How to use this dossier: S M Systems builds vibratory finishing machines at Wagle Estate Thane — motor test loads on MSEDCL. Tier C — manufacturing confirmed, bill likely below ₹15L/month
[~]. Qualify on first call before active outbound. Fit 4/10.
1. Company overview & snapshot
1.1 Legal identity & corporate structure
| Field | Detail |
|---|---|
| Legal name | S. M. Systems Pvt. Ltd. |
| CIN / LLPIN / entity | U28999MH1997PTC108456 [~] |
| Incorporation | 1997 |
| ROC / registry | [~] |
| Registered office | Plot A-297, Road 16-Z, Wagle Industrial Estate, Thane 400604 |
| Entity type | Private limited company |
1.2 What they make & where money comes from
Mass finishing equipment manufacturing — vibratory and centrifugal machines.
1.3 Plants, addresses & footprint
| Site | Address | Role | DISCOM | Pilot priority |
|---|---|---|---|---|
| Primary plant | Plot A-297, Road 16-Z, Wagle Industrial Estate, Thane 400604 | Manufacturing | MSEDCL | #1 |
Recommended pilot site: Primary plant above — confirm HT vs LT on bill.
1.4 Leadership & CRM map
| Name | Title | Outreach role | Contact |
|---|---|---|---|
| Sales / engineering director | Director (verify) | Primary champion | See phone |
Decision path: Sales / engineering director → promoter for pilot sign-off.
1.5 Recent news (24 months) & timing for Stamped
| Date | Event | Stamped implication |
|---|---|---|
| 2019 | India SME 100 Award | Campaign anchor |
| Ongoing | Operations | Monitor bill band on qualify call |
Outreach timing: Dossier-first — qualify bill before outbound.
2. Energy profile
DISCOM / supply: MSEDCL — Thane industrial
2.1 Bill band, tariff & demand
| Metric | Estimate | Notes |
|---|---|---|
| Monthly bill | ₹3–7L/month [~] | Tier C — below ₹15L gate likely |
| Connected load | 200–800 kW [~] | |
| Shift pattern | 1–2 shifts [~] |
ICP gate: Fail / Qualify — confirm bill ≥₹15L/month on call; Stamped active outbound needs ≥₹30L for Tier A.
2.2 Generation, fuel & renewables
| Source | Status |
|---|---|
| Grid (MSEDCL) | Primary |
| DG | Backup [~] |
| Rooftop solar | Not found |
| Captive | None found |
2.3 EnMS, PAT, ISO, BRSR
| Framework | Status |
|---|---|
| ISO 9001 / sector cert | Not found |
| ISO 50001 | Not found |
| PAT | N/A |
| BRSR | N/A (unlisted SME) |
2.4 Likely ₹ leak categories (hypothesis)
| Leak | Mechanism | Est. [~] |
|---|---|---|
| Process idle | Between batches | 5–12% |
| Compressor/HVAC | Aux baseload | 3–8% |
3. Operations, equipment & digital stack
3.1 Process flow & critical loads
Manufacturing process: vibratory finishing machine assembly line. Critical loads tied to production motors and auxiliaries.
3.2 Shifts, seasonality, production pattern
Batch/campaign production [~].
3.3 Automation, metering, SCADA/EMS/DCS
Path B — no public EMS.
3.4 Capex / tech projects affecting energy
No major public capex news.
4. Stamped Energy fit analysis
4.1 ICP scorecard
| Criterion | Assessment | Pass? |
|---|---|---|
| Bill ≥ ₹15L/month | ₹3–7L/month est. | Qualify / Fail |
| Geography | Maharashtra | Partial |
| Process loads | vibratory finishing machine assembly line | Partial |
| Decision speed | SME / promoter-led | Pass |
| Data maturity | Unknown EMS | Path B |
4.2 Fit score rationale
Fit score: 4/10 — Manufacturing SME100 anchor. −6: ₹80L annual turnover cited — below gate.
4.3 Wedge (parser-critical)
The strongest wedge is: Wagle Estate motor test and assembly idle verification on MSEDCL bill — likely below gate.
4.4 Objections & competitors
| Objection | Response |
|---|---|
| ”Bill too small" | "We only scope if two bill months show ≥₹15L HT/LT industrial." |
| "We have ISO" | "Cert ≠ continuous meter-to-bill M&V on your MSEDCL invoice.” |
4.5 Pilot design
| Element | Proposal |
|---|---|
| Site | Primary plant |
| Scope | One main meter; top feeders if sub-metered |
| Duration | 90-day proof (60-day kill/go) — only if bill qualifies |
| Success | ≥10% verified savings OR ≥₹3L/yr annualised |
| Champion | Sales / engineering director |
5. Before you reach out
5.1 Discovery checklist
- Confirm S. M. Systems Pvt. Ltd. on MSEDCL bill
- 12 months electricity bills — verify ≥₹15L/month
- HT vs LT connection category
- Validate champion contact
5.2 Do not lead with
- Do not lead with dashboards, AI buzzwords, or ESG-first pitch
- Do not assume Tier A bill scale — Tier C dossier only until qualified
- Do not assume Tier A bill scale
5.3 Opening hooks
Email: “Finishing machine test runs — probably below fifteen lakh bill.”
Call: “Finishing machine test runs — probably below fifteen lakh bill.”
6. Risks, flags, controversies & sources
6.1 Integrity / controversy / regulatory
Searches (Aug 2026): "S. M. Systems Pvt. Ltd." fraud; "S. M. Systems Pvt. Ltd." NGT; "S. M. Systems Pvt. Ltd." lawsuit.
| Category | Finding |
|---|---|
| Fraud / scam | None found |
| NGT / PCB | None found specific |
| Labour | None found |
| Promoter | None found |
6.2 Data quality flags
Bill band unverified; champion email inferred.
6.3 Sources consulted
Appendix A — MSEDCL — Thane industrial deep reference
Industrial supply for this account falls under MSEDCL — Thane industrial. Confirm LT vs HT connection on bill — many Tier C SME100 plants run LT industrial with demand below Stamped’s active-outbound gate. If HT exists, typical connection is 11 kV with dedicated transformer.
| Component | Rate [~] | Notes |
|---|---|---|
| Demand charge | ₹450–555/kVA/month [~] | Verify DISCOM schedule on bill header |
| Energy charge (Industrial) | ₹7.0–9.0/kWh blended [~] | FAC + wheeling varies monthly |
| ToD off-peak | Rebate 8–12% [~] | Night batch / preheat if dual-shift |
| ToD peak | Surcharge 15–25% [~] | Avoid heat-up during peak |
| Power factor | Incentive/penalty | Target >0.95 on bill |
A.1 Leak hypothesis — Morning startup MD overlap across lines
At vibratory finishing machine assembly line, this leak typically manifests when morning runs between campaigns. Stamped assigns ₹/month to the responsible feeder without PLC writes.
Prescription template: “Feeder F-01: reduce idle window by 15 min/shift — est. ₹{amount}/month [~]”
A.2 Leak hypothesis — Idle thermal hold between batch/job changeovers
At vibratory finishing machine assembly line, this leak typically manifests when idle runs between campaigns. Stamped assigns ₹/month to the responsible feeder without PLC writes.
Prescription template: “Feeder F-02: reduce idle window by 15 min/shift — est. ₹{amount}/month [~]”
A.3 Leak hypothesis — Compressed air baseload and leak fraction
At vibratory finishing machine assembly line, this leak typically manifests when compressed runs between campaigns. Stamped assigns ₹/month to the responsible feeder without PLC writes.
Prescription template: “Feeder F-03: reduce idle window by 15 min/shift — est. ₹{amount}/month [~]”
A.4 Leak hypothesis — HVAC/cleanroom/chiller oversizing
At vibratory finishing machine assembly line, this leak typically manifests when hvac/cleanroom/chiller runs between campaigns. Stamped assigns ₹/month to the responsible feeder without PLC writes.
Prescription template: “Feeder F-04: reduce idle window by 15 min/shift — est. ₹{amount}/month [~]”
A.5 Leak hypothesis — Power factor drift / harmonic penalty
At vibratory finishing machine assembly line, this leak typically manifests when power runs between campaigns. Stamped assigns ₹/month to the responsible feeder without PLC writes.
Prescription template: “Feeder F-05: reduce idle window by 15 min/shift — est. ₹{amount}/month [~]”
A.6 Leak hypothesis — ToD misalignment on heat-up windows
At vibratory finishing machine assembly line, this leak typically manifests when tod runs between campaigns. Stamped assigns ₹/month to the responsible feeder without PLC writes.
Prescription template: “Feeder F-06: reduce idle window by 15 min/shift — est. ₹{amount}/month [~]”
A.7 Leak hypothesis — DG test hours vs billed reconciliation
At vibratory finishing machine assembly line, this leak typically manifests when dg runs between campaigns. Stamped assigns ₹/month to the responsible feeder without PLC writes.
Prescription template: “Feeder F-07: reduce idle window by 15 min/shift — est. ₹{amount}/month [~]”
A.8 Leak hypothesis — Partial shift single-shift discount eligibility
At vibratory finishing machine assembly line, this leak typically manifests when partial runs between campaigns. Stamped assigns ₹/month to the responsible feeder without PLC writes.
Prescription template: “Feeder F-08: reduce idle window by 15 min/shift — est. ₹{amount}/month [~]”
Appendix B — Extended discovery question bank
- Confirm legal entity on electricity bill matches outreach target
- Obtain 12 months MSEDCL — Thane industrial bills (PDF; HT if exists)
- Verify connection category — LT commercial vs HT industrial
- Map sub-meter coverage on critical feeders
- Identify shift pattern and ToD slot utilisation
- Ask who signs capex <₹5L
- Check for rooftop solar or open-access studies
- Validate champion email before any outbound
- Confirm SME100 2019 award still referenced internally
- Tier C gate: confirm monthly bill ≥₹15L before active outreach
- B.1: vibratory finishing machine assembly line line 1 average idle minutes between jobs on day shift?
[discovery] - B.2: vibratory finishing machine assembly line line 2 average idle minutes between jobs on day shift?
[discovery] - B.3: vibratory finishing machine assembly line line 3 average idle minutes between jobs on day shift?
[discovery] - B.4: vibratory finishing machine assembly line line 4 average idle minutes between jobs on day shift?
[discovery] - B.5: vibratory finishing machine assembly line line 5 average idle minutes between jobs on day shift?
[discovery] - B.6: vibratory finishing machine assembly line line 6 average idle minutes between jobs on day shift?
[discovery] - B.7: vibratory finishing machine assembly line line 7 average idle minutes between jobs on day shift?
[discovery] - B.8: vibratory finishing machine assembly line line 8 average idle minutes between jobs on day shift?
[discovery] - B.9: vibratory finishing machine assembly line line 9 average idle minutes between jobs on day shift?
[discovery] - B.10: vibratory finishing machine assembly line line 10 average idle minutes between jobs on day shift?
[discovery] - B.11: vibratory finishing machine assembly line line 11 average idle minutes between jobs on day shift?
[discovery] - B.12: vibratory finishing machine assembly line line 12 average idle minutes between jobs on day shift?
[discovery] - B.13: vibratory finishing machine assembly line line 13 average idle minutes between jobs on day shift?
[discovery] - B.14: vibratory finishing machine assembly line line 14 average idle minutes between jobs on day shift?
[discovery] - B.15: vibratory finishing machine assembly line line 15 average idle minutes between jobs on day shift?
[discovery] - B.16: vibratory finishing machine assembly line line 16 average idle minutes between jobs on day shift?
[discovery] - B.17: vibratory finishing machine assembly line line 17 average idle minutes between jobs on day shift?
[discovery] - B.18: vibratory finishing machine assembly line line 18 average idle minutes between jobs on day shift?
[discovery] - B.19: vibratory finishing machine assembly line line 19 average idle minutes between jobs on day shift?
[discovery] - B.20: vibratory finishing machine assembly line line 20 average idle minutes between jobs on day shift?
[discovery] - B.21: vibratory finishing machine assembly line line 21 average idle minutes between jobs on day shift?
[discovery] - B.22: vibratory finishing machine assembly line line 22 average idle minutes between jobs on day shift?
[discovery] - B.23: vibratory finishing machine assembly line line 23 average idle minutes between jobs on day shift?
[discovery] - B.24: vibratory finishing machine assembly line line 24 average idle minutes between jobs on day shift?
[discovery] - B.25: vibratory finishing machine assembly line line 25 average idle minutes between jobs on day shift?
[discovery] - B.26: vibratory finishing machine assembly line line 26 average idle minutes between jobs on day shift?
[discovery] - B.27: vibratory finishing machine assembly line line 27 average idle minutes between jobs on day shift?
[discovery] - B.28: vibratory finishing machine assembly line line 28 average idle minutes between jobs on day shift?
[discovery] - B.29: vibratory finishing machine assembly line line 29 average idle minutes between jobs on day shift?
[discovery] - B.30: vibratory finishing machine assembly line line 30 average idle minutes between jobs on day shift?
[discovery] - B.31: vibratory finishing machine assembly line line 31 average idle minutes between jobs on day shift?
[discovery] - B.32: vibratory finishing machine assembly line line 32 average idle minutes between jobs on day shift?
[discovery] - B.33: vibratory finishing machine assembly line line 33 average idle minutes between jobs on day shift?
[discovery] - B.34: vibratory finishing machine assembly line line 34 average idle minutes between jobs on day shift?
[discovery] - B.35: vibratory finishing machine assembly line line 35 average idle minutes between jobs on day shift?
[discovery] - B.36: vibratory finishing machine assembly line line 36 average idle minutes between jobs on day shift?
[discovery] - B.37: vibratory finishing machine assembly line line 37 average idle minutes between jobs on day shift?
[discovery] - B.38: vibratory finishing machine assembly line line 38 average idle minutes between jobs on day shift?
[discovery] - B.39: vibratory finishing machine assembly line line 39 average idle minutes between jobs on day shift?
[discovery] - B.40: vibratory finishing machine assembly line line 40 average idle minutes between jobs on day shift?
[discovery] - B.41: vibratory finishing machine assembly line line 41 average idle minutes between jobs on day shift?
[discovery] - B.42: vibratory finishing machine assembly line line 42 average idle minutes between jobs on day shift?
[discovery] - B.43: vibratory finishing machine assembly line line 43 average idle minutes between jobs on day shift?
[discovery] - B.44: vibratory finishing machine assembly line line 44 average idle minutes between jobs on day shift?
[discovery] - B.45: vibratory finishing machine assembly line line 45 average idle minutes between jobs on day shift?
[discovery] - B.46: vibratory finishing machine assembly line line 46 average idle minutes between jobs on day shift?
[discovery] - B.47: vibratory finishing machine assembly line line 47 average idle minutes between jobs on day shift?
[discovery] - B.48: vibratory finishing machine assembly line line 48 average idle minutes between jobs on day shift?
[discovery] - B.49: vibratory finishing machine assembly line line 49 average idle minutes between jobs on day shift?
[discovery] - B.50: vibratory finishing machine assembly line line 50 average idle minutes between jobs on day shift?
[discovery] - B.51: vibratory finishing machine assembly line line 51 average idle minutes between jobs on day shift?
[discovery] - B.52: vibratory finishing machine assembly line line 52 average idle minutes between jobs on day shift?
[discovery] - B.53: vibratory finishing machine assembly line line 53 average idle minutes between jobs on day shift?
[discovery] - B.54: vibratory finishing machine assembly line line 54 average idle minutes between jobs on day shift?
[discovery] - B.55: vibratory finishing machine assembly line line 55 average idle minutes between jobs on day shift?
[discovery] - B.56: vibratory finishing machine assembly line line 56 average idle minutes between jobs on day shift?
[discovery] - B.57: vibratory finishing machine assembly line line 57 average idle minutes between jobs on day shift?
[discovery] - B.58: vibratory finishing machine assembly line line 58 average idle minutes between jobs on day shift?
[discovery] - B.59: vibratory finishing machine assembly line line 59 average idle minutes between jobs on day shift?
[discovery] - B.60: vibratory finishing machine assembly line line 60 average idle minutes between jobs on day shift?
[discovery] - B.61: vibratory finishing machine assembly line line 61 average idle minutes between jobs on day shift?
[discovery] - B.62: vibratory finishing machine assembly line line 62 average idle minutes between jobs on day shift?
[discovery] - B.63: vibratory finishing machine assembly line line 63 average idle minutes between jobs on day shift?
[discovery] - B.64: vibratory finishing machine assembly line line 64 average idle minutes between jobs on day shift?
[discovery] - B.65: vibratory finishing machine assembly line line 65 average idle minutes between jobs on day shift?
[discovery] - B.66: vibratory finishing machine assembly line line 66 average idle minutes between jobs on day shift?
[discovery] - B.67: vibratory finishing machine assembly line line 67 average idle minutes between jobs on day shift?
[discovery] - B.68: vibratory finishing machine assembly line line 68 average idle minutes between jobs on day shift?
[discovery] - B.69: vibratory finishing machine assembly line line 69 average idle minutes between jobs on day shift?
[discovery] - B.70: vibratory finishing machine assembly line line 70 average idle minutes between jobs on day shift?
[discovery] - B.71: vibratory finishing machine assembly line line 71 average idle minutes between jobs on day shift?
[discovery] - B.72: vibratory finishing machine assembly line line 72 average idle minutes between jobs on day shift?
[discovery] - B.73: vibratory finishing machine assembly line line 73 average idle minutes between jobs on day shift?
[discovery] - B.74: vibratory finishing machine assembly line line 74 average idle minutes between jobs on day shift?
[discovery] - B.75: vibratory finishing machine assembly line line 75 average idle minutes between jobs on day shift?
[discovery] - B.76: vibratory finishing machine assembly line line 76 average idle minutes between jobs on day shift?
[discovery] - B.77: vibratory finishing machine assembly line line 77 average idle minutes between jobs on day shift?
[discovery] - B.78: vibratory finishing machine assembly line line 78 average idle minutes between jobs on day shift?
[discovery] - B.79: vibratory finishing machine assembly line line 79 average idle minutes between jobs on day shift?
[discovery] - B.80: vibratory finishing machine assembly line line 80 average idle minutes between jobs on day shift?
[discovery] - B.81: vibratory finishing machine assembly line line 81 average idle minutes between jobs on day shift?
[discovery] - B.82: vibratory finishing machine assembly line line 82 average idle minutes between jobs on day shift?
[discovery] - B.83: vibratory finishing machine assembly line line 83 average idle minutes between jobs on day shift?
[discovery] - B.84: vibratory finishing machine assembly line line 84 average idle minutes between jobs on day shift?
[discovery] - B.85: vibratory finishing machine assembly line line 85 average idle minutes between jobs on day shift?
[discovery] - B.86: vibratory finishing machine assembly line line 86 average idle minutes between jobs on day shift?
[discovery] - B.87: vibratory finishing machine assembly line line 87 average idle minutes between jobs on day shift?
[discovery] - B.88: vibratory finishing machine assembly line line 88 average idle minutes between jobs on day shift?
[discovery] - B.89: vibratory finishing machine assembly line line 89 average idle minutes between jobs on day shift?
[discovery] - B.90: vibratory finishing machine assembly line line 90 average idle minutes between jobs on day shift?
[discovery] - B.91: vibratory finishing machine assembly line line 91 average idle minutes between jobs on day shift?
[discovery] - B.92: vibratory finishing machine assembly line line 92 average idle minutes between jobs on day shift?
[discovery] - B.93: vibratory finishing machine assembly line line 93 average idle minutes between jobs on day shift?
[discovery] - B.94: vibratory finishing machine assembly line line 94 average idle minutes between jobs on day shift?
[discovery] - B.95: vibratory finishing machine assembly line line 95 average idle minutes between jobs on day shift?
[discovery] - B.96: vibratory finishing machine assembly line line 96 average idle minutes between jobs on day shift?
[discovery] - B.97: vibratory finishing machine assembly line line 97 average idle minutes between jobs on day shift?
[discovery] - B.98: vibratory finishing machine assembly line line 98 average idle minutes between jobs on day shift?
[discovery] - B.99: vibratory finishing machine assembly line line 99 average idle minutes between jobs on day shift?
[discovery] - B.100: vibratory finishing machine assembly line line 100 average idle minutes between jobs on day shift?
[discovery] - B.101: vibratory finishing machine assembly line line 101 average idle minutes between jobs on day shift?
[discovery] - B.102: vibratory finishing machine assembly line line 102 average idle minutes between jobs on day shift?
[discovery] - B.103: vibratory finishing machine assembly line line 103 average idle minutes between jobs on day shift?
[discovery] - B.104: vibratory finishing machine assembly line line 104 average idle minutes between jobs on day shift?
[discovery] - B.105: vibratory finishing machine assembly line line 105 average idle minutes between jobs on day shift?
[discovery] - B.106: vibratory finishing machine assembly line line 106 average idle minutes between jobs on day shift?
[discovery] - B.107: vibratory finishing machine assembly line line 107 average idle minutes between jobs on day shift?
[discovery] - B.108: vibratory finishing machine assembly line line 108 average idle minutes between jobs on day shift?
[discovery] - B.109: vibratory finishing machine assembly line line 109 average idle minutes between jobs on day shift?
[discovery] - B.110: vibratory finishing machine assembly line line 110 average idle minutes between jobs on day shift?
[discovery] - B.111: vibratory finishing machine assembly line line 111 average idle minutes between jobs on day shift?
[discovery] - B.112: vibratory finishing machine assembly line line 112 average idle minutes between jobs on day shift?
[discovery] - B.113: vibratory finishing machine assembly line line 113 average idle minutes between jobs on day shift?
[discovery] - B.114: vibratory finishing machine assembly line line 114 average idle minutes between jobs on day shift?
[discovery] - B.115: vibratory finishing machine assembly line line 115 average idle minutes between jobs on day shift?
[discovery] - B.116: vibratory finishing machine assembly line line 116 average idle minutes between jobs on day shift?
[discovery] - B.117: vibratory finishing machine assembly line line 117 average idle minutes between jobs on day shift?
[discovery] - B.118: vibratory finishing machine assembly line line 118 average idle minutes between jobs on day shift?
[discovery] - B.119: vibratory finishing machine assembly line line 119 average idle minutes between jobs on day shift?
[discovery] - B.120: vibratory finishing machine assembly line line 120 average idle minutes between jobs on day shift?
[discovery]
Appendix C — Stamped wedge reinforcement
The strongest wedge is: Wagle Estate motor test and assembly idle verification on MSEDCL bill — likely below gate.
C.1 Week-1 pilot checkpoint
- Day 7: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.2 Week-1 pilot checkpoint
- Day 14: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.3 Week-1 pilot checkpoint
- Day 21: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.4 Week-1 pilot checkpoint
- Day 28: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.5 Week-2 pilot checkpoint
- Day 35: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.6 Week-2 pilot checkpoint
- Day 42: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.7 Week-2 pilot checkpoint
- Day 49: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.8 Week-2 pilot checkpoint
- Day 56: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.9 Week-3 pilot checkpoint
- Day 63: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.10 Week-3 pilot checkpoint
- Day 70: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.11 Week-3 pilot checkpoint
- Day 77: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.12 Week-3 pilot checkpoint
- Day 84: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.13 Week-4 pilot checkpoint
- Day 91: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.14 Week-4 pilot checkpoint
- Day 98: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.15 Week-4 pilot checkpoint
- Day 105: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.16 Week-4 pilot checkpoint
- Day 112: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.17 Week-5 pilot checkpoint
- Day 119: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.18 Week-5 pilot checkpoint
- Day 126: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.19 Week-5 pilot checkpoint
- Day 133: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.20 Week-5 pilot checkpoint
- Day 140: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.21 Week-6 pilot checkpoint
- Day 147: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.22 Week-6 pilot checkpoint
- Day 154: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.23 Week-6 pilot checkpoint
- Day 161: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.24 Week-6 pilot checkpoint
- Day 168: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.25 Week-7 pilot checkpoint
- Day 175: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.26 Week-7 pilot checkpoint
- Day 182: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.27 Week-7 pilot checkpoint
- Day 189: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.28 Week-7 pilot checkpoint
- Day 196: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.29 Week-8 pilot checkpoint
- Day 203: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.30 Week-8 pilot checkpoint
- Day 210: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.31 Week-8 pilot checkpoint
- Day 217: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.32 Week-8 pilot checkpoint
- Day 224: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.33 Week-9 pilot checkpoint
- Day 231: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.34 Week-9 pilot checkpoint
- Day 238: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.35 Week-9 pilot checkpoint
- Day 245: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.36 Week-9 pilot checkpoint
- Day 252: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.37 Week-10 pilot checkpoint
- Day 259: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.38 Week-10 pilot checkpoint
- Day 266: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.39 Week-10 pilot checkpoint
- Day 273: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.40 Week-10 pilot checkpoint
- Day 280: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.41 Week-11 pilot checkpoint
- Day 287: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.42 Week-11 pilot checkpoint
- Day 294: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.43 Week-11 pilot checkpoint
- Day 301: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.44 Week-11 pilot checkpoint
- Day 308: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.45 Week-12 pilot checkpoint
- Day 315: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.46 Week-12 pilot checkpoint
- Day 322: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.47 Week-12 pilot checkpoint
- Day 329: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.48 Week-12 pilot checkpoint
- Day 336: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.49 Week-13 pilot checkpoint
- Day 343: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.50 Week-13 pilot checkpoint
- Day 350: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.51 Week-13 pilot checkpoint
- Day 357: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.52 Week-13 pilot checkpoint
- Day 364: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.53 Week-14 pilot checkpoint
- Day 371: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.54 Week-14 pilot checkpoint
- Day 378: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.55 Week-14 pilot checkpoint
- Day 385: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.56 Week-14 pilot checkpoint
- Day 392: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.57 Week-15 pilot checkpoint
- Day 399: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.58 Week-15 pilot checkpoint
- Day 406: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.59 Week-15 pilot checkpoint
- Day 413: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.60 Week-15 pilot checkpoint
- Day 420: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.61 Week-16 pilot checkpoint
- Day 427: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.62 Week-16 pilot checkpoint
- Day 434: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.63 Week-16 pilot checkpoint
- Day 441: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.64 Week-16 pilot checkpoint
- Day 448: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.65 Week-17 pilot checkpoint
- Day 455: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.66 Week-17 pilot checkpoint
- Day 462: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.67 Week-17 pilot checkpoint
- Day 469: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.68 Week-17 pilot checkpoint
- Day 476: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.69 Week-18 pilot checkpoint
- Day 483: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.70 Week-18 pilot checkpoint
- Day 490: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.71 Week-18 pilot checkpoint
- Day 497: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.72 Week-18 pilot checkpoint
- Day 504: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.73 Week-19 pilot checkpoint
- Day 511: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.74 Week-19 pilot checkpoint
- Day 518: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.75 Week-19 pilot checkpoint
- Day 525: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.76 Week-19 pilot checkpoint
- Day 532: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.77 Week-20 pilot checkpoint
- Day 539: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.78 Week-20 pilot checkpoint
- Day 546: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.79 Week-20 pilot checkpoint
- Day 553: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
C.80 Week-20 pilot checkpoint
- Day 560: Review MSEDCL — Thane industrial bill vs meter data for vibratory finishing machine assembly line scope.
- Kill at day 60 if verified savings <5% with full data access.
Appendix D — SME100 2019 Tier C campaign context
India SME 100 Award 2019 — Tier C band (<₹15L/month bill likely). Policy: dossier + qualify kit; no cold outbound until bill gate confirmed on call.
- 2019: Monitor capex, tariff true-up, leadership changes.
- 2020: Monitor capex, tariff true-up, leadership changes.
- 2021: Monitor capex, tariff true-up, leadership changes.
- 2022: Monitor capex, tariff true-up, leadership changes.
- 2023: Monitor capex, tariff true-up, leadership changes.
- 2024: Monitor capex, tariff true-up, leadership changes.
- 2025: Monitor capex, tariff true-up, leadership changes.
- 2026: Monitor capex, tariff true-up, leadership changes.
Appendix E — Objection handling scripts
Objection: “Bill too small for your product”
Response: We only proceed if two bill months show ≥₹15L — otherwise we stop.
Objection: “We already have solar”
Response: Solar offsets kWh; we target MD sequencing and idle thermal hold on the DISCOM bill.
Objection: “We have ISO / GMP”
Response: Certs ≠ meter-to-bill M&V — 90-day proof on one feeder if bill qualifies.
Objection: “Send a brochure”
Response: We send two bill months + one-page ₹ map — not a product deck.
Appendix F.1 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-001 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.2 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-002 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.3 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-003 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.4 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-004 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.5 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-005 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.6 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-006 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.7 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-007 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.8 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-008 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.9 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-009 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.10 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-010 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.11 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-011 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.12 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-012 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.13 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-013 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.14 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-014 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.15 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-015 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.16 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-016 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.17 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-017 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.18 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-018 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.19 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-019 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.20 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-020 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.21 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-021 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.22 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-022 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.23 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-023 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.24 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-024 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.25 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-025 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.26 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-026 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.27 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-027 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.28 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-028 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.29 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-029 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.30 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-030 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.31 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-031 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.32 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-032 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.33 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-033 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.34 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-034 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.35 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-035 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.36 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-036 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.37 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-037 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.38 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-038 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.39 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-039 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.40 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-040 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.41 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-041 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.42 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-042 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.43 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-043 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.44 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-044 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.45 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-045 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.46 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-046 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.47 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-047 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.48 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-048 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.49 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-049 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.50 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-050 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.51 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-051 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.52 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-052 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.53 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-053 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.54 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-054 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.55 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-055 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.56 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-056 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.57 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-057 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.58 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-058 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.59 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-059 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.60 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-060 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.61 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-061 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.62 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-062 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.63 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-063 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.64 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-064 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.65 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-065 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.66 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-066 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.67 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-067 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.68 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-068 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.69 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-069 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.70 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-070 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.71 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-071 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.72 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-072 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.73 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-073 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.74 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-074 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.75 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-075 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.76 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-076 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.77 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-077 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.78 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-078 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.79 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-079 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.80 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-080 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.81 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-081 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.82 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-082 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.83 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-083 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.84 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-084 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.85 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-085 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.86 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-086 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.87 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-087 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.88 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-088 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.89 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-089 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.90 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-090 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.91 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-091 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.92 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-092 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.93 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-093 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.94 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-094 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.95 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-095 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.96 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-096 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.97 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-097 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.98 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-098 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.99 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-099 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.100 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-100 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.101 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-101 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.102 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-102 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.103 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-103 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.104 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-104 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.105 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-105 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.106 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-106 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.107 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-107 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.108 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-108 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.109 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-109 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.110 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-110 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.111 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-111 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.112 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-112 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.113 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-113 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.114 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-114 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.115 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-115 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.116 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-116 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.117 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-117 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.118 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-118 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.119 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-119 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.120 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-120 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.121 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-121 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.122 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-122 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.123 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-123 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.124 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-124 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.125 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-125 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.126 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-126 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.127 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-127 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.128 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-128 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.129 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-129 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.130 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-130 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.131 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-131 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.132 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-132 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.133 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-133 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.134 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-134 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.135 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-135 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.136 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-136 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.137 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-137 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.138 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-138 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.139 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-139 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.140 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-140 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.141 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-141 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.142 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-142 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.143 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-143 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.144 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-144 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.145 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-145 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.146 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-146 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.147 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-147 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.148 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-148 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.149 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-149 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.150 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-150 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.151 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-151 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.152 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-152 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.153 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-153 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.154 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-154 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.155 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-155 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.156 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-156 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.157 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-157 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.158 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-158 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.159 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-159 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.160 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-160 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.161 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-161 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.162 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-162 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.163 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-163 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.164 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-164 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.165 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-165 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.166 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-166 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.167 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-167 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.168 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-168 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.169 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-169 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.170 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-170 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.171 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-171 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.172 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-172 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.173 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-173 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.174 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-174 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.175 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-175 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.176 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-176 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.177 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-177 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.178 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-178 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.179 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-179 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.180 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-180 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.181 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-181 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.182 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-182 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.183 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-183 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.184 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-184 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.185 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-185 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.186 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-186 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.187 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-187 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.188 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-188 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.189 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-189 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.190 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-190 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.191 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-191 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.192 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-192 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.193 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-193 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.194 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-194 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.195 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-195 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.196 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-196 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.197 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-197 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.198 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-198 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.199 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-199 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.200 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-200 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.201 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-201 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.202 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-202 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.203 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-203 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.204 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-204 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.205 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-205 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.206 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-206 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.207 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-207 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.208 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-208 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.209 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-209 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.210 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-210 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.211 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-211 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.212 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-212 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.213 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-213 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.214 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-214 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.215 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-215 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.216 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-216 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.217 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-217 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.218 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-218 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.219 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-219 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.220 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-220 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.221 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-221 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.222 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-222 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.223 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-223 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.224 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-224 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.225 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-225 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.226 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-226 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.227 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-227 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.228 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-228 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.229 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-229 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.230 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-230 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.231 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-231 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.232 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-232 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.233 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-233 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.234 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-234 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.235 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-235 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.236 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-236 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.237 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-237 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.238 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-238 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.239 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-239 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.240 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-240 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.241 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-241 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.242 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-242 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.243 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-243 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.244 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-244 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.245 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-245 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.246 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-246 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.247 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-247 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.248 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-248 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.249 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-249 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.250 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-250 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.251 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-251 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.252 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-252 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.253 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-253 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.254 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-254 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.255 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-255 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.256 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-256 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.257 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-257 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.258 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-258 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.259 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-259 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.260 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-260 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.261 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-261 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.262 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-262 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.263 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-263 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.264 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-264 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.265 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-265 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.266 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-266 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.267 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-267 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.268 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-268 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.269 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-269 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.270 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-270 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.271 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-271 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.272 — Field note (72-sm-systems)
Cross-check MSEDCL — Thane industrial tariff order before customer calls. Process: vibratory finishing machine assembly line. Post-discovery notes.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-272 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |