How to use: Supreem Pharmaceuticals Mysore Private Limited — India SME 100 (2019), Tier B. Stamped lead: granulation, HVAC cleanroom, and chiller baseload on MESCOM HT bill. Read §2 (MESCOM) and §3.1 (granulation/HVAC) before calling Amit S Rao.
1. Company overview & snapshot
1.1 Legal identity & corporate structure
| Field | Detail |
|---|---|
| Legal name | Supreem Pharmaceuticals Mysore Private Limited |
| CIN | U24231KA1996PTC020988 |
| Incorporation | 16 August 1996 (operating since ~1985 per company narrative) |
| ROC | Bangalore |
| Listing | Unlisted |
| Registered office | # 73, 74 & 48P-1, KIADB Industrial Area, Nanjangud, Mysuru 571302 |
| Industry (MCA) | Manufacture of pharmaceutical substances / stabilized vitamins |
Promoter family: S N Rao (Chairman & MD), Geeta S Rao (Executive Director), Aditya S Rao (Commercial), Amit S Rao (Technical). 159 employees [Tracxn Aug 2025]. WHO, US FDA, ISO 9001 cited on website.
1.2 What they make & where money comes from
Stabilized vitamins, herbal extracts, nutraceuticals, food supplements, tasteless minerals, APIs. Four divisions: Pharmaceuticals, Nutraceutical, Food (caseinates), Superfoods.
| Segment | Examples | Share [~] |
|---|---|---|
| Stabilized vitamins (B2B) | Pharma ingredient supply | ~45% |
| Herbal / nutraceutical | Garcinia, bitter melon extracts | ~30% |
| Food / superfoods | FMCG retail (Supreem Super Foods, 2022+) | ~25% |
1.3 Plants, addresses & footprint
| Site | Address | Role | DISCOM | Pilot |
|---|---|---|---|---|
| Nanjangud KIADB plant | #73, 74 & 48P-1, KIADB Industrial Area, Nanjangud Taluk, Mysuru 571302 | API, vitamins, extracts, superfoods | MESCOM | #1 |
Recommended pilot site: Nanjangud KIADB campus — single integrated pharma/nutraceutical site
1.4 Leadership & CRM map
| Name | Title | Outreach role |
|---|---|---|
| Amit Sadanand Rao | Director – Technical | Champion — production, QA, GMP |
| Kalavathi H | VP Technical | Secondary technical |
| S N Rao | Chairman & MD | Economic buyer |
| Aditya S Rao | Director – Commercial | Secondary |
Amit LinkedIn: https://www.linkedin.com/in/amit-sadanand-rao-51a4a970
Decision path: Amit Rao (technical) → S N Rao (MD) for <₹5L pilot
1.5 Recent news (24 months) & timing for Stamped
| Date | Event | Stamped implication |
|---|---|---|
| 2019 | India SME 100 Award | Campaign anchor |
| 2022 | Supreem Super Foods FMCG launch | New filling/packaging lines — startup MD risk |
| 2024–25 | IPHEX / export growth narrative | Production campaigns shift — baseline still valuable |
Outreach timing: Now — post-monsoon steady production; avoid year-end audit freeze if plant closes books in Mar
2. Energy profile
DISCOM / supply: MESCOM (Karnataka). Nanjangud industrial area under Mysore Electric Supply Company (MESCOM).
2.1 Bill band, tariff & demand
| Metric | Estimate | Notes |
|---|---|---|
| Monthly HT bill | ₹18–28L/month [~] | Tier B — qualify ≥₹15L; likely at upper band given 159 headcount + HVAC |
| Connected load | 1.5–2.5 MW [~] | |
| Billed MD | 600–1,200 kVA [~] | |
| Shift pattern | 1–2 shifts [~] [~] |
MESCOM HT Industrial (KERC tariff — confirm on bill):
| Component | FY25-26 [~] | Notes |
|---|---|---|
| Demand | ₹450–520/kVA/month | |
| Energy | ₹7.5–8.5/kWh blended | FAC monthly |
| ToD | Night rebate / peak surcharge | Granulation preheat scheduling |
2.2 Generation, fuel & renewables
| Source | Status |
|---|---|
| Grid (MESCOM) | Primary |
| DG | GMP backup — verify test-hour billing |
| Solar rooftop | Not found publicly |
| Captive | None |
2.3 EnMS, PAT, ISO, BRSR
| Framework | Status |
|---|---|
| ISO 9001 | Yes (website) |
| WHO / US FDA | Yes (PharmaSource) |
| ISO 50001 | Not found |
| PAT / BRSR | N/A (unlisted SME) |
2.4 Likely ₹ leak categories (hypothesis)
| Leak | Mechanism | Est. savings [~] |
|---|---|---|
| Granulation / dryer idle hold | Batch pharma thermal between campaigns | 8–15% line kWh |
| HVAC cleanroom baseload | 24/7 GMP air handling | 10–20% aux |
| Chiller / cold chain | Superfoods division | 5–12% |
| Morning MD overlap | Multi-line startup | ₹1–2L/month MD |
| Compressed air | Pneumatic handling, packaging | 5–10% |
3. Operations, equipment & digital stack
3.1 Process flow & critical loads
- Raw material prep / blending — mixers 5–15 kW
- Granulation / drying — 20–60 kW thermal cycles
- Milling / sizing — 3–10 kW
- Encapsulation / tableting / packaging — 10–40 kW lines
- HVAC / cleanroom AHU — central plant major baseload
- Cold chain / chillers — superfoods FMCG lines
Critical loads ranked: HVAC/cleanroom > granulation/dryers > packaging > chillers > compressed air
3.2 Shifts, seasonality, production pattern
Batch campaigns by SKU (vitamins vs herbal extracts vs superfoods). Export vs domestic mix shifts monthly [~].
3.3 Automation, metering, SCADA/EMS/DCS
GMP automation likely partial. Path B entry via HT bill + main meter; sub-meters on HVAC if present.
3.4 Capex / tech projects affecting energy
Supreem Super Foods FMCG expansion (2022+) — new packaging/filling baseload. Verify separate HT point vs shared campus.
4. Stamped Energy fit analysis
4.1 ICP scorecard
| Criterion | Assessment | Pass? |
|---|---|---|
| Bill ≥ ₹15L/month | ₹18–28L est. | Qualify |
| Geography | Karnataka (South) | Partial (not North India priority) |
| Process loads | Thermal + HVAC GMP | Pass |
| Decision speed | Family SME | Pass |
| Data maturity | Unknown EMS | Path B |
4.2 Fit score rationale
Fit score: 8/10 — Established pharma/nutraceutical site with clear GMP HVAC and batch thermal loads, technical champion on LinkedIn. −2: South India geography vs North ICP priority; bill band unverified.
4.3 Wedge (parser-critical)
The strongest wedge is: Nanjangud KIADB granulation and cleanroom HVAC idle-load verification on the MESCOM HT bill — read-only on existing meters, assigning batch thermal hold and AHU baseload leaks to specific production lines in ₹/month, proven on the next invoice within 90 days, without PLC writes or capex.
4.4 Objections & competitors
| Objection | Response |
|---|---|
| ”We have GMP / FDA audits" | "Audit compliance ≠ monthly MD leak detection — 90-day bill proof on one feeder." |
| "Superfoods is separate P&L" | "Start shared campus HT; attribute FMCG chillers once sub-meter map exists.” |
4.5 Pilot design
| Element | Proposal |
|---|---|
| Site | Nanjangud KIADB campus — single integrated pharma/nutraceutical site |
| Scope | One HT connection; top production feeders if sub-metered |
| Duration | 90-day proof (60-day kill/go) |
| Success | ≥10% verified savings OR ≥₹6L/yr annualised |
| Champion | Amit Sadanand Rao |
| Policy | full dossier + kit; qualify bill on first call |
5. Before you reach out
5.1 Discovery checklist
- Confirm Supreem Pharmaceuticals Mysore Pvt Ltd on MESCOM bill
- 12 months HT bills Nanjangud KIADB
- Map granulation vs HVAC feeders
- Validate
info@supreempharma.inor Amit direct email
5.2 Do not lead with
- Do not lead with dashboards, AI buzzwords, or ESG-first pitch
- Do not confuse with Supreme Pharmaceuticals (other entities)
- Do not lead with ESG/carbon — lead with ₹ on MESCOM invoice
5.3 Opening hooks
Email: “40-year vitamin site in Nanjangud — I’d verify granulation idle hold and cleanroom AHU baseload on your MESCOM bill before adding hardware.”
Call: “Amit, one HT feeder, 90 days, prove ₹ on the next MESCOM invoice — read-only on your meters.”
6. Risks, flags, controversies & sources
6.1 Integrity / controversy / regulatory
Searches (Aug 2026): "Supreem Pharmaceuticals Mysore" fraud; NGT; PCB; labour; promoter.
| Category | Finding |
|---|---|
| Fraud / scam | None found |
| NGT / PCB | None found specific to Nanjangud plant |
| Labour | None found |
| Promoter | Rao family — no SEBI/litigation hits found |
6.2 Data quality flags
- Employee count 159 (Tracxn) vs LinkedIn 30–40 — verify on call
- Superfoods division may share or split HT connection
6.3 Sources consulted
- https://supreempharma.in/
- https://supreempharma.in/our-team/
- https://pharmasource.global/directory/supreem-pharmaceuticals-mysore-pvt/
- https://tracxn.com/d/legal-entities/india/supreem-pharmaceuticals-mysore-private-limited/
- https://www.linkedin.com/in/amit-sadanand-rao-51a4a970
- https://www.indiasme100.com/winners-2019.php
Appendix A — MESCOM deep reference
Industrial supply under MESCOM. Confirm HT vs LT tariff category on bill header.
| Component | Rate [~] | Notes |
|---|---|---|
| Demand charge | ₹520–580/kVA/month [~] | State tariff order varies |
| Energy (HT Industry) | ₹7.0–9.0/kWh blended [~] | FAC monthly |
| ToD off-peak | Rebate 8–12% [~] | Night preheat / batch shift |
| ToD peak | Surcharge 15–25% [~] | Avoid simultaneous startups |
| Power factor | Incentive/penalty band | Target >0.95 on bill |
A.1 Leak hypothesis — Morning startup MD overlap across lines
At granulation, HVAC cleanroom, and chiller baseload, this manifests when morning startup md overlap across lines persists between campaigns. Stamped assigns ₹/month to the responsible feeder without PLC writes.
Prescription template: “Feeder F-01: reduce idle window 15 min/shift — est. savings [~]”
A.2 Leak hypothesis — Idle thermal hold between batch/job changeovers
At granulation, HVAC cleanroom, and chiller baseload, this manifests when idle thermal hold between batch/job changeovers persists between campaigns. Stamped assigns ₹/month to the responsible feeder without PLC writes.
Prescription template: “Feeder F-02: reduce idle window 15 min/shift — est. savings [~]”
A.3 Leak hypothesis — Compressed air baseload and leak fraction
At granulation, HVAC cleanroom, and chiller baseload, this manifests when compressed air baseload and leak fraction persists between campaigns. Stamped assigns ₹/month to the responsible feeder without PLC writes.
Prescription template: “Feeder F-03: reduce idle window 15 min/shift — est. savings [~]”
A.4 Leak hypothesis — HVAC/cleanroom/chiller oversizing
At granulation, HVAC cleanroom, and chiller baseload, this manifests when hvac/cleanroom/chiller oversizing persists between campaigns. Stamped assigns ₹/month to the responsible feeder without PLC writes.
Prescription template: “Feeder F-04: reduce idle window 15 min/shift — est. savings [~]”
A.5 Leak hypothesis — Power factor drift / harmonic penalty
At granulation, HVAC cleanroom, and chiller baseload, this manifests when power factor drift / harmonic penalty persists between campaigns. Stamped assigns ₹/month to the responsible feeder without PLC writes.
Prescription template: “Feeder F-05: reduce idle window 15 min/shift — est. savings [~]”
A.6 Leak hypothesis — ToD misalignment on heat-up windows
At granulation, HVAC cleanroom, and chiller baseload, this manifests when tod misalignment on heat-up windows persists between campaigns. Stamped assigns ₹/month to the responsible feeder without PLC writes.
Prescription template: “Feeder F-06: reduce idle window 15 min/shift — est. savings [~]”
A.7 Leak hypothesis — DG test hours vs billed reconciliation
At granulation, HVAC cleanroom, and chiller baseload, this manifests when dg test hours vs billed reconciliation persists between campaigns. Stamped assigns ₹/month to the responsible feeder without PLC writes.
Prescription template: “Feeder F-07: reduce idle window 15 min/shift — est. savings [~]”
A.8 Leak hypothesis — Partial-shift utilisation vs connected load
At granulation, HVAC cleanroom, and chiller baseload, this manifests when partial-shift utilisation vs connected load persists between campaigns. Stamped assigns ₹/month to the responsible feeder without PLC writes.
Prescription template: “Feeder F-08: reduce idle window 15 min/shift — est. savings [~]”
Appendix B — Extended discovery question bank
- Confirm legal entity on HT bill matches outreach target
- Obtain 12 months MESCOM HT bills
- Count HT connections — separate vs pooled
- Verify billed MD vs connected load
- Map sub-meter coverage on critical feeders
- Identify shift pattern and ToD utilisation
- Ask who signs capex <₹5L
- Check solar/open-access studies in progress
- Validate champion email before send
- Confirm SME100 2019 award referenced internally
- B.1: granulation, HVAC cleanroom, and chiller baseload line 1 avg idle minutes between jobs?
[discovery] - B.2: granulation, HVAC cleanroom, and chiller baseload line 2 avg idle minutes between jobs?
[discovery] - B.3: granulation, HVAC cleanroom, and chiller baseload line 3 avg idle minutes between jobs?
[discovery] - B.4: granulation, HVAC cleanroom, and chiller baseload line 4 avg idle minutes between jobs?
[discovery] - B.5: granulation, HVAC cleanroom, and chiller baseload line 5 avg idle minutes between jobs?
[discovery] - B.6: granulation, HVAC cleanroom, and chiller baseload line 6 avg idle minutes between jobs?
[discovery] - B.7: granulation, HVAC cleanroom, and chiller baseload line 7 avg idle minutes between jobs?
[discovery] - B.8: granulation, HVAC cleanroom, and chiller baseload line 8 avg idle minutes between jobs?
[discovery] - B.9: granulation, HVAC cleanroom, and chiller baseload line 9 avg idle minutes between jobs?
[discovery] - B.10: granulation, HVAC cleanroom, and chiller baseload line 10 avg idle minutes between jobs?
[discovery] - B.11: granulation, HVAC cleanroom, and chiller baseload line 11 avg idle minutes between jobs?
[discovery] - B.12: granulation, HVAC cleanroom, and chiller baseload line 12 avg idle minutes between jobs?
[discovery] - B.13: granulation, HVAC cleanroom, and chiller baseload line 13 avg idle minutes between jobs?
[discovery] - B.14: granulation, HVAC cleanroom, and chiller baseload line 14 avg idle minutes between jobs?
[discovery] - B.15: granulation, HVAC cleanroom, and chiller baseload line 15 avg idle minutes between jobs?
[discovery] - B.16: granulation, HVAC cleanroom, and chiller baseload line 16 avg idle minutes between jobs?
[discovery] - B.17: granulation, HVAC cleanroom, and chiller baseload line 17 avg idle minutes between jobs?
[discovery] - B.18: granulation, HVAC cleanroom, and chiller baseload line 18 avg idle minutes between jobs?
[discovery] - B.19: granulation, HVAC cleanroom, and chiller baseload line 19 avg idle minutes between jobs?
[discovery] - B.20: granulation, HVAC cleanroom, and chiller baseload line 20 avg idle minutes between jobs?
[discovery] - B.21: granulation, HVAC cleanroom, and chiller baseload line 21 avg idle minutes between jobs?
[discovery] - B.22: granulation, HVAC cleanroom, and chiller baseload line 22 avg idle minutes between jobs?
[discovery] - B.23: granulation, HVAC cleanroom, and chiller baseload line 23 avg idle minutes between jobs?
[discovery] - B.24: granulation, HVAC cleanroom, and chiller baseload line 24 avg idle minutes between jobs?
[discovery] - B.25: granulation, HVAC cleanroom, and chiller baseload line 25 avg idle minutes between jobs?
[discovery] - B.26: granulation, HVAC cleanroom, and chiller baseload line 26 avg idle minutes between jobs?
[discovery] - B.27: granulation, HVAC cleanroom, and chiller baseload line 27 avg idle minutes between jobs?
[discovery] - B.28: granulation, HVAC cleanroom, and chiller baseload line 28 avg idle minutes between jobs?
[discovery] - B.29: granulation, HVAC cleanroom, and chiller baseload line 29 avg idle minutes between jobs?
[discovery] - B.30: granulation, HVAC cleanroom, and chiller baseload line 30 avg idle minutes between jobs?
[discovery] - B.31: granulation, HVAC cleanroom, and chiller baseload line 31 avg idle minutes between jobs?
[discovery] - B.32: granulation, HVAC cleanroom, and chiller baseload line 32 avg idle minutes between jobs?
[discovery] - B.33: granulation, HVAC cleanroom, and chiller baseload line 33 avg idle minutes between jobs?
[discovery] - B.34: granulation, HVAC cleanroom, and chiller baseload line 34 avg idle minutes between jobs?
[discovery] - B.35: granulation, HVAC cleanroom, and chiller baseload line 35 avg idle minutes between jobs?
[discovery] - B.36: granulation, HVAC cleanroom, and chiller baseload line 36 avg idle minutes between jobs?
[discovery] - B.37: granulation, HVAC cleanroom, and chiller baseload line 37 avg idle minutes between jobs?
[discovery] - B.38: granulation, HVAC cleanroom, and chiller baseload line 38 avg idle minutes between jobs?
[discovery] - B.39: granulation, HVAC cleanroom, and chiller baseload line 39 avg idle minutes between jobs?
[discovery] - B.40: granulation, HVAC cleanroom, and chiller baseload line 40 avg idle minutes between jobs?
[discovery] - B.41: granulation, HVAC cleanroom, and chiller baseload line 41 avg idle minutes between jobs?
[discovery] - B.42: granulation, HVAC cleanroom, and chiller baseload line 42 avg idle minutes between jobs?
[discovery] - B.43: granulation, HVAC cleanroom, and chiller baseload line 43 avg idle minutes between jobs?
[discovery] - B.44: granulation, HVAC cleanroom, and chiller baseload line 44 avg idle minutes between jobs?
[discovery] - B.45: granulation, HVAC cleanroom, and chiller baseload line 45 avg idle minutes between jobs?
[discovery] - B.46: granulation, HVAC cleanroom, and chiller baseload line 46 avg idle minutes between jobs?
[discovery] - B.47: granulation, HVAC cleanroom, and chiller baseload line 47 avg idle minutes between jobs?
[discovery] - B.48: granulation, HVAC cleanroom, and chiller baseload line 48 avg idle minutes between jobs?
[discovery] - B.49: granulation, HVAC cleanroom, and chiller baseload line 49 avg idle minutes between jobs?
[discovery] - B.50: granulation, HVAC cleanroom, and chiller baseload line 50 avg idle minutes between jobs?
[discovery] - B.51: granulation, HVAC cleanroom, and chiller baseload line 51 avg idle minutes between jobs?
[discovery] - B.52: granulation, HVAC cleanroom, and chiller baseload line 52 avg idle minutes between jobs?
[discovery] - B.53: granulation, HVAC cleanroom, and chiller baseload line 53 avg idle minutes between jobs?
[discovery] - B.54: granulation, HVAC cleanroom, and chiller baseload line 54 avg idle minutes between jobs?
[discovery] - B.55: granulation, HVAC cleanroom, and chiller baseload line 55 avg idle minutes between jobs?
[discovery] - B.56: granulation, HVAC cleanroom, and chiller baseload line 56 avg idle minutes between jobs?
[discovery] - B.57: granulation, HVAC cleanroom, and chiller baseload line 57 avg idle minutes between jobs?
[discovery] - B.58: granulation, HVAC cleanroom, and chiller baseload line 58 avg idle minutes between jobs?
[discovery] - B.59: granulation, HVAC cleanroom, and chiller baseload line 59 avg idle minutes between jobs?
[discovery] - B.60: granulation, HVAC cleanroom, and chiller baseload line 60 avg idle minutes between jobs?
[discovery] - B.61: granulation, HVAC cleanroom, and chiller baseload line 61 avg idle minutes between jobs?
[discovery] - B.62: granulation, HVAC cleanroom, and chiller baseload line 62 avg idle minutes between jobs?
[discovery] - B.63: granulation, HVAC cleanroom, and chiller baseload line 63 avg idle minutes between jobs?
[discovery] - B.64: granulation, HVAC cleanroom, and chiller baseload line 64 avg idle minutes between jobs?
[discovery] - B.65: granulation, HVAC cleanroom, and chiller baseload line 65 avg idle minutes between jobs?
[discovery] - B.66: granulation, HVAC cleanroom, and chiller baseload line 66 avg idle minutes between jobs?
[discovery] - B.67: granulation, HVAC cleanroom, and chiller baseload line 67 avg idle minutes between jobs?
[discovery] - B.68: granulation, HVAC cleanroom, and chiller baseload line 68 avg idle minutes between jobs?
[discovery] - B.69: granulation, HVAC cleanroom, and chiller baseload line 69 avg idle minutes between jobs?
[discovery] - B.70: granulation, HVAC cleanroom, and chiller baseload line 70 avg idle minutes between jobs?
[discovery] - B.71: granulation, HVAC cleanroom, and chiller baseload line 71 avg idle minutes between jobs?
[discovery] - B.72: granulation, HVAC cleanroom, and chiller baseload line 72 avg idle minutes between jobs?
[discovery] - B.73: granulation, HVAC cleanroom, and chiller baseload line 73 avg idle minutes between jobs?
[discovery] - B.74: granulation, HVAC cleanroom, and chiller baseload line 74 avg idle minutes between jobs?
[discovery] - B.75: granulation, HVAC cleanroom, and chiller baseload line 75 avg idle minutes between jobs?
[discovery] - B.76: granulation, HVAC cleanroom, and chiller baseload line 76 avg idle minutes between jobs?
[discovery] - B.77: granulation, HVAC cleanroom, and chiller baseload line 77 avg idle minutes between jobs?
[discovery] - B.78: granulation, HVAC cleanroom, and chiller baseload line 78 avg idle minutes between jobs?
[discovery] - B.79: granulation, HVAC cleanroom, and chiller baseload line 79 avg idle minutes between jobs?
[discovery] - B.80: granulation, HVAC cleanroom, and chiller baseload line 80 avg idle minutes between jobs?
[discovery] - B.81: granulation, HVAC cleanroom, and chiller baseload line 81 avg idle minutes between jobs?
[discovery] - B.82: granulation, HVAC cleanroom, and chiller baseload line 82 avg idle minutes between jobs?
[discovery] - B.83: granulation, HVAC cleanroom, and chiller baseload line 83 avg idle minutes between jobs?
[discovery] - B.84: granulation, HVAC cleanroom, and chiller baseload line 84 avg idle minutes between jobs?
[discovery] - B.85: granulation, HVAC cleanroom, and chiller baseload line 85 avg idle minutes between jobs?
[discovery] - B.86: granulation, HVAC cleanroom, and chiller baseload line 86 avg idle minutes between jobs?
[discovery] - B.87: granulation, HVAC cleanroom, and chiller baseload line 87 avg idle minutes between jobs?
[discovery] - B.88: granulation, HVAC cleanroom, and chiller baseload line 88 avg idle minutes between jobs?
[discovery] - B.89: granulation, HVAC cleanroom, and chiller baseload line 89 avg idle minutes between jobs?
[discovery] - B.90: granulation, HVAC cleanroom, and chiller baseload line 90 avg idle minutes between jobs?
[discovery] - B.91: granulation, HVAC cleanroom, and chiller baseload line 91 avg idle minutes between jobs?
[discovery] - B.92: granulation, HVAC cleanroom, and chiller baseload line 92 avg idle minutes between jobs?
[discovery] - B.93: granulation, HVAC cleanroom, and chiller baseload line 93 avg idle minutes between jobs?
[discovery] - B.94: granulation, HVAC cleanroom, and chiller baseload line 94 avg idle minutes between jobs?
[discovery] - B.95: granulation, HVAC cleanroom, and chiller baseload line 95 avg idle minutes between jobs?
[discovery] - B.96: granulation, HVAC cleanroom, and chiller baseload line 96 avg idle minutes between jobs?
[discovery] - B.97: granulation, HVAC cleanroom, and chiller baseload line 97 avg idle minutes between jobs?
[discovery] - B.98: granulation, HVAC cleanroom, and chiller baseload line 98 avg idle minutes between jobs?
[discovery] - B.99: granulation, HVAC cleanroom, and chiller baseload line 99 avg idle minutes between jobs?
[discovery] - B.100: granulation, HVAC cleanroom, and chiller baseload line 100 avg idle minutes between jobs?
[discovery] - B.101: granulation, HVAC cleanroom, and chiller baseload line 101 avg idle minutes between jobs?
[discovery] - B.102: granulation, HVAC cleanroom, and chiller baseload line 102 avg idle minutes between jobs?
[discovery] - B.103: granulation, HVAC cleanroom, and chiller baseload line 103 avg idle minutes between jobs?
[discovery] - B.104: granulation, HVAC cleanroom, and chiller baseload line 104 avg idle minutes between jobs?
[discovery] - B.105: granulation, HVAC cleanroom, and chiller baseload line 105 avg idle minutes between jobs?
[discovery] - B.106: granulation, HVAC cleanroom, and chiller baseload line 106 avg idle minutes between jobs?
[discovery] - B.107: granulation, HVAC cleanroom, and chiller baseload line 107 avg idle minutes between jobs?
[discovery] - B.108: granulation, HVAC cleanroom, and chiller baseload line 108 avg idle minutes between jobs?
[discovery] - B.109: granulation, HVAC cleanroom, and chiller baseload line 109 avg idle minutes between jobs?
[discovery] - B.110: granulation, HVAC cleanroom, and chiller baseload line 110 avg idle minutes between jobs?
[discovery] - B.111: granulation, HVAC cleanroom, and chiller baseload line 111 avg idle minutes between jobs?
[discovery] - B.112: granulation, HVAC cleanroom, and chiller baseload line 112 avg idle minutes between jobs?
[discovery] - B.113: granulation, HVAC cleanroom, and chiller baseload line 113 avg idle minutes between jobs?
[discovery] - B.114: granulation, HVAC cleanroom, and chiller baseload line 114 avg idle minutes between jobs?
[discovery] - B.115: granulation, HVAC cleanroom, and chiller baseload line 115 avg idle minutes between jobs?
[discovery] - B.116: granulation, HVAC cleanroom, and chiller baseload line 116 avg idle minutes between jobs?
[discovery] - B.117: granulation, HVAC cleanroom, and chiller baseload line 117 avg idle minutes between jobs?
[discovery] - B.118: granulation, HVAC cleanroom, and chiller baseload line 118 avg idle minutes between jobs?
[discovery] - B.119: granulation, HVAC cleanroom, and chiller baseload line 119 avg idle minutes between jobs?
[discovery] - B.120: granulation, HVAC cleanroom, and chiller baseload line 120 avg idle minutes between jobs?
[discovery]
Appendix C — Stamped wedge reinforcement
The strongest wedge is: Nanjangud KIADB granulation and cleanroom HVAC idle-load verification on the MESCOM HT bill — read-only on existing meters, assigning batch thermal hold and AHU baseload leaks to specific production lines in ₹/month, proven on the next invoice within 90 days, without PLC writes or capex.
C.1 Week-1 checkpoint
- Day 7: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.2 Week-1 checkpoint
- Day 14: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.3 Week-1 checkpoint
- Day 21: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.4 Week-1 checkpoint
- Day 28: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.5 Week-2 checkpoint
- Day 35: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.6 Week-2 checkpoint
- Day 42: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.7 Week-2 checkpoint
- Day 49: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.8 Week-2 checkpoint
- Day 56: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.9 Week-3 checkpoint
- Day 63: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.10 Week-3 checkpoint
- Day 70: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.11 Week-3 checkpoint
- Day 77: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.12 Week-3 checkpoint
- Day 84: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.13 Week-4 checkpoint
- Day 91: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.14 Week-4 checkpoint
- Day 98: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.15 Week-4 checkpoint
- Day 105: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.16 Week-4 checkpoint
- Day 112: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.17 Week-5 checkpoint
- Day 119: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.18 Week-5 checkpoint
- Day 126: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.19 Week-5 checkpoint
- Day 133: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.20 Week-5 checkpoint
- Day 140: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.21 Week-6 checkpoint
- Day 147: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.22 Week-6 checkpoint
- Day 154: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.23 Week-6 checkpoint
- Day 161: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.24 Week-6 checkpoint
- Day 168: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.25 Week-7 checkpoint
- Day 175: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.26 Week-7 checkpoint
- Day 182: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.27 Week-7 checkpoint
- Day 189: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.28 Week-7 checkpoint
- Day 196: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.29 Week-8 checkpoint
- Day 203: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.30 Week-8 checkpoint
- Day 210: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.31 Week-8 checkpoint
- Day 217: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.32 Week-8 checkpoint
- Day 224: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.33 Week-9 checkpoint
- Day 231: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.34 Week-9 checkpoint
- Day 238: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.35 Week-9 checkpoint
- Day 245: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.36 Week-9 checkpoint
- Day 252: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.37 Week-10 checkpoint
- Day 259: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.38 Week-10 checkpoint
- Day 266: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.39 Week-10 checkpoint
- Day 273: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.40 Week-10 checkpoint
- Day 280: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.41 Week-11 checkpoint
- Day 287: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.42 Week-11 checkpoint
- Day 294: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.43 Week-11 checkpoint
- Day 301: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.44 Week-11 checkpoint
- Day 308: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.45 Week-12 checkpoint
- Day 315: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.46 Week-12 checkpoint
- Day 322: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.47 Week-12 checkpoint
- Day 329: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.48 Week-12 checkpoint
- Day 336: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.49 Week-13 checkpoint
- Day 343: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.50 Week-13 checkpoint
- Day 350: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.51 Week-13 checkpoint
- Day 357: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.52 Week-13 checkpoint
- Day 364: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.53 Week-14 checkpoint
- Day 371: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.54 Week-14 checkpoint
- Day 378: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.55 Week-14 checkpoint
- Day 385: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.56 Week-14 checkpoint
- Day 392: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.57 Week-15 checkpoint
- Day 399: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.58 Week-15 checkpoint
- Day 406: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.59 Week-15 checkpoint
- Day 413: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.60 Week-15 checkpoint
- Day 420: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.61 Week-16 checkpoint
- Day 427: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.62 Week-16 checkpoint
- Day 434: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.63 Week-16 checkpoint
- Day 441: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.64 Week-16 checkpoint
- Day 448: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.65 Week-17 checkpoint
- Day 455: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.66 Week-17 checkpoint
- Day 462: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.67 Week-17 checkpoint
- Day 469: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.68 Week-17 checkpoint
- Day 476: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.69 Week-18 checkpoint
- Day 483: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.70 Week-18 checkpoint
- Day 490: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.71 Week-18 checkpoint
- Day 497: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.72 Week-18 checkpoint
- Day 504: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.73 Week-19 checkpoint
- Day 511: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.74 Week-19 checkpoint
- Day 518: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.75 Week-19 checkpoint
- Day 525: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.76 Week-19 checkpoint
- Day 532: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.77 Week-20 checkpoint
- Day 539: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.78 Week-20 checkpoint
- Day 546: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.79 Week-20 checkpoint
- Day 553: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
C.80 Week-20 checkpoint
- Day 560: Review MESCOM bill vs meter data for granulation, HVAC cleanroom, and chiller baseload scope.
- Kill at day 60 if verified savings <5% with full data access.
Appendix D — SME100 2019 context
Tier B — qualify bill on first call.
- 2019: Monitor capex, tariff true-up, leadership changes.
- 2020: Monitor capex, tariff true-up, leadership changes.
- 2021: Monitor capex, tariff true-up, leadership changes.
- 2022: Monitor capex, tariff true-up, leadership changes.
- 2023: Monitor capex, tariff true-up, leadership changes.
- 2024: Monitor capex, tariff true-up, leadership changes.
- 2025: Monitor capex, tariff true-up, leadership changes.
- 2026: Monitor capex, tariff true-up, leadership changes.
Appendix E — Objection handling
Objection: “We already have solar”
Response: Solar offsets kWh, not MD sequencing — bill-first baseline.
Objection: “We have ISO / GMP”
Response: Certs ≠ continuous meter-to-bill M&V — 90-day proof on one feeder.
Objection: “Too busy”
Response: Read-only — no production stops; prescriptions are scheduling levers.
Objection: “Send a brochure”
Response: Two bill months + one-page ₹ map — not a product deck.
Appendix F.1 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 1.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-001 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.2 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 2.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-002 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.3 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 3.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-003 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.4 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 4.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-004 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.5 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 5.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-005 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.6 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 6.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-006 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.7 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 7.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-007 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.8 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 8.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-008 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.9 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 9.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-009 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.10 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 10.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-010 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.11 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 11.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-011 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.12 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 12.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-012 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.13 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 13.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-013 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.14 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 14.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-014 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.15 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 15.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-015 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.16 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 16.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-016 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.17 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 17.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-017 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.18 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 18.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-018 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.19 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 19.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-019 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.20 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 20.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-020 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.21 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 21.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-021 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.22 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 22.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-022 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.23 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 23.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-023 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.24 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 24.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-024 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.25 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 25.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-025 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.26 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 26.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-026 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.27 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 27.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-027 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.28 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 28.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-028 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.29 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 29.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-029 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.30 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 30.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-030 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.31 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 31.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-031 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.32 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 32.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-032 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.33 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 33.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-033 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.34 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 34.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-034 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.35 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 35.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-035 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.36 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 36.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-036 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.37 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 37.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-037 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.38 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 38.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-038 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.39 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 39.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-039 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.40 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 40.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-040 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.41 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 41.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-041 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.42 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 42.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-042 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.43 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 43.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-043 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.44 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 44.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-044 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.45 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 45.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-045 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.46 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 46.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-046 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.47 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 47.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-047 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.48 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 48.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-048 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.49 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 49.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-049 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.50 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 50.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-050 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.51 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 51.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-051 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.52 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 52.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-052 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.53 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 53.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-053 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.54 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 54.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-054 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.55 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 55.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-055 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.56 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 56.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-056 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.57 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 57.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-057 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.58 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 58.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-058 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.59 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 59.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-059 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.60 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 60.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-060 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.61 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 61.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-061 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.62 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 62.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-062 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.63 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 63.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-063 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.64 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 64.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-064 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.65 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 65.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-065 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.66 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 66.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-066 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.67 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 67.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-067 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.68 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 68.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-068 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.69 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 69.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-069 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.70 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 70.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-070 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.71 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 71.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-071 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.72 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 72.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-072 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.73 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 73.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-073 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.74 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 74.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-074 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.75 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 75.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-075 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.76 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 76.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-076 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.77 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 77.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-077 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.78 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 78.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-078 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.79 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 79.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-079 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.80 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 80.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-080 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.81 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 81.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-081 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.82 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 82.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-082 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.83 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 83.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-083 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.84 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 84.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-084 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.85 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 85.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-085 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.86 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 86.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-086 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.87 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 87.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-087 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.88 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 88.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-088 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.89 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 89.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-089 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.90 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 90.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-090 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.91 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 91.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-091 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.92 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 92.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-092 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.93 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 93.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-093 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.94 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 94.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-094 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.95 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 95.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-095 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.96 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 96.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-096 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.97 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 97.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-097 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.98 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 98.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-098 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.99 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 99.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-099 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.100 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 100.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-100 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.101 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 101.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-101 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.102 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 102.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-102 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.103 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 103.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-103 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.104 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 104.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-104 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.105 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 105.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-105 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.106 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 106.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-106 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.107 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 107.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-107 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.108 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 108.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-108 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.109 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 109.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-109 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.110 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 110.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-110 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.111 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 111.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-111 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.112 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 112.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-112 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.113 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 113.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-113 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.114 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 114.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-114 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.115 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 115.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-115 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.116 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 116.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-116 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.117 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 117.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-117 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.118 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 118.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-118 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.119 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 119.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-119 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.120 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 120.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-120 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.121 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 121.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-121 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.122 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 122.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-122 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.123 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 123.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-123 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.124 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 124.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-124 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.125 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 125.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-125 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.126 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 126.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-126 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.127 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 127.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-127 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.128 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 128.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-128 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.129 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 129.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-129 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.130 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 130.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-130 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.131 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 131.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-131 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.132 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 132.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-132 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.133 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 133.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-133 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.134 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 134.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-134 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.135 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 135.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-135 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.136 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 136.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-136 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.137 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 137.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-137 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.138 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 138.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-138 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.139 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 139.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-139 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.140 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 140.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-140 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.141 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 141.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-141 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.142 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 142.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-142 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.143 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 143.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-143 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.144 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 144.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-144 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.145 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 145.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-145 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.146 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 146.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-146 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.147 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 147.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-147 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.148 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 148.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-148 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.149 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 149.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-149 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.150 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 150.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-150 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.151 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 151.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-151 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.152 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 152.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-152 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.153 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 153.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-153 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.154 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 154.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-154 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.155 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 155.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-155 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.156 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 156.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-156 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.157 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 157.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-157 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.158 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 158.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-158 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.159 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 159.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-159 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.160 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 160.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-160 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.161 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 161.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-161 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.162 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 162.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-162 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.163 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 163.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-163 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.164 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 164.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-164 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.165 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 165.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-165 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.166 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 166.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-166 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.167 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 167.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-167 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.168 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 168.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-168 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.169 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 169.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-169 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.170 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 170.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-170 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.171 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 171.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-171 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.172 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 172.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-172 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.173 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 173.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-173 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.174 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 174.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-174 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.175 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 175.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-175 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.176 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 176.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-176 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.177 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 177.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-177 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.178 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 178.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-178 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.179 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 179.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-179 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.180 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 180.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-180 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.181 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 181.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-181 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.182 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 182.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-182 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.183 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 183.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-183 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.184 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 184.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-184 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.185 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 185.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-185 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.186 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 186.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-186 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.187 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 187.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-187 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.188 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 188.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-188 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.189 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 189.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-189 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.190 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 190.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-190 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.191 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 191.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-191 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.192 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 192.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-192 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.193 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 193.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-193 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.194 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 194.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-194 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.195 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 195.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-195 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.196 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 196.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-196 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.197 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 197.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-197 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.198 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 198.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-198 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.199 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 199.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-199 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.200 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 200.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-200 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.201 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 201.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-201 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.202 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 202.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-202 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.203 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 203.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-203 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.204 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 204.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-204 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.205 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 205.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-205 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.206 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 206.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-206 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.207 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 207.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-207 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.208 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 208.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-208 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.209 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 209.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-209 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.210 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 210.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-210 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |
Appendix F.211 — Field note (40-supreem-pharma-mysore)
Cross-check MESCOM tariff order before calls. Process: granulation, HVAC cleanroom, and chiller baseload. Post-discovery notes line 211.
| Field | Value [post-call] |
|---|
| Feeder ID | TBD-211 |
| Est. monthly kWh | [~] |
| Est. monthly ₹ | [~] |
| Champion confirmed | Y/N |