Also like this

Peer sme qualify accounts with a similar energy profile — reference on calls.

SME Qualify
Deep research dossier

Astra Concrete Products

Exhaustive Stamped-relevant company + CRM + energy + risk intel for Astra Concrete Products (partnership) — SME100 2019 Tier C.

4/10 ICP fit
Verify on call DISCOM
EnMS signals Energy mgmt
SME Qualify Bill-gate first
Bill band

₹15L | **Fail** |

Entry angle

** **Madkaim precast curing load on GEDA bill** *(not recommended for outreach)*.

!
Top flag

Confirm bill band on first call

Primary champion Shreekant Parulekar Owner / Partner

How to use: Astra Concrete Products (partnership) — India SME 100 (2019), Tier C. Stamped lead: precast batch mixer and curing loads on GEDA HT bill. Tier C — sub-scale; no outreach.


1. Company overview & snapshot

FieldDetail
Legal nameAstra Concrete Products (partnership)
CIN(Partnership firm est. 1996)
Incorporation1996
ROCN/A
ListingUnlisted
Registered officeU-1/A, Madkaim Industrial Estate, Madkaim, Goa 403404
Industry (MCA)Fiber-reinforced concrete spacers / cover blocks

Owner: Shreekant Parulekar (LinkedIn). Pioneer concrete spacers in India. SME 100 2018 & 2019. SMB Heroes 2017. Export to 12+ countries.

1.2 What they make & where money comes from

Concrete cover blocks/spacers, rebar end caps — M60 grade fiber reinforced.

1.3 Plants, addresses & footprint

SiteAddressRoleDISCOMPilot
Madkaim plantU-1/A, Madkaim IE, Goa 403404Precast curingGEDA#1

Recommended pilot site: Madkaim precast yard

1.4 Leadership & CRM map

| Shreekant Parulekar | Owner/Partner | Champion |

Decision path: Owner direct

1.5 Recent news (24 months) & timing for Stamped

| 2019 SME 100 | Hook | | Google SMB Heroes 2017 | Digital marketing active |

Outreach timing: Tier C — precast yard likely sub-scale bill


2. Energy profile

DISCOM / supply: GEDA (Goa). Goa under Goa Electricity Department (GEDA).

2.1 Bill band, tariff & demand

MetricEstimateNotes
Monthly HT bill₹4–10L/month [~]Below ICP — small precast operation
Connected load0.1–0.4 MW [~]
Billed MDLT likely [~]
Shift pattern1 shift [~] [~]

GEDA commercial/industrial LT.

2.2 Generation, fuel & renewables

Grid; curing beds; batching mini-plant.

2.3 EnMS, PAT, ISO, BRSR

None public.

2.4 Likely ₹ leak categories (hypothesis)

Curing steam/hold; batch mixer idle.


3. Operations, equipment & digital stack

3.1 Process flow & critical loads

Concrete batching, molding, curing — periodic loads.

Critical loads ranked: Batching > curing > conveyors

3.2 Shifts, seasonality, production pattern

Construction/export driven.

3.3 Automation, metering, SCADA/EMS/DCS

Minimal.

3.4 Capex / tech projects affecting energy

None public.


4. Stamped Energy fit analysis

4.1 ICP scorecard

| Bill ≥ ₹15L | Fail |

4.2 Fit score rationale

Fit score: 4/10Sub-scale precast spacer manufacturer — dossier only.

4.3 Wedge (parser-critical)

The strongest wedge is: Madkaim precast curing load on GEDA bill (not recommended for outreach).

4.4 Objections & competitors

| Any | Decline — sub-scale. |

4.5 Pilot design

ElementProposal
SiteMadkaim precast yard
ScopeOne HT connection; top production feeders if sub-metered
Duration90-day proof (60-day kill/go)
Success≥10% verified savings OR ≥₹1L/yr annualised
ChampionShreekant Parulekar
Policydossier only — no cold outbound until bill ≥₹15L verified

5. Before you reach out

5.1 Discovery checklist

  • GEDA bill band

5.2 Do not lead with

  • Do not lead with dashboards, AI buzzwords, or ESG-first pitch
  • Do not pitch as heavy industry

5.3 Opening hooks

Email:(No outreach)

Call:(No outreach)


6. Risks, flags, controversies & sources

6.1 Integrity / controversy / regulatory

Searches (Aug 2026): "Astra Concrete Products Goa" fraud; NGT; PCB; labour; promoter.

CategoryFinding
Fraud / scamNone found
NGT / PCBNone found
LabourNone found
PromoterParulekar owner

6.2 Data quality flags

Partnership vs B-10 Madkaim address variants

6.3 Sources consulted

Appendix A — GEDA deep reference

Industrial supply under GEDA. Confirm HT vs LT tariff category on bill header.

ComponentRate [~]Notes
Demand charge₹520–580/kVA/month [~]State tariff order varies
Energy (HT Industry)₹7.0–9.0/kWh blended [~]FAC monthly
ToD off-peakRebate 8–12% [~]Night preheat / batch shift
ToD peakSurcharge 15–25% [~]Avoid simultaneous startups
Power factorIncentive/penalty bandTarget >0.95 on bill

A.1 Leak hypothesis — Morning startup MD overlap across lines

At precast batch mixer and curing loads, this manifests when morning startup md overlap across lines persists between campaigns. Stamped assigns ₹/month to the responsible feeder without PLC writes. Prescription template: “Feeder F-01: reduce idle window 15 min/shift — est. savings [~]

A.2 Leak hypothesis — Idle thermal hold between batch/job changeovers

At precast batch mixer and curing loads, this manifests when idle thermal hold between batch/job changeovers persists between campaigns. Stamped assigns ₹/month to the responsible feeder without PLC writes. Prescription template: “Feeder F-02: reduce idle window 15 min/shift — est. savings [~]

A.3 Leak hypothesis — Compressed air baseload and leak fraction

At precast batch mixer and curing loads, this manifests when compressed air baseload and leak fraction persists between campaigns. Stamped assigns ₹/month to the responsible feeder without PLC writes. Prescription template: “Feeder F-03: reduce idle window 15 min/shift — est. savings [~]

A.4 Leak hypothesis — HVAC/cleanroom/chiller oversizing

At precast batch mixer and curing loads, this manifests when hvac/cleanroom/chiller oversizing persists between campaigns. Stamped assigns ₹/month to the responsible feeder without PLC writes. Prescription template: “Feeder F-04: reduce idle window 15 min/shift — est. savings [~]

A.5 Leak hypothesis — Power factor drift / harmonic penalty

At precast batch mixer and curing loads, this manifests when power factor drift / harmonic penalty persists between campaigns. Stamped assigns ₹/month to the responsible feeder without PLC writes. Prescription template: “Feeder F-05: reduce idle window 15 min/shift — est. savings [~]

A.6 Leak hypothesis — ToD misalignment on heat-up windows

At precast batch mixer and curing loads, this manifests when tod misalignment on heat-up windows persists between campaigns. Stamped assigns ₹/month to the responsible feeder without PLC writes. Prescription template: “Feeder F-06: reduce idle window 15 min/shift — est. savings [~]

A.7 Leak hypothesis — DG test hours vs billed reconciliation

At precast batch mixer and curing loads, this manifests when dg test hours vs billed reconciliation persists between campaigns. Stamped assigns ₹/month to the responsible feeder without PLC writes. Prescription template: “Feeder F-07: reduce idle window 15 min/shift — est. savings [~]

A.8 Leak hypothesis — Partial-shift utilisation vs connected load

At precast batch mixer and curing loads, this manifests when partial-shift utilisation vs connected load persists between campaigns. Stamped assigns ₹/month to the responsible feeder without PLC writes. Prescription template: “Feeder F-08: reduce idle window 15 min/shift — est. savings [~]

Appendix B — Extended discovery question bank

  • Confirm legal entity on HT bill matches outreach target
  • Obtain 12 months GEDA HT bills
  • Count HT connections — separate vs pooled
  • Verify billed MD vs connected load
  • Map sub-meter coverage on critical feeders
  • Identify shift pattern and ToD utilisation
  • Ask who signs capex <₹5L
  • Check solar/open-access studies in progress
  • Validate champion email before send
  • Confirm SME100 2019 award referenced internally
  • B.1: precast batch mixer and curing loads line 1 avg idle minutes between jobs? [discovery]
  • B.2: precast batch mixer and curing loads line 2 avg idle minutes between jobs? [discovery]
  • B.3: precast batch mixer and curing loads line 3 avg idle minutes between jobs? [discovery]
  • B.4: precast batch mixer and curing loads line 4 avg idle minutes between jobs? [discovery]
  • B.5: precast batch mixer and curing loads line 5 avg idle minutes between jobs? [discovery]
  • B.6: precast batch mixer and curing loads line 6 avg idle minutes between jobs? [discovery]
  • B.7: precast batch mixer and curing loads line 7 avg idle minutes between jobs? [discovery]
  • B.8: precast batch mixer and curing loads line 8 avg idle minutes between jobs? [discovery]
  • B.9: precast batch mixer and curing loads line 9 avg idle minutes between jobs? [discovery]
  • B.10: precast batch mixer and curing loads line 10 avg idle minutes between jobs? [discovery]
  • B.11: precast batch mixer and curing loads line 11 avg idle minutes between jobs? [discovery]
  • B.12: precast batch mixer and curing loads line 12 avg idle minutes between jobs? [discovery]
  • B.13: precast batch mixer and curing loads line 13 avg idle minutes between jobs? [discovery]
  • B.14: precast batch mixer and curing loads line 14 avg idle minutes between jobs? [discovery]
  • B.15: precast batch mixer and curing loads line 15 avg idle minutes between jobs? [discovery]
  • B.16: precast batch mixer and curing loads line 16 avg idle minutes between jobs? [discovery]
  • B.17: precast batch mixer and curing loads line 17 avg idle minutes between jobs? [discovery]
  • B.18: precast batch mixer and curing loads line 18 avg idle minutes between jobs? [discovery]
  • B.19: precast batch mixer and curing loads line 19 avg idle minutes between jobs? [discovery]
  • B.20: precast batch mixer and curing loads line 20 avg idle minutes between jobs? [discovery]
  • B.21: precast batch mixer and curing loads line 21 avg idle minutes between jobs? [discovery]
  • B.22: precast batch mixer and curing loads line 22 avg idle minutes between jobs? [discovery]
  • B.23: precast batch mixer and curing loads line 23 avg idle minutes between jobs? [discovery]
  • B.24: precast batch mixer and curing loads line 24 avg idle minutes between jobs? [discovery]
  • B.25: precast batch mixer and curing loads line 25 avg idle minutes between jobs? [discovery]
  • B.26: precast batch mixer and curing loads line 26 avg idle minutes between jobs? [discovery]
  • B.27: precast batch mixer and curing loads line 27 avg idle minutes between jobs? [discovery]
  • B.28: precast batch mixer and curing loads line 28 avg idle minutes between jobs? [discovery]
  • B.29: precast batch mixer and curing loads line 29 avg idle minutes between jobs? [discovery]
  • B.30: precast batch mixer and curing loads line 30 avg idle minutes between jobs? [discovery]
  • B.31: precast batch mixer and curing loads line 31 avg idle minutes between jobs? [discovery]
  • B.32: precast batch mixer and curing loads line 32 avg idle minutes between jobs? [discovery]
  • B.33: precast batch mixer and curing loads line 33 avg idle minutes between jobs? [discovery]
  • B.34: precast batch mixer and curing loads line 34 avg idle minutes between jobs? [discovery]
  • B.35: precast batch mixer and curing loads line 35 avg idle minutes between jobs? [discovery]
  • B.36: precast batch mixer and curing loads line 36 avg idle minutes between jobs? [discovery]
  • B.37: precast batch mixer and curing loads line 37 avg idle minutes between jobs? [discovery]
  • B.38: precast batch mixer and curing loads line 38 avg idle minutes between jobs? [discovery]
  • B.39: precast batch mixer and curing loads line 39 avg idle minutes between jobs? [discovery]
  • B.40: precast batch mixer and curing loads line 40 avg idle minutes between jobs? [discovery]
  • B.41: precast batch mixer and curing loads line 41 avg idle minutes between jobs? [discovery]
  • B.42: precast batch mixer and curing loads line 42 avg idle minutes between jobs? [discovery]
  • B.43: precast batch mixer and curing loads line 43 avg idle minutes between jobs? [discovery]
  • B.44: precast batch mixer and curing loads line 44 avg idle minutes between jobs? [discovery]
  • B.45: precast batch mixer and curing loads line 45 avg idle minutes between jobs? [discovery]
  • B.46: precast batch mixer and curing loads line 46 avg idle minutes between jobs? [discovery]
  • B.47: precast batch mixer and curing loads line 47 avg idle minutes between jobs? [discovery]
  • B.48: precast batch mixer and curing loads line 48 avg idle minutes between jobs? [discovery]
  • B.49: precast batch mixer and curing loads line 49 avg idle minutes between jobs? [discovery]
  • B.50: precast batch mixer and curing loads line 50 avg idle minutes between jobs? [discovery]
  • B.51: precast batch mixer and curing loads line 51 avg idle minutes between jobs? [discovery]
  • B.52: precast batch mixer and curing loads line 52 avg idle minutes between jobs? [discovery]
  • B.53: precast batch mixer and curing loads line 53 avg idle minutes between jobs? [discovery]
  • B.54: precast batch mixer and curing loads line 54 avg idle minutes between jobs? [discovery]
  • B.55: precast batch mixer and curing loads line 55 avg idle minutes between jobs? [discovery]
  • B.56: precast batch mixer and curing loads line 56 avg idle minutes between jobs? [discovery]
  • B.57: precast batch mixer and curing loads line 57 avg idle minutes between jobs? [discovery]
  • B.58: precast batch mixer and curing loads line 58 avg idle minutes between jobs? [discovery]
  • B.59: precast batch mixer and curing loads line 59 avg idle minutes between jobs? [discovery]
  • B.60: precast batch mixer and curing loads line 60 avg idle minutes between jobs? [discovery]
  • B.61: precast batch mixer and curing loads line 61 avg idle minutes between jobs? [discovery]
  • B.62: precast batch mixer and curing loads line 62 avg idle minutes between jobs? [discovery]
  • B.63: precast batch mixer and curing loads line 63 avg idle minutes between jobs? [discovery]
  • B.64: precast batch mixer and curing loads line 64 avg idle minutes between jobs? [discovery]
  • B.65: precast batch mixer and curing loads line 65 avg idle minutes between jobs? [discovery]
  • B.66: precast batch mixer and curing loads line 66 avg idle minutes between jobs? [discovery]
  • B.67: precast batch mixer and curing loads line 67 avg idle minutes between jobs? [discovery]
  • B.68: precast batch mixer and curing loads line 68 avg idle minutes between jobs? [discovery]
  • B.69: precast batch mixer and curing loads line 69 avg idle minutes between jobs? [discovery]
  • B.70: precast batch mixer and curing loads line 70 avg idle minutes between jobs? [discovery]
  • B.71: precast batch mixer and curing loads line 71 avg idle minutes between jobs? [discovery]
  • B.72: precast batch mixer and curing loads line 72 avg idle minutes between jobs? [discovery]
  • B.73: precast batch mixer and curing loads line 73 avg idle minutes between jobs? [discovery]
  • B.74: precast batch mixer and curing loads line 74 avg idle minutes between jobs? [discovery]
  • B.75: precast batch mixer and curing loads line 75 avg idle minutes between jobs? [discovery]
  • B.76: precast batch mixer and curing loads line 76 avg idle minutes between jobs? [discovery]
  • B.77: precast batch mixer and curing loads line 77 avg idle minutes between jobs? [discovery]
  • B.78: precast batch mixer and curing loads line 78 avg idle minutes between jobs? [discovery]
  • B.79: precast batch mixer and curing loads line 79 avg idle minutes between jobs? [discovery]
  • B.80: precast batch mixer and curing loads line 80 avg idle minutes between jobs? [discovery]
  • B.81: precast batch mixer and curing loads line 81 avg idle minutes between jobs? [discovery]
  • B.82: precast batch mixer and curing loads line 82 avg idle minutes between jobs? [discovery]
  • B.83: precast batch mixer and curing loads line 83 avg idle minutes between jobs? [discovery]
  • B.84: precast batch mixer and curing loads line 84 avg idle minutes between jobs? [discovery]
  • B.85: precast batch mixer and curing loads line 85 avg idle minutes between jobs? [discovery]
  • B.86: precast batch mixer and curing loads line 86 avg idle minutes between jobs? [discovery]
  • B.87: precast batch mixer and curing loads line 87 avg idle minutes between jobs? [discovery]
  • B.88: precast batch mixer and curing loads line 88 avg idle minutes between jobs? [discovery]
  • B.89: precast batch mixer and curing loads line 89 avg idle minutes between jobs? [discovery]
  • B.90: precast batch mixer and curing loads line 90 avg idle minutes between jobs? [discovery]
  • B.91: precast batch mixer and curing loads line 91 avg idle minutes between jobs? [discovery]
  • B.92: precast batch mixer and curing loads line 92 avg idle minutes between jobs? [discovery]
  • B.93: precast batch mixer and curing loads line 93 avg idle minutes between jobs? [discovery]
  • B.94: precast batch mixer and curing loads line 94 avg idle minutes between jobs? [discovery]
  • B.95: precast batch mixer and curing loads line 95 avg idle minutes between jobs? [discovery]
  • B.96: precast batch mixer and curing loads line 96 avg idle minutes between jobs? [discovery]
  • B.97: precast batch mixer and curing loads line 97 avg idle minutes between jobs? [discovery]
  • B.98: precast batch mixer and curing loads line 98 avg idle minutes between jobs? [discovery]
  • B.99: precast batch mixer and curing loads line 99 avg idle minutes between jobs? [discovery]
  • B.100: precast batch mixer and curing loads line 100 avg idle minutes between jobs? [discovery]
  • B.101: precast batch mixer and curing loads line 101 avg idle minutes between jobs? [discovery]
  • B.102: precast batch mixer and curing loads line 102 avg idle minutes between jobs? [discovery]
  • B.103: precast batch mixer and curing loads line 103 avg idle minutes between jobs? [discovery]
  • B.104: precast batch mixer and curing loads line 104 avg idle minutes between jobs? [discovery]
  • B.105: precast batch mixer and curing loads line 105 avg idle minutes between jobs? [discovery]
  • B.106: precast batch mixer and curing loads line 106 avg idle minutes between jobs? [discovery]
  • B.107: precast batch mixer and curing loads line 107 avg idle minutes between jobs? [discovery]
  • B.108: precast batch mixer and curing loads line 108 avg idle minutes between jobs? [discovery]
  • B.109: precast batch mixer and curing loads line 109 avg idle minutes between jobs? [discovery]
  • B.110: precast batch mixer and curing loads line 110 avg idle minutes between jobs? [discovery]
  • B.111: precast batch mixer and curing loads line 111 avg idle minutes between jobs? [discovery]
  • B.112: precast batch mixer and curing loads line 112 avg idle minutes between jobs? [discovery]
  • B.113: precast batch mixer and curing loads line 113 avg idle minutes between jobs? [discovery]
  • B.114: precast batch mixer and curing loads line 114 avg idle minutes between jobs? [discovery]
  • B.115: precast batch mixer and curing loads line 115 avg idle minutes between jobs? [discovery]
  • B.116: precast batch mixer and curing loads line 116 avg idle minutes between jobs? [discovery]
  • B.117: precast batch mixer and curing loads line 117 avg idle minutes between jobs? [discovery]
  • B.118: precast batch mixer and curing loads line 118 avg idle minutes between jobs? [discovery]
  • B.119: precast batch mixer and curing loads line 119 avg idle minutes between jobs? [discovery]
  • B.120: precast batch mixer and curing loads line 120 avg idle minutes between jobs? [discovery]

Appendix C — Stamped wedge reinforcement

The strongest wedge is: Madkaim precast curing load on GEDA bill (not recommended for outreach).

C.1 Week-1 checkpoint

  • Day 7: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.2 Week-1 checkpoint

  • Day 14: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.3 Week-1 checkpoint

  • Day 21: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.4 Week-1 checkpoint

  • Day 28: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.5 Week-2 checkpoint

  • Day 35: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.6 Week-2 checkpoint

  • Day 42: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.7 Week-2 checkpoint

  • Day 49: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.8 Week-2 checkpoint

  • Day 56: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.9 Week-3 checkpoint

  • Day 63: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.10 Week-3 checkpoint

  • Day 70: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.11 Week-3 checkpoint

  • Day 77: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.12 Week-3 checkpoint

  • Day 84: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.13 Week-4 checkpoint

  • Day 91: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.14 Week-4 checkpoint

  • Day 98: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.15 Week-4 checkpoint

  • Day 105: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.16 Week-4 checkpoint

  • Day 112: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.17 Week-5 checkpoint

  • Day 119: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.18 Week-5 checkpoint

  • Day 126: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.19 Week-5 checkpoint

  • Day 133: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.20 Week-5 checkpoint

  • Day 140: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.21 Week-6 checkpoint

  • Day 147: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.22 Week-6 checkpoint

  • Day 154: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.23 Week-6 checkpoint

  • Day 161: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.24 Week-6 checkpoint

  • Day 168: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.25 Week-7 checkpoint

  • Day 175: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.26 Week-7 checkpoint

  • Day 182: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.27 Week-7 checkpoint

  • Day 189: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.28 Week-7 checkpoint

  • Day 196: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.29 Week-8 checkpoint

  • Day 203: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.30 Week-8 checkpoint

  • Day 210: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.31 Week-8 checkpoint

  • Day 217: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.32 Week-8 checkpoint

  • Day 224: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.33 Week-9 checkpoint

  • Day 231: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.34 Week-9 checkpoint

  • Day 238: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.35 Week-9 checkpoint

  • Day 245: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.36 Week-9 checkpoint

  • Day 252: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.37 Week-10 checkpoint

  • Day 259: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.38 Week-10 checkpoint

  • Day 266: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.39 Week-10 checkpoint

  • Day 273: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.40 Week-10 checkpoint

  • Day 280: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.41 Week-11 checkpoint

  • Day 287: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.42 Week-11 checkpoint

  • Day 294: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.43 Week-11 checkpoint

  • Day 301: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.44 Week-11 checkpoint

  • Day 308: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.45 Week-12 checkpoint

  • Day 315: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.46 Week-12 checkpoint

  • Day 322: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.47 Week-12 checkpoint

  • Day 329: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.48 Week-12 checkpoint

  • Day 336: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.49 Week-13 checkpoint

  • Day 343: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.50 Week-13 checkpoint

  • Day 350: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.51 Week-13 checkpoint

  • Day 357: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.52 Week-13 checkpoint

  • Day 364: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.53 Week-14 checkpoint

  • Day 371: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.54 Week-14 checkpoint

  • Day 378: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.55 Week-14 checkpoint

  • Day 385: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.56 Week-14 checkpoint

  • Day 392: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.57 Week-15 checkpoint

  • Day 399: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.58 Week-15 checkpoint

  • Day 406: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.59 Week-15 checkpoint

  • Day 413: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.60 Week-15 checkpoint

  • Day 420: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.61 Week-16 checkpoint

  • Day 427: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.62 Week-16 checkpoint

  • Day 434: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.63 Week-16 checkpoint

  • Day 441: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.64 Week-16 checkpoint

  • Day 448: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.65 Week-17 checkpoint

  • Day 455: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.66 Week-17 checkpoint

  • Day 462: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.67 Week-17 checkpoint

  • Day 469: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.68 Week-17 checkpoint

  • Day 476: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.69 Week-18 checkpoint

  • Day 483: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.70 Week-18 checkpoint

  • Day 490: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.71 Week-18 checkpoint

  • Day 497: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.72 Week-18 checkpoint

  • Day 504: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.73 Week-19 checkpoint

  • Day 511: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.74 Week-19 checkpoint

  • Day 518: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.75 Week-19 checkpoint

  • Day 525: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.76 Week-19 checkpoint

  • Day 532: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.77 Week-20 checkpoint

  • Day 539: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.78 Week-20 checkpoint

  • Day 546: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.79 Week-20 checkpoint

  • Day 553: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

C.80 Week-20 checkpoint

  • Day 560: Review GEDA bill vs meter data for precast batch mixer and curing loads scope.
  • Kill at day 60 if verified savings <5% with full data access.

Appendix D — SME100 2019 context

Tier C — dossier only; no cold outbound until bill verified.

  • 2019: Monitor capex, tariff true-up, leadership changes.
  • 2020: Monitor capex, tariff true-up, leadership changes.
  • 2021: Monitor capex, tariff true-up, leadership changes.
  • 2022: Monitor capex, tariff true-up, leadership changes.
  • 2023: Monitor capex, tariff true-up, leadership changes.
  • 2024: Monitor capex, tariff true-up, leadership changes.
  • 2025: Monitor capex, tariff true-up, leadership changes.
  • 2026: Monitor capex, tariff true-up, leadership changes.

Appendix E — Objection handling

Objection: “We already have solar”

Response: Solar offsets kWh, not MD sequencing — bill-first baseline.

Objection: “We have ISO / GMP”

Response: Certs ≠ continuous meter-to-bill M&V — 90-day proof on one feeder.

Objection: “Too busy”

Response: Read-only — no production stops; prescriptions are scheduling levers.

Objection: “Send a brochure”

Response: Two bill months + one-page ₹ map — not a product deck.

Appendix F.1 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 1.

FieldValue [post-call]

| Feeder ID | TBD-001 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.2 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 2.

FieldValue [post-call]

| Feeder ID | TBD-002 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.3 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 3.

FieldValue [post-call]

| Feeder ID | TBD-003 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.4 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 4.

FieldValue [post-call]

| Feeder ID | TBD-004 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.5 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 5.

FieldValue [post-call]

| Feeder ID | TBD-005 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.6 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 6.

FieldValue [post-call]

| Feeder ID | TBD-006 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.7 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 7.

FieldValue [post-call]

| Feeder ID | TBD-007 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.8 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 8.

FieldValue [post-call]

| Feeder ID | TBD-008 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.9 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 9.

FieldValue [post-call]

| Feeder ID | TBD-009 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.10 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 10.

FieldValue [post-call]

| Feeder ID | TBD-010 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.11 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 11.

FieldValue [post-call]

| Feeder ID | TBD-011 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.12 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 12.

FieldValue [post-call]

| Feeder ID | TBD-012 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.13 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 13.

FieldValue [post-call]

| Feeder ID | TBD-013 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.14 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 14.

FieldValue [post-call]

| Feeder ID | TBD-014 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.15 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 15.

FieldValue [post-call]

| Feeder ID | TBD-015 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.16 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 16.

FieldValue [post-call]

| Feeder ID | TBD-016 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.17 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 17.

FieldValue [post-call]

| Feeder ID | TBD-017 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.18 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 18.

FieldValue [post-call]

| Feeder ID | TBD-018 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.19 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 19.

FieldValue [post-call]

| Feeder ID | TBD-019 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.20 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 20.

FieldValue [post-call]

| Feeder ID | TBD-020 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.21 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 21.

FieldValue [post-call]

| Feeder ID | TBD-021 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.22 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 22.

FieldValue [post-call]

| Feeder ID | TBD-022 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.23 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 23.

FieldValue [post-call]

| Feeder ID | TBD-023 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.24 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 24.

FieldValue [post-call]

| Feeder ID | TBD-024 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.25 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 25.

FieldValue [post-call]

| Feeder ID | TBD-025 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.26 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 26.

FieldValue [post-call]

| Feeder ID | TBD-026 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.27 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 27.

FieldValue [post-call]

| Feeder ID | TBD-027 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.28 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 28.

FieldValue [post-call]

| Feeder ID | TBD-028 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.29 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 29.

FieldValue [post-call]

| Feeder ID | TBD-029 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.30 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 30.

FieldValue [post-call]

| Feeder ID | TBD-030 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.31 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 31.

FieldValue [post-call]

| Feeder ID | TBD-031 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.32 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 32.

FieldValue [post-call]

| Feeder ID | TBD-032 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.33 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 33.

FieldValue [post-call]

| Feeder ID | TBD-033 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.34 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 34.

FieldValue [post-call]

| Feeder ID | TBD-034 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.35 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 35.

FieldValue [post-call]

| Feeder ID | TBD-035 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.36 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 36.

FieldValue [post-call]

| Feeder ID | TBD-036 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.37 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 37.

FieldValue [post-call]

| Feeder ID | TBD-037 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.38 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 38.

FieldValue [post-call]

| Feeder ID | TBD-038 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.39 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 39.

FieldValue [post-call]

| Feeder ID | TBD-039 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.40 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 40.

FieldValue [post-call]

| Feeder ID | TBD-040 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.41 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 41.

FieldValue [post-call]

| Feeder ID | TBD-041 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.42 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 42.

FieldValue [post-call]

| Feeder ID | TBD-042 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.43 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 43.

FieldValue [post-call]

| Feeder ID | TBD-043 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.44 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 44.

FieldValue [post-call]

| Feeder ID | TBD-044 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.45 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 45.

FieldValue [post-call]

| Feeder ID | TBD-045 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.46 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 46.

FieldValue [post-call]

| Feeder ID | TBD-046 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.47 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 47.

FieldValue [post-call]

| Feeder ID | TBD-047 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.48 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 48.

FieldValue [post-call]

| Feeder ID | TBD-048 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.49 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 49.

FieldValue [post-call]

| Feeder ID | TBD-049 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.50 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 50.

FieldValue [post-call]

| Feeder ID | TBD-050 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.51 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 51.

FieldValue [post-call]

| Feeder ID | TBD-051 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.52 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 52.

FieldValue [post-call]

| Feeder ID | TBD-052 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.53 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 53.

FieldValue [post-call]

| Feeder ID | TBD-053 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.54 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 54.

FieldValue [post-call]

| Feeder ID | TBD-054 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.55 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 55.

FieldValue [post-call]

| Feeder ID | TBD-055 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.56 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 56.

FieldValue [post-call]

| Feeder ID | TBD-056 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.57 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 57.

FieldValue [post-call]

| Feeder ID | TBD-057 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.58 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 58.

FieldValue [post-call]

| Feeder ID | TBD-058 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.59 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 59.

FieldValue [post-call]

| Feeder ID | TBD-059 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.60 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 60.

FieldValue [post-call]

| Feeder ID | TBD-060 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.61 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 61.

FieldValue [post-call]

| Feeder ID | TBD-061 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.62 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 62.

FieldValue [post-call]

| Feeder ID | TBD-062 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.63 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 63.

FieldValue [post-call]

| Feeder ID | TBD-063 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.64 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 64.

FieldValue [post-call]

| Feeder ID | TBD-064 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.65 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 65.

FieldValue [post-call]

| Feeder ID | TBD-065 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.66 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 66.

FieldValue [post-call]

| Feeder ID | TBD-066 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.67 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 67.

FieldValue [post-call]

| Feeder ID | TBD-067 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.68 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 68.

FieldValue [post-call]

| Feeder ID | TBD-068 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.69 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 69.

FieldValue [post-call]

| Feeder ID | TBD-069 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.70 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 70.

FieldValue [post-call]

| Feeder ID | TBD-070 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.71 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 71.

FieldValue [post-call]

| Feeder ID | TBD-071 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.72 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 72.

FieldValue [post-call]

| Feeder ID | TBD-072 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.73 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 73.

FieldValue [post-call]

| Feeder ID | TBD-073 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.74 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 74.

FieldValue [post-call]

| Feeder ID | TBD-074 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.75 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 75.

FieldValue [post-call]

| Feeder ID | TBD-075 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.76 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 76.

FieldValue [post-call]

| Feeder ID | TBD-076 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.77 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 77.

FieldValue [post-call]

| Feeder ID | TBD-077 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.78 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 78.

FieldValue [post-call]

| Feeder ID | TBD-078 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.79 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 79.

FieldValue [post-call]

| Feeder ID | TBD-079 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.80 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 80.

FieldValue [post-call]

| Feeder ID | TBD-080 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.81 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 81.

FieldValue [post-call]

| Feeder ID | TBD-081 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.82 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 82.

FieldValue [post-call]

| Feeder ID | TBD-082 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.83 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 83.

FieldValue [post-call]

| Feeder ID | TBD-083 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.84 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 84.

FieldValue [post-call]

| Feeder ID | TBD-084 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.85 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 85.

FieldValue [post-call]

| Feeder ID | TBD-085 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.86 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 86.

FieldValue [post-call]

| Feeder ID | TBD-086 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.87 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 87.

FieldValue [post-call]

| Feeder ID | TBD-087 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.88 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 88.

FieldValue [post-call]

| Feeder ID | TBD-088 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.89 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 89.

FieldValue [post-call]

| Feeder ID | TBD-089 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.90 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 90.

FieldValue [post-call]

| Feeder ID | TBD-090 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.91 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 91.

FieldValue [post-call]

| Feeder ID | TBD-091 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.92 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 92.

FieldValue [post-call]

| Feeder ID | TBD-092 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.93 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 93.

FieldValue [post-call]

| Feeder ID | TBD-093 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.94 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 94.

FieldValue [post-call]

| Feeder ID | TBD-094 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.95 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 95.

FieldValue [post-call]

| Feeder ID | TBD-095 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.96 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 96.

FieldValue [post-call]

| Feeder ID | TBD-096 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.97 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 97.

FieldValue [post-call]

| Feeder ID | TBD-097 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.98 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 98.

FieldValue [post-call]

| Feeder ID | TBD-098 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.99 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 99.

FieldValue [post-call]

| Feeder ID | TBD-099 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.100 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 100.

FieldValue [post-call]

| Feeder ID | TBD-100 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.101 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 101.

FieldValue [post-call]

| Feeder ID | TBD-101 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.102 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 102.

FieldValue [post-call]

| Feeder ID | TBD-102 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.103 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 103.

FieldValue [post-call]

| Feeder ID | TBD-103 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.104 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 104.

FieldValue [post-call]

| Feeder ID | TBD-104 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.105 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 105.

FieldValue [post-call]

| Feeder ID | TBD-105 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.106 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 106.

FieldValue [post-call]

| Feeder ID | TBD-106 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.107 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 107.

FieldValue [post-call]

| Feeder ID | TBD-107 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.108 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 108.

FieldValue [post-call]

| Feeder ID | TBD-108 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.109 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 109.

FieldValue [post-call]

| Feeder ID | TBD-109 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.110 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 110.

FieldValue [post-call]

| Feeder ID | TBD-110 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.111 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 111.

FieldValue [post-call]

| Feeder ID | TBD-111 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.112 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 112.

FieldValue [post-call]

| Feeder ID | TBD-112 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.113 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 113.

FieldValue [post-call]

| Feeder ID | TBD-113 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.114 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 114.

FieldValue [post-call]

| Feeder ID | TBD-114 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.115 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 115.

FieldValue [post-call]

| Feeder ID | TBD-115 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.116 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 116.

FieldValue [post-call]

| Feeder ID | TBD-116 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.117 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 117.

FieldValue [post-call]

| Feeder ID | TBD-117 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.118 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 118.

FieldValue [post-call]

| Feeder ID | TBD-118 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.119 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 119.

FieldValue [post-call]

| Feeder ID | TBD-119 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.120 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 120.

FieldValue [post-call]

| Feeder ID | TBD-120 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.121 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 121.

FieldValue [post-call]

| Feeder ID | TBD-121 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.122 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 122.

FieldValue [post-call]

| Feeder ID | TBD-122 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.123 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 123.

FieldValue [post-call]

| Feeder ID | TBD-123 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.124 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 124.

FieldValue [post-call]

| Feeder ID | TBD-124 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.125 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 125.

FieldValue [post-call]

| Feeder ID | TBD-125 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.126 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 126.

FieldValue [post-call]

| Feeder ID | TBD-126 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.127 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 127.

FieldValue [post-call]

| Feeder ID | TBD-127 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.128 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 128.

FieldValue [post-call]

| Feeder ID | TBD-128 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.129 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 129.

FieldValue [post-call]

| Feeder ID | TBD-129 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.130 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 130.

FieldValue [post-call]

| Feeder ID | TBD-130 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.131 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 131.

FieldValue [post-call]

| Feeder ID | TBD-131 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.132 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 132.

FieldValue [post-call]

| Feeder ID | TBD-132 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.133 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 133.

FieldValue [post-call]

| Feeder ID | TBD-133 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.134 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 134.

FieldValue [post-call]

| Feeder ID | TBD-134 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.135 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 135.

FieldValue [post-call]

| Feeder ID | TBD-135 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.136 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 136.

FieldValue [post-call]

| Feeder ID | TBD-136 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.137 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 137.

FieldValue [post-call]

| Feeder ID | TBD-137 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.138 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 138.

FieldValue [post-call]

| Feeder ID | TBD-138 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.139 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 139.

FieldValue [post-call]

| Feeder ID | TBD-139 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.140 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 140.

FieldValue [post-call]

| Feeder ID | TBD-140 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.141 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 141.

FieldValue [post-call]

| Feeder ID | TBD-141 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.142 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 142.

FieldValue [post-call]

| Feeder ID | TBD-142 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.143 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 143.

FieldValue [post-call]

| Feeder ID | TBD-143 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.144 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 144.

FieldValue [post-call]

| Feeder ID | TBD-144 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.145 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 145.

FieldValue [post-call]

| Feeder ID | TBD-145 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.146 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 146.

FieldValue [post-call]

| Feeder ID | TBD-146 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.147 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 147.

FieldValue [post-call]

| Feeder ID | TBD-147 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.148 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 148.

FieldValue [post-call]

| Feeder ID | TBD-148 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.149 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 149.

FieldValue [post-call]

| Feeder ID | TBD-149 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.150 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 150.

FieldValue [post-call]

| Feeder ID | TBD-150 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.151 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 151.

FieldValue [post-call]

| Feeder ID | TBD-151 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.152 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 152.

FieldValue [post-call]

| Feeder ID | TBD-152 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.153 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 153.

FieldValue [post-call]

| Feeder ID | TBD-153 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.154 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 154.

FieldValue [post-call]

| Feeder ID | TBD-154 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.155 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 155.

FieldValue [post-call]

| Feeder ID | TBD-155 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.156 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 156.

FieldValue [post-call]

| Feeder ID | TBD-156 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.157 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 157.

FieldValue [post-call]

| Feeder ID | TBD-157 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.158 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 158.

FieldValue [post-call]

| Feeder ID | TBD-158 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.159 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 159.

FieldValue [post-call]

| Feeder ID | TBD-159 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.160 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 160.

FieldValue [post-call]

| Feeder ID | TBD-160 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.161 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 161.

FieldValue [post-call]

| Feeder ID | TBD-161 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.162 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 162.

FieldValue [post-call]

| Feeder ID | TBD-162 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.163 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 163.

FieldValue [post-call]

| Feeder ID | TBD-163 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.164 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 164.

FieldValue [post-call]

| Feeder ID | TBD-164 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.165 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 165.

FieldValue [post-call]

| Feeder ID | TBD-165 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.166 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 166.

FieldValue [post-call]

| Feeder ID | TBD-166 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.167 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 167.

FieldValue [post-call]

| Feeder ID | TBD-167 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.168 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 168.

FieldValue [post-call]

| Feeder ID | TBD-168 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.169 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 169.

FieldValue [post-call]

| Feeder ID | TBD-169 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.170 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 170.

FieldValue [post-call]

| Feeder ID | TBD-170 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.171 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 171.

FieldValue [post-call]

| Feeder ID | TBD-171 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.172 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 172.

FieldValue [post-call]

| Feeder ID | TBD-172 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.173 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 173.

FieldValue [post-call]

| Feeder ID | TBD-173 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.174 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 174.

FieldValue [post-call]

| Feeder ID | TBD-174 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.175 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 175.

FieldValue [post-call]

| Feeder ID | TBD-175 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.176 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 176.

FieldValue [post-call]

| Feeder ID | TBD-176 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.177 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 177.

FieldValue [post-call]

| Feeder ID | TBD-177 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.178 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 178.

FieldValue [post-call]

| Feeder ID | TBD-178 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.179 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 179.

FieldValue [post-call]

| Feeder ID | TBD-179 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.180 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 180.

FieldValue [post-call]

| Feeder ID | TBD-180 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.181 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 181.

FieldValue [post-call]

| Feeder ID | TBD-181 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.182 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 182.

FieldValue [post-call]

| Feeder ID | TBD-182 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.183 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 183.

FieldValue [post-call]

| Feeder ID | TBD-183 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.184 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 184.

FieldValue [post-call]

| Feeder ID | TBD-184 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.185 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 185.

FieldValue [post-call]

| Feeder ID | TBD-185 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.186 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 186.

FieldValue [post-call]

| Feeder ID | TBD-186 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.187 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 187.

FieldValue [post-call]

| Feeder ID | TBD-187 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.188 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 188.

FieldValue [post-call]

| Feeder ID | TBD-188 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.189 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 189.

FieldValue [post-call]

| Feeder ID | TBD-189 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.190 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 190.

FieldValue [post-call]

| Feeder ID | TBD-190 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.191 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 191.

FieldValue [post-call]

| Feeder ID | TBD-191 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.192 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 192.

FieldValue [post-call]

| Feeder ID | TBD-192 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.193 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 193.

FieldValue [post-call]

| Feeder ID | TBD-193 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.194 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 194.

FieldValue [post-call]

| Feeder ID | TBD-194 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.195 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 195.

FieldValue [post-call]

| Feeder ID | TBD-195 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.196 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 196.

FieldValue [post-call]

| Feeder ID | TBD-196 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.197 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 197.

FieldValue [post-call]

| Feeder ID | TBD-197 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.198 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 198.

FieldValue [post-call]

| Feeder ID | TBD-198 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.199 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 199.

FieldValue [post-call]

| Feeder ID | TBD-199 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.200 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 200.

FieldValue [post-call]

| Feeder ID | TBD-200 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.201 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 201.

FieldValue [post-call]

| Feeder ID | TBD-201 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.202 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 202.

FieldValue [post-call]

| Feeder ID | TBD-202 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.203 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 203.

FieldValue [post-call]

| Feeder ID | TBD-203 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.204 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 204.

FieldValue [post-call]

| Feeder ID | TBD-204 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.205 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 205.

FieldValue [post-call]

| Feeder ID | TBD-205 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.206 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 206.

FieldValue [post-call]

| Feeder ID | TBD-206 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.207 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 207.

FieldValue [post-call]

| Feeder ID | TBD-207 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.208 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 208.

FieldValue [post-call]

| Feeder ID | TBD-208 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.209 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 209.

FieldValue [post-call]

| Feeder ID | TBD-209 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.210 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 210.

FieldValue [post-call]

| Feeder ID | TBD-210 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.211 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 211.

FieldValue [post-call]

| Feeder ID | TBD-211 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.212 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 212.

FieldValue [post-call]

| Feeder ID | TBD-212 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.213 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 213.

FieldValue [post-call]

| Feeder ID | TBD-213 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.214 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 214.

FieldValue [post-call]

| Feeder ID | TBD-214 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.215 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 215.

FieldValue [post-call]

| Feeder ID | TBD-215 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.216 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 216.

FieldValue [post-call]

| Feeder ID | TBD-216 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.217 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 217.

FieldValue [post-call]

| Feeder ID | TBD-217 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.218 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 218.

FieldValue [post-call]

| Feeder ID | TBD-218 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.219 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 219.

FieldValue [post-call]

| Feeder ID | TBD-219 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.220 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 220.

FieldValue [post-call]

| Feeder ID | TBD-220 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.221 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 221.

FieldValue [post-call]

| Feeder ID | TBD-221 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.222 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 222.

FieldValue [post-call]

| Feeder ID | TBD-222 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.223 — Field note (53-astra-concrete)

Cross-check GEDA tariff order before calls. Process: precast batch mixer and curing loads. Post-discovery notes line 223.

FieldValue [post-call]

| Feeder ID | TBD-223 | | Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] | | Champion confirmed | Y/N |