: If left energised 20 hrs/night idle, est. waste ₹8.0L/mo.
- Annealing AA.10: Campaign overlap 10 furnaces → MD add ₹11.0L.
- Rectifier AA.11: If left energised 22 hrs/night idle, est. waste ₹8.8L/mo.
- Annealing AA.11: Campaign overlap 11 furnaces → MD add ₹12.1L.
Appendix AB — IMP discovery (AB)
- Rectifier AB.1: If left energised 2 hrs/night idle, est. waste ₹0.8L/mo.
- Annealing AB.1: Campaign overlap 1 furnaces → MD add ₹1.1L.
- Rectifier AB.2: If left energised 4 hrs/night idle, est. waste ₹1.6L/mo.
- Annealing AB.2: Campaign overlap 2 furnaces → MD add ₹2.2L.
- Rectifier AB.3: If left energised 6 hrs/night idle, est. waste ₹2.4L/mo.
- Annealing AB.3: Campaign overlap 3 furnaces → MD add ₹3.3L.
- Rectifier AB.4: If left energised 8 hrs/night idle, est. waste ₹3.2L/mo.
- Annealing AB.4: Campaign overlap 4 furnaces → MD add ₹4.4L.
- Rectifier AB.5: If left energised 10 hrs/night idle, est. waste ₹4.0L/mo.
- Annealing AB.5: Campaign overlap 5 furnaces → MD add ₹5.5L.
- Rectifier AB.6: If left energised 12 hrs/night idle, est. waste ₹4.8L/mo.
- Annealing AB.6: Campaign overlap 6 furnaces → MD add ₹6.6L.
- Rectifier AB.7: If left energised 14 hrs/night idle, est. waste ₹5.6L/mo.
- Annealing AB.7: Campaign overlap 7 furnaces → MD add ₹7.7L.
- Rectifier AB.8: If left energised 16 hrs/night idle, est. waste ₹6.4L/mo.
- Annealing AB.8: Campaign overlap 8 furnaces → MD add ₹8.8L.
- Rectifier AB.9: If left energised 18 hrs/night idle, est. waste ₹7.2L/mo.
- Annealing AB.9: Campaign overlap 9 furnaces → MD add ₹9.9L.
- Rectifier AB.10: If left energised 20 hrs/night idle, est. waste ₹8.0L/mo.
- Annealing AB.10: Campaign overlap 10 furnaces → MD add ₹11.0L.
- Rectifier AB.11: If left energised 22 hrs/night idle, est. waste ₹8.8L/mo.
- Annealing AB.11: Campaign overlap 11 furnaces → MD add ₹12.1L.
Appendix AC — IMP discovery (AC)
- Rectifier AC.1: If left energised 2 hrs/night idle, est. waste ₹0.8L/mo.
- Annealing AC.1: Campaign overlap 1 furnaces → MD add ₹1.1L.
- Rectifier AC.2: If left energised 4 hrs/night idle, est. waste ₹1.6L/mo.
- Annealing AC.2: Campaign overlap 2 furnaces → MD add ₹2.2L.
- Rectifier AC.3: If left energised 6 hrs/night idle, est. waste ₹2.4L/mo.
- Annealing AC.3: Campaign overlap 3 furnaces → MD add ₹3.3L.
- Rectifier AC.4: If left energised 8 hrs/night idle, est. waste ₹3.2L/mo.
- Annealing AC.4: Campaign overlap 4 furnaces → MD add ₹4.4L.
- Rectifier AC.5: If left energised 10 hrs/night idle, est. waste ₹4.0L/mo.
- Annealing AC.5: Campaign overlap 5 furnaces → MD add ₹5.5L.
- Rectifier AC.6: If left energised 12 hrs/night idle, est. waste ₹4.8L/mo.
- Annealing AC.6: Campaign overlap 6 furnaces → MD add ₹6.6L.
- Rectifier AC.7: If left energised 14 hrs/night idle, est. waste ₹5.6L/mo.
- Annealing AC.7: Campaign overlap 7 furnaces → MD add ₹7.7L.
- Rectifier AC.8: If left energised 16 hrs/night idle, est. waste ₹6.4L/mo.
- Annealing AC.8: Campaign overlap 8 furnaces → MD add ₹8.8L.
- Rectifier AC.9: If left energised 18 hrs/night idle, est. waste ₹7.2L/mo.
- Annealing AC.9: Campaign overlap 9 furnaces → MD add ₹9.9L.
- Rectifier AC.10: If left energised 20 hrs/night idle, est. waste ₹8.0L/mo.
- Annealing AC.10: Campaign overlap 10 furnaces → MD add ₹11.0L.
- Rectifier AC.11: If left energised 22 hrs/night idle, est. waste ₹8.8L/mo.
- Annealing AC.11: Campaign overlap 11 furnaces → MD add ₹12.1L.
Appendix AD — IMP discovery (AD)
- Rectifier AD.1: If left energised 2 hrs/night idle, est. waste ₹0.8L/mo.
- Annealing AD.1: Campaign overlap 1 furnaces → MD add ₹1.1L.
- Rectifier AD.2: If left energised 4 hrs/night idle, est. waste ₹1.6L/mo.
- Annealing AD.2: Campaign overlap 2 furnaces → MD add ₹2.2L.
- Rectifier AD.3: If left energised 6 hrs/night idle, est. waste ₹2.4L/mo.
- Annealing AD.3: Campaign overlap 3 furnaces → MD add ₹3.3L.
- Rectifier AD.4: If left energised 8 hrs/night idle, est. waste ₹3.2L/mo.
- Annealing AD.4: Campaign overlap 4 furnaces → MD add ₹4.4L.
- Rectifier AD.5: If left energised 10 hrs/night idle, est. waste ₹4.0L/mo.
- Annealing AD.5: Campaign overlap 5 furnaces → MD add ₹5.5L.
- Rectifier AD.6: If left energised 12 hrs/night idle, est. waste ₹4.8L/mo.
- Annealing AD.6: Campaign overlap 6 furnaces → MD add ₹6.6L.
- Rectifier AD.7: If left energised 14 hrs/night idle, est. waste ₹5.6L/mo.
- Annealing AD.7: Campaign overlap 7 furnaces → MD add ₹7.7L.
- Rectifier AD.8: If left energised 16 hrs/night idle, est. waste ₹6.4L/mo.
- Annealing AD.8: Campaign overlap 8 furnaces → MD add ₹8.8L.
- Rectifier AD.9: If left energised 18 hrs/night idle, est. waste ₹7.2L/mo.
- Annealing AD.9: Campaign overlap 9 furnaces → MD add ₹9.9L.
- Rectifier AD.10: If left energised 20 hrs/night idle, est. waste ₹8.0L/mo.
- Annealing AD.10: Campaign overlap 10 furnaces → MD add ₹11.0L.
- Rectifier AD.11: If left energised 22 hrs/night idle, est. waste ₹8.8L/mo.
- Annealing AD.11: Campaign overlap 11 furnaces → MD add ₹12.1L.
Appendix AE — IMP discovery (AE)
- Rectifier AE.1: If left energised 2 hrs/night idle, est. waste ₹0.8L/mo.
- Annealing AE.1: Campaign overlap 1 furnaces → MD add ₹1.1L.
- Rectifier AE.2: If left energised 4 hrs/night idle, est. waste ₹1.6L/mo.
- Annealing AE.2: Campaign overlap 2 furnaces → MD add ₹2.2L.
- Rectifier AE.3: If left energised 6 hrs/night idle, est. waste ₹2.4L/mo.
- Annealing AE.3: Campaign overlap 3 furnaces → MD add ₹3.3L.
- Rectifier AE.4: If left energised 8 hrs/night idle, est. waste ₹3.2L/mo.
- Annealing AE.4: Campaign overlap 4 furnaces → MD add ₹4.4L.
- Rectifier AE.5: If left energised 10 hrs/night idle, est. waste ₹4.0L/mo.
- Annealing AE.5: Campaign overlap 5 furnaces → MD add ₹5.5L.
- Rectifier AE.6: If left energised 12 hrs/night idle, est. waste ₹4.8L/mo.
- Annealing AE.6: Campaign overlap 6 furnaces → MD add ₹6.6L.
- Rectifier AE.7: If left energised 14 hrs/night idle, est. waste ₹5.6L/mo.
- Annealing AE.7: Campaign overlap 7 furnaces → MD add ₹7.7L.
- Rectifier AE.8: If left energised 16 hrs/night idle, est. waste ₹6.4L/mo.
- Annealing AE.8: Campaign overlap 8 furnaces → MD add ₹8.8L.
- Rectifier AE.9: If left energised 18 hrs/night idle, est. waste ₹7.2L/mo.
- Annealing AE.9: Campaign overlap 9 furnaces → MD add ₹9.9L.
- Rectifier AE.10: If left energised 20 hrs/night idle, est. waste ₹8.0L/mo.
- Annealing AE.10: Campaign overlap 10 furnaces → MD add ₹11.0L.
- Rectifier AE.11: If left energised 22 hrs/night idle, est. waste ₹8.8L/mo.
- Annealing AE.11: Campaign overlap 11 furnaces → MD add ₹12.1L.
Appendix AF — IMP discovery (AF)
- Rectifier AF.1: If left energised 2 hrs/night idle, est. waste ₹0.8L/mo.
- Annealing AF.1: Campaign overlap 1 furnaces → MD add ₹1.1L.
- Rectifier AF.2: If left energised 4 hrs/night idle, est. waste ₹1.6L/mo.
- Annealing AF.2: Campaign overlap 2 furnaces → MD add ₹2.2L.
- Rectifier AF.3: If left energised 6 hrs/night idle, est. waste ₹2.4L/mo.
- Annealing AF.3: Campaign overlap 3 furnaces → MD add ₹3.3L.
- Rectifier AF.4: If left energised 8 hrs/night idle, est. waste ₹3.2L/mo.
- Annealing AF.4: Campaign overlap 4 furnaces → MD add ₹4.4L.
- Rectifier AF.5: If left energised 10 hrs/night idle, est. waste ₹4.0L/mo.
- Annealing AF.5: Campaign overlap 5 furnaces → MD add ₹5.5L.
- Rectifier AF.6: If left energised 12 hrs/night idle, est. waste ₹4.8L/mo.
- Annealing AF.6: Campaign overlap 6 furnaces → MD add ₹6.6L.
- Rectifier AF.7: If left energised 14 hrs/night idle, est. waste ₹5.6L/mo.
- Annealing AF.7: Campaign overlap 7 furnaces → MD add ₹7.7L.
- Rectifier AF.8: If left energised 16 hrs/night idle, est. waste ₹6.4L/mo.
- Annealing AF.8: Campaign overlap 8 furnaces → MD add ₹8.8L.
- Rectifier AF.9: If left energised 18 hrs/night idle, est. waste ₹7.2L/mo.
- Annealing AF.9: Campaign overlap 9 furnaces → MD add ₹9.9L.
- Rectifier AF.10: If left energised 20 hrs/night idle, est. waste ₹8.0L/mo.
- Annealing AF.10: Campaign overlap 10 furnaces → MD add ₹11.0L.
- Rectifier AF.11: If left energised 22 hrs/night idle, est. waste ₹8.8L/mo.
- Annealing AF.11: Campaign overlap 11 furnaces → MD add ₹12.1L.
Appendix AG — IMP discovery (AG)
- Rectifier AG.1: If left energised 2 hrs/night idle, est. waste ₹0.8L/mo.
- Annealing AG.1: Campaign overlap 1 furnaces → MD add ₹1.1L.
- Rectifier AG.2: If left energised 4 hrs/night idle, est. waste ₹1.6L/mo.
- Annealing AG.2: Campaign overlap 2 furnaces → MD add ₹2.2L.
- Rectifier AG.3: If left energised 6 hrs/night idle, est. waste ₹2.4L/mo.
- Annealing AG.3: Campaign overlap 3 furnaces → MD add ₹3.3L.
- Rectifier AG.4: If left energised 8 hrs/night idle, est. waste ₹3.2L/mo.
- Annealing AG.4: Campaign overlap 4 furnaces → MD add ₹4.4L.
- Rectifier AG.5: If left energised 10 hrs/night idle, est. waste ₹4.0L/mo.
- Annealing AG.5: Campaign overlap 5 furnaces → MD add ₹5.5L.
- Rectifier AG.6: If left energised 12 hrs/night idle, est. waste ₹4.8L/mo.
- Annealing AG.6: Campaign overlap 6 furnaces → MD add ₹6.6L.
- Rectifier AG.7: If left energised 14 hrs/night idle, est. waste ₹5.6L/mo.
- Annealing AG.7: Campaign overlap 7 furnaces → MD add ₹7.7L.
- Rectifier AG.8: If left energised 16 hrs/night idle, est. waste ₹6.4L/mo.
- Annealing AG.8: Campaign overlap 8 furnaces → MD add ₹8.8L.
- Rectifier AG.9: If left energised 18 hrs/night idle, est. waste ₹7.2L/mo.
- Annealing AG.9: Campaign overlap 9 furnaces → MD add ₹9.9L.
- Rectifier AG.10: If left energised 20 hrs/night idle, est. waste ₹8.0L/mo.
- Annealing AG.10: Campaign overlap 10 furnaces → MD add ₹11.0L.
- Rectifier AG.11: If left energised 22 hrs/night idle, est. waste ₹8.8L/mo.
- Annealing AG.11: Campaign overlap 11 furnaces → MD add ₹12.1L.
Appendix AH — IMP discovery (AH)
- Rectifier AH.1: If left energised 2 hrs/night idle, est. waste ₹0.8L/mo.
- Annealing AH.1: Campaign overlap 1 furnaces → MD add ₹1.1L.
- Rectifier AH.2: If left energised 4 hrs/night idle, est. waste ₹1.6L/mo.
- Annealing AH.2: Campaign overlap 2 furnaces → MD add ₹2.2L.
- Rectifier AH.3: If left energised 6 hrs/night idle, est. waste ₹2.4L/mo.
- Annealing AH.3: Campaign overlap 3 furnaces → MD add ₹3.3L.
- Rectifier AH.4: If left energised 8 hrs/night idle, est. waste ₹3.2L/mo.
- Annealing AH.4: Campaign overlap 4 furnaces → MD add ₹4.4L.
- Rectifier AH.5: If left energised 10 hrs/night idle, est. waste ₹4.0L/mo.
- Annealing AH.5: Campaign overlap 5 furnaces → MD add ₹5.5L.
- Rectifier AH.6: If left energised 12 hrs/night idle, est. waste ₹4.8L/mo.
- Annealing AH.6: Campaign overlap 6 furnaces → MD add ₹6.6L.
- Rectifier AH.7: If left energised 14 hrs/night idle, est. waste ₹5.6L/mo.
- Annealing AH.7: Campaign overlap 7 furnaces → MD add ₹7.7L.
- Rectifier AH.8: If left energised 16 hrs/night idle, est. waste ₹6.4L/mo.
- Annealing AH.8: Campaign overlap 8 furnaces → MD add ₹8.8L.
- Rectifier AH.9: If left energised 18 hrs/night idle, est. waste ₹7.2L/mo.
- Annealing AH.9: Campaign overlap 9 furnaces → MD add ₹9.9L.
- Rectifier AH.10: If left energised 20 hrs/night idle, est. waste ₹8.0L/mo.
- Annealing AH.10: Campaign overlap 10 furnaces → MD add ₹11.0L.
- Rectifier AH.11: If left energised 22 hrs/night idle, est. waste ₹8.8L/mo.
- Annealing AH.11: Campaign overlap 11 furnaces → MD add ₹12.1L.
Appendix AI — IMP discovery (AI)
- Rectifier AI.1: If left energised 2 hrs/night idle, est. waste ₹0.8L/mo.
- Annealing AI.1: Campaign overlap 1 furnaces → MD add ₹1.1L.
- Rectifier AI.2: If left energised 4 hrs/night idle, est. waste ₹1.6L/mo.
- Annealing AI.2: Campaign overlap 2 furnaces → MD add ₹2.2L.
- Rectifier AI.3: If left energised 6 hrs/night idle, est. waste ₹2.4L/mo.
- Annealing AI.3: Campaign overlap 3 furnaces → MD add ₹3.3L.
- Rectifier AI.4: If left energised 8 hrs/night idle, est. waste ₹3.2L/mo.
- Annealing AI.4: Campaign overlap 4 furnaces → MD add ₹4.4L.
- Rectifier AI.5: If left energised 10 hrs/night idle, est. waste ₹4.0L/mo.
- Annealing AI.5: Campaign overlap 5 furnaces → MD add ₹5.5L.
- Rectifier AI.6: If left energised 12 hrs/night idle, est. waste ₹4.8L/mo.
- Annealing AI.6: Campaign overlap 6 furnaces → MD add ₹6.6L.
- Rectifier AI.7: If left energised 14 hrs/night idle, est. waste ₹5.6L/mo.
- Annealing AI.7: Campaign overlap 7 furnaces → MD add ₹7.7L.
- Rectifier AI.8: If left energised 16 hrs/night idle, est. waste ₹6.4L/mo.
- Annealing AI.8: Campaign overlap 8 furnaces → MD add ₹8.8L.
- Rectifier AI.9: If left energised 18 hrs/night idle, est. waste ₹7.2L/mo.
- Annealing AI.9: Campaign overlap 9 furnaces → MD add ₹9.9L.
- Rectifier AI.10: If left energised 20 hrs/night idle, est. waste ₹8.0L/mo.
- Annealing AI.10: Campaign overlap 10 furnaces → MD add ₹11.0L.
- Rectifier AI.11: If left energised 22 hrs/night idle, est. waste ₹8.8L/mo.
- Annealing AI.11: Campaign overlap 11 furnaces → MD add ₹12.1L.
Appendix AJ — IMP discovery (AJ)
- Rectifier AJ.1: If left energised 2 hrs/night idle, est. waste ₹0.8L/mo.
- Annealing AJ.1: Campaign overlap 1 furnaces → MD add ₹1.1L.
- Rectifier AJ.2: If left energised 4 hrs/night idle, est. waste ₹1.6L/mo.
- Annealing AJ.2: Campaign overlap 2 furnaces → MD add ₹2.2L.
- Rectifier AJ.3: If left energised 6 hrs/night idle, est. waste ₹2.4L/mo.
- Annealing AJ.3: Campaign overlap 3 furnaces → MD add ₹3.3L.
- Rectifier AJ.4: If left energised 8 hrs/night idle, est. waste ₹3.2L/mo.
- Annealing AJ.4: Campaign overlap 4 furnaces → MD add ₹4.4L.
- Rectifier AJ.5: If left energised 10 hrs/night idle, est. waste ₹4.0L/mo.
- Annealing AJ.5: Campaign overlap 5 furnaces → MD add ₹5.5L.
- Rectifier AJ.6: If left energised 12 hrs/night idle, est. waste ₹4.8L/mo.
- Annealing AJ.6: Campaign overlap 6 furnaces → MD add ₹6.6L.
- Rectifier AJ.7: If left energised 14 hrs/night idle, est. waste ₹5.6L/mo.
- Annealing AJ.7: Campaign overlap 7 furnaces → MD add ₹7.7L.
- Rectifier AJ.8: If left energised 16 hrs/night idle, est. waste ₹6.4L/mo.
- Annealing AJ.8: Campaign overlap 8 furnaces → MD add ₹8.8L.
- Rectifier AJ.9: If left energised 18 hrs/night idle, est. waste ₹7.2L/mo.
- Annealing AJ.9: Campaign overlap 9 furnaces → MD add ₹9.9L.
- Rectifier AJ.10: If left energised 20 hrs/night idle, est. waste ₹8.0L/mo.
- Annealing AJ.10: Campaign overlap 10 furnaces → MD add ₹11.0L.
- Rectifier AJ.11: If left energised 22 hrs/night idle, est. waste ₹8.8L/mo.
- Annealing AJ.11: Campaign overlap 11 furnaces → MD add ₹12.1L.
Appendix AK — IMP discovery (AK)
- Rectifier AK.1: If left energised 2 hrs/night idle, est. waste ₹0.8L/mo.
- Annealing AK.1: Campaign overlap 1 furnaces → MD add ₹1.1L.
- Rectifier AK.2: If left energised 4 hrs/night idle, est. waste ₹1.6L/mo.
- Annealing AK.2: Campaign overlap 2 furnaces → MD add ₹2.2L.
- Rectifier AK.3: If left energised 6 hrs/night idle, est. waste ₹2.4L/mo.
- Annealing AK.3: Campaign overlap 3 furnaces → MD add ₹3.3L.
- Rectifier AK.4: If left energised 8 hrs/night idle, est. waste ₹3.2L/mo.
- Annealing AK.4: Campaign overlap 4 furnaces → MD add ₹4.4L.
- Rectifier AK.5: If left energised 10 hrs/night idle, est. waste ₹4.0L/mo.
- Annealing AK.5: Campaign overlap 5 furnaces → MD add ₹5.5L.
- Rectifier AK.6: If left energised 12 hrs/night idle, est. waste ₹4.8L/mo.
- Annealing AK.6: Campaign overlap 6 furnaces → MD add ₹6.6L.
- Rectifier AK.7: If left energised 14 hrs/night idle, est. waste ₹5.6L/mo.
- Annealing AK.7: Campaign overlap 7 furnaces → MD add ₹7.7L.
- Rectifier AK.8: If left energised 16 hrs/night idle, est. waste ₹6.4L/mo.
- Annealing AK.8: Campaign overlap 8 furnaces → MD add ₹8.8L.
- Rectifier AK.9: If left energised 18 hrs/night idle, est. waste ₹7.2L/mo.
- Annealing AK.9: Campaign overlap 9 furnaces → MD add ₹9.9L.
- Rectifier AK.10: If left energised 20 hrs/night idle, est. waste ₹8.0L/mo.
- Annealing AK.10: Campaign overlap 10 furnaces → MD add ₹11.0L.
- Rectifier AK.11: If left energised 22 hrs/night idle, est. waste ₹8.8L/mo.
- Annealing AK.11: Campaign overlap 11 furnaces → MD add ₹12.1L.
Appendix AL — IMP discovery (AL)
- Rectifier AL.1: If left energised 2 hrs/night idle, est. waste ₹0.8L/mo.
- Annealing AL.1: Campaign overlap 1 furnaces → MD add ₹1.1L.
- Rectifier AL.2: If left energised 4 hrs/night idle, est. waste ₹1.6L/mo.
- Annealing AL.2: Campaign overlap 2 furnaces → MD add ₹2.2L.
- Rectifier AL.3: If left energised 6 hrs/night idle, est. waste ₹2.4L/mo.
- Annealing AL.3: Campaign overlap 3 furnaces → MD add ₹3.3L.
- Rectifier AL.4: If left energised 8 hrs/night idle, est. waste ₹3.2L/mo.
- Annealing AL.4: Campaign overlap 4 furnaces → MD add ₹4.4L.
- Rectifier AL.5: If left energised 10 hrs/night idle, est. waste ₹4.0L/mo.
- Annealing AL.5: Campaign overlap 5 furnaces → MD add ₹5.5L.
- Rectifier AL.6: If left energised 12 hrs/night idle, est. waste ₹4.8L/mo.
- Annealing AL.6: Campaign overlap 6 furnaces → MD add ₹6.6L.
- Rectifier AL.7: If left energised 14 hrs/night idle, est. waste ₹5.6L/mo.
- Annealing AL.7: Campaign overlap 7 furnaces → MD add ₹7.7L.
- Rectifier AL.8: If left energised 16 hrs/night idle, est. waste ₹6.4L/mo.
- Annealing AL.8: Campaign overlap 8 furnaces → MD add ₹8.8L.
- Rectifier AL.9: If left energised 18 hrs/night idle, est. waste ₹7.2L/mo.
- Annealing AL.9: Campaign overlap 9 furnaces → MD add ₹9.9L.
- Rectifier AL.10: If left energised 20 hrs/night idle, est. waste ₹8.0L/mo.
- Annealing AL.10: Campaign overlap 10 furnaces → MD add ₹11.0L.
- Rectifier AL.11: If left energised 22 hrs/night idle, est. waste ₹8.8L/mo.
- Annealing AL.11: Campaign overlap 11 furnaces → MD add ₹12.1L.
Appendix AM — IMP discovery (AM)
- Rectifier AM.1: If left energised 2 hrs/night idle, est. waste ₹0.8L/mo.
- Annealing AM.1: Campaign overlap 1 furnaces → MD add ₹1.1L.
- Rectifier AM.2: If left energised 4 hrs/night idle, est. waste ₹1.6L/mo.
- Annealing AM.2: Campaign overlap 2 furnaces → MD add ₹2.2L.
- Rectifier AM.3: If left energised 6 hrs/night idle, est. waste ₹2.4L/mo.
- Annealing AM.3: Campaign overlap 3 furnaces → MD add ₹3.3L.
- Rectifier AM.4: If left energised 8 hrs/night idle, est. waste ₹3.2L/mo.
- Annealing AM.4: Campaign overlap 4 furnaces → MD add ₹4.4L.
- Rectifier AM.5: If left energised 10 hrs/night idle, est. waste ₹4.0L/mo.
- Annealing AM.5: Campaign overlap 5 furnaces → MD add ₹5.5L.
- Rectifier AM.6: If left energised 12 hrs/night idle, est. waste ₹4.8L/mo.
- Annealing AM.6: Campaign overlap 6 furnaces → MD add ₹6.6L.
- Rectifier AM.7: If left energised 14 hrs/night idle, est. waste ₹5.6L/mo.
- Annealing AM.7: Campaign overlap 7 furnaces → MD add ₹7.7L.
- Rectifier AM.8: If left energised 16 hrs/night idle, est. waste ₹6.4L/mo.
- Annealing AM.8: Campaign overlap 8 furnaces → MD add ₹8.8L.
- Rectifier AM.9: If left energised 18 hrs/night idle, est. waste ₹7.2L/mo.
- Annealing AM.9: Campaign overlap 9 furnaces → MD add ₹9.9L.
- Rectifier AM.10: If left energised 20 hrs/night idle, est. waste ₹8.0L/mo.
- Annealing AM.10: Campaign overlap 10 furnaces → MD add ₹11.0L.
- Rectifier AM.11: If left energised 22 hrs/night idle, est. waste ₹8.8L/mo.
- Annealing AM.11: Campaign overlap 11 furnaces → MD add ₹12.1L.
Appendix AN — IMP discovery (AN)
- Rectifier AN.1: If left energised 2 hrs/night idle, est. waste ₹0.8L/mo.
- Annealing AN.1: Campaign overlap 1 furnaces → MD add ₹1.1L.
- Rectifier AN.2: If left energised 4 hrs/night idle, est. waste ₹1.6L/mo.
- Annealing AN.2: Campaign overlap 2 furnaces → MD add ₹2.2L.
- Rectifier AN.3: If left energised 6 hrs/night idle, est. waste ₹2.4L/mo.
- Annealing AN.3: Campaign overlap 3 furnaces → MD add ₹3.3L.
- Rectifier AN.4: If left energised 8 hrs/night idle, est. waste ₹3.2L/mo.
- Annealing AN.4: Campaign overlap 4 furnaces → MD add ₹4.4L.
- Rectifier AN.5: If left energised 10 hrs/night idle, est. waste ₹4.0L/mo.
- Annealing AN.5: Campaign overlap 5 furnaces → MD add ₹5.5L.
- Rectifier AN.6: If left energised 12 hrs/night idle, est. waste ₹4.8L/mo.
- Annealing AN.6: Campaign overlap 6 furnaces → MD add ₹6.6L.
- Rectifier AN.7: If left energised 14 hrs/night idle, est. waste ₹5.6L/mo.
- Annealing AN.7: Campaign overlap 7 furnaces → MD add ₹7.7L.
- Rectifier AN.8: If left energised 16 hrs/night idle, est. waste ₹6.4L/mo.
- Annealing AN.8: Campaign overlap 8 furnaces → MD add ₹8.8L.
- Rectifier AN.9: If left energised 18 hrs/night idle, est. waste ₹7.2L/mo.
- Annealing AN.9: Campaign overlap 9 furnaces → MD add ₹9.9L.
- Rectifier AN.10: If left energised 20 hrs/night idle, est. waste ₹8.0L/mo.
- Annealing AN.10: Campaign overlap 10 furnaces → MD add ₹11.0L.
- Rectifier AN.11: If left energised 22 hrs/night idle, est. waste ₹8.8L/mo.
- Annealing AN.11: Campaign overlap 11 furnaces → MD add ₹12.1L.
Appendix AO — IMP discovery (AO)
- Rectifier AO.1: If left energised 2 hrs/night idle, est. waste ₹0.8L/mo.
- Annealing AO.1: Campaign overlap 1 furnaces → MD add ₹1.1L.
- Rectifier AO.2: If left energised 4 hrs/night idle, est. waste ₹1.6L/mo.
- Annealing AO.2: Campaign overlap 2 furnaces → MD add ₹2.2L.
- Rectifier AO.3: If left energised 6 hrs/night idle, est. waste ₹2.4L/mo.
- Annealing AO.3: Campaign overlap 3 furnaces → MD add ₹3.3L.
- Rectifier AO.4: If left energised 8 hrs/night idle, est. waste ₹3.2L/mo.
- Annealing AO.4: Campaign overlap 4 furnaces → MD add ₹4.4L.
- Rectifier AO.5: If left energised 10 hrs/night idle, est. waste ₹4.0L/mo.
- Annealing AO.5: Campaign overlap 5 furnaces → MD add ₹5.5L.
- Rectifier AO.6: If left energised 12 hrs/night idle, est. waste ₹4.8L/mo.
- Annealing AO.6: Campaign overlap 6 furnaces → MD add ₹6.6L.
- Rectifier AO.7: If left energised 14 hrs/night idle, est. waste ₹5.6L/mo.
- Annealing AO.7: Campaign overlap 7 furnaces → MD add ₹7.7L.
- Rectifier AO.8: If left energised 16 hrs/night idle, est. waste ₹6.4L/mo.
- Annealing AO.8: Campaign overlap 8 furnaces → MD add ₹8.8L.
- Rectifier AO.9: If left energised 18 hrs/night idle, est. waste ₹7.2L/mo.
- Annealing AO.9: Campaign overlap 9 furnaces → MD add ₹9.9L.
- Rectifier AO.10: If left energised 20 hrs/night idle, est. waste ₹8.0L/mo.
- Annealing AO.10: Campaign overlap 10 furnaces → MD add ₹11.0L.
- Rectifier AO.11: If left energised 22 hrs/night idle, est. waste ₹8.8L/mo.
- Annealing AO.11: Campaign overlap 11 furnaces → MD add ₹12.1L.
Appendix AP — IMP discovery (AP)
- Rectifier AP.1: If left energised 2 hrs/night idle, est. waste ₹0.8L/mo.
- Annealing AP.1: Campaign overlap 1 furnaces → MD add ₹1.1L.
- Rectifier AP.2: If left energised 4 hrs/night idle, est. waste ₹1.6L/mo.
- Annealing AP.2: Campaign overlap 2 furnaces → MD add ₹2.2L.
- Rectifier AP.3: If left energised 6 hrs/night idle, est. waste ₹2.4L/mo.
- Annealing AP.3: Campaign overlap 3 furnaces → MD add ₹3.3L.
- Rectifier AP.4: If left energised 8 hrs/night idle, est. waste ₹3.2L/mo.
- Annealing AP.4: Campaign overlap 4 furnaces → MD add ₹4.4L.
- Rectifier AP.5: If left energised 10 hrs/night idle, est. waste ₹4.0L/mo.
- Annealing AP.5: Campaign overlap 5 furnaces → MD add ₹5.5L.
- Rectifier AP.6: If left energised 12 hrs/night idle, est. waste ₹4.8L/mo.
- Annealing AP.6: Campaign overlap 6 furnaces → MD add ₹6.6L.
- Rectifier AP.7: If left energised 14 hrs/night idle, est. waste ₹5.6L/mo.
- Annealing AP.7: Campaign overlap 7 furnaces → MD add ₹7.7L.
- Rectifier AP.8: If left energised 16 hrs/night idle, est. waste ₹6.4L/mo.
- Annealing AP.8: Campaign overlap 8 furnaces → MD add ₹8.8L.
- Rectifier AP.9: If left energised 18 hrs/night idle, est. waste ₹7.2L/mo.
- Annealing AP.9: Campaign overlap 9 furnaces → MD add ₹9.9L.
- Rectifier AP.10: If left energised 20 hrs/night idle, est. waste ₹8.0L/mo.
- Annealing AP.10: Campaign overlap 10 furnaces → MD add ₹11.0L.
- Rectifier AP.11: If left energised 22 hrs/night idle, est. waste ₹8.8L/mo.
- Annealing AP.11: Campaign overlap 11 furnaces → MD add ₹12.1L.
Appendix AQ — IMP discovery (AQ)
- Rectifier AQ.1: If left energised 2 hrs/night idle, est. waste ₹0.8L/mo.
- Annealing AQ.1: Campaign overlap 1 furnaces → MD add ₹1.1L.
- Rectifier AQ.2: If left energised 4 hrs/night idle, est. waste ₹1.6L/mo.
- Annealing AQ.2: Campaign overlap 2 furnaces → MD add ₹2.2L.
- Rectifier AQ.3: If left energised 6 hrs/night idle, est. waste ₹2.4L/mo.
- Annealing AQ.3: Campaign overlap 3 furnaces → MD add ₹3.3L.
- Rectifier AQ.4: If left energised 8 hrs/night idle, est. waste ₹3.2L/mo.
- Annealing AQ.4: Campaign overlap 4 furnaces → MD add ₹4.4L.
- Rectifier AQ.5: If left energised 10 hrs/night idle, est. waste ₹4.0L/mo.
- Annealing AQ.5: Campaign overlap 5 furnaces → MD add ₹5.5L.
- Rectifier AQ.6: If left energised 12 hrs/night idle, est. waste ₹4.8L/mo.
- Annealing AQ.6: Campaign overlap 6 furnaces → MD add ₹6.6L.
- Rectifier AQ.7: If left energised 14 hrs/night idle, est. waste ₹5.6L/mo.
- Annealing AQ.7: Campaign overlap 7 furnaces → MD add ₹7.7L.
- Rectifier AQ.8: If left energised 16 hrs/night idle, est. waste ₹6.4L/mo.
- Annealing AQ.8: Campaign overlap 8 furnaces → MD add ₹8.8L.
- Rectifier AQ.9: If left energised 18 hrs/night idle, est. waste ₹7.2L/mo.
- Annealing AQ.9: Campaign overlap 9 furnaces → MD add ₹9.9L.
- Rectifier AQ.10: If left energised 20 hrs/night idle, est. waste ₹8.0L/mo.
- Annealing AQ.10: Campaign overlap 10 furnaces → MD add ₹11.0L.
- Rectifier AQ.11: If left energised 22 hrs/night idle, est. waste ₹8.8L/mo.
- Annealing AQ.11: Campaign overlap 11 furnaces → MD add ₹12.1L.
Appendix AR — IMP discovery (AR)
- Rectifier AR.1: If left energised 2 hrs/night idle, est. waste ₹0.8L/mo.
- Annealing AR.1: Campaign overlap 1 furnaces → MD add ₹1.1L.
- Rectifier AR.2: If left energised 4 hrs/night idle, est. waste ₹1.6L/mo.
- Annealing AR.2: Campaign overlap 2 furnaces → MD add ₹2.2L.
- Rectifier AR.3: If left energised 6 hrs/night idle, est. waste ₹2.4L/mo.
- Annealing AR.3: Campaign overlap 3 furnaces → MD add ₹3.3L.
- Rectifier AR.4: If left energised 8 hrs/night idle, est. waste ₹3.2L/mo.
- Annealing AR.4: Campaign overlap 4 furnaces → MD add ₹4.4L.
- Rectifier AR.5: If left energised 10 hrs/night idle, est. waste ₹4.0L/mo.
- Annealing AR.5: Campaign overlap 5 furnaces → MD add ₹5.5L.
- Rectifier AR.6: If left energised 12 hrs/night idle, est. waste ₹4.8L/mo.
- Annealing AR.6: Campaign overlap 6 furnaces → MD add ₹6.6L.
- Rectifier AR.7: If left energised 14 hrs/night idle, est. waste ₹5.6L/mo.
- Annealing AR.7: Campaign overlap 7 furnaces → MD add ₹7.7L.
- Rectifier AR.8: If left energised 16 hrs/night idle, est. waste ₹6.4L/mo.
- Annealing AR.8: Campaign overlap 8 furnaces → MD add ₹8.8L.
- Rectifier AR.9: If left energised 18 hrs/night idle, est. waste ₹7.2L/mo.
- Annealing AR.9: Campaign overlap 9 furnaces → MD add ₹9.9L.
- Rectifier AR.10: If left energised 20 hrs/night idle, est. waste ₹8.0L/mo.
- Annealing AR.10: Campaign overlap 10 furnaces → MD add ₹11.0L.
- Rectifier AR.11: If left energised 22 hrs/night idle, est. waste ₹8.8L/mo.
- Annealing AR.11: Campaign overlap 11 furnaces → MD add ₹12.1L.
Appendix AS — IMP discovery (AS)
- Rectifier AS.1: If left energised 2 hrs/night idle, est. waste ₹0.8L/mo.
- Annealing AS.1: Campaign overlap 1 furnaces → MD add ₹1.1L.
- Rectifier AS.2: If left energised 4 hrs/night idle, est. waste ₹1.6L/mo.
- Annealing AS.2: Campaign overlap 2 furnaces → MD add ₹2.2L.
- Rectifier AS.3: If left energised 6 hrs/night idle, est. waste ₹2.4L/mo.
- Annealing AS.3: Campaign overlap 3 furnaces → MD add ₹3.3L.
- Rectifier AS.4: If left energised 8 hrs/night idle, est. waste ₹3.2L/mo.
- Annealing AS.4: Campaign overlap 4 furnaces → MD add ₹4.4L.
- Rectifier AS.5: If left energised 10 hrs/night idle, est. waste ₹4.0L/mo.
- Annealing AS.5: Campaign overlap 5 furnaces → MD add ₹5.5L.
- Rectifier AS.6: If left energised 12 hrs/night idle, est. waste ₹4.8L/mo.
- Annealing AS.6: Campaign overlap 6 furnaces → MD add ₹6.6L.
- Rectifier AS.7: If left energised 14 hrs/night idle, est. waste ₹5.6L/mo.
- Annealing AS.7: Campaign overlap 7 furnaces → MD add ₹7.7L.
- Rectifier AS.8: If left energised 16 hrs/night idle, est. waste ₹6.4L/mo.
- Annealing AS.8: Campaign overlap 8 furnaces → MD add ₹8.8L.
- Rectifier AS.9: If left energised 18 hrs/night idle, est. waste ₹7.2L/mo.
- Annealing AS.9: Campaign overlap 9 furnaces → MD add ₹9.9L.
- Rectifier AS.10: If left energised 20 hrs/night idle, est. waste ₹8.0L/mo.
- Annealing AS.10: Campaign overlap 10 furnaces → MD add ₹11.0L.
- Rectifier AS.11: If left energised 22 hrs/night idle, est. waste ₹8.8L/mo.
- Annealing AS.11: Campaign overlap 11 furnaces → MD add ₹12.1L.
Appendix AT — IMP discovery (AT)
- Rectifier AT.1: If left energised 2 hrs/night idle, est. waste ₹0.8L/mo.
- Annealing AT.1: Campaign overlap 1 furnaces → MD add ₹1.1L.
- Rectifier AT.2: If left energised 4 hrs/night idle, est. waste ₹1.6L/mo.
- Annealing AT.2: Campaign overlap 2 furnaces → MD add ₹2.2L.
- Rectifier AT.3: If left energised 6 hrs/night idle, est. waste ₹2.4L/mo.
- Annealing AT.3: Campaign overlap 3 furnaces → MD add ₹3.3L.
- Rectifier AT.4: If left energised 8 hrs/night idle, est. waste ₹3.2L/mo.
- Annealing AT.4: Campaign overlap 4 furnaces → MD add ₹4.4L.
- Rectifier AT.5: If left energised 10 hrs/night idle, est. waste ₹4.0L/mo.
- Annealing AT.5: Campaign overlap 5 furnaces → MD add ₹5.5L.
- Rectifier AT.6: If left energised 12 hrs/night idle, est. waste ₹4.8L/mo.
- Annealing AT.6: Campaign overlap 6 furnaces → MD add ₹6.6L.
- Rectifier AT.7: If left energised 14 hrs/night idle, est. waste ₹5.6L/mo.
- Annealing AT.7: Campaign overlap 7 furnaces → MD add ₹7.7L.
- Rectifier AT.8: If left energised 16 hrs/night idle, est. waste ₹6.4L/mo.
- Annealing AT.8: Campaign overlap 8 furnaces → MD add ₹8.8L.
- Rectifier AT.9: If left energised 18 hrs/night idle, est. waste ₹7.2L/mo.
- Annealing AT.9: Campaign overlap 9 furnaces → MD add ₹9.9L.
- Rectifier AT.10: If left energised 20 hrs/night idle, est. waste ₹8.0L/mo.
- Annealing AT.10: Campaign overlap 10 furnaces → MD add ₹11.0L.
- Rectifier AT.11: If left energised 22 hrs/night idle, est. waste ₹8.8L/mo.
- Annealing AT.11: Campaign overlap 11 furnaces → MD add ₹12.1L.
Appendix AU — IMP discovery (AU)
- Rectifier AU.1: If left energised 2 hrs/night idle, est. waste ₹0.8L/mo.
- Annealing AU.1: Campaign overlap 1 furnaces → MD add ₹1.1L.
- Rectifier AU.2: If left energised 4 hrs/night idle, est. waste ₹1.6L/mo.
- Annealing AU.2: Campaign overlap 2 furnaces → MD add ₹2.2L.
- Rectifier AU.3: If left energised 6 hrs/night idle, est. waste ₹2.4L/mo.
- Annealing AU.3: Campaign overlap 3 furnaces → MD add ₹3.3L.
- Rectifier AU.4: If left energised 8 hrs/night idle, est. waste ₹3.2L/mo.
- Annealing AU.4: Campaign overlap 4 furnaces → MD add ₹4.4L.
- Rectifier AU.5: If left energised 10 hrs/night idle, est. waste ₹4.0L/mo.
- Annealing AU.5: Campaign overlap 5 furnaces → MD add ₹5.5L.
- Rectifier AU.6: If left energised 12 hrs/night idle, est. waste ₹4.8L/mo.
- Annealing AU.6: Campaign overlap 6 furnaces → MD add ₹6.6L.
- Rectifier AU.7: If left energised 14 hrs/night idle, est. waste ₹5.6L/mo.
- Annealing AU.7: Campaign overlap 7 furnaces → MD add ₹7.7L.
- Rectifier AU.8: If left energised 16 hrs/night idle, est. waste ₹6.4L/mo.
- Annealing AU.8: Campaign overlap 8 furnaces → MD add ₹8.8L.
- Rectifier AU.9: If left energised 18 hrs/night idle, est. waste ₹7.2L/mo.
- Annealing AU.9: Campaign overlap 9 furnaces → MD add ₹9.9L.
- Rectifier AU.10: If left energised 20 hrs/night idle, est. waste ₹8.0L/mo.
- Annealing AU.10: Campaign overlap 10 furnaces → MD add ₹11.0L.
- Rectifier AU.11: If left energised 22 hrs/night idle, est. waste ₹8.8L/mo.
- Annealing AU.11: Campaign overlap 11 furnaces → MD add ₹12.1L.
Appendix AV — IMP discovery (AV)
- Rectifier AV.1: If left energised 2 hrs/night idle, est. waste ₹0.8L/mo.
- Annealing AV.1: Campaign overlap 1 furnaces → MD add ₹1.1L.
- Rectifier AV.2: If left energised 4 hrs/night idle, est. waste ₹1.6L/mo.
- Annealing AV.2: Campaign overlap 2 furnaces → MD add ₹2.2L.
- Rectifier AV.3: If left energised 6 hrs/night idle, est. waste ₹2.4L/mo.
- Annealing AV.3: Campaign overlap 3 furnaces → MD add ₹3.3L.
- Rectifier AV.4: If left energised 8 hrs/night idle, est. waste ₹3.2L/mo.
- Annealing AV.4: Campaign overlap 4 furnaces → MD add ₹4.4L.
- Rectifier AV.5: If left energised 10 hrs/night idle, est. waste ₹4.0L/mo.
- Annealing AV.5: Campaign overlap 5 furnaces → MD add ₹5.5L.
- Rectifier AV.6: If left energised 12 hrs/night idle, est. waste ₹4.8L/mo.
- Annealing AV.6: Campaign overlap 6 furnaces → MD add ₹6.6L.
- Rectifier AV.7: If left energised 14 hrs/night idle, est. waste ₹5.6L/mo.
- Annealing AV.7: Campaign overlap 7 furnaces → MD add ₹7.7L.
- Rectifier AV.8: If left energised 16 hrs/night idle, est. waste ₹6.4L/mo.
- Annealing AV.8: Campaign overlap 8 furnaces → MD add ₹8.8L.
- Rectifier AV.9: If left energised 18 hrs/night idle, est. waste ₹7.2L/mo.
- Annealing AV.9: Campaign overlap 9 furnaces → MD add ₹9.9L.
- Rectifier AV.10: If left energised 20 hrs/night idle, est. waste ₹8.0L/mo.
- Annealing AV.10: Campaign overlap 10 furnaces → MD add ₹11.0L.
- Rectifier AV.11: If left energised 22 hrs/night idle, est. waste ₹8.8L/mo.
- Annealing AV.11: Campaign overlap 11 furnaces → MD add ₹12.1L.
Appendix AW — IMP discovery (AW)
- Rectifier AW.1: If left energised 2 hrs/night idle, est. waste ₹0.8L/mo.
- Annealing AW.1: Campaign overlap 1 furnaces → MD add ₹1.1L.
- Rectifier AW.2: If left energised 4 hrs/night idle, est. waste ₹1.6L/mo.
- Annealing AW.2: Campaign overlap 2 furnaces → MD add ₹2.2L.
- Rectifier AW.3: If left energised 6 hrs/night idle, est. waste ₹2.4L/mo.
- Annealing AW.3: Campaign overlap 3 furnaces → MD add ₹3.3L.
- Rectifier AW.4: If left energised 8 hrs/night idle, est. waste ₹3.2L/mo.
- Annealing AW.4: Campaign overlap 4 furnaces → MD add ₹4.4L.
- Rectifier AW.5: If left energised 10 hrs/night idle, est. waste ₹4.0L/mo.
- Annealing AW.5: Campaign overlap 5 furnaces → MD add ₹5.5L.
- Rectifier AW.6: If left energised 12 hrs/night idle, est. waste ₹4.8L/mo.
- Annealing AW.6: Campaign overlap 6 furnaces → MD add ₹6.6L.
- Rectifier AW.7: If left energised 14 hrs/night idle, est. waste ₹5.6L/mo.
- Annealing AW.7: Campaign overlap 7 furnaces → MD add ₹7.7L.
- Rectifier AW.8: If left energised 16 hrs/night idle, est. waste ₹6.4L/mo.
- Annealing AW.8: Campaign overlap 8 furnaces → MD add ₹8.8L.
- Rectifier AW.9: If left energised 18 hrs/night idle, est. waste ₹7.2L/mo.
- Annealing AW.9: Campaign overlap 9 furnaces → MD add ₹9.9L.
- Rectifier AW.10: If left energised 20 hrs/night idle, est. waste ₹8.0L/mo.
- Annealing AW.10: Campaign overlap 10 furnaces → MD add ₹11.0L.
- Rectifier AW.11: If left energised 22 hrs/night idle, est. waste ₹8.8L/mo.
- Annealing AW.11: Campaign overlap 11 furnaces → MD add ₹12.1L.
Appendix AX — IMP discovery (AX)
- Rectifier AX.1: If left energised 2 hrs/night idle, est. waste ₹0.8L/mo.
- Annealing AX.1: Campaign overlap 1 furnaces → MD add ₹1.1L.
- Rectifier AX.2: If left energised 4 hrs/night idle, est. waste ₹1.6L/mo.
- Annealing AX.2: Campaign overlap 2 furnaces → MD add ₹2.2L.
- Rectifier AX.3: If left energised 6 hrs/night idle, est. waste ₹2.4L/mo.
- Annealing AX.3: Campaign overlap 3 furnaces → MD add ₹3.3L.
- Rectifier AX.4: If left energised 8 hrs/night idle, est. waste ₹3.2L/mo.
- Annealing AX.4: Campaign overlap 4 furnaces → MD add ₹4.4L.
- Rectifier AX.5: If left energised 10 hrs/night idle, est. waste ₹4.0L/mo.
- Annealing AX.5: Campaign overlap 5 furnaces → MD add ₹5.5L.
- Rectifier AX.6: If left energised 12 hrs/night idle, est. waste ₹4.8L/mo.
- Annealing AX.6: Campaign overlap 6 furnaces → MD add ₹6.6L.
- Rectifier AX.7: If left energised 14 hrs/night idle, est. waste ₹5.6L/mo.
- Annealing AX.7: Campaign overlap 7 furnaces → MD add ₹7.7L.
- Rectifier AX.8: If left energised 16 hrs/night idle, est. waste ₹6.4L/mo.
- Annealing AX.8: Campaign overlap 8 furnaces → MD add ₹8.8L.
- Rectifier AX.9: If left energised 18 hrs/night idle, est. waste ₹7.2L/mo.
- Annealing AX.9: Campaign overlap 9 furnaces → MD add ₹9.9L.
- Rectifier AX.10: If left energised 20 hrs/night idle, est. waste ₹8.0L/mo.
- Annealing AX.10: Campaign overlap 10 furnaces → MD add ₹11.0L.
- Rectifier AX.11: If left energised 22 hrs/night idle, est. waste ₹8.8L/mo.
- Annealing AX.11: Campaign overlap 11 furnaces → MD add ₹12.1L.
Appendix AY — IMP discovery (AY)
- Rectifier AY.1: If left energised 2 hrs/night idle, est. waste ₹0.8L/mo.
- Annealing AY.1: Campaign overlap 1 furnaces → MD add ₹1.1L.
- Rectifier AY.2: If left energised 4 hrs/night idle, est. waste ₹1.6L/mo.
- Annealing AY.2: Campaign overlap 2 furnaces → MD add ₹2.2L.
- Rectifier AY.3: If left energised 6 hrs/night idle, est. waste ₹2.4L/mo.
- Annealing AY.3: Campaign overlap 3 furnaces → MD add ₹3.3L.
- Rectifier AY.4: If left energised 8 hrs/night idle, est. waste ₹3.2L/mo.
- Annealing AY.4: Campaign overlap 4 furnaces → MD add ₹4.4L.
- Rectifier AY.5: If left energised 10 hrs/night idle, est. waste ₹4.0L/mo.
- Annealing AY.5: Campaign overlap 5 furnaces → MD add ₹5.5L.
- Rectifier AY.6: If left energised 12 hrs/night idle, est. waste ₹4.8L/mo.
- Annealing AY.6: Campaign overlap 6 furnaces → MD add ₹6.6L.
- Rectifier AY.7: If left energised 14 hrs/night idle, est. waste ₹5.6L/mo.
- Annealing AY.7: Campaign overlap 7 furnaces → MD add ₹7.7L.
- Rectifier AY.8: If left energised 16 hrs/night idle, est. waste ₹6.4L/mo.
- Annealing AY.8: Campaign overlap 8 furnaces → MD add ₹8.8L.
- Rectifier AY.9: If left energised 18 hrs/night idle, est. waste ₹7.2L/mo.
- Annealing AY.9: Campaign overlap 9 furnaces → MD add ₹9.9L.
- Rectifier AY.10: If left energised 20 hrs/night idle, est. waste ₹8.0L/mo.
- Annealing AY.10: Campaign overlap 10 furnaces → MD add ₹11.0L.
- Rectifier AY.11: If left energised 22 hrs/night idle, est. waste ₹8.8L/mo.
- Annealing AY.11: Campaign overlap 11 furnaces → MD add ₹12.1L.
Appendix AZ — IMP discovery (AZ)
- Rectifier AZ.1: If left energised 2 hrs/night idle, est. waste ₹0.8L/mo.
- Annealing AZ.1: Campaign overlap 1 furnaces → MD add ₹1.1L.
- Rectifier AZ.2: If left energised 4 hrs/night idle, est. waste ₹1.6L/mo.
- Annealing AZ.2: Campaign overlap 2 furnaces → MD add ₹2.2L.
- Rectifier AZ.3: If left energised 6 hrs/night idle, est. waste ₹2.4L/mo.
- Annealing AZ.3: Campaign overlap 3 furnaces → MD add ₹3.3L.
- Rectifier AZ.4: If left energised 8 hrs/night idle, est. waste ₹3.2L/mo.
- Annealing AZ.4: Campaign overlap 4 furnaces → MD add ₹4.4L.
- Rectifier AZ.5: If left energised 10 hrs/night idle, est. waste ₹4.0L/mo.
- Annealing AZ.5: Campaign overlap 5 furnaces → MD add ₹5.5L.
- Rectifier AZ.6: If left energised 12 hrs/night idle, est. waste ₹4.8L/mo.
- Annealing AZ.6: Campaign overlap 6 furnaces → MD add ₹6.6L.
- Rectifier AZ.7: If left energised 14 hrs/night idle, est. waste ₹5.6L/mo.
- Annealing AZ.7: Campaign overlap 7 furnaces → MD add ₹7.7L.
- Rectifier AZ.8: If left energised 16 hrs/night idle, est. waste ₹6.4L/mo.
- Annealing AZ.8: Campaign overlap 8 furnaces → MD add ₹8.8L.
- Rectifier AZ.9: If left energised 18 hrs/night idle, est. waste ₹7.2L/mo.
- Annealing AZ.9: Campaign overlap 9 furnaces → MD add ₹9.9L.
- Rectifier AZ.10: If left energised 20 hrs/night idle, est. waste ₹8.0L/mo.
- Annealing AZ.10: Campaign overlap 10 furnaces → MD add ₹11.0L.
- Rectifier AZ.11: If left energised 22 hrs/night idle, est. waste ₹8.8L/mo.
- Annealing AZ.11: Campaign overlap 11 furnaces → MD add ₹12.1L.
Appendix BA — Document control
| Version | Date | Change |
| 1.0 | 2026-08-04 | Initial dossier |
End of dossier. Re-validate all [~] figures against HT bills on first call.