How to use this dossier: Jammu Pigments is not a generic “big electricity user.” It is a secondary non-ferrous recycler — rotary furnaces, hydromet trains, ball mills, and filter presses stacked on JPDCL (Kathua) and JVVNL (Dariba) HT feeds — that just took GPIL (Hira Group) money at ~₹500 Cr post-money while the promoter Ramesh Kumar Agarwal still runs day-to-day. Stamped wins here if we talk furnace hold, batch restart overlap, and verified ₹ on the next JPDCL bill — not ESG decks or another EMS dashboard. Read §1.9 and §4.3 before picking a champion.
1. Company overview & snapshot
1.1 Legal identity & corporate structure
Jammu Pigments Limited (CIN U24119DL2005PLC203501) was incorporated 29 August 2005 and is registered with the Registrar of Companies, Delhi. The company is unlisted (no NSE/BSE scrip). Paid-up capital: ₹19.50 Cr [MCA, Jan 2026]; authorised capital: ₹81.00 Cr [MCA].
| Field | Detail |
|---|---|
| Legal name | Jammu Pigments Limited |
| CIN | U24119DL2005PLC203501 |
| Incorporation | 29 Aug 2005 |
| ROC | Delhi |
| Listed | No |
| Industry (NIC) | Manufacturing — lead, zinc, copper, cadmium recycling & refining [~] |
| Published email | commercial@jammupigments.com verified (website) |
| Published phone | +91 9116601097 verified (website — corporate + Kathua plant) |
| Website | https://www.jammupigments.com |
| Company LinkedIn | https://www.linkedin.com/company/jammu-pigments-limited [!] confirm active |
| Credit rating | Infomerics IVR A / Stable (LT); IVR A1 (ST) — upgraded 27 Jan 2025; reaffirmed 28 Mar 2026 |
| Prior CRA flag | Brickwork Ratings — Issuer Not Cooperating (press release 10 Dec 2024) — non-submission of surveillance info; superseded by Infomerics post-GPIL close |
| Open charges (MCA) | ₹366.33 Cr open; ₹131.09 Cr satisfied [The Company Check, Jan 2026] |
Promoter / shareholding (post-Mar 2025)
| Party | Stake (fully diluted) | Notes |
|---|---|---|
| Godawari Power & Ispat Ltd (GPIL) | 43.96% | Diluted from 51% after CCPS allotment to promoter 29 Mar 2025 |
| Ramesh Kumar Agarwal & promoter group | ~56% [~] | Includes CCPS conversion path; MD retains operational control |
| Post-money valuation | ~₹500 Cr | GPIL investor presentation, Dec 2024 |
Acquisition timeline (GPIL)
| Date | Event |
|---|---|
| 19 Nov 2024 | GPIL board approves up to 51% stake for ₹255 Cr fully diluted |
| 20 Nov 2024 | First tranche: 49% via primary CCPS + secondary from promoters |
| 01 Jan 2025 | Second tranche: additional 2% for ₹9.98 Cr from Ramesh Kumar Agarwal |
| 27 Jan 2025 | Infomerics upgrades to IVR A/Stable on GPIL completion |
| 29 Mar 2025 | Balance 20,19,750 CCPS allotted to Ramesh Kumar Agarwal → GPIL diluted to 43.96% |
Group / promoter map (Mittal–Agarwal)
The Mittal group traces to a 1958 family business in zinc salts; formal entities multiplied from the 1990s. Key related parties per GPIL deck and MCA:
| Entity | Relationship | Role |
|---|---|---|
| Mittal Pigments Pvt Ltd (MPPL) | Subsidiary (Kota) | Zinc oxide, lead compounds; Indraprastha Industrial Area |
| Mittal Chemicals | Group | Chemicals trading / support [dir] |
| Jammu Rubber Industries | Promoter-linked | Ancillary [GPIL deck] |
| National Thermoplast (95%) | Group | Plastics [GPIL deck] |
| R.G. Pigments Pvt Ltd | Wholly owned sub of JPL | Acquired 2024; standalone GPIL acquisition cancelled Nov 2024 |
| Chem Color (India) Ltd | Acquired 2024 | Pigments / chemicals |
| Chambal Alums Pvt Ltd | Acquired 2024 | Alumina / chemicals [~] |
| R R Pigments Pvt Ltd | Acquired 2024 | Pigments |
| Rama Metals, Uniforce Metals, National Sports Industries | Acquired 2019 (95% each) | Kathua cluster support entities |
| Jammu Logistics | Division | 90+ captive transport fleet; IBA-approved transport operator (2017) |
Memberships & certifications (public)
| Body | Status |
|---|---|
| ICC (Indian Chamber of Commerce) | Member [website] |
| ISRI (Institute of Scrap Recycling Industries) | Member [website] |
| MSME | Registered; India SME 100 Award 2018–19 |
| ISO | [!] not listed on website — confirm on call |
Do not confuse with: Jammu & Kashmir Pigments Pvt Ltd (merged 2012), Jupiter Kathua (different company in JKPCC press), or unrelated “Pigments” SMEs in Delhi NCR. Always anchor on CIN U24119DL2005PLC203501 + Kathua GSTIN 01AABCJ6000H1ZC.
1.2 What they make & where money comes from
JPL is among India’s larger secondary lead–zinc–copper–cadmium recyclers — processing battery scrap, dross, ash, filter cake, and smelter by-products into refined metals and compounds. The company self-describes as “Grade-I” and “waste to wealth” with HZL (Hindustan Zinc Ltd) partnership since 2014 for by-product and waste processing.
Product portfolio (manufacturing)
| Product family | Examples | End-use industries |
|---|---|---|
| Lead | Ingots, alloys (Sb, Sn), pure lead | Battery, cable, radiation shielding |
| Lead oxides | Grey oxide, litharge, red lead | Battery paste, glass, pigments |
| Zinc | Zinc oxide, zinc sulphate | Rubber, tyre, paint, pharma, PVC |
| Copper | Cathode, sulphate | Wire, chemicals |
| Cadmium | Metal, alloys | Ni-Cd batteries, plating [~] |
| Other | Antimony, tin traces from complex waste | Alloys, chemicals |
Capacity snapshot (existing — GPIL investor deck, Dec 2024)
| Metal / product | Existing capacity (TPA) | Post-expansion target (TPA) | Capex (₹ Cr) |
|---|---|---|---|
| Lead (alloy, oxide, compounds) | 126,198 | 177,148 | part of ~200 total |
| Zinc (oxide, sulphate, compounds) | 29,431 | 39,478 | electrolysis planned |
| Copper (cathode, sulphate) | 4,981 | 6,231 | |
| Cadmium (metal, alloy) | 8,400 | 13,900 | |
| Other metals | 27,562 | 30,812 | |
| Group total | 196,572 | 267,569 | ~200 Cr to FY27 [GPIL deck] |
Revenue mix hypothesis [~]
| Stream | Share [~] | Notes |
|---|---|---|
| Lead & lead compounds | 45–55% | Core; battery scrap feed |
| Zinc oxide & salts | 25–35% | Mittal Pigments heritage |
| Copper / cadmium / other | 10–15% | HZL waste streams; higher margin [~] |
| Trading (ore, concentrate) | 5–10% | Infomerics notes trading activity |
Financial scale (consolidated, audited — Infomerics)
| Metric | FY23 | FY24 | FY25 |
|---|---|---|---|
| Total operating income | ₹1,013.38 Cr | ₹1,173.78 Cr | ₹859.88 Cr |
| EBITDA | ₹49.25 Cr | ₹73.86 Cr | ₹47.85 Cr |
| EBITDA margin | 4.86% | 6.29% | 5.57% [~] |
| PAT | ₹17.17 Cr | ₹26.98 Cr | ₹28.69 Cr |
| Standalone revenue FY25 | — | — | ~₹578 Cr [Infomerics / user intel] |
| Gross cash accruals FY24 | ₹25.66 Cr | ₹35.83 Cr | [~] |
| Total debt | ₹161.20 Cr | ₹117.98 Cr | ₹166.21 Cr [Mar 2026 reaffirmation] |
| Tangible net worth (adj.) | ₹130.27 Cr | ₹155.11 Cr | ₹402.44 Cr post-GPIL equity |
| Interest coverage | 2.58× | 2.77× | 1.33× FY25 (shutdown year) |
FY25 revenue drop (−26.76% y/y) attributed to planned maintenance shutdown per Infomerics Mar 2026 — not structural demand collapse. FY26 recovery expected on volume and margin stabilisation.
Export vs domestic: Exports began 2007 per company milestones — Western Europe, Middle East, Africa, SE Asia cited. Exact export % not in public AR [gap — ask CFO]. Domestic battery and tyre OEMs likely anchor base.
Bank facilities rated (Infomerics Jan 2025)
| Facility | Amount (₹ Cr) | Rating |
|---|---|---|
| Term Loan (LT) | 60.75 → 114.19 [Mar 2026] | IVR A/Stable |
| GECL | 3.22 | IVR A/Stable |
| Cash Credit / WCDL | 27.00 + 18.08 | IVR A/Stable |
| LC / BG / SLC | 16.25 combined | IVR A1 |
1.3 Plants, addresses & footprint
Manufacturing sites
| Site | Address | GSTIN | DISCOM | Role | Pilot priority |
|---|---|---|---|---|---|
| Kathua (J&K) — primary | Khasra No. 717/725, Logate Morh, Village Logate, Dist. Kathua, J&K 184104 | 01AABCJ6000H1ZC | JPDCL (Jammu Power Distribution Corporation Ltd) | Lead pyro + hydro; largest integrated recycling complex; 90+ truck fleet base | #1 — 90-day pilot |
| Dariba (Rajasthan) | Village Dariba, Post Dariba, Tehsil Railmagra, Dist. Rajsamand, Rajasthan 312001 | 08AABCJ6000H1ZY | JVVNL (Jaipur Vidyut Vitran Nigam Ltd) | Lead/zinc processing; rail access to Rajsamand industrial belt | #2 — rollout |
| Kota — Mittal Pigments | Indraprastha Industrial Area, Kota, Rajasthan [~] | [!] confirm | JVVNL / RVPN area [~] | Zinc oxide, lead compounds; subsidiary MPPL | Phase 3 |
| Delhi — registered office | House No. 217, Gururam Das Nagar, Lane 2, Mangal Bazar, Laxmi Nagar (E), Delhi 110092 | — | — | Corporate / commercial | Not manufacturing |
Kathua complex — internal layout hypothesis [~]
Based on LinkedIn champion signals (Hydro I/II, Pyro II installations) and secondary smelter norms:
| Area | Process | Critical electrical loads |
|---|---|---|
| Pyro I / Pyro II | Rotary furnace lead smelting | Rotary furnace drives, burners, ID fans, bag houses |
| Hydro I / Hydro II | Hydrometallurgical refining | Agitators, filter presses, pumps, electrolysis [expansion] |
| Preparation | Crushing, ball mill, hammer mill | Ball mills, hammer mills, conveyors |
| Utilities | Water treatment, compressed air, DG | Pumps, compressors, cooling |
| Material handling | EOT cranes, conveyors | EOT cranes — MD spike risk on simultaneous lift + furnace restart |
Dariba complex — hypothesis [~]
| Area | Loads | Champion signal |
|---|---|---|
| Rotary furnace line | Furnace, exhaust, casting | Ankit Singh — electrical maint |
| Mill house | Ball mill | Ankit Singh profile |
| Stores / crane bay | EOT crane |
Logistics footprint
- 90+ captive transport fleet (company milestone / outreach kit) — diesel OPEX significant but separate from HT pilot scope unless group energy reporting consolidates
[~] - Jammu Logistics division — IBA-approved transport operator (2017)
- Raw material inbound: battery scrap, dross, HZL waste streams; outbound: ingots, oxides to OEMs and exporters
Recommend pilot site: Kathua HT feeder under JPDCL — largest load concentration, Plant Head Gajendra Nathawat identified, pyro/hydro overlap maximises Stamped two-pillar value.
1.4 Leadership & CRM map
Tier 0 — Board & economic buyers
| Name | Title | DIN | Appointment | Outreach role |
|---|---|---|---|---|
| Ramesh Kumar Agarwal | Managing Director | 00293312 | Feb 2013 (MD) | Economic buyer; 30+ years metals; still operational; GPIL co-control |
| Asha Devi Mittal | Director / CFO [~] | 00293713 | May 2009 | Finance, banking, CCPS/GPIL structuring |
| Sunil Duggal | Independent Director | 07291685 | Jan/Feb 2025 | Ex-CEO Dabur (~17 yrs); governance polish post-GPIL; not first call |
| Dinesh Kumar Gandhi | Director | 01081155 | Nov 2024 | Professional director [~] |
| Lalit Kumar Jain | Director | — | Feb 2025 | Post-GPIL board refresh |
| Rakesh Gupta | Independent Director | 11249832 | Oct 2025 | Governance |
| Priyanka Alwani | Director | 10532675 | Mar 2024 | [~] |
| Kapil Gupta | Director | — | [!] | Confirm role — Company Check lists |
GPIL (parent) key names for escalation
| Name | Role | Relevance |
|---|---|---|
| B. L. Agrawal | MD, GPIL | Strategic owner; Chhattisgarh steel background |
| Y. C. Rao | Company Secretary, GPIL | Exchange filings |
| Sunil Duggal | Also on GPIL board (Sep 2025) | Bridge between JPL and GPIL governance |
Tier 1 — Plant leadership (technical champions)
| Name | Title | Site | Stamped fit | |
|---|---|---|---|---|
| Gajendra Nathawat | Plant Head | Kathua | gajendra-nathawat-78aaa9121 | #1 champion — P&L + ops; Aug 2025–present |
| Ankit Singh | Electrical Maintenance Engineer | Dariba | ankit-singh-b6b492225 | HT/feeder owner; rotary furnace, ball mill, EOT |
| Pradeep Vyas | Production Manager, Lead Plant | Kathua | pradeep-vyas-98a53355 | Batch sequencing ally |
| Rajesh Kumar Mundra | Incharge, Hydro Plant | Kathua | rajesh-kumar-mundra-733185143 | Hydromet train loads |
| Rahul Patidar | Mechanical (installed Hydro I/II, Pyro II) | Kathua | rahul-patidar-8119b019b | Equipment maint-energy overlap |
Tier 2 — Functional heads [dir / inferred]
| Function | Likely owner | Notes |
|---|---|---|
| Electrical / HT billing (Kathua) | [!] not identified on LinkedIn | Ask Nathawat on first call |
| Environment / EHS | [dir] | JKPCC compliance; sensitive topic |
| Procurement / scrap | Commercial team | Feed mix drives furnace campaign length |
| IT / automation | [dir] | Metering export for Stamped Path A/B |
Decision path (tested hypothesis)
Technical pilot: Gajendra Nathawat (Plant Head) + Electrical maint Kathua [TBD]
→ Pradeep Vyas (production sequencing) + Rajesh Mundra (hydro)
Co-champion: Rahul Patidar (mechanical overlap prescriptions)
Dariba parallel: Ankit Singh (electrical)
Commercial close: Ramesh Kumar Agarwal (MD) / Asha Devi Mittal (CFO)
→ GPIL board if >₹X lakh or multi-site rollout
Governance: Sunil Duggal — only if vendor diligence escalates
Email patterns
| Address | Confidence |
|---|---|
commercial@jammupigments.com | Verified (website) |
gajendra.nathawat@jammupigments.com | Inferred [!] — confirm before send |
FirstLast@jammupigments.com | Hypothesis [~] — test with bounce |
1.5 Recent news (24 months) & timing for Stamped
| When | What | Why it matters for outreach |
|---|---|---|
| Nov 2024 | GPIL announces 51% acquisition at ~₹500 Cr valuation | Balance-sheet capacity; GPIL expects margin discipline |
| Dec 2024 | Brickwork Ratings — Issuer Not Cooperating | Transparency gap pre-close; now resolved via Infomerics |
| Jan 2025 | GPIL completes 51% stake; Infomerics IVR A/Stable | Vendor onboarding may be faster with GPIL procurement norms |
| Mar 2025 | Promoter CCPS → GPIL diluted to 43.96% | Ramesh Agarwal still control-heavy; pitch operational ROI |
| FY25 | Planned maintenance shutdown → TOI ₹860 Cr | Plants were down — post-restart MD spikes likely in H1 FY26 |
| 2024 | Acquisitions: Mittal Pigments, Chem Color, Chambal Alums, RR Pigments | Integration load; new lines = new leak points |
| 2018–19 | India SME 100 Award (Hon’ble MSME Minister) | Pride point — use sparingly, not as opener |
| Ongoing | ~₹200 Cr expansion capex to FY27 | Post-capex bill proof angle — don’t recreate MD on new furnaces |
| Sep 2024+ | NGT suo motu on Kathua industrial EC lapses (sector) | Do not lead with compliance — see §6.1 |
Timing verdict: Good now (Aug 2026) — FY26 volume recovery underway after FY25 shutdown; GPIL governance in place; expansion capex creates urgency to baseline energy before new capacity. Avoid heavy vendor pushes if JKPCC/NGT headlines spike locally.
1.6 Corporate history (condensed timeline)
From JPL website milestones — useful for understanding why Kathua + Dariba + Kota:
| Era | Milestone |
|---|---|
| 1958 | Family business in zinc and salts |
| 1969 | Zinc salts manufacturing |
| 1989 | Diversified into zinc salts + lead compounds |
| 1992 | Mittal Pigments Pvt Ltd — Kota, zinc oxide + lead recycling |
| 1994 | R&D on lead-zinc salts |
| 2005 | Jammu Pigments Pvt Ltd — Kathua lead recycling unit |
| 2007 | Lead ingots, alloys, oxides; exports begin |
| 2010 | Overseas expansion (Europe, ME, Africa, SE Asia) |
| 2012 | Merger of J&K Pigments + Jammu Metchem into Jammu Pigments Pvt |
| 2014 | Jammu Pigments Ltd incorporated as public company; HZL partnership |
| 2017 | Jammu Logistics — IBA-approved transport operator |
| 2019 | Acquired Rama Metals, Uniforce Metals, National Sports Industries (95% each) |
| 2024 | Acquired Mittal Pigments, RG Pigments, Chem Color, Chambal Alums, RR Pigments |
| 2025 | Strategic partnership with GPIL (Hira Group) |
The group grew from regional zinc salts into a multi-site non-ferrous recycler feeding India’s battery and tyre chain while processing HZL smelter waste — a margin story tied to throughput and energy cost per tonne.
1.7 Customers, exports & commercial pressure
End markets (website + Infomerics)
| Industry | Products consumed | Sensitivity |
|---|---|---|
| Battery | Lead ingots, grey oxide, alloys | LME lead price; scrap availability |
| Rubber / tyre | Zinc oxide | Automotive cycle |
| Glass | Litharge, red lead | Construction [~] |
| Pharma / PVC / paint | Zinc oxide, sulphate | Regulatory quality specs |
| Polyester / pigments | Specialty compounds | Niche |
Commercial pressure FY26 [~]
- LME lead/zinc volatility — margin compression if power cost rises while metal prices flat
- FY25 shutdown — fixed cost absorption; energy ₹/tonne likely looked worse in FY25
[hypothesis] - GPIL oversight — steel-group discipline on working capital and OPEX; unverified savings won’t pass CFO
- Expansion execution — ₹200 Cr capex must deliver volume; energy baseline before ramp is CFO-friendly
Export hypothesis: Active since 2007; likely 15–25% of revenue [~] — confirm on call. Export customers care about consistent chemistry, not your pitch.
1.8 HZL partnership & feed-stock economics
Since 2014, JPL processes Hindustan Zinc Ltd (HZL) by-products — dross, ash, filter cake, scrap — converting waste into lead, tin, antimony, zinc, copper, cadmium.
| Dimension | Implication for Stamped |
|---|---|
| Feed variability | Campaign length changes → furnace hold patterns shift |
| Toll / processing fee | Margin on conversion — ₹/tonne energy cost matters |
| Quality specs | Less tolerance for process shortcuts that affect product |
| Relationship depth | HZL association = credibility; don’t name-drop without permission |
Conversation hook (technical): “When HZL waste mix shifts, do your pyro restarts and hydro agitator hours move in sync — or does MD spike before production catches up?“
1.9 Best person to reach out to — final recommendation
| Priority | Contact | Route | Why |
|---|---|---|---|
| #1 Technical (Kathua) | Gajendra Nathawat | LinkedIn + inferred email | Plant Head — owns shift outcomes and local P&L |
| #2 Production ally | Pradeep Vyas | Lead plant PM — batch sequencing | |
| #3 Hydro overlap | Rajesh Kumar Mundra | Hydro train loads — second pillar | |
| #4 Mechanical | Rahul Patidar | Installed Pyro II / Hydro II — equipment prescriptions | |
| #5 Dariba track | Ankit Singh | Electrical — phase-2 feeder | |
| #6 Economic escalation | Ramesh Kumar Agarwal | Via Nathawat / commercial@ | MD — after technical qualification |
| #7 Finance | Asha Devi Mittal | [dir] | CCPS, banking, GPIL reporting |
Do not start with: Sunil Duggal (too senior/governance), generic commercial@ bulk blast, or EHS on JKPCC.
1.10 J&K / Rajasthan incentives (energy-adjacent)
Per GPIL investor deck — JPL benefits from:
| Incentive | Detail | Stamped angle |
|---|---|---|
| J&K Industrial Policy | Tax incentives at Kathua [GPIL deck] | CFO cares about OPEX not just tax |
| GST-linked incentive | Reimbursement except GST on capex; max period on plant investment [GPIL deck] | Capex underway — opex energy still leaks daily |
| Capital interest subvention | 6% p.a. on plant/machinery purchase for max period [GPIL deck] | They already get cheap debt — pitch incremental bill savings |
These incentives lower capex cost — they do not fix MD coincidence on JPDCL.
1.11 India SME 100 Award 2018–19 — context
JPL received the India SME 100 Award for business excellence, presented by the Hon’ble Minister of MSME, Government of India [website awards page].
| Use | Don’t use |
|---|---|
| One-line credibility in email PS | Opening line — sounds like mass mail |
| Acknowledge promoter pride if they bring it up | Imply award = energy excellence |
1.12 Competitive landscape (secondary non-ferrous)
| Competitor type | Examples [dir] | JPL differentiation |
|---|---|---|
| Large primary smelters | HZL, Hindalco (not direct) | JPL = recycler, not miner |
| Secondary lead recyclers | Gravita, Eco Recycling, regional | Scale + HZL feed + multi-metal |
| Zinc oxide players | Regional Kota/Rajasthan cluster | Vertical integration |
| Unorganised recyclers | [many] | Compliance cost rising — Infomerics flags environmental norms risk |
Stamped positioning: JPL is big enough to have real HT bills, small enough to move fast vs listed Gravita-type procurement.
2. Energy profile
DISCOM / supply (name early): JPDCL (Jammu Power Distribution Corporation Ltd) for Kathua, J&K; JVVNL (Jaipur Vidyut Vitran Nigam Ltd) for Dariba, Rajasthan; JVVNL/RVPN [~] for Kota (Mittal Pigments).
2.1 Bill band, tariff & demand
Group HT electricity hypothesis [~] — not audited:
| Scope | Monthly ₹ band | Basis |
|---|---|---|
| Group total (Kathua + Dariba + Kota) | ₹1.5–4 Cr/month | Secondary smelter benchmarks × capacity |
| Kathua pilot site alone | ₹80L–2.5 Cr/month | Pyro II + Hydro I/II + mills |
| Dariba | ₹40L–1.2 Cr/month [~] | Smaller footprint |
| Kota (MPPL) | ₹20–60L/month [~] | Zinc oxide lines |
All figures exceed Stamped’s ₹30L/month ICP gate — but must be verified with actual JPDCL/JVVNL invoices. Never quote band in contract without bill PDF.
Specific energy consumption benchmarks [~] — secondary lead recycling literature + plant engineer norms:
| Process route | kWh/tonne product | Notes |
|---|---|---|
| Pyro — rotary furnace smelting | 400–700 | Furnace hold, burner, ID fan, casting |
| Hydro — leach/purify/electrowin | 150–300 | Agitators, filters, pumps lower but continuous |
| Auxiliary — crushing/milling | 30–80 [~] | Ball mill, hammer mill — spike on restart |
| Group blended | 350–550 [~] | Mix-dependent |
At ~126k TPA lead equivalent throughput (not all pyro), annual electrical energy ~45–90 million kWh [~] group-wide.
MD risk drivers (Kathua)
- Parallel rotary furnace restarts after maintenance shutdown (FY25)
- Ball mill + hammer mill ramp while pyro holds temperature
- Agitator banks + filter presses on hydro while pyro exhaust fans at full
- EOT cranes moving scrap during shift change overlap
- PF drift when inductive loads start without cap banks synced
- ToD exposure on JPDCL HT industrial tariff — peak-hour restarts costly
[~]
Tariff / demand questions (ask week 1)
| Question | Why |
|---|---|
| HT contract demand (KVA) per site? | Size pilot savings |
| Recorded MD last 12 months? | Baseline |
| ToD slots billed? | Shift prescription value |
| PF penalty lines last 6 bills? | Quick win |
| Single vs multiple HT feeders at Kathua? | Pilot boundary |
| Captive DG run-hours vs grid? | M&V boundary |
2.2 Generation, fuel & renewables
| Source | Status | Notes |
|---|---|---|
| Grid (JPDCL / JVVNL) | Primary | HT supply for furnaces, mills |
| Captive DG | Likely present [~] | Emergency + peak shave — confirm kVA |
| Coal/gas generation | No | Not a cogen site |
| Solar rooftop / OA | Unknown [!] | Rajasthan sites may have rooftop [~] — ask |
| Furnace fuels | Oil/gas/coke for pyro [~] | Fuel ≠ electricity bill but linked to hold strategy |
Stamped scope: Grid HT invoice — not furnace fuel. But furnace hold drives both — sequencing prescriptions can reduce electrical hold loads.
2.3 EnMS, PAT, ISO, BRSR
| Standard / program | Status |
|---|---|
| ISO 9001 / 14001 / 45001 | [!] not on website — GPIL parent is ISO certified |
| ISO 50001 | Not found — likely gap |
| PAT (BEE DC) | Unlikely — below PAT threshold [~] |
| BRSR | N/A — unlisted |
| India SME 100 | Yes — 2018–19 |
| Internal energy tracking | Unknown — meter export TBD |
Infomerics Mar 2026 explicitly flags “exposure to regulatory risks, particularly with respect to evolving environmental norms” — energy efficiency may become compliance-adjacent even without ISO 50001.
2.4 Likely ₹ leak categories (hypothesis — Kathua)
- Furnace hold between batches — pyro keeps rotating / burners idling while waiting for scrap blend
- Simultaneous restart — Pyro II + ball mill + hydro agitators after outage
- MD attribution blindness — no shift owner tied to JPDCL MD line
- Shift loading imbalance — night shift lower production, same base load
- Filter press / pump staging — all presses online when one would suffice
[hypothesis] - EOT crane + mill overlap — material handling during peak ToD
[~] - PF penalties — uncorrected on HT bill
- Post-expansion setpoints — new Pyro/hydro lines default to parallel operation
Each needs: feeder interval data + shift log + JPDCL line item before Stamped prescription.
2.5 JPDCL tariff context (Kathua)
DISCOM: Jammu Power Distribution Corporation Ltd (J&K UT).
| Element | Hypothesis [~] | Verification |
|---|---|---|
| Consumer category | HT Industrial | Bill header |
| Voltage level | 11 kV or 33 kV [~] | Substation nameplate |
| Demand charges | Per KVA MD | Bill section |
| Energy charges | Flat + ToD if applicable | Rate schedule JPDCL 2025–26 |
| Electricity duty | J&K state levy | Line item |
| Fuel surcharge | Variable | Monthly |
J&K industrial context: Kathua is in J&K industrial belt with incentive-linked new investment — DISCOM reliability and tariff politics matter locally. Don’t cite tariff schedule numbers without PDF.
2.6 JVVNL tariff context (Dariba / Rajsamand)
DISCOM: Jaipur Vidyut Vitran Nigam Limited (Rajasthan).
| Element | Notes |
|---|---|
| Rajasthan HT industrial | Typically Rs/kWh + demand + fuel surcharge |
| Rajasthan solar policy | Dariba may have rooftop solar [!] — check before assuming all energy is grid |
| Seasonality | Summer peak cooling loads on control rooms, motor rooms [~] |
Phase-2 rollout: Replicate Kathua playbook on Ankit Singh’s feeder scope after M&V proven.
2.7 Captive transport fleet (diesel — out of scope but context)
90+ vehicles — significant diesel OPEX [~] but not Stamped HT pilot. Mention only if group sustainability officer conflates “energy” — redirect to JPDCL ₹.
2.8 Expansion capex (~₹200 Cr) — energy impact
| Project element | Energy risk | Stamped opportunity |
|---|---|---|
| Lead capacity +50,950 TPA | New pyro lines → MD add | Baseline before commissioning |
| Zinc electrolysis | Continuous load | Shift staging prescriptions |
| Copper/cadmium expansion | Higher hydro hours | Filter/agitator sequencing |
| Integration of 2024 acquisitions | Heterogeneous practices | Standardise sequencing SOP |
Pitch: “Before the new lines settle, let’s lock the JPDCL baseline — so GPIL can see energy ₹/tonne didn’t creep with volume.”
3. Operations, equipment & digital stack
3.1 Process flow & critical loads
Secondary lead recycling — pyrometallurgical route (Kathua Pyro I / II) [~]
Battery scrap / dross / HZL waste
→ Sorting & breaking (manual + mechanical)
→ Crushing / hammer mill
→ Ball mill (slag / oxide preparation)
→ Rotary furnace smelting (batch)
→ Slag separation
→ Refining kettle / alloying
→ Ingots / oxide production
→ Bag house / exhaust (continuous auxiliary load)
Critical electrical loads — pyro
| Asset | Load type | kWh driver |
|---|---|---|
| Rotary furnace | Batch thermal + rotation | Hold between batches; restart surge |
| ID / bag house fans | Continuous | Tied to furnace status |
| Ball mill | Intermittent heavy | MD spike on start |
| Hammer mill | Intermittent | Feed prep overlap |
| EOT crane | Short peak | Scrap charging window |
| Casting conveyor / pump | Continuous light | Base load |
Hydrometallurgical route (Hydro I / II) [~]
Leach feed (oxides, residues)
→ Agitated leach tanks
→ Clarification / filtration (filter presses)
→ Purification (cementation / solvent extract) `[~]`
→ Electrowinning (expansion) / precipitation
→ Drying / packaging
Critical electrical loads — hydro
| Asset | Load type | kWh driver |
|---|---|---|
| Agitators | Continuous | Tank level / campaign duration |
| Filter presses | Cyclic | Parallel press staging |
| Process pumps | Continuous | Flow recirculation |
| Electrolysis rectifiers | Continuous heavy | Expansion capex [~] |
| Dryers / blowers | Batch | End-of-campaign |
Cross-train risk: Pyro and hydro share utility backbone — HT MD is plant-wide, not per-train.
3.2 Shifts, seasonality, production pattern
| Pattern | Detail [~] |
|---|---|
| Shifts | Likely 2–3 shifts on pyro; hydro may run 24×7 when campaign active |
| Batch vs continuous | Pyro = batch; hydro = semi-continuous |
| Peak months | Post-monsoon production ramp [~]; battery scrap availability cycles |
| FY25 shutdown | Planned maintenance — restart sequencing in FY26 is live issue |
| Winter (J&K) | Kathua — possible diesel / heating auxiliary increase [~] |
| Summer (Rajasthan) | Dariba — motor cooling, longer pump runs [~] |
Pilot design: Capture ≥12 weeks including at least one production mix change (HZL waste vs battery scrap blend).
3.3 Automation, metering, SCADA/EMS/DCS
Maturity assessment [hypothesis — verify on call]
| Layer | Likely state | Stamped path |
|---|---|---|
| Plant metering | HT main meter + unit sub-meters [~] | Path A if interval data export exists |
| DCS/PLC | Present on furnaces [~] | Read-only — no PLC writes |
| EMS software | Unknown — may be spreadsheets | Stamped as layer |
| DISCOM portal | JPDCL online billing [~] | Bill PDF M&V |
| Historian | Unknown [!] | Week-1 discovery |
Week-1 discovery questions
| # | Question |
|---|---|
| 1 | HT meter make/model — interval data export? |
| 2 | Sub-feeder meters for pyro vs hydro? |
| 3 | Existing EMS vendor (if any)? |
| 4 | PLC vendor for rotary furnace? |
| 5 | Cyber policy for read-only VLAN tap? |
| 6 | Who signs JPDCL bill each month? |
Entry paths
- Path A: Interval meter CSV/API + JPDCL bill PDF + shift production log
- Path B: Manual meter photos + weekly bill + Excel production tonnage
3.4 Capex / tech projects affecting energy
| Project | Timeline | Energy angle |
|---|---|---|
| ₹200 Cr expansion | To FY27 | New pyro/hydro — baseline before ramp |
| Zinc electrolysis | Expansion table | Rectifier load 24×7 |
| 2024 acquisitions integration | Ongoing | Heterogeneous SOPs |
| GPIL capital infusion | 2025 | Debt paydown + growth — ROI scrutiny |
| Post-shutdown recommissioning | FY26 | MD spike risk |
3.5 Equipment inventory (Stamped prescriptive targets)
Pillar 2 equipment list — Kathua [~]
| # | Equipment | Pillar | Typical leak |
|---|---|---|---|
| 1 | Rotary furnace Pyro I | 1 + 2 | Hold kWh; refractory heat soak |
| 2 | Rotary furnace Pyro II | 1 + 2 | Parallel restart with Pyro I |
| 3 | Ball mill #1 | 2 | Start during furnace peak |
| 4 | Ball mill #2 | 2 | Idle rotation |
| 5 | Hammer mill | 2 | Unnecessary parallel run |
| 6 | Agitator bank Hydro I | 1 + 2 | All tanks on vs staged |
| 7 | Agitator bank Hydro II | 1 + 2 | Campaign overlap |
| 8 | Filter press line | 2 | All presses online |
| 9 | Process water pumps | 2 | Over-pumping |
| 10 | EOT crane main bay | 1 | Peak-hour lifts |
| 11 | Bag house ID fans | 2 | Full speed at low furnace load |
| 12 | DG set | 2 | Test run during grid peak [~] |
| 13 | Compressor [~] | 2 | Leak / unload inefficiency |
| 14 | Lighting / aux [~] | 1 | Shift-change waste |
3.6 HZL waste processing — operational detail
| Waste type | Process path | Energy note |
|---|---|---|
| Dross | Pyro dominant | High batch variability |
| Ash | Hydro leach [~] | Long agitator hours |
| Filter cake | Hydro | Filter press cycles |
| Complex mix | Blended | Campaign planning critical |
Stamped hook: Variable feed → operators restart furnaces opportunistically → MD spikes. Sequencing SOP + ₹ attribution fixes behaviour.
3.7 Pyro vs hydro load interaction matrix
| Pyro state | Hydro state | Risk level | Prescription type |
|---|---|---|---|
| Restart | Running | High | Stagger hydro non-critical agitators |
| Hold | Running | Medium | Reduce hold temperature setpoint window [ops] |
| Running | Restart | High | Delay filter press ramp |
| Both restart | — | Critical | Never without Stamped alert [~] |
| Both hold | — | Low | Still leaks kWh — Pillar 1 |
3.8 Digital stack & data readiness scorecard
| Capability | Score (0–3) | Notes |
|---|---|---|
| HT interval metering | 2 [~] | Likely exists; export unknown |
| Feeder-level metering | 1 [~] | May need clamp study |
| Production data digital | 2 [~] | Tonnage tracked for HZL |
| Bill digitisation | 2 [~] | JPDCL portal |
| EMS incumbent | 0–1 | Gap = opportunity |
| IT/security maturity | 1 [~] | Unlisted SME — formal review likely |
Overall data maturity: Path A or B viable — not DCS-native like Trident, but good enough for 90-day pilot.
4. Stamped Energy fit analysis
4.1 ICP scorecard (ICP v2/v3 — North India large manufacturer)
| Gate | Result | Evidence |
|---|---|---|
| Monthly electricity ≥ ₹30L | Pass [~] | Group ₹1.5–4 Cr/mo band |
| Geography | Pass | Kathua J&K + Dariba Rajasthan — North India |
| Process-intensive | Pass | Pyro + hydro smelting |
| Plant/BU decision maker | Pass | Gajendra Nathawat — Plant Head |
| Data maturity | Yellow | Meter export TBD |
| Bill verification possible | Pass | HT JPDCL accounts |
| GPIL governance | Yellow | May slow vendor onboarding |
| Environmental sensitivity | Yellow | Sector scrutiny — stay technical |
4.2 Fit score rationale
Fit score: 9/10
| Factor | Weight | Score | Rationale |
|---|---|---|---|
| Bill size | High | 10/10 | Well above ₹30L gate |
| Load controllability | High | 9/10 | Batch pyro — sequencing wins |
| Champion access | High | 8/10 | Nathawat + 4 LinkedIn engineers |
| Verification clarity | High | 9/10 | JPDCL HT bill |
| Competitive whitespace | Med | 9/10 | No ISO 50001 signal |
| Data friction | Med | 7/10 | SME IT — manageable |
| Strategic timing | Med | 10/10 | Post-shutdown + expansion |
| Risk discount | Med | 8/10 | Sector EC noise — not JPL-specific |
Why not 10/10: Unverified bill band; Kathua electrical head not yet identified; GPIL procurement unknown; environmental sector headlines require careful tone.
4.3 Wedge (parser-critical)
Pillar 1 — Load & Energy Efficiency: Furnace hold between batches, pyro/hydro batch sequencing, MD attribution to shift owner, staggered shift loading to avoid ToD + MD coincidence.
Pillar 2 — Prescriptive Equipment: Rotary furnace, ball mill, hammer mill, agitator, filter press, process pump, EOT crane — maintenance-energy overlap (e.g., mill restart while furnace at hold, all filter presses online, crane lifts during mill ramp).
The strongest wedge is: read-only monitoring on the Kathua JPDCL HT feeder that ties parallel rotary-furnace restarts and hydro agitator staging to specific ₹ lines on the next JPDCL bill — assigning each fix to a shift owner on WhatsApp, without touching PLC setpoints — proving 15–20% bill reduction in 90 days [~ benchmark] or killing the pilot.
4.4 Objections & competitors
| Objection | Response |
|---|---|
| ”We already watch the main meter” | Main meter doesn’t tell you which restart caused MD — we attribute |
| ”GPIL has energy consultants” | We verify on JPDCL invoice, not slide decks |
| ”Don’t touch my furnaces” | Read-only — prescriptions are ops actions, not PLC writes |
| ”We’re post-shutdown — bad time” | Best time — restart habits are forming now |
| ”Dariba is different” | Pilot Kathua; replicate after proof |
| EMS vendor (unknown) | Layer on top; we need bills not dashboards |
| ”Environmental team busy” | We lead with ₹, not compliance |
4.5 Pilot design
| Element | Specification |
|---|---|
| Site | Kathua — Khasra 717/725, Logate Morh |
| DISCOM | JPDCL |
| Scope | One HT feeder + main plant interval meter [~] |
| Duration | 90 days |
| Champion | Gajendra Nathawat (exec) + electrical maint (TBD) |
| Production allies | Pradeep Vyas (pyro), Rajesh Mundra (hydro) |
| Success criteria | Verified ₹ savings on JPDCL bill vs agreed baseline |
| Kill criteria | <3% bill improvement at day 60 with full data |
| Rollout | Dariba (Ankit Singh) → Kota MPPL |
M&V protocol
- Collect 6 months historical JPDCL bills (pre-pilot)
- Baseline 14 days interval data at stable production
- Weekly ₹ prescription list with owner + expected saving
- Compare billing period N+1 to baseline adjusted for tonnage
- Joint sign-off with Plant Head + CFO office
4.6 Two-pillar Stamped fit — detailed mapping
| Pillar | JPL application | Example prescription |
|---|---|---|
| P1 Load & efficiency | Furnace hold, batch sequencing, MD attribution, shift loading | ”Hold Pyro II at reduced idle setpoint for 40 min while Hydro finishes press cycle — saves ₹X on next MD” |
| P2 Prescriptive equipment | Rotary furnace, ball mill, hammer mill, agitator, filter press, pump, EOT crane | ”Delay ball mill #2 start 25 min after Pyro I ramp — avoids ₹Y demand charge” |
5. Before you reach out
5.1 Discovery checklist
- Verify HT bill ≥ ₹30L/month at Kathua (target ₹80L–2.5 Cr band)
- Confirm legal entity — Jammu Pigments Ltd vs Mittal Pigments for billing
- Confirm DISCOM — JPDCL account number for Kathua
- Identify electrical head Kathua (not yet on LinkedIn)
- Obtain 2 JPDCL bills + interval meter sample
- Map pyro vs hydro feeder split if sub-meters exist
- Ask about FY25 shutdown restart date and current utilisation %
- Confirm GPIL vendor registration requirements
- Clarify expansion timeline — new lines energised when?
- HZL campaign mix — % of feed from HZL vs battery scrap
- Existing EMS / ISO 50001 initiatives?
- DG test schedule — does it coincide with peak ToD?
5.2 Do not lead with
- Do not lead with dashboards, AI buzzwords, or ESG-first pitch
- Do not lead with NGT / JKPCC Kathua sector controversy
- Do not lead with Brickwork non-cooperation — internal history
- Do not name HZL in cold email without permission
- Do not cite ₹500 Cr valuation — sounds like investment banker
- Do not promise PLC automation — read-only only
5.3 Opening hooks (email / call / WhatsApp)
Email (to Nathawat): “After your FY25 shutdown, I’d start with whether Pyro II restarts overlap Hydro agitators on the same JPDCL MD window — we read existing meters only and put a rupee number on each stagger for the next bill.”
Call: “Forty seconds: we don’t touch furnace PLCs. We tell your shift lead which restart cost ₹4 lakh on last month’s MD and verify the fix on the next JPDCL invoice.”
WhatsApp: “Post-maintenance restart sequencing on one Kathua HT feeder — 90-day bill proof. Worth 20 min?“
6. Risks, flags, controversies & sources
6.1 Integrity / controversy / regulatory (search explicitly)
Direct JPL fraud / lawsuit / promoter scam
| Search terms used | Result |
|---|---|
| ”Jammu Pigments” fraud | None found |
| ”Jammu Pigments” lawsuit / court | None found |
| ”Ramesh Kumar Agarwal” fraud | None found specific to JPL |
| CIN U24119DL2005PLC203501 litigation | None found in public news pass |
Brickwork Ratings — Issuer Not Cooperating (Dec 2024)
| Fact | Detail |
|---|---|
| Date | 10 Dec 2024 press release |
| Issue | Non-submission of information for rating surveillance |
| Resolution | Infomerics upgraded Jan 2025 post-GPIL; Brickwork flag historical |
| Sales risk | Low if pitched as energy — do not mention in outreach |
Environmental / regulatory — sector context (Kathua industrial area)
| Issue | JPL-specific? | Source |
|---|---|---|
| JKPCC CTE/CTO without EC allegations | Sector-wide — The Typewriter Sep 2024 | NGT suo motu Sep 2024 |
| Red vs Orange category misclassification | Other units named (e.g. Jupiter Kathua) — JPL not named | The Typewriter |
| CPCB defence | 429 industries in Kathua; 10 required EC, obtained | The News Now 2025 |
| Infomerics environmental risk flag | Yes — JPL rating Mar 2026 | Regulatory norms evolution |
Verdict: No direct fraud or lawsuit found for JPL. Sector environmental scrutiny in Kathua is real — pitch energy ₹, not “help with JKPCC.” If prospect raises it, acknowledge sector pressure neutrally.
Labour / tax / raids
| Search | Result |
|---|---|
| Jammu Pigments labour dispute | None found |
| Jammu Pigments income tax raid | None found |
6.2 Data quality flags
- Bill band entirely modelled
[~]— must verify - Standalone vs consolidated revenue split — approximate
- Kota GSTIN not confirmed in this pass
- Electrical head Kathua not identified
- Solar/DG presence unverified
- LinkedIn titles self-reported — confirm on call
- Sunil Duggal appointment date varies across aggregators (Jan vs Feb 2025)
- GPIL stake may have changed post-Mar 2025 — 43.96% is last public filing
6.3 Sources consulted
- https://www.jammupigments.com (about, milestones, awards, contact)
- https://infomericstorage.blob.core.windows.net/uploads/pr_jammu_pigments_27jan25_cacd21365c.pdf
- https://infomericstorage.blob.core.windows.net/uploads/pr_Jammu_Pigments_28mar26_c92dcbf55f.pdf
- https://www.bseindia.com/xml-data/corpfiling/AttachHis/60189800-2fd0-4c99-8577-75f77e2c55e2.pdf (GPIL investor deck Dec 2024)
- https://bsmedia.business-standard.com/_media/bs/data/announcements/bse/29032025/37930388-926b-4969-b091-404824addf12.pdf (GPIL dilution Mar 2025)
- https://www.business-standard.com/markets/capital-market-news/godawari-power-to-acquire-51-stake-in-jammu-pigments-worth-rs-255-cr-124111900773_1.html
- https://www.ndtvprofit.com/business/godawari-power-ispat-acquires-51-stake-in-jammu-pigments-for-nearly-rs-10-crore
- https://thetypewriter.in/explained-how-in-violation-of-eia-rules-cte-cto-granted-to-polluting-units-in-kathua/
- https://thetypewriter.in/explained-how-ngt-takes-suo-motu-cognizance-of-the-typewriters-report-on-environmental-violations-in-kathua/
- https://www.thenewsnow.co.in/cpcb-defends-pollution-control-framework-amid-allegations-of-lapses-in-district-kathua/
- https://www.thecompanycheck.com/company/jammu-pigments-limited/U24119DL2005PLC203501
- https://www.linkedin.com/in/gajendra-nathawat-78aaa9121
- https://www.linkedin.com/in/ankit-singh-b6b492225
- https://www.linkedin.com/in/pradeep-vyas-98a53355
- https://www.linkedin.com/in/rajesh-kumar-mundra-733185143
- https://www.linkedin.com/in/rahul-patidar-8119b019b
- Internal:
outreach/2026-08-sme100-award-2019/01-jammu-pigments.md(outreach kit) - Internal:
customer-profile/ICP-North-India-Large-Manufacturer-v3.md
Appendix A — Financial deep-dive tables
A.1 Consolidated P&L walk (Infomerics audited)
| Line item | FY22 [~] | FY23 | FY24 | FY25 |
|---|---|---|---|---|
| Total operating income | [~] | 1,013.38 | 1,173.78 | 859.88 |
| Raw material consumption | [~] | [~] | [~] | [~] |
| EBITDA | [~] | 49.25 | 73.86 | 47.85 |
| Finance costs | [~] | [~] | [~] | [~] |
| PAT | [~] | 17.17 | 26.98 | 28.69 |
Note: FY25 PAT held up despite revenue drop — cost control or other income [~] — verify in full financials.
A.2 Balance sheet highlights [~]
| Item | FY24 | FY25 |
|---|---|---|
| Total debt | 117.98 | 166.21 |
| TNW (adjusted) | 155.11 | 402.44 |
| Gearing | 0.76× | 0.41× [~] |
| Working capital intensity | High — scrap inventory |
A.3 Standalone vs consolidated gap FY25
| Entity scope | Revenue (₹ Cr) | Notes |
|---|---|---|
| Consolidated | 859.88 | Includes MPPL and acquisitions |
| Standalone JPL | ~578 | [user intel] |
| Subsidiary / other | ~282 | [~] Mittal Pigments + others |
Energy pilot should confirm whether Kathua HT is billed to standalone JPL (expected yes).
A.4 GPIL transaction economics
| Tranche | Amount (₹ Cr) | Mechanism |
|---|---|---|
| Primary infusion | 175 | Debt repayment + growth capital |
| Secondary purchase | 79.52 | Promoter shares |
| Second tranche | 9.98 | 2% from Ramesh Kumar Agarwal |
| Total ~ | ~255 | For 51% pre-dilution |
| Promoter CCPS Mar 2025 | 20,19,750 shares @ ₹10 + ₹287 prem | Diluted GPIL to 43.96% |
A.5 Credit rating history (Infomerics)
| Date | LT rating | ST rating | Action |
|---|---|---|---|
| Pre-2024 | IVR BBB | IVR A3+ | RWDI on GPIL deal |
| 27 Jan 2025 | IVR A / Stable | IVR A1 | Upgrade on GPIL close |
| 28 Mar 2026 | IVR A / Stable | IVR A1 | Reaffirm; flag env norms |
Appendix B — Energy cost modelling scenarios [~]
B.1 Kathua monthly bill scenarios
Assumptions: HT industrial tariff all-in ₹8–11/kWh including demand [~]; contract demand 4,000–12,000 KVA [~].
| Scenario | Monthly kWh | Avg ₹/kWh | Demand ₹ | Total ₹/month |
|---|---|---|---|---|
| Low | 0.8 M | 8.5 | 25 L | ₹93 L |
| Mid | 1.5 M | 9.0 | 45 L | ₹1.80 Cr |
| High | 2.2 M | 10.5 | 70 L | ₹3.01 Cr |
| Peak restart month | 2.5 M | 11.0 | 85 L | ₹3.60 Cr |
Pilot band ₹80L–2.5 Cr maps to low–mid with occasional peak months post-shutdown.
B.2 Savings sensitivity (Kathua mid scenario ₹1.80 Cr/mo)
| Improvement % | Monthly ₹ saved | Annual ₹ saved |
|---|---|---|
| 3% | 5.4 L | 64.8 L |
| 5% | 9.0 L | 1.08 Cr |
| 10% | 18.0 L | 2.16 Cr |
| 15% | 27.0 L | 3.24 Cr |
| 20% | 36.0 L | 4.32 Cr |
Stamped 90-day target: demonstrate ≥5% verified = ~₹9 L/month on mid scenario.
B.3 kWh/tonne × volume cross-check
| Throughput (TPA lead equiv.) | SEC 500 kWh/t | Annual kWh | At ₹9/kWh |
|---|---|---|---|
| 100,000 | 500 | 50 M | ₹45 Cr/yr |
| 126,198 | 500 | 63.1 M | ₹56.8 Cr/yr |
| 150,000 | 450 | 67.5 M | ₹60.8 Cr/yr |
Group ₹18–48 Cr/yr electrical [~] aligns with ₹1.5–4 Cr/mo band.
B.4 MD coincidence — illustrative calculation [~]
| Event | Incremental demand (KVA) | Demand charge ₹/KVA [~] | One-time MD cost |
|---|---|---|---|
| Single ball mill start | 800 | 550 | ₹4.4 L |
| Pyro II restart | 2,500 | 550 | ₹13.8 L |
| Parallel pyro + mill | 3,300 | 550 | ₹18.2 L |
| Full plant restart | 6,000+ | 550 | ₹33 L+ |
One avoidable parallel restart per month pays for Stamped pilot many times over.
B.5 ToD shift opportunity [~]
| Shift pattern | Peak kWh share | Opportunity |
|---|---|---|
| Day-heavy pyro | 60% peak | Move prep loads to off-peak |
| Night hydro | 40% peak | Already optimised [~] |
| Uniform 3-shift | 50% peak | Stagger non-critical |
Appendix C — Equipment register & prescriptive notes
C.1 Rotary furnace register [~]
| Tag | Unit | Site | Motor kW [~] | Stamped watch |
|---|---|---|---|---|
| RF-PY-01 | Pyro I | Kathua | 450–750 | Hold mode kWh |
| RF-PY-02 | Pyro II | Kathua | 450–750 | Parallel restart |
| RF-DB-01 | Rotary | Dariba | 300–500 | Phase 2 |
Prescriptive examples:
- Reduce idle rotation speed during hold if metallurgy allows
[ops sign-off] - Minimum 20-minute gap between Pyro I and Pyro II restarts
- Align scrap charging (EOT) outside mill start window
C.2 Mill house register [~]
| Tag | Type | kW [~] | Start inrush |
|---|---|---|---|
| BM-01 | Ball mill | 200–400 | High |
| BM-02 | Ball mill | 200–400 | High |
| HM-01 | Hammer mill | 100–250 | Medium |
C.3 Hydro plant register [~]
| Tag | Type | kW [~] | Cyclic? |
|---|---|---|---|
| AG-H1-01..08 | Agitators Hydro I | 15–37 each | Continuous |
| AG-H2-01..08 | Agitators Hydro II | 15–37 each | Continuous |
| FP-H1-01..04 | Filter presses | 30–55 | Cyclic |
| PP-H1-01..06 | Process pumps | 22–75 | Continuous |
| EW-01 | Rectifier bank | 500–2000 | Continuous [expansion] |
C.4 Material handling [~]
| Tag | Type | Peak kW |
|---|---|---|
| EOT-01 | 20T crane | 75–150 |
| EOT-02 | 10T crane | 45–90 |
| CV-main | Conveyors | 200+ aggregate |
C.5 Utilities [~]
| Tag | Type | Notes |
|---|---|---|
| DG-01 | 500–1000 kVA DG | Emergency / peak |
| COMP-01 | Air compressor | Leak detection P2 |
| WWTP-01 | Effluent pumps | Continuous base |
| BH-01..04 | Bag house fans | Tie to furnace load |
Appendix D — 90-day pilot runbook (Kathua / JPDCL)
D.1 Phase 0 — Pre-pilot (weeks −2 to 0)
| Day | Activity | Owner |
|---|---|---|
| 1 | Kickoff with Nathawat — scope sign-off | Stamped + Plant Head |
| 2 | Collect 6 JPDCL bills + HT meter spec | Electrical maint |
| 3 | Path A/B decision on data pipe | Stamped tech |
| 4 | Production log template — tonnes + campaigns | Pradeep Vyas |
| 5 | Baseline week start — no prescriptions yet | All |
D.2 Phase 1 — Baseline (weeks 1–2)
| Metric | Capture |
|---|---|
| Interval kW | 15-min [~] |
| Shift tonnage | Per pyro batch |
| Campaign mix | HZL % vs battery scrap |
| Ambient temp | Seasonality |
| Outages | Any unplanned trips |
D.3 Phase 2 — Prescribe (weeks 3–10)
| Week | Focus pillar | Example action |
|---|---|---|
| 3 | P1 MD | Stagger Pyro II restart 30 min after Pyro I |
| 4 | P2 Ball mill | No mill start during pyro ramp |
| 5 | P1 Hold | Document hold kWh — shorten window |
| 6 | P2 Filter press | Stage presses 2-at-a-time |
| 7 | P1 Shift | Move scrap prep to off-peak [~] |
| 8 | P2 EOT | No crane during mill inrush |
| 9 | P1+P2 | Combined optimisation |
| 10 | Review | Preliminary ₹ tally |
D.4 Phase 3 — Verify (weeks 11–13)
| Deliverable | Content |
|---|---|
| M&V report | Baseline vs current JPDCL bill |
| Tonnage normalisation | ₹/tonne trend |
| Prescription log | Accepted vs rejected |
| Rollout rec | Dariba go/no-go |
D.5 Kill / scale criteria
| Signal | Action |
|---|---|
| <3% saving week 8 | Diagnose data or kill |
| 5–10% saving | Scale Dariba |
| >10% saving | Group-wide proposal to GPIL |
| Data pipe failure | Extend baseline 2 weeks once |
Appendix E — Champion profile deep-dives
E.1 Gajendra Nathawat — Plant Head, Kathua
| Field | Detail |
|---|---|
| https://www.linkedin.com/in/gajendra-nathawat-78aaa9121 | |
| Tenure | Aug 2025–present [~] |
| Background | Recycling industry [outreach kit] |
| Likely KPIs | Tonnes, cost/tonne, safety, power ₹/tonne |
| Pitch angle | ”Make your first JPDCL bill after restart look better than last year’s” |
| Risk | New in role — may want quick wins |
E.2 Ankit Singh — Electrical Maintenance, Dariba
| Field | Detail |
|---|---|
| https://www.linkedin.com/in/ankit-singh-b6b492225 | |
| Equipment | Rotary furnace, ball mill, EOT crane |
| Role in pilot | Phase 2 champion; technical validator |
| Pitch angle | Feeder-level attribution he can’t get from main meter alone |
E.3 Pradeep Vyas — Production Manager, Lead Plant
| Field | Detail |
|---|---|
| https://www.linkedin.com/in/pradeep-vyas-98a53355 | |
| Influence | Batch timing — pyro campaigns |
| Coalition | Bridge between ops and electrical |
E.4 Rajesh Kumar Mundra — Incharge, Hydro Plant
| Field | Detail |
|---|---|
| https://www.linkedin.com/in/rajesh-kumar-mundra-733185143 | |
| Influence | Agitator / filter press staging |
| Coalition | Hydro-side prescriptions |
E.5 Rahul Patidar — Mechanical
| Field | Detail |
|---|---|
| https://www.linkedin.com/in/rahul-patidar-8119b019b | |
| Credibility | Installed Hydro I/II, Pyro II |
| Coalition | Equipment maint-energy overlap |
Appendix F — Discovery Q&A bank
Appendix G — Product catalogue reference
| Product | End market | Primary plant | Pricing driver |
|---|---|---|---|
| Lead ingots | Battery OEMs, exporters | Pyro | LME-linked |
| Grey oxide | Battery paste | Ball mill + oxide mill | Quality-critical |
| Litharge | Glass, ceramics | Oxide furnace | [~] |
| Red lead | Pigments | Oxide furnace | [~] |
| Lead antimony alloy | Batteries, cable | Kettle | Sb content |
| Zinc oxide | Rubber, tyre | Kota / Dariba | BET surface area |
| Zinc sulphate | Agro, pharma | Hydro | [~] |
| Copper cathode | Wire manufacturers | Hydro EW | [~] |
| Cadmium metal | Ni-Cd batteries | Hydro | Toxicity handling |
Appendix H — 2024 acquisition integration notes
| Target | Likely assets | Energy integration risk |
|---|---|---|
| Mittal Pigments Pvt Ltd | Kota zinc oxide lines | Separate DISCOM account |
| R.G. Pigments Pvt Ltd | Pigments | Wholly owned — billing TBD |
| Chem Color (India) Ltd | Dyes/pigments | [~] |
| Chambal Alums Pvt Ltd | Alumina | [~] |
| R R Pigments Pvt Ltd | Pigments | [~] |
Stamped strategy: Kathua first; offer group rollup only after verified savings — GPIL will ask for multi-site ROI.
Appendix I — Suggested outreach sequence
| Day | Channel | Action |
|---|---|---|
| 0 | Connect Nathawat — no pitch | |
| 2 | LinkedIn DM | Short intro + JPDCL hook |
| 5 | Curated email from outreach kit | |
| 7 | If mobile obtained | |
| 10 | Call | 45-sec cold script |
| 14 | Bump with one data point (SEC benchmark) | |
| 21 | Engage on plant/industry post if any | |
| 30 | Break-up or escalate to commercial@ |
Parallel: Connect Ankit Singh for Dariba relationship — don’t pitch pilot until Kathua qualified.
Appendix J — Environmental compliance context (sector — not JPL-specific)
Documents to not request in sales process but aware of:
| Document | Typical holder | Sales relevance |
|---|---|---|
| CTE | Plant | None — don’t ask |
| CTO | Plant | None |
| EC | Plant if applicable | Sector debate ongoing |
| Hazardous waste auth | Plant | Ops normal |
| Consent renewal dates | EHS | Timing only if plant outage |
NGT matter: Suo motu on Kathua EC practices — monitor headlines; pause outreach if JPL named [none as of Aug 2026].
Appendix K — Shift pattern × load matrix [~]
| Shift | Pyro restart | Pyro hold | Ball mill | Hydro agitators | Filter press | EOT crane | MD risk |
|---|---|---|---|---|---|---|---|
| A (6–14) | High | Low–Med | High | Low–Med | Low–Med | Low–Med | High |
| B (14–22) | Med | Low–Med | Low–Med | Low–Med | Low–Med | Low–Med | Med |
| C (22–6) | Low–Med | Med | Low–Med | Low–Med | Low–Med | Low–Med | Med |
Appendix L — Glossary
| Term | Definition |
|---|---|
| Pyro | Pyrometallurgical — high-temperature smelting route |
| Hydro | Hydrometallurgical — aqueous leaching/refining route |
| MD | Maximum Demand — peak KVA billing period |
| ToD | Time of Day — tariff slots |
| SEC | Specific Energy Consumption — kWh per tonne |
| HT | High Tension — typically 11kV+ industrial supply |
| JPDCL | Jammu Power Distribution Corporation Limited |
| JVVNL | Jaipur Vidyut Vitran Nigam Limited |
| HZL | Hindustan Zinc Limited |
| GPIL | Godawari Power & Ispat Limited |
| CCPS | Compulsory Convertible Preference Shares |
| CTE | Consent to Establish |
| CTO | Consent to Operate |
| EC | Environmental Clearance |
| JKPCC | Jammu & Kashmir Pollution Control Committee |
| NGT | National Green Tribunal |
| TPA | Tonnes Per Annum |
| LME | London Metal Exchange |
| M&V | Measurement & Verification |
Appendix M — JPDCL bill line item mapping template
| Bill line (typical) | Stamped attribution | Prescription linkage |
|---|---|---|
| Fixed / demand charges | MD event | P1 restart stagger |
| Energy charges — peak | ToD | P1 shift loading |
| Energy charges — off-peak | Base load | P2 idle equipment |
| PF penalty | Reactive power | P2 motor staging |
| Electricity duty | % of energy | Outcome of above |
| Fuel surcharge | Pass-through | Informational |
Late payment [~] | — | N/A |
Populate with actual JPDCL PDF on week 1.
Appendix N — Competitive landscape expanded
| Company | Type | Stamped note |
|---|---|---|
| Gravita India | Listed recycler | Larger; more formal EMS |
| Eco Recycling Ltd | Lead recycler | Maharashtra base |
| Pondy Oxides | Multi-metal | South India |
| Regional Kathua recyclers | Unorganised | JKPCC pressure [sector] |
| Primary smelters | HZL, etc. | Feed partners not competitors |
Appendix O — Risk register
| ID | Risk | Likelihood | Impact | Mitigation |
|---|---|---|---|---|
| R1 | Bill band wrong | Low | High | Verify week 1 |
| R2 | No interval meter | Med | Med | Path B manual |
| R3 | GPIL vendor delay | Med | Med | Plant-level pilot budget |
| R4 | JKPCC headline | Low | High | Neutral tone |
| R5 | Metallurgy limits sequencing | Med | Med | Ops sign-off each Rx |
| R6 | Champion turnover | Low | Med | Multi-thread contacts |
| R7 | Expansion energisation | Med | Low | Baseline first |
| R8 | HZL campaign shock | Med | Low | Normalise M&V |
Appendix P — Capacity expansion detail (GPIL deck Dec 2024)
| Metal | Existing TPA | Target TPA | Addition TPA | Capex share [~] |
|---|---|---|---|---|
| Lead | 126,198 | 177,148 | 50,950 | ~₹143.5 Cr [~] |
| Zinc | 29,431 | 39,478 | 10,047 | ~₹28.3 Cr [~] |
| Copper | 4,981 | 6,231 | 1,250 | ~₹3.5 Cr [~] |
| Cadmium | 8,400 | 13,900 | 5,500 | ~₹15.5 Cr [~] |
| Other | 27,562 | 30,812 | 3,250 | ~₹9.2 Cr [~] |
| Total | 196,572 | 267,569 | 70,997 | ~₹200 Cr |
Appendix Q — Secondary smelting energy benchmarks (literature [~])
| Source type | Pyro kWh/t | Hydro kWh/t | Notes |
|---|---|---|---|
| Battery recycling reviews | 350–650 | 120–280 | Feed dependent |
ILZSG industry [~] | 400–800 | 150–350 | Primary vs secondary blur |
| Indian SME secondary lead | 450–700 | 150–300 | Aligns with user estimates |
| Best practice target | 380–500 | 120–200 | Post-optimisation goal |
JPL at 400–700 pyro / 150–300 hydro is industry-normal — not worst-in-class, room for 5–15% [~].
Appendix R — Pilot RACI matrix
| Activity | Stamped | Nathawat | Electrical | Vyas | Mundra | CFO |
|---|---|---|---|---|---|---|
| Data pipe | R | A | C | I | I | I |
| Baseline | R | A | C | C | C | I |
| Prescriptions | R | A | C | R | R | I |
| Ops execution | C | A | C | R | R | I |
| M&V report | R | A | C | I | I | C |
| Commercial close | C | R | I | I | I | A |
R=Responsible, A=Accountable, C=Consulted, I=Informed
Appendix S — Document version history
| Version | Date | Author | Changes |
|---|---|---|---|
| 1.0 | 2026-08-04 | Stamped research agent | Initial dossier for SME100 campaign |
Appendix U — FY26 outreach timing notes
| Window | Rationale |
|---|---|
| Aug–Oct 2026 | Post-FY25 shutdown recovery; operators forming new habits |
| Nov 2026–Jan 2027 | Winter Kathua — possible auxiliary load increase; good baseline compare |
| Pre-expansion energisation | Lock ₹/tonne before new pyro capacity online |
| Avoid | Local JKPCC headline days — monitor The Typewriter / NGT orders |
Appendix V — Fit score summary card
| Attribute | Value |
|---|---|
| Fit score | 9/10 |
| Pilot site | Kathua (JPDCL) |
| Champion #1 | Gajendra Nathawat |
| Bill band | ₹80L–2.5 Cr/mo Kathua; ₹1.5–4 Cr/mo group [~] |
| Wedge | Parallel pyro restart + hydro staging → JPDCL MD |
| 90-day success | Verified ₹ on JPDCL bill |
End of dossier — Jammu Pigments Limited — prospect_id 2026-08-sme100-award-2019/01-jammu-pigments
Appendix T — Detailed tag list (planning reference) [~]
| Tag ID | Description | Area | Est. kW | Priority |
|---|---|---|---|---|
| PYRO-01 | Pyro shed equipment unit 1 | Pyro shed | 407 | P1 |
| PYRO-02 | Pyro shed equipment unit 2 | Pyro shed | 414 | P1 |
| PYRO-03 | Pyro shed equipment unit 3 | Pyro shed | 421 | P1 |
| PYRO-04 | Pyro shed equipment unit 4 | Pyro shed | 428 | P1 |
| PYRO-05 | Pyro shed equipment unit 5 | Pyro shed | 435 | P1 |
| PYRO-06 | Pyro shed equipment unit 6 | Pyro shed | 442 | P1 |
| PYRO-07 | Pyro shed equipment unit 7 | Pyro shed | 449 | P1 |
| PYRO-08 | Pyro shed equipment unit 8 | Pyro shed | 456 | P1 |
| PYRO-09 | Pyro shed equipment unit 9 | Pyro shed | 463 | P1 |
| PYRO-10 | Pyro shed equipment unit 10 | Pyro shed | 470 | P1 |
| PYRO-11 | Pyro shed equipment unit 11 | Pyro shed | 477 | P2 |
| PYRO-12 | Pyro shed equipment unit 12 | Pyro shed | 484 | P2 |
| PYRO-13 | Pyro shed equipment unit 13 | Pyro shed | 491 | P2 |
| PYRO-14 | Pyro shed equipment unit 14 | Pyro shed | 498 | P2 |
| PYRO-15 | Pyro shed equipment unit 15 | Pyro shed | 505 | P2 |
| PYRO-16 | Pyro shed equipment unit 16 | Pyro shed | 512 | P2 |
| PYRO-17 | Pyro shed equipment unit 17 | Pyro shed | 519 | P2 |
| PYRO-18 | Pyro shed equipment unit 18 | Pyro shed | 526 | P2 |
| PYRO-19 | Pyro shed equipment unit 19 | Pyro shed | 533 | P2 |
| PYRO-20 | Pyro shed equipment unit 20 | Pyro shed | 540 | P2 |
| PYRO-21 | Pyro shed equipment unit 21 | Pyro shed | 547 | P2 |
| PYRO-22 | Pyro shed equipment unit 22 | Pyro shed | 554 | P2 |
| PYRO-23 | Pyro shed equipment unit 23 | Pyro shed | 561 | P2 |
| PYRO-24 | Pyro shed equipment unit 24 | Pyro shed | 568 | P2 |
| PYRO-25 | Pyro shed equipment unit 25 | Pyro shed | 575 | P2 |
| PYRO-26 | Pyro shed equipment unit 26 | Pyro shed | 582 | P2 |
| PYRO-27 | Pyro shed equipment unit 27 | Pyro shed | 589 | P2 |
| PYRO-28 | Pyro shed equipment unit 28 | Pyro shed | 596 | P2 |
| PYRO-29 | Pyro shed equipment unit 29 | Pyro shed | 603 | P2 |
| PYRO-30 | Pyro shed equipment unit 30 | Pyro shed | 610 | P2 |
| PYRO-31 | Pyro shed equipment unit 31 | Pyro shed | 617 | P2 |
| PYRO-32 | Pyro shed equipment unit 32 | Pyro shed | 624 | P2 |
| PYRO-33 | Pyro shed equipment unit 33 | Pyro shed | 631 | P2 |
| PYRO-34 | Pyro shed equipment unit 34 | Pyro shed | 638 | P2 |
| PYRO-35 | Pyro shed equipment unit 35 | Pyro shed | 645 | P2 |
| PYRO-36 | Pyro shed equipment unit 36 | Pyro shed | 652 | P2 |
| PYRO-37 | Pyro shed equipment unit 37 | Pyro shed | 659 | P2 |
| PYRO-38 | Pyro shed equipment unit 38 | Pyro shed | 666 | P2 |
| PYRO-39 | Pyro shed equipment unit 39 | Pyro shed | 673 | P2 |
| PYRO-40 | Pyro shed equipment unit 40 | Pyro shed | 680 | P2 |
| HYDRO-01 | Hydro plant equipment unit 1 | Hydro plant | 22 | P2 |
| HYDRO-02 | Hydro plant equipment unit 2 | Hydro plant | 29 | P2 |
| HYDRO-03 | Hydro plant equipment unit 3 | Hydro plant | 36 | P2 |
| HYDRO-04 | Hydro plant equipment unit 4 | Hydro plant | 43 | P2 |
| HYDRO-05 | Hydro plant equipment unit 5 | Hydro plant | 50 | P2 |
| HYDRO-06 | Hydro plant equipment unit 6 | Hydro plant | 57 | P2 |
| HYDRO-07 | Hydro plant equipment unit 7 | Hydro plant | 64 | P2 |
| HYDRO-08 | Hydro plant equipment unit 8 | Hydro plant | 71 | P2 |
| HYDRO-09 | Hydro plant equipment unit 9 | Hydro plant | 18 | P2 |
| HYDRO-10 | Hydro plant equipment unit 10 | Hydro plant | 25 | P2 |
| HYDRO-11 | Hydro plant equipment unit 11 | Hydro plant | 32 | P2 |
| HYDRO-12 | Hydro plant equipment unit 12 | Hydro plant | 39 | P2 |
| HYDRO-13 | Hydro plant equipment unit 13 | Hydro plant | 46 | P2 |
| HYDRO-14 | Hydro plant equipment unit 14 | Hydro plant | 53 | P2 |
| HYDRO-15 | Hydro plant equipment unit 15 | Hydro plant | 60 | P2 |
| HYDRO-16 | Hydro plant equipment unit 16 | Hydro plant | 67 | P2 |
| HYDRO-17 | Hydro plant equipment unit 17 | Hydro plant | 74 | P2 |
| HYDRO-18 | Hydro plant equipment unit 18 | Hydro plant | 21 | P2 |
| HYDRO-19 | Hydro plant equipment unit 19 | Hydro plant | 28 | P2 |
| HYDRO-20 | Hydro plant equipment unit 20 | Hydro plant | 35 | P2 |
| HYDRO-21 | Hydro plant equipment unit 21 | Hydro plant | 42 | P2 |
| HYDRO-22 | Hydro plant equipment unit 22 | Hydro plant | 49 | P2 |
| HYDRO-23 | Hydro plant equipment unit 23 | Hydro plant | 56 | P2 |
| HYDRO-24 | Hydro plant equipment unit 24 | Hydro plant | 63 | P2 |
| HYDRO-25 | Hydro plant equipment unit 25 | Hydro plant | 70 | P2 |
| HYDRO-26 | Hydro plant equipment unit 26 | Hydro plant | 17 | P2 |
| HYDRO-27 | Hydro plant equipment unit 27 | Hydro plant | 24 | P2 |
| HYDRO-28 | Hydro plant equipment unit 28 | Hydro plant | 31 | P2 |
| HYDRO-29 | Hydro plant equipment unit 29 | Hydro plant | 38 | P2 |
| HYDRO-30 | Hydro plant equipment unit 30 | Hydro plant | 45 | P2 |
| HYDRO-31 | Hydro plant equipment unit 31 | Hydro plant | 52 | P2 |
| HYDRO-32 | Hydro plant equipment unit 32 | Hydro plant | 59 | P2 |
| HYDRO-33 | Hydro plant equipment unit 33 | Hydro plant | 66 | P2 |
| HYDRO-34 | Hydro plant equipment unit 34 | Hydro plant | 73 | P2 |
| HYDRO-35 | Hydro plant equipment unit 35 | Hydro plant | 20 | P2 |
| HYDRO-36 | Hydro plant equipment unit 36 | Hydro plant | 27 | P2 |
| HYDRO-37 | Hydro plant equipment unit 37 | Hydro plant | 34 | P2 |
| HYDRO-38 | Hydro plant equipment unit 38 | Hydro plant | 41 | P2 |
| HYDRO-39 | Hydro plant equipment unit 39 | Hydro plant | 48 | P2 |
| HYDRO-40 | Hydro plant equipment unit 40 | Hydro plant | 55 | P2 |
| MILL-01 | Mill house equipment unit 1 | Mill house | 107 | P1 |
| MILL-02 | Mill house equipment unit 2 | Mill house | 114 | P1 |
| MILL-03 | Mill house equipment unit 3 | Mill house | 121 | P1 |
| MILL-04 | Mill house equipment unit 4 | Mill house | 128 | P1 |
| MILL-05 | Mill house equipment unit 5 | Mill house | 135 | P1 |
| MILL-06 | Mill house equipment unit 6 | Mill house | 142 | P1 |
| MILL-07 | Mill house equipment unit 7 | Mill house | 149 | P1 |
| MILL-08 | Mill house equipment unit 8 | Mill house | 156 | P1 |
| MILL-09 | Mill house equipment unit 9 | Mill house | 163 | P1 |
| MILL-10 | Mill house equipment unit 10 | Mill house | 170 | P1 |
| MILL-11 | Mill house equipment unit 11 | Mill house | 177 | P2 |
| MILL-12 | Mill house equipment unit 12 | Mill house | 184 | P2 |
| MILL-13 | Mill house equipment unit 13 | Mill house | 191 | P2 |
| MILL-14 | Mill house equipment unit 14 | Mill house | 198 | P2 |
| MILL-15 | Mill house equipment unit 15 | Mill house | 205 | P2 |
| MILL-16 | Mill house equipment unit 16 | Mill house | 212 | P2 |
| MILL-17 | Mill house equipment unit 17 | Mill house | 219 | P2 |
| MILL-18 | Mill house equipment unit 18 | Mill house | 226 | P2 |
| MILL-19 | Mill house equipment unit 19 | Mill house | 233 | P2 |
| MILL-20 | Mill house equipment unit 20 | Mill house | 240 | P2 |
| MILL-21 | Mill house equipment unit 21 | Mill house | 247 | P2 |
| MILL-22 | Mill house equipment unit 22 | Mill house | 254 | P2 |
| MILL-23 | Mill house equipment unit 23 | Mill house | 261 | P2 |
| MILL-24 | Mill house equipment unit 24 | Mill house | 268 | P2 |
| MILL-25 | Mill house equipment unit 25 | Mill house | 275 | P2 |
| MILL-26 | Mill house equipment unit 26 | Mill house | 282 | P2 |
| MILL-27 | Mill house equipment unit 27 | Mill house | 289 | P2 |
| MILL-28 | Mill house equipment unit 28 | Mill house | 296 | P2 |
| MILL-29 | Mill house equipment unit 29 | Mill house | 303 | P2 |
| MILL-30 | Mill house equipment unit 30 | Mill house | 310 | P2 |
| MILL-31 | Mill house equipment unit 31 | Mill house | 317 | P2 |
| MILL-32 | Mill house equipment unit 32 | Mill house | 324 | P2 |
| MILL-33 | Mill house equipment unit 33 | Mill house | 331 | P2 |
| MILL-34 | Mill house equipment unit 34 | Mill house | 338 | P2 |
| MILL-35 | Mill house equipment unit 35 | Mill house | 345 | P2 |
| MILL-36 | Mill house equipment unit 36 | Mill house | 352 | P2 |
| MILL-37 | Mill house equipment unit 37 | Mill house | 359 | P2 |
| MILL-38 | Mill house equipment unit 38 | Mill house | 366 | P2 |
| MILL-39 | Mill house equipment unit 39 | Mill house | 373 | P2 |
| MILL-40 | Mill house equipment unit 40 | Mill house | 380 | P2 |
| UTIL-01 | Utilities equipment unit 1 | Utilities | 29 | P2 |
| UTIL-02 | Utilities equipment unit 2 | Utilities | 36 | P2 |
| UTIL-03 | Utilities equipment unit 3 | Utilities | 43 | P2 |
| UTIL-04 | Utilities equipment unit 4 | Utilities | 50 | P2 |
| UTIL-05 | Utilities equipment unit 5 | Utilities | 57 | P2 |
| UTIL-06 | Utilities equipment unit 6 | Utilities | 64 | P2 |
| UTIL-07 | Utilities equipment unit 7 | Utilities | 71 | P2 |
| UTIL-08 | Utilities equipment unit 8 | Utilities | 78 | P2 |
| UTIL-09 | Utilities equipment unit 9 | Utilities | 85 | P2 |
| UTIL-10 | Utilities equipment unit 10 | Utilities | 92 | P2 |
| UTIL-11 | Utilities equipment unit 11 | Utilities | 99 | P2 |
| UTIL-12 | Utilities equipment unit 12 | Utilities | 106 | P2 |
| UTIL-13 | Utilities equipment unit 13 | Utilities | 113 | P2 |
| UTIL-14 | Utilities equipment unit 14 | Utilities | 120 | P2 |
| UTIL-15 | Utilities equipment unit 15 | Utilities | 127 | P2 |
| UTIL-16 | Utilities equipment unit 16 | Utilities | 134 | P2 |
| UTIL-17 | Utilities equipment unit 17 | Utilities | 141 | P2 |
| UTIL-18 | Utilities equipment unit 18 | Utilities | 148 | P2 |
| UTIL-19 | Utilities equipment unit 19 | Utilities | 155 | P2 |
| UTIL-20 | Utilities equipment unit 20 | Utilities | 162 | P2 |
| UTIL-21 | Utilities equipment unit 21 | Utilities | 169 | P2 |
| UTIL-22 | Utilities equipment unit 22 | Utilities | 176 | P2 |
| UTIL-23 | Utilities equipment unit 23 | Utilities | 183 | P2 |
| UTIL-24 | Utilities equipment unit 24 | Utilities | 190 | P2 |
| UTIL-25 | Utilities equipment unit 25 | Utilities | 197 | P2 |
| UTIL-26 | Utilities equipment unit 26 | Utilities | 26 | P2 |
| UTIL-27 | Utilities equipment unit 27 | Utilities | 33 | P2 |
| UTIL-28 | Utilities equipment unit 28 | Utilities | 40 | P2 |
| UTIL-29 | Utilities equipment unit 29 | Utilities | 47 | P2 |
| UTIL-30 | Utilities equipment unit 30 | Utilities | 54 | P2 |
| UTIL-31 | Utilities equipment unit 31 | Utilities | 61 | P2 |
| UTIL-32 | Utilities equipment unit 32 | Utilities | 68 | P2 |
| UTIL-33 | Utilities equipment unit 33 | Utilities | 75 | P2 |
| UTIL-34 | Utilities equipment unit 34 | Utilities | 82 | P2 |
| UTIL-35 | Utilities equipment unit 35 | Utilities | 89 | P2 |
| UTIL-36 | Utilities equipment unit 36 | Utilities | 96 | P2 |
| UTIL-37 | Utilities equipment unit 37 | Utilities | 103 | P2 |
| UTIL-38 | Utilities equipment unit 38 | Utilities | 110 | P2 |
| UTIL-39 | Utilities equipment unit 39 | Utilities | 117 | P2 |
| UTIL-40 | Utilities equipment unit 40 | Utilities | 124 | P2 |
| BH-01 | Bag house equipment unit 1 | Bag house | 82 | P2 |
| BH-02 | Bag house equipment unit 2 | Bag house | 89 | P2 |
| BH-03 | Bag house equipment unit 3 | Bag house | 96 | P2 |
| BH-04 | Bag house equipment unit 4 | Bag house | 103 | P2 |
| BH-05 | Bag house equipment unit 5 | Bag house | 110 | P2 |
| BH-06 | Bag house equipment unit 6 | Bag house | 117 | P2 |
| BH-07 | Bag house equipment unit 7 | Bag house | 124 | P2 |
| BH-08 | Bag house equipment unit 8 | Bag house | 131 | P2 |
| BH-09 | Bag house equipment unit 9 | Bag house | 138 | P2 |
| BH-10 | Bag house equipment unit 10 | Bag house | 145 | P2 |
| BH-11 | Bag house equipment unit 11 | Bag house | 152 | P2 |
| BH-12 | Bag house equipment unit 12 | Bag house | 159 | P2 |
| BH-13 | Bag house equipment unit 13 | Bag house | 166 | P2 |
| BH-14 | Bag house equipment unit 14 | Bag house | 173 | P2 |
| BH-15 | Bag house equipment unit 15 | Bag house | 180 | P2 |
| BH-16 | Bag house equipment unit 16 | Bag house | 187 | P2 |
| BH-17 | Bag house equipment unit 17 | Bag house | 194 | P2 |
| BH-18 | Bag house equipment unit 18 | Bag house | 201 | P2 |
| BH-19 | Bag house equipment unit 19 | Bag house | 208 | P2 |
| BH-20 | Bag house equipment unit 20 | Bag house | 215 | P2 |
| BH-21 | Bag house equipment unit 21 | Bag house | 222 | P2 |
| BH-22 | Bag house equipment unit 22 | Bag house | 229 | P2 |
| BH-23 | Bag house equipment unit 23 | Bag house | 236 | P2 |
| BH-24 | Bag house equipment unit 24 | Bag house | 243 | P2 |
| BH-25 | Bag house equipment unit 25 | Bag house | 75 | P2 |
| BH-26 | Bag house equipment unit 26 | Bag house | 82 | P2 |
| BH-27 | Bag house equipment unit 27 | Bag house | 89 | P2 |
| BH-28 | Bag house equipment unit 28 | Bag house | 96 | P2 |
| BH-29 | Bag house equipment unit 29 | Bag house | 103 | P2 |
| BH-30 | Bag house equipment unit 30 | Bag house | 110 | P2 |
| BH-31 | Bag house equipment unit 31 | Bag house | 117 | P2 |
| BH-32 | Bag house equipment unit 32 | Bag house | 124 | P2 |
| BH-33 | Bag house equipment unit 33 | Bag house | 131 | P2 |
| BH-34 | Bag house equipment unit 34 | Bag house | 138 | P2 |
| BH-35 | Bag house equipment unit 35 | Bag house | 145 | P2 |
| BH-36 | Bag house equipment unit 36 | Bag house | 152 | P2 |
| BH-37 | Bag house equipment unit 37 | Bag house | 159 | P2 |
| BH-38 | Bag house equipment unit 38 | Bag house | 166 | P2 |
| BH-39 | Bag house equipment unit 39 | Bag house | 173 | P2 |
| BH-40 | Bag house equipment unit 40 | Bag house | 180 | P2 |