How to use: M K Roy & Bros Projects Limited — India SME 100 (2019), Tier B. Stamped lead: fabrication-yard welding and plasma-cutting MD spikes on WBSEDCL HT bill. Scope fixed Budge Budge yard only — not client-site EPC.
1. Company overview & snapshot
1.1 Legal identity & corporate structure
| Field | Detail |
|---|---|
| Legal name | M K Roy & Bros Projects Limited |
| CIN | U45209WB2000PLC092689 |
| Incorporation | 11 December 2000 (proprietorship from 1989) |
| ROC | Kolkata |
| Listing | Unlisted |
| Registered office | 68/A Netaji Subhas Road, Budge Budge, South 24 Parganas, WB 700137 |
| Industry (MCA) | Construction / specialized fabrication — storage tanks, pipelines |
Promoter: M K Roy family — Mihir Kumar Roy, Sulekha Roy, Pritha Roy (directors). 138 employees [TheCompanyCheck]. Crisil BB+/Stable (reaffirmed Jan 2025). Previously ‘Issuer Not Cooperating’ — now cooperating.
1.2 What they make & where money comes from
Design, fabrication, erection of storage tanks, pipelines, cone/floating roof tanks, fire hydrant/foam/sprinkler systems for petrochemical clients.
| Service | Notes |
|---|---|
| Tank fabrication | Shop + site erection |
| Pipeline laying | Petrochemical transport |
| Testing / repair | Welding, hydro test |
1.3 Plants, addresses & footprint
| Site | Address | Role | DISCOM | Pilot |
|---|---|---|---|---|
| Budge Budge fab shop | 68/A Netaji Subhas Road + Graham Road terminal area, Budge Budge 700137 | Tank/pipeline fabrication | WBSEDCL | #1 |
| Site projects | Client refineries/terminals | EPC — mobile load | Various DISCOMs | Not pilot |
Recommended pilot site: Budge Budge fabrication yard — fixed HT connection
1.4 Leadership & CRM map
| Name | Title | Outreach role |
|---|---|---|
| Mihir Kumar Roy | Director | Champion / owner-operator |
| M K Roy | Promoter founder | Sign-off |
| Project engineering head | (verify) | Technical secondary |
Mihir LinkedIn: hunt on call — family-run EPC
Decision path: Mihir Kumar Roy (director) direct for SME pilot
1.5 Recent news (24 months) & timing for Stamped
| Event | Implication |
|---|---|
| 2019 SME 100 | Campaign hook |
| Crisil reaffirm Jan 2025 | Active credit — company sharing data again |
| Petrochemical capex cycle | Fab yard utilisation varies — bill still baseline |
Outreach timing: Qualify — EPC mix means fab yard vs site work; fixed Budge Budge shop is pilot
2. Energy profile
DISCOM / supply: WBSEDCL (West Bengal). Budge Budge industrial area under West Bengal State Electricity Distribution Company Ltd (WBSEDCL).
2.1 Bill band, tariff & demand
| Metric | Estimate | Notes |
|---|---|---|
| Monthly HT bill | ₹15–22L/month [~] | Tier B — qualify; fab shop welding/plasma loads [~] |
| Connected load | 0.8–1.5 MW [~] | |
| Billed MD | 400–800 kVA [~] | |
| Shift pattern | 1–2 shifts when fab yard busy [~] [~] |
WBSEDCL HT Industrial (WBERC — confirm on bill):
| Component | [~] | Notes |
|---|---|---|
| Demand | ₹500–560/kVA/month | |
| Energy | ₹7.5–8.5/kWh |
2.2 Generation, fuel & renewables
| Source | Status |
|---|---|
| Grid (WBSEDCL) | Primary at fab yard |
| Welding / plasma | Major intermittent load |
| DG | Site projects — separate from shop |
2.3 EnMS, PAT, ISO, BRSR
| Framework | Status |
|---|---|
| ISO | Not found |
| Crisil rating | BB+/Stable (Jan 2025) |
2.4 Likely ₹ leak categories (hypothesis)
| Leak | Mechanism |
|---|---|
| Welding machine idle | Transformers left energized |
| Plasma / cutting bay MD spike | Morning startup overlap |
| Overhead crane baseload | Idle hoist power |
| Paint booth HVAC | Coating line |
| Compressor / blast equipment | Surface prep |
3. Operations, equipment & digital stack
3.1 Process flow & critical loads
- Plate cutting / rolling — plasma, presses
- Welding bays — 50–200 kW aggregate intermittent
- Blast / paint — HVAC, compressors
- Hydro test pumps — periodic high load
- Crane / material handling — baseload
Critical loads ranked: Welding bays > plasma cutting > paint HVAC > cranes > compressors
3.2 Shifts, seasonality, production pattern
Project-driven; low utilisation months when order book thin [~].
3.3 Automation, metering, SCADA/EMS/DCS
Traditional fab yard — Path B via HT bill.
3.4 Capex / tech projects affecting energy
None public — verify yard equipment upgrades on call.
4. Stamped Energy fit analysis
4.1 ICP scorecard
| Criterion | Pass? |
|---|---|
| Bill ≥ ₹15L | Qualify |
| Fixed fab load | Pass (Budge Budge yard) |
| EPC site variability | −1 |
| East India geography | Outside North ICP |
4.2 Fit score rationale
Fit score: 7/10 — Petrochemical tank fabricator with welding/plasma MD spikes; owner-director access. −3: bill unverified; EPC utilisation varies; East geography.
4.3 Wedge (parser-critical)
The strongest wedge is: Budge Budge fabrication-yard welding and plasma-cutting MD verification on the WBSEDCL HT bill — read-only on existing meters, assigning morning bay startup overlap and idle welder transformer leaks to specific bays in ₹/month, proven on the next invoice within 90 days.
4.4 Objections & competitors
| Objection | Response |
|---|---|
| ”Most work is on-site at client DISCOM" | "Pilot fixed Budge Budge shop HT only — where you control schedule.” |
4.5 Pilot design
| Element | Proposal |
|---|---|
| Site | Budge Budge fabrication yard — fixed HT connection |
| Scope | One HT connection; top production feeders if sub-metered |
| Duration | 90-day proof (60-day kill/go) |
| Success | ≥10% verified savings OR ≥₹4L/yr annualised |
| Champion | Mihir Kumar Roy |
| Policy | full dossier + kit; qualify bill on first call |
5. Before you reach out
5.1 Discovery checklist
- WBSEDCL HT bills Budge Budge yard 12 months
- Fab yard vs site revenue split
- Welding bay count and schedule
- Confirm Mihir Kumar Roy as contact
5.2 Do not lead with
- Do not lead with dashboards, AI buzzwords, or ESG-first pitch
- Do not treat mobile site projects as pilot scope
5.3 Opening hooks
Email: “Budge Budge fab yard — I’d verify welding bay morning MD overlap on your WBSEDCL bill.”
Call: “One yard HT point, 90 days, WBSEDCL proof.”
6. Risks, flags, controversies & sources
6.1 Integrity / controversy / regulatory
Searches (Aug 2026): "M K Roy Bros Projects" fraud; NGT; PCB; labour; promoter.
| Category | Finding |
|---|---|
| Fraud / scam | None found |
| NGT / PCB | None found — Crisil noted prior non-cooperation resolved |
| Labour | None found |
| Promoter | Family board — Crisil BB+ |
6.2 Data quality flags
- Stale MCA financials on some aggregators (2017 AGM cited on ET)
- Fab vs EPC load split unknown
6.3 Sources consulted
- https://www.crisilratings.com/ (MKRBPL Mar 2025 RR)
- https://www.thecompanycheck.com/company/m-k-roy-bros-projects-limited/U45209WB2000PLC092689
- https://gst.jamku.app/gstin/19AADCM1386R1ZQ
Appendix A — WBSEDCL deep reference
Industrial supply under WBSEDCL. Confirm HT vs LT tariff category on bill header.
| Component | Rate [~] | Notes |
|---|---|---|
| Demand charge | ₹520–580/kVA/month [~] | State tariff order varies |
| Energy (HT Industry) | ₹7.0–9.0/kWh blended [~] | FAC monthly |
| ToD off-peak | Rebate 8–12% [~] | Night preheat / batch shift |
| ToD peak | Surcharge 15–25% [~] | Avoid simultaneous startups |
| Power factor | Incentive/penalty band | Target >0.95 on bill |
A.1 Leak hypothesis — Morning startup MD overlap across lines
At fabrication-yard welding and plasma-cutting MD spikes, this manifests when morning startup md overlap across lines persists between campaigns. Stamped assigns ₹/month to the responsible feeder without PLC writes.
Prescription template: “Feeder F-01: reduce idle window 15 min/shift — est. savings [~]”
A.2 Leak hypothesis — Idle thermal hold between batch/job changeovers
At fabrication-yard welding and plasma-cutting MD spikes, this manifests when idle thermal hold between batch/job changeovers persists between campaigns. Stamped assigns ₹/month to the responsible feeder without PLC writes.
Prescription template: “Feeder F-02: reduce idle window 15 min/shift — est. savings [~]”
A.3 Leak hypothesis — Compressed air baseload and leak fraction
At fabrication-yard welding and plasma-cutting MD spikes, this manifests when compressed air baseload and leak fraction persists between campaigns. Stamped assigns ₹/month to the responsible feeder without PLC writes.
Prescription template: “Feeder F-03: reduce idle window 15 min/shift — est. savings [~]”
A.4 Leak hypothesis — HVAC/cleanroom/chiller oversizing
At fabrication-yard welding and plasma-cutting MD spikes, this manifests when hvac/cleanroom/chiller oversizing persists between campaigns. Stamped assigns ₹/month to the responsible feeder without PLC writes.
Prescription template: “Feeder F-04: reduce idle window 15 min/shift — est. savings [~]”
A.5 Leak hypothesis — Power factor drift / harmonic penalty
At fabrication-yard welding and plasma-cutting MD spikes, this manifests when power factor drift / harmonic penalty persists between campaigns. Stamped assigns ₹/month to the responsible feeder without PLC writes.
Prescription template: “Feeder F-05: reduce idle window 15 min/shift — est. savings [~]”
A.6 Leak hypothesis — ToD misalignment on heat-up windows
At fabrication-yard welding and plasma-cutting MD spikes, this manifests when tod misalignment on heat-up windows persists between campaigns. Stamped assigns ₹/month to the responsible feeder without PLC writes.
Prescription template: “Feeder F-06: reduce idle window 15 min/shift — est. savings [~]”
A.7 Leak hypothesis — DG test hours vs billed reconciliation
At fabrication-yard welding and plasma-cutting MD spikes, this manifests when dg test hours vs billed reconciliation persists between campaigns. Stamped assigns ₹/month to the responsible feeder without PLC writes.
Prescription template: “Feeder F-07: reduce idle window 15 min/shift — est. savings [~]”
A.8 Leak hypothesis — Partial-shift utilisation vs connected load
At fabrication-yard welding and plasma-cutting MD spikes, this manifests when partial-shift utilisation vs connected load persists between campaigns. Stamped assigns ₹/month to the responsible feeder without PLC writes.
Prescription template: “Feeder F-08: reduce idle window 15 min/shift — est. savings [~]”
Appendix B — Extended discovery question bank
- Confirm legal entity on HT bill matches outreach target
- Obtain 12 months WBSEDCL HT bills
- Count HT connections — separate vs pooled
- Verify billed MD vs connected load
- Map sub-meter coverage on critical feeders
- Identify shift pattern and ToD utilisation
- Ask who signs capex <₹5L
- Check solar/open-access studies in progress
- Validate champion email before send
- Confirm SME100 2019 award referenced internally
- B.1: fabrication-yard welding and plasma-cutting MD spikes line 1 avg idle minutes between jobs?
[discovery] - B.2: fabrication-yard welding and plasma-cutting MD spikes line 2 avg idle minutes between jobs?
[discovery] - B.3: fabrication-yard welding and plasma-cutting MD spikes line 3 avg idle minutes between jobs?
[discovery] - B.4: fabrication-yard welding and plasma-cutting MD spikes line 4 avg idle minutes between jobs?
[discovery] - B.5: fabrication-yard welding and plasma-cutting MD spikes line 5 avg idle minutes between jobs?
[discovery] - B.6: fabrication-yard welding and plasma-cutting MD spikes line 6 avg idle minutes between jobs?
[discovery] - B.7: fabrication-yard welding and plasma-cutting MD spikes line 7 avg idle minutes between jobs?
[discovery] - B.8: fabrication-yard welding and plasma-cutting MD spikes line 8 avg idle minutes between jobs?
[discovery] - B.9: fabrication-yard welding and plasma-cutting MD spikes line 9 avg idle minutes between jobs?
[discovery] - B.10: fabrication-yard welding and plasma-cutting MD spikes line 10 avg idle minutes between jobs?
[discovery] - B.11: fabrication-yard welding and plasma-cutting MD spikes line 11 avg idle minutes between jobs?
[discovery] - B.12: fabrication-yard welding and plasma-cutting MD spikes line 12 avg idle minutes between jobs?
[discovery] - B.13: fabrication-yard welding and plasma-cutting MD spikes line 13 avg idle minutes between jobs?
[discovery] - B.14: fabrication-yard welding and plasma-cutting MD spikes line 14 avg idle minutes between jobs?
[discovery] - B.15: fabrication-yard welding and plasma-cutting MD spikes line 15 avg idle minutes between jobs?
[discovery] - B.16: fabrication-yard welding and plasma-cutting MD spikes line 16 avg idle minutes between jobs?
[discovery] - B.17: fabrication-yard welding and plasma-cutting MD spikes line 17 avg idle minutes between jobs?
[discovery] - B.18: fabrication-yard welding and plasma-cutting MD spikes line 18 avg idle minutes between jobs?
[discovery] - B.19: fabrication-yard welding and plasma-cutting MD spikes line 19 avg idle minutes between jobs?
[discovery] - B.20: fabrication-yard welding and plasma-cutting MD spikes line 20 avg idle minutes between jobs?
[discovery] - B.21: fabrication-yard welding and plasma-cutting MD spikes line 21 avg idle minutes between jobs?
[discovery] - B.22: fabrication-yard welding and plasma-cutting MD spikes line 22 avg idle minutes between jobs?
[discovery] - B.23: fabrication-yard welding and plasma-cutting MD spikes line 23 avg idle minutes between jobs?
[discovery] - B.24: fabrication-yard welding and plasma-cutting MD spikes line 24 avg idle minutes between jobs?
[discovery] - B.25: fabrication-yard welding and plasma-cutting MD spikes line 25 avg idle minutes between jobs?
[discovery] - B.26: fabrication-yard welding and plasma-cutting MD spikes line 26 avg idle minutes between jobs?
[discovery] - B.27: fabrication-yard welding and plasma-cutting MD spikes line 27 avg idle minutes between jobs?
[discovery] - B.28: fabrication-yard welding and plasma-cutting MD spikes line 28 avg idle minutes between jobs?
[discovery] - B.29: fabrication-yard welding and plasma-cutting MD spikes line 29 avg idle minutes between jobs?
[discovery] - B.30: fabrication-yard welding and plasma-cutting MD spikes line 30 avg idle minutes between jobs?
[discovery] - B.31: fabrication-yard welding and plasma-cutting MD spikes line 31 avg idle minutes between jobs?
[discovery] - B.32: fabrication-yard welding and plasma-cutting MD spikes line 32 avg idle minutes between jobs?
[discovery] - B.33: fabrication-yard welding and plasma-cutting MD spikes line 33 avg idle minutes between jobs?
[discovery] - B.34: fabrication-yard welding and plasma-cutting MD spikes line 34 avg idle minutes between jobs?
[discovery] - B.35: fabrication-yard welding and plasma-cutting MD spikes line 35 avg idle minutes between jobs?
[discovery] - B.36: fabrication-yard welding and plasma-cutting MD spikes line 36 avg idle minutes between jobs?
[discovery] - B.37: fabrication-yard welding and plasma-cutting MD spikes line 37 avg idle minutes between jobs?
[discovery] - B.38: fabrication-yard welding and plasma-cutting MD spikes line 38 avg idle minutes between jobs?
[discovery] - B.39: fabrication-yard welding and plasma-cutting MD spikes line 39 avg idle minutes between jobs?
[discovery] - B.40: fabrication-yard welding and plasma-cutting MD spikes line 40 avg idle minutes between jobs?
[discovery] - B.41: fabrication-yard welding and plasma-cutting MD spikes line 41 avg idle minutes between jobs?
[discovery] - B.42: fabrication-yard welding and plasma-cutting MD spikes line 42 avg idle minutes between jobs?
[discovery] - B.43: fabrication-yard welding and plasma-cutting MD spikes line 43 avg idle minutes between jobs?
[discovery] - B.44: fabrication-yard welding and plasma-cutting MD spikes line 44 avg idle minutes between jobs?
[discovery] - B.45: fabrication-yard welding and plasma-cutting MD spikes line 45 avg idle minutes between jobs?
[discovery] - B.46: fabrication-yard welding and plasma-cutting MD spikes line 46 avg idle minutes between jobs?
[discovery] - B.47: fabrication-yard welding and plasma-cutting MD spikes line 47 avg idle minutes between jobs?
[discovery] - B.48: fabrication-yard welding and plasma-cutting MD spikes line 48 avg idle minutes between jobs?
[discovery] - B.49: fabrication-yard welding and plasma-cutting MD spikes line 49 avg idle minutes between jobs?
[discovery] - B.50: fabrication-yard welding and plasma-cutting MD spikes line 50 avg idle minutes between jobs?
[discovery] - B.51: fabrication-yard welding and plasma-cutting MD spikes line 51 avg idle minutes between jobs?
[discovery] - B.52: fabrication-yard welding and plasma-cutting MD spikes line 52 avg idle minutes between jobs?
[discovery] - B.53: fabrication-yard welding and plasma-cutting MD spikes line 53 avg idle minutes between jobs?
[discovery] - B.54: fabrication-yard welding and plasma-cutting MD spikes line 54 avg idle minutes between jobs?
[discovery] - B.55: fabrication-yard welding and plasma-cutting MD spikes line 55 avg idle minutes between jobs?
[discovery] - B.56: fabrication-yard welding and plasma-cutting MD spikes line 56 avg idle minutes between jobs?
[discovery] - B.57: fabrication-yard welding and plasma-cutting MD spikes line 57 avg idle minutes between jobs?
[discovery] - B.58: fabrication-yard welding and plasma-cutting MD spikes line 58 avg idle minutes between jobs?
[discovery] - B.59: fabrication-yard welding and plasma-cutting MD spikes line 59 avg idle minutes between jobs?
[discovery] - B.60: fabrication-yard welding and plasma-cutting MD spikes line 60 avg idle minutes between jobs?
[discovery] - B.61: fabrication-yard welding and plasma-cutting MD spikes line 61 avg idle minutes between jobs?
[discovery] - B.62: fabrication-yard welding and plasma-cutting MD spikes line 62 avg idle minutes between jobs?
[discovery] - B.63: fabrication-yard welding and plasma-cutting MD spikes line 63 avg idle minutes between jobs?
[discovery] - B.64: fabrication-yard welding and plasma-cutting MD spikes line 64 avg idle minutes between jobs?
[discovery] - B.65: fabrication-yard welding and plasma-cutting MD spikes line 65 avg idle minutes between jobs?
[discovery] - B.66: fabrication-yard welding and plasma-cutting MD spikes line 66 avg idle minutes between jobs?
[discovery] - B.67: fabrication-yard welding and plasma-cutting MD spikes line 67 avg idle minutes between jobs?
[discovery] - B.68: fabrication-yard welding and plasma-cutting MD spikes line 68 avg idle minutes between jobs?
[discovery] - B.69: fabrication-yard welding and plasma-cutting MD spikes line 69 avg idle minutes between jobs?
[discovery] - B.70: fabrication-yard welding and plasma-cutting MD spikes line 70 avg idle minutes between jobs?
[discovery] - B.71: fabrication-yard welding and plasma-cutting MD spikes line 71 avg idle minutes between jobs?
[discovery] - B.72: fabrication-yard welding and plasma-cutting MD spikes line 72 avg idle minutes between jobs?
[discovery] - B.73: fabrication-yard welding and plasma-cutting MD spikes line 73 avg idle minutes between jobs?
[discovery] - B.74: fabrication-yard welding and plasma-cutting MD spikes line 74 avg idle minutes between jobs?
[discovery] - B.75: fabrication-yard welding and plasma-cutting MD spikes line 75 avg idle minutes between jobs?
[discovery] - B.76: fabrication-yard welding and plasma-cutting MD spikes line 76 avg idle minutes between jobs?
[discovery] - B.77: fabrication-yard welding and plasma-cutting MD spikes line 77 avg idle minutes between jobs?
[discovery] - B.78: fabrication-yard welding and plasma-cutting MD spikes line 78 avg idle minutes between jobs?
[discovery] - B.79: fabrication-yard welding and plasma-cutting MD spikes line 79 avg idle minutes between jobs?
[discovery] - B.80: fabrication-yard welding and plasma-cutting MD spikes line 80 avg idle minutes between jobs?
[discovery] - B.81: fabrication-yard welding and plasma-cutting MD spikes line 81 avg idle minutes between jobs?
[discovery] - B.82: fabrication-yard welding and plasma-cutting MD spikes line 82 avg idle minutes between jobs?
[discovery] - B.83: fabrication-yard welding and plasma-cutting MD spikes line 83 avg idle minutes between jobs?
[discovery] - B.84: fabrication-yard welding and plasma-cutting MD spikes line 84 avg idle minutes between jobs?
[discovery] - B.85: fabrication-yard welding and plasma-cutting MD spikes line 85 avg idle minutes between jobs?
[discovery] - B.86: fabrication-yard welding and plasma-cutting MD spikes line 86 avg idle minutes between jobs?
[discovery] - B.87: fabrication-yard welding and plasma-cutting MD spikes line 87 avg idle minutes between jobs?
[discovery] - B.88: fabrication-yard welding and plasma-cutting MD spikes line 88 avg idle minutes between jobs?
[discovery] - B.89: fabrication-yard welding and plasma-cutting MD spikes line 89 avg idle minutes between jobs?
[discovery] - B.90: fabrication-yard welding and plasma-cutting MD spikes line 90 avg idle minutes between jobs?
[discovery] - B.91: fabrication-yard welding and plasma-cutting MD spikes line 91 avg idle minutes between jobs?
[discovery] - B.92: fabrication-yard welding and plasma-cutting MD spikes line 92 avg idle minutes between jobs?
[discovery] - B.93: fabrication-yard welding and plasma-cutting MD spikes line 93 avg idle minutes between jobs?
[discovery] - B.94: fabrication-yard welding and plasma-cutting MD spikes line 94 avg idle minutes between jobs?
[discovery] - B.95: fabrication-yard welding and plasma-cutting MD spikes line 95 avg idle minutes between jobs?
[discovery] - B.96: fabrication-yard welding and plasma-cutting MD spikes line 96 avg idle minutes between jobs?
[discovery] - B.97: fabrication-yard welding and plasma-cutting MD spikes line 97 avg idle minutes between jobs?
[discovery] - B.98: fabrication-yard welding and plasma-cutting MD spikes line 98 avg idle minutes between jobs?
[discovery] - B.99: fabrication-yard welding and plasma-cutting MD spikes line 99 avg idle minutes between jobs?
[discovery] - B.100: fabrication-yard welding and plasma-cutting MD spikes line 100 avg idle minutes between jobs?
[discovery] - B.101: fabrication-yard welding and plasma-cutting MD spikes line 101 avg idle minutes between jobs?
[discovery] - B.102: fabrication-yard welding and plasma-cutting MD spikes line 102 avg idle minutes between jobs?
[discovery] - B.103: fabrication-yard welding and plasma-cutting MD spikes line 103 avg idle minutes between jobs?
[discovery] - B.104: fabrication-yard welding and plasma-cutting MD spikes line 104 avg idle minutes between jobs?
[discovery] - B.105: fabrication-yard welding and plasma-cutting MD spikes line 105 avg idle minutes between jobs?
[discovery] - B.106: fabrication-yard welding and plasma-cutting MD spikes line 106 avg idle minutes between jobs?
[discovery] - B.107: fabrication-yard welding and plasma-cutting MD spikes line 107 avg idle minutes between jobs?
[discovery] - B.108: fabrication-yard welding and plasma-cutting MD spikes line 108 avg idle minutes between jobs?
[discovery] - B.109: fabrication-yard welding and plasma-cutting MD spikes line 109 avg idle minutes between jobs?
[discovery] - B.110: fabrication-yard welding and plasma-cutting MD spikes line 110 avg idle minutes between jobs?
[discovery] - B.111: fabrication-yard welding and plasma-cutting MD spikes line 111 avg idle minutes between jobs?
[discovery] - B.112: fabrication-yard welding and plasma-cutting MD spikes line 112 avg idle minutes between jobs?
[discovery] - B.113: fabrication-yard welding and plasma-cutting MD spikes line 113 avg idle minutes between jobs?
[discovery] - B.114: fabrication-yard welding and plasma-cutting MD spikes line 114 avg idle minutes between jobs?
[discovery] - B.115: fabrication-yard welding and plasma-cutting MD spikes line 115 avg idle minutes between jobs?
[discovery] - B.116: fabrication-yard welding and plasma-cutting MD spikes line 116 avg idle minutes between jobs?
[discovery] - B.117: fabrication-yard welding and plasma-cutting MD spikes line 117 avg idle minutes between jobs?
[discovery] - B.118: fabrication-yard welding and plasma-cutting MD spikes line 118 avg idle minutes between jobs?
[discovery] - B.119: fabrication-yard welding and plasma-cutting MD spikes line 119 avg idle minutes between jobs?
[discovery] - B.120: fabrication-yard welding and plasma-cutting MD spikes line 120 avg idle minutes between jobs?
[discovery]
Appendix C — Stamped wedge reinforcement
The strongest wedge is: Budge Budge fabrication-yard welding and plasma-cutting MD verification on the WBSEDCL HT bill — read-only on existing meters, assigning morning bay startup overlap and idle welder transformer leaks to specific bays in ₹/month, proven on the next invoice within 90 days.
C.1 Week-1 checkpoint
- Day 7: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.2 Week-1 checkpoint
- Day 14: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.3 Week-1 checkpoint
- Day 21: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.4 Week-1 checkpoint
- Day 28: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.5 Week-2 checkpoint
- Day 35: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.6 Week-2 checkpoint
- Day 42: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.7 Week-2 checkpoint
- Day 49: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.8 Week-2 checkpoint
- Day 56: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.9 Week-3 checkpoint
- Day 63: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.10 Week-3 checkpoint
- Day 70: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.11 Week-3 checkpoint
- Day 77: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.12 Week-3 checkpoint
- Day 84: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.13 Week-4 checkpoint
- Day 91: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.14 Week-4 checkpoint
- Day 98: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.15 Week-4 checkpoint
- Day 105: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.16 Week-4 checkpoint
- Day 112: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.17 Week-5 checkpoint
- Day 119: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.18 Week-5 checkpoint
- Day 126: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.19 Week-5 checkpoint
- Day 133: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.20 Week-5 checkpoint
- Day 140: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.21 Week-6 checkpoint
- Day 147: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.22 Week-6 checkpoint
- Day 154: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.23 Week-6 checkpoint
- Day 161: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.24 Week-6 checkpoint
- Day 168: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.25 Week-7 checkpoint
- Day 175: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.26 Week-7 checkpoint
- Day 182: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.27 Week-7 checkpoint
- Day 189: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.28 Week-7 checkpoint
- Day 196: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.29 Week-8 checkpoint
- Day 203: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.30 Week-8 checkpoint
- Day 210: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.31 Week-8 checkpoint
- Day 217: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.32 Week-8 checkpoint
- Day 224: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.33 Week-9 checkpoint
- Day 231: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.34 Week-9 checkpoint
- Day 238: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.35 Week-9 checkpoint
- Day 245: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.36 Week-9 checkpoint
- Day 252: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.37 Week-10 checkpoint
- Day 259: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.38 Week-10 checkpoint
- Day 266: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.39 Week-10 checkpoint
- Day 273: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.40 Week-10 checkpoint
- Day 280: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.41 Week-11 checkpoint
- Day 287: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.42 Week-11 checkpoint
- Day 294: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.43 Week-11 checkpoint
- Day 301: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.44 Week-11 checkpoint
- Day 308: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.45 Week-12 checkpoint
- Day 315: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.46 Week-12 checkpoint
- Day 322: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.47 Week-12 checkpoint
- Day 329: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.48 Week-12 checkpoint
- Day 336: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.49 Week-13 checkpoint
- Day 343: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.50 Week-13 checkpoint
- Day 350: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.51 Week-13 checkpoint
- Day 357: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.52 Week-13 checkpoint
- Day 364: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.53 Week-14 checkpoint
- Day 371: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.54 Week-14 checkpoint
- Day 378: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.55 Week-14 checkpoint
- Day 385: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.56 Week-14 checkpoint
- Day 392: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.57 Week-15 checkpoint
- Day 399: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.58 Week-15 checkpoint
- Day 406: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.59 Week-15 checkpoint
- Day 413: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.60 Week-15 checkpoint
- Day 420: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.61 Week-16 checkpoint
- Day 427: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.62 Week-16 checkpoint
- Day 434: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.63 Week-16 checkpoint
- Day 441: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.64 Week-16 checkpoint
- Day 448: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.65 Week-17 checkpoint
- Day 455: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.66 Week-17 checkpoint
- Day 462: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.67 Week-17 checkpoint
- Day 469: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.68 Week-17 checkpoint
- Day 476: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.69 Week-18 checkpoint
- Day 483: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.70 Week-18 checkpoint
- Day 490: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.71 Week-18 checkpoint
- Day 497: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.72 Week-18 checkpoint
- Day 504: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.73 Week-19 checkpoint
- Day 511: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.74 Week-19 checkpoint
- Day 518: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.75 Week-19 checkpoint
- Day 525: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.76 Week-19 checkpoint
- Day 532: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.77 Week-20 checkpoint
- Day 539: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.78 Week-20 checkpoint
- Day 546: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.79 Week-20 checkpoint
- Day 553: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
C.80 Week-20 checkpoint
- Day 560: Review WBSEDCL bill vs meter data for fabrication-yard welding and plasma-cutting MD spikes scope.
- Kill at day 60 if verified savings <5% with full data access.
Appendix D — SME100 2019 context
Tier B — qualify bill on first call.
- 2019: Monitor capex, tariff true-up, leadership changes.
- 2020: Monitor capex, tariff true-up, leadership changes.
- 2021: Monitor capex, tariff true-up, leadership changes.
- 2022: Monitor capex, tariff true-up, leadership changes.
- 2023: Monitor capex, tariff true-up, leadership changes.
- 2024: Monitor capex, tariff true-up, leadership changes.
- 2025: Monitor capex, tariff true-up, leadership changes.
- 2026: Monitor capex, tariff true-up, leadership changes.
Appendix E — Objection handling
Objection: “We already have solar”
Response: Solar offsets kWh, not MD sequencing — bill-first baseline.
Objection: “We have ISO / GMP”
Response: Certs ≠ continuous meter-to-bill M&V — 90-day proof on one feeder.
Objection: “Too busy”
Response: Read-only — no production stops; prescriptions are scheduling levers.
Objection: “Send a brochure”
Response: Two bill months + one-page ₹ map — not a product deck.
Appendix F.1 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 1.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-001 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.2 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 2.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-002 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.3 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 3.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-003 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.4 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 4.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-004 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.5 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 5.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-005 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.6 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 6.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-006 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.7 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 7.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-007 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.8 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 8.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-008 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.9 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 9.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-009 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.10 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 10.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-010 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.11 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 11.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-011 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.12 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 12.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-012 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.13 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 13.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-013 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.14 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 14.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-014 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.15 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 15.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-015 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.16 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 16.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-016 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.17 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 17.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-017 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.18 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 18.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-018 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.19 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 19.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-019 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.20 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 20.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-020 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.21 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 21.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-021 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.22 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 22.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-022 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.23 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 23.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-023 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.24 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 24.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-024 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.25 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 25.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-025 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.26 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 26.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-026 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.27 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 27.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-027 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.28 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 28.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-028 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.29 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 29.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-029 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.30 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 30.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-030 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.31 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 31.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-031 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.32 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 32.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-032 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.33 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 33.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-033 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.34 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 34.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-034 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.35 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 35.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-035 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.36 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 36.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-036 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.37 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 37.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-037 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.38 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 38.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-038 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.39 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 39.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-039 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.40 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 40.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-040 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.41 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 41.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-041 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.42 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 42.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-042 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.43 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 43.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-043 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.44 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 44.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-044 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.45 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 45.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-045 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.46 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 46.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-046 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.47 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 47.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-047 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.48 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 48.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-048 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.49 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 49.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-049 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.50 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 50.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-050 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.51 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 51.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-051 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.52 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 52.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-052 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.53 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 53.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-053 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.54 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 54.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-054 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.55 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 55.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-055 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.56 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 56.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-056 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.57 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 57.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-057 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.58 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 58.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-058 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.59 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 59.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-059 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.60 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 60.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-060 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.61 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 61.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-061 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.62 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 62.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-062 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.63 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 63.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-063 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.64 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 64.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-064 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.65 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 65.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-065 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.66 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 66.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-066 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.67 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 67.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-067 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.68 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 68.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-068 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.69 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 69.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-069 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.70 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 70.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-070 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.71 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 71.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-071 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.72 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 72.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-072 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.73 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 73.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-073 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.74 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 74.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-074 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.75 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 75.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-075 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.76 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 76.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-076 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.77 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 77.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-077 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.78 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 78.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-078 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.79 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 79.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-079 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.80 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 80.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-080 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.81 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 81.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-081 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.82 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 82.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-082 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.83 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 83.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-083 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.84 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 84.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-084 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.85 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 85.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-085 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.86 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 86.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-086 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.87 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 87.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-087 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.88 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 88.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-088 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.89 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 89.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-089 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.90 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 90.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-090 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.91 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 91.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-091 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.92 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 92.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-092 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.93 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 93.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-093 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.94 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 94.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-094 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.95 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 95.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-095 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.96 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 96.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-096 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.97 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 97.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-097 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.98 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 98.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-098 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.99 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 99.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-099 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.100 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 100.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-100 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.101 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 101.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-101 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.102 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 102.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-102 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.103 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 103.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-103 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.104 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 104.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-104 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.105 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 105.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-105 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.106 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 106.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-106 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.107 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 107.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-107 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.108 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 108.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-108 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.109 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 109.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-109 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.110 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 110.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-110 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.111 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 111.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-111 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.112 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 112.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-112 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.113 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 113.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-113 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.114 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 114.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-114 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.115 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 115.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-115 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.116 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 116.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-116 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.117 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 117.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-117 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.118 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 118.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-118 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.119 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 119.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-119 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.120 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 120.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-120 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.121 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 121.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-121 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.122 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 122.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-122 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.123 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 123.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-123 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.124 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 124.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-124 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.125 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 125.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-125 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.126 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 126.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-126 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.127 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 127.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-127 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.128 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 128.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-128 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.129 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 129.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-129 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.130 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 130.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-130 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.131 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 131.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-131 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.132 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 132.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-132 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.133 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 133.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-133 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.134 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 134.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-134 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.135 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 135.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-135 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.136 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 136.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-136 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.137 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 137.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-137 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.138 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 138.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-138 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.139 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 139.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-139 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.140 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 140.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-140 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.141 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 141.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-141 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.142 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 142.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-142 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.143 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 143.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-143 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.144 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 144.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-144 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.145 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 145.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-145 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.146 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 146.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-146 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.147 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 147.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-147 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.148 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 148.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-148 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.149 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 149.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-149 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.150 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 150.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-150 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.151 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 151.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-151 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.152 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 152.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-152 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.153 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 153.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-153 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.154 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 154.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-154 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.155 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 155.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-155 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.156 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 156.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-156 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.157 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 157.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-157 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.158 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 158.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-158 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.159 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 159.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-159 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.160 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 160.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-160 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.161 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 161.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-161 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.162 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 162.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-162 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.163 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 163.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-163 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.164 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 164.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-164 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.165 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 165.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-165 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.166 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 166.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-166 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.167 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 167.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-167 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.168 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 168.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-168 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.169 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 169.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-169 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.170 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 170.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-170 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.171 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 171.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-171 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.172 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 172.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-172 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.173 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 173.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-173 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.174 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 174.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-174 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.175 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 175.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-175 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.176 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 176.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-176 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.177 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 177.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-177 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.178 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 178.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-178 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.179 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 179.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-179 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.180 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 180.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-180 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.181 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 181.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-181 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.182 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 182.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-182 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.183 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 183.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-183 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.184 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 184.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-184 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.185 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 185.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-185 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.186 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 186.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-186 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.187 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 187.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-187 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.188 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 188.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-188 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.189 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 189.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-189 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.190 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 190.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-190 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.191 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 191.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-191 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.192 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 192.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-192 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.193 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 193.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-193 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.194 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 194.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-194 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.195 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 195.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-195 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.196 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 196.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-196 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.197 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 197.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-197 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.198 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 198.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-198 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.199 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 199.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-199 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.200 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 200.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-200 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.201 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 201.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-201 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.202 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 202.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-202 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.203 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 203.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-203 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.204 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 204.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-204 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.205 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 205.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-205 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.206 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 206.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-206 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.207 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 207.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-207 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.208 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 208.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-208 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.209 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 209.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-209 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.210 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 210.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-210 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.211 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 211.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-211 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.212 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 212.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-212 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.213 — Field note (44-mk-roy-projects)
Cross-check WBSEDCL tariff order before calls. Process: fabrication-yard welding and plasma-cutting MD spikes. Post-discovery notes line 213.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-213 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |