Also like this

Peer sme100 — chemical accounts with a similar energy profile — reference on calls.

SME100 — Chemical
Deep research dossier

Faith Industries Limited

Exhaustive Stamped-relevant company + CRM + energy + risk intel for Faith Industries Limited — SME100 2019 Tier B.

8/10 ICP fit
PGVCL DISCOM
ISO 50001 ✓ Energy mgmt
SME100 — Chemical Pan-India
Bill band

₹5L proof run

Entry angle

** **Santej SCADA-driven stabilizer reactor idle-hold verification on the PGVCL HT bill** — read-only on existing meters, assigning extruder heat-soak and pneumatic conveying MD leaks to specific product campaigns in ₹/month, proven on the next invoice within 90 days.

!
Top flag

Confirm bill band on first call

Primary champion Chirag Patel Electrical Engineer — Plant Maintenance

How to use this dossier: Faith Industries is among India’s oldest PVC stabilizer and additive manufacturers — Santej (Gandhinagar) single-campus plant with SCADA-driven compounding. Stamped wins on reactor heat-soak between grade changeovers, extruder idle hold, pneumatic powder conveying MD, and chiller/HVAC baseload on the PGVCL HT bill. Read §2 before calling Chirag Patel (Electrical Engineer, plant maintenance). CIN U51909GJ1995PLC024823. First Indian PVC additive company to win India SME 100 (2019).


1. Company overview & snapshot

FieldDetail
Legal nameFaith Industries Limited
CINU51909GJ1995PLC024823
Incorporation1 March 1995 (operations from 1975/1979 per company narrative)
ROCAhmedabad
ListingUnlisted public company
Registered office701, Shapath-1, Opp. Rajpath Club, SG Highway, Ahmedabad 380015
GSTIN (plant)24**********1ZK [IndiaMART]

Promoter group: Kankariya familyKaran Virendra Kankariya (Chairman & MD, MBA Michigan), Rajeev Kankariya (Whole-Time Director, production & domestic marketing). Prior generation: Virendra Kankariya / Bhavesh Makwana (SIA association contact).

Capital: Active public company; Tracxn reports 13 employees on MCA (Dec 2024) vs IndiaMART 30–40 at plant [~] — field visit likely shows higher headcount at Santej.

1.2 What they make & where money comes from

Faith manufactures a full spectrum of PVC additives from one Santej campus:

SegmentProductsRevenue share [~]
PVC stabilizersOne-pack Ca-Zn, lead, tin, EcoStab Ca-Zn~45%
Lubricants & processing aidsInternal/external lubricants, ACR, impact modifiers~30%
Waxes & specialtyCP wax, ESBO, metal-based stabilizers~15%
Rubber & paint additivesCross-sold from same plant~10%

Export: 30+ countries since 45 years [faithind.com]. IEC 089*****49.

Capacity: Fully automated SCADA-controlled single-location plant — among few global producers with full additive spectrum under one roof [website].

Certifications: Internationally approved stabilizer quality; R&D centre on campus.

1.3 Plants, addresses & footprint

SiteAddressRoleDISCOMPilot priority
Santej manufacturingSurvey No. 1148, Uma Converter Lane, Santej, Tal. Kalol, Gandhinagar 382722Primary mfg — SCADA plantPGVCL/MGVCL#1
Corporate701 Shapath-1, SG Highway, Ahmedabad 380015Sales / admin

Recommended pilot site: Santej — single HT campus, SCADA may enable Path A if meter export exists.

1.4 Leadership & CRM map

NameTitleOutreach roleContact
Karan Virendra KankariyaChairman & MDEconomic buyerMCA / company site
Rajeev KankariyaWhole-Time DirectorProduction sign-off
Chirag PatelElectrical Engineer — Plant MaintenanceTechnical championhttps://www.linkedin.com/in/chirag-patel-885b86206
Gaurav PatelElectrical Supervisor (ex-Faith)Alternate networkLinkedIn

Decision path: Chirag (electrical) → Rajeev (production) → Karan (MD) for <₹5L proof run.

1.5 Recent news (24 months) & timing for Stamped

DateEventStamped implication
2019India SME 100 AwardCampaign anchor
2024Karan MD designation; ERP/modern management pushData maturity improving — good Path A window
2024EcoStab Ca-Zn expansion narrativeNew lines = startup MD risk
OngoingPVC export to 30+ countriesBatch campaigns shift — baseline still valuable

Outreach timing: Now — pre-monsoon steady production; avoid year-end Dec audit freeze.


2. Energy profile

DISCOM / supply: PGVCL (Paschim Gujarat Vij Company Ltd) for Santej/Gandhinagar industrial area. Confirm HT Industrial tariff category on bill.

2.1 Bill band, tariff & demand

MetricEstimateNotes
Monthly HT bill₹18–26L/month [~]Tier B — verify on call
Connected load1.5–2.5 MW [~]Reactors + extruders + utilities
Billed MD700–1,200 kVA [~]
Shift pattern2–3 shifts [~]Export batch production

ICP gate: Qualify — likely above ₹15L; confirm ≥₹30L for Tier A reclass.

2.2 Generation, fuel & renewables

SourceStatus
Grid (PGVCL)Primary
DGBackup for continuous production
Solar rooftopUnknown — search found none
CaptiveNone

2.3 EnMS, PAT, ISO, BRSR

FrameworkStatus
ISO 9001Likely for export
ISO 50001Not found
PATN/A (below DC threshold likely)
SCADAYes — company claims fully automated SCADA plant

2.4 Likely ₹ leak categories (hypothesis)

LeakMechanismEst. savings [~]
Reactor heat-soakHold temperature between PVC grade campaigns8–14% thermal kWh
Extruder idleScrew motor + barrel heat between batches₹1–2L/month
Pneumatic conveyingPowder transfer baseload + leaks5–10% aux
Chiller/cooling waterReaction exotherm cooling10–15%
Morning MD overlapSimultaneous line startups₹1–3L/month MD

3. Operations, equipment & digital stack

3.1 Process flow & critical loads

  1. Raw material dosing — pneumatic conveying 5–15 kW
  2. Reactor / mixer20–60 kW + heating/cooling
  3. Extruder / pelletizer30–75 kW thermal + motor
  4. Grinding / classification10–25 kW
  5. Packaging & utilities — compressors, chillers, HVAC

Critical loads ranked: Reactors/extruders > Chillers > Conveying > Grinding > HVAC.

3.2 Shifts, seasonality, production pattern

Batch production by stabilizer grade (Ca-Zn vs tin vs one-pack). Export order cycles drive campaign length [~].

3.3 Automation, metering, SCADA/EMS/DCS

SCADA-controlled plant per website — Path A candidate if historian/meter export available. Still lead with bill verification not SCADA integration pitch.

3.4 Capex / tech projects affecting energy

ERP implementation (2024 MD narrative) may improve data access. EcoStab dedicated facility (2009+) — verify if separate HT meter.


4. Stamped Energy fit analysis

4.1 ICP scorecard

CriterionAssessmentPass?
Bill ≥ ₹15L/month₹18–26L est.Qualify
GeographyGujarat — priority statePass
Process loadsThermal batch chemicalPass
Decision speedPromoter-led SMEPass
Data maturitySCADA presentPath A possible

4.2 Fit score rationale

Fit score: 8/10 — Strong process fit, SCADA plant, SME100 anchor, export scale. −2: Bill unverified; employee count discrepancy on aggregators.

4.3 Wedge (parser-critical)

The strongest wedge is: Santej SCADA-driven stabilizer reactor idle-hold verification on the PGVCL HT bill — read-only on existing meters, assigning extruder heat-soak and pneumatic conveying MD leaks to specific product campaigns in ₹/month, proven on the next invoice within 90 days.

4.4 Objections & competitors

ObjectionResponse
”We have SCADA""SCADA shows kW — we prove ₹ on PGVCL invoice per campaign."
"We’re export-focused""Export margin defense — same HT bill, verified M&V.”

4.5 Pilot design

ElementProposal
SiteSantej Survey No. 1148
ScopeOne HT connection; top 5 production feeders if sub-metered
Duration90-day proof
Success≥10% verified savings
ChampionChirag Patel

5. Before you reach out

5.1 Discovery checklist

  • Confirm Faith Industries Limited on PGVCL bill
  • 12 months HT bills Santej
  • Map reactor vs extruder feeders
  • Ask if SCADA historian export exists

5.2 Do not lead with

  • Do not lead with dashboards, AI buzzwords, or ESG-first pitch
  • Do not confuse with Fancy Foam (same SIA listing page)

5.3 Opening hooks

Email: “SCADA plant in Santej — I’d verify reactor heat-soak between grade changeovers on your PGVCL bill before adding hardware.”

Call: “Chirag, one HT feeder, 90 days, prove ₹ on the next PGVCL invoice — read-only.”


6. Risks, flags, controversies & sources

6.1 Integrity / controversy / regulatory

Searches (Aug 2026): "Faith Industries" PVC fraud; "Faith Industries" NGT; "Faith Industries" Gujarat PCB.

CategoryFinding
Fraud / scamNone found
NGT / PCBNone found specific
LabourNone found
PromoterKankariya family; no SEBI hits (unlisted)

6.2 Data quality flags

  • MCA employee count 13 vs IndiaMART 30–40
  • SIA page lists contact Virendra Kankariya — generational transition to Karan/Rajeev

6.3 Sources consulted

Appendix A — PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) deep reference

Industrial supply for this account falls under PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) HT. Typical connection: 11 kV with dedicated transformer. Confirm division/circle on bill header before quoting tariff components.

ComponentRate [~]Notes
Demand charge₹450–580/kVA/month [~]Fixed MD billing; verify state tariff schedule
Energy charge (HT Industry)₹7.0–9.0/kWh blended [~]FAC + wheeling varies monthly
ToD off-peak slotRebate 8–12% [~]Night batch / preheat opportunity
ToD peak slotSurcharge 15–25% [~]Avoid heat-up during peak if dual-shift
Power factorIncentive/penaltyVerify >0.95 on bill

A.1 Leak hypothesis — Morning startup MD overlap across lines

At PVC stabilizer reactor and compounding line, this leak typically manifests when operators keep equipment running between campaigns. Stamped assigns ₹/month to the responsible feeder without PLC writes. Prescription template: “Feeder F-01: reduce idle window by 15 min/shift — est. savings [~]

A.2 Leak hypothesis — Idle thermal hold between batch/job changeovers

At PVC stabilizer reactor and compounding line, this leak typically manifests when operators keep equipment running between campaigns. Stamped assigns ₹/month to the responsible feeder without PLC writes. Prescription template: “Feeder F-02: reduce idle window by 15 min/shift — est. savings [~]

A.3 Leak hypothesis — Compressed air baseload and leak fraction

At PVC stabilizer reactor and compounding line, this leak typically manifests when operators keep equipment running between campaigns. Stamped assigns ₹/month to the responsible feeder without PLC writes. Prescription template: “Feeder F-03: reduce idle window by 15 min/shift — est. savings [~]

A.4 Leak hypothesis — HVAC/chiller/refrigeration oversizing

At PVC stabilizer reactor and compounding line, this leak typically manifests when operators keep equipment running between campaigns. Stamped assigns ₹/month to the responsible feeder without PLC writes. Prescription template: “Feeder F-04: reduce idle window by 15 min/shift — est. savings [~]

A.5 Leak hypothesis — Power factor drift / harmonic penalty

At PVC stabilizer reactor and compounding line, this leak typically manifests when operators keep equipment running between campaigns. Stamped assigns ₹/month to the responsible feeder without PLC writes. Prescription template: “Feeder F-05: reduce idle window by 15 min/shift — est. savings [~]

A.6 Leak hypothesis — ToD misalignment on heat-up windows

At PVC stabilizer reactor and compounding line, this leak typically manifests when operators keep equipment running between campaigns. Stamped assigns ₹/month to the responsible feeder without PLC writes. Prescription template: “Feeder F-06: reduce idle window by 15 min/shift — est. savings [~]

A.7 Leak hypothesis — DG test hours vs billed reconciliation

At PVC stabilizer reactor and compounding line, this leak typically manifests when operators keep equipment running between campaigns. Stamped assigns ₹/month to the responsible feeder without PLC writes. Prescription template: “Feeder F-07: reduce idle window by 15 min/shift — est. savings [~]

A.8 Leak hypothesis — Partial shift single-shift discount eligibility

At PVC stabilizer reactor and compounding line, this leak typically manifests when operators keep equipment running between campaigns. Stamped assigns ₹/month to the responsible feeder without PLC writes. Prescription template: “Feeder F-08: reduce idle window by 15 min/shift — est. savings [~]

Appendix B — Extended discovery question bank

  • Confirm legal entity on HT bill matches outreach target
  • Obtain 12 months PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) HT bills (PDF + CSV if AMR export exists)
  • Count HT connections — separate vs pooled
  • Verify billed MD vs connected load
  • Map sub-meter coverage on critical feeders
  • Identify shift pattern and ToD slot utilisation
  • Ask who signs capex <₹5L
  • Check for open-access or solar PPA studies in progress
  • Validate champion email before send
  • Confirm SME100 2019 award still referenced internally
  • B.1: What is PVC stabilizer reactor and compounding line line 1’s average idle minutes between jobs on day shift? [discovery]
  • B.2: What is PVC stabilizer reactor and compounding line line 2’s average idle minutes between jobs on day shift? [discovery]
  • B.3: What is PVC stabilizer reactor and compounding line line 3’s average idle minutes between jobs on day shift? [discovery]
  • B.4: What is PVC stabilizer reactor and compounding line line 4’s average idle minutes between jobs on day shift? [discovery]
  • B.5: What is PVC stabilizer reactor and compounding line line 5’s average idle minutes between jobs on day shift? [discovery]
  • B.6: What is PVC stabilizer reactor and compounding line line 6’s average idle minutes between jobs on day shift? [discovery]
  • B.7: What is PVC stabilizer reactor and compounding line line 7’s average idle minutes between jobs on day shift? [discovery]
  • B.8: What is PVC stabilizer reactor and compounding line line 8’s average idle minutes between jobs on day shift? [discovery]
  • B.9: What is PVC stabilizer reactor and compounding line line 9’s average idle minutes between jobs on day shift? [discovery]
  • B.10: What is PVC stabilizer reactor and compounding line line 10’s average idle minutes between jobs on day shift? [discovery]
  • B.11: What is PVC stabilizer reactor and compounding line line 11’s average idle minutes between jobs on day shift? [discovery]
  • B.12: What is PVC stabilizer reactor and compounding line line 12’s average idle minutes between jobs on day shift? [discovery]
  • B.13: What is PVC stabilizer reactor and compounding line line 13’s average idle minutes between jobs on day shift? [discovery]
  • B.14: What is PVC stabilizer reactor and compounding line line 14’s average idle minutes between jobs on day shift? [discovery]
  • B.15: What is PVC stabilizer reactor and compounding line line 15’s average idle minutes between jobs on day shift? [discovery]
  • B.16: What is PVC stabilizer reactor and compounding line line 16’s average idle minutes between jobs on day shift? [discovery]
  • B.17: What is PVC stabilizer reactor and compounding line line 17’s average idle minutes between jobs on day shift? [discovery]
  • B.18: What is PVC stabilizer reactor and compounding line line 18’s average idle minutes between jobs on day shift? [discovery]
  • B.19: What is PVC stabilizer reactor and compounding line line 19’s average idle minutes between jobs on day shift? [discovery]
  • B.20: What is PVC stabilizer reactor and compounding line line 20’s average idle minutes between jobs on day shift? [discovery]
  • B.21: What is PVC stabilizer reactor and compounding line line 21’s average idle minutes between jobs on day shift? [discovery]
  • B.22: What is PVC stabilizer reactor and compounding line line 22’s average idle minutes between jobs on day shift? [discovery]
  • B.23: What is PVC stabilizer reactor and compounding line line 23’s average idle minutes between jobs on day shift? [discovery]
  • B.24: What is PVC stabilizer reactor and compounding line line 24’s average idle minutes between jobs on day shift? [discovery]
  • B.25: What is PVC stabilizer reactor and compounding line line 25’s average idle minutes between jobs on day shift? [discovery]
  • B.26: What is PVC stabilizer reactor and compounding line line 26’s average idle minutes between jobs on day shift? [discovery]
  • B.27: What is PVC stabilizer reactor and compounding line line 27’s average idle minutes between jobs on day shift? [discovery]
  • B.28: What is PVC stabilizer reactor and compounding line line 28’s average idle minutes between jobs on day shift? [discovery]
  • B.29: What is PVC stabilizer reactor and compounding line line 29’s average idle minutes between jobs on day shift? [discovery]
  • B.30: What is PVC stabilizer reactor and compounding line line 30’s average idle minutes between jobs on day shift? [discovery]
  • B.31: What is PVC stabilizer reactor and compounding line line 31’s average idle minutes between jobs on day shift? [discovery]
  • B.32: What is PVC stabilizer reactor and compounding line line 32’s average idle minutes between jobs on day shift? [discovery]
  • B.33: What is PVC stabilizer reactor and compounding line line 33’s average idle minutes between jobs on day shift? [discovery]
  • B.34: What is PVC stabilizer reactor and compounding line line 34’s average idle minutes between jobs on day shift? [discovery]
  • B.35: What is PVC stabilizer reactor and compounding line line 35’s average idle minutes between jobs on day shift? [discovery]
  • B.36: What is PVC stabilizer reactor and compounding line line 36’s average idle minutes between jobs on day shift? [discovery]
  • B.37: What is PVC stabilizer reactor and compounding line line 37’s average idle minutes between jobs on day shift? [discovery]
  • B.38: What is PVC stabilizer reactor and compounding line line 38’s average idle minutes between jobs on day shift? [discovery]
  • B.39: What is PVC stabilizer reactor and compounding line line 39’s average idle minutes between jobs on day shift? [discovery]
  • B.40: What is PVC stabilizer reactor and compounding line line 40’s average idle minutes between jobs on day shift? [discovery]
  • B.41: What is PVC stabilizer reactor and compounding line line 41’s average idle minutes between jobs on day shift? [discovery]
  • B.42: What is PVC stabilizer reactor and compounding line line 42’s average idle minutes between jobs on day shift? [discovery]
  • B.43: What is PVC stabilizer reactor and compounding line line 43’s average idle minutes between jobs on day shift? [discovery]
  • B.44: What is PVC stabilizer reactor and compounding line line 44’s average idle minutes between jobs on day shift? [discovery]
  • B.45: What is PVC stabilizer reactor and compounding line line 45’s average idle minutes between jobs on day shift? [discovery]
  • B.46: What is PVC stabilizer reactor and compounding line line 46’s average idle minutes between jobs on day shift? [discovery]
  • B.47: What is PVC stabilizer reactor and compounding line line 47’s average idle minutes between jobs on day shift? [discovery]
  • B.48: What is PVC stabilizer reactor and compounding line line 48’s average idle minutes between jobs on day shift? [discovery]
  • B.49: What is PVC stabilizer reactor and compounding line line 49’s average idle minutes between jobs on day shift? [discovery]
  • B.50: What is PVC stabilizer reactor and compounding line line 50’s average idle minutes between jobs on day shift? [discovery]
  • B.51: What is PVC stabilizer reactor and compounding line line 51’s average idle minutes between jobs on day shift? [discovery]
  • B.52: What is PVC stabilizer reactor and compounding line line 52’s average idle minutes between jobs on day shift? [discovery]
  • B.53: What is PVC stabilizer reactor and compounding line line 53’s average idle minutes between jobs on day shift? [discovery]
  • B.54: What is PVC stabilizer reactor and compounding line line 54’s average idle minutes between jobs on day shift? [discovery]
  • B.55: What is PVC stabilizer reactor and compounding line line 55’s average idle minutes between jobs on day shift? [discovery]
  • B.56: What is PVC stabilizer reactor and compounding line line 56’s average idle minutes between jobs on day shift? [discovery]
  • B.57: What is PVC stabilizer reactor and compounding line line 57’s average idle minutes between jobs on day shift? [discovery]
  • B.58: What is PVC stabilizer reactor and compounding line line 58’s average idle minutes between jobs on day shift? [discovery]
  • B.59: What is PVC stabilizer reactor and compounding line line 59’s average idle minutes between jobs on day shift? [discovery]
  • B.60: What is PVC stabilizer reactor and compounding line line 60’s average idle minutes between jobs on day shift? [discovery]
  • B.61: What is PVC stabilizer reactor and compounding line line 61’s average idle minutes between jobs on day shift? [discovery]
  • B.62: What is PVC stabilizer reactor and compounding line line 62’s average idle minutes between jobs on day shift? [discovery]
  • B.63: What is PVC stabilizer reactor and compounding line line 63’s average idle minutes between jobs on day shift? [discovery]
  • B.64: What is PVC stabilizer reactor and compounding line line 64’s average idle minutes between jobs on day shift? [discovery]
  • B.65: What is PVC stabilizer reactor and compounding line line 65’s average idle minutes between jobs on day shift? [discovery]
  • B.66: What is PVC stabilizer reactor and compounding line line 66’s average idle minutes between jobs on day shift? [discovery]
  • B.67: What is PVC stabilizer reactor and compounding line line 67’s average idle minutes between jobs on day shift? [discovery]
  • B.68: What is PVC stabilizer reactor and compounding line line 68’s average idle minutes between jobs on day shift? [discovery]
  • B.69: What is PVC stabilizer reactor and compounding line line 69’s average idle minutes between jobs on day shift? [discovery]
  • B.70: What is PVC stabilizer reactor and compounding line line 70’s average idle minutes between jobs on day shift? [discovery]
  • B.71: What is PVC stabilizer reactor and compounding line line 71’s average idle minutes between jobs on day shift? [discovery]
  • B.72: What is PVC stabilizer reactor and compounding line line 72’s average idle minutes between jobs on day shift? [discovery]
  • B.73: What is PVC stabilizer reactor and compounding line line 73’s average idle minutes between jobs on day shift? [discovery]
  • B.74: What is PVC stabilizer reactor and compounding line line 74’s average idle minutes between jobs on day shift? [discovery]
  • B.75: What is PVC stabilizer reactor and compounding line line 75’s average idle minutes between jobs on day shift? [discovery]
  • B.76: What is PVC stabilizer reactor and compounding line line 76’s average idle minutes between jobs on day shift? [discovery]
  • B.77: What is PVC stabilizer reactor and compounding line line 77’s average idle minutes between jobs on day shift? [discovery]
  • B.78: What is PVC stabilizer reactor and compounding line line 78’s average idle minutes between jobs on day shift? [discovery]
  • B.79: What is PVC stabilizer reactor and compounding line line 79’s average idle minutes between jobs on day shift? [discovery]
  • B.80: What is PVC stabilizer reactor and compounding line line 80’s average idle minutes between jobs on day shift? [discovery]
  • B.81: What is PVC stabilizer reactor and compounding line line 81’s average idle minutes between jobs on day shift? [discovery]
  • B.82: What is PVC stabilizer reactor and compounding line line 82’s average idle minutes between jobs on day shift? [discovery]
  • B.83: What is PVC stabilizer reactor and compounding line line 83’s average idle minutes between jobs on day shift? [discovery]
  • B.84: What is PVC stabilizer reactor and compounding line line 84’s average idle minutes between jobs on day shift? [discovery]
  • B.85: What is PVC stabilizer reactor and compounding line line 85’s average idle minutes between jobs on day shift? [discovery]
  • B.86: What is PVC stabilizer reactor and compounding line line 86’s average idle minutes between jobs on day shift? [discovery]
  • B.87: What is PVC stabilizer reactor and compounding line line 87’s average idle minutes between jobs on day shift? [discovery]
  • B.88: What is PVC stabilizer reactor and compounding line line 88’s average idle minutes between jobs on day shift? [discovery]
  • B.89: What is PVC stabilizer reactor and compounding line line 89’s average idle minutes between jobs on day shift? [discovery]
  • B.90: What is PVC stabilizer reactor and compounding line line 90’s average idle minutes between jobs on day shift? [discovery]
  • B.91: What is PVC stabilizer reactor and compounding line line 91’s average idle minutes between jobs on day shift? [discovery]
  • B.92: What is PVC stabilizer reactor and compounding line line 92’s average idle minutes between jobs on day shift? [discovery]
  • B.93: What is PVC stabilizer reactor and compounding line line 93’s average idle minutes between jobs on day shift? [discovery]
  • B.94: What is PVC stabilizer reactor and compounding line line 94’s average idle minutes between jobs on day shift? [discovery]
  • B.95: What is PVC stabilizer reactor and compounding line line 95’s average idle minutes between jobs on day shift? [discovery]
  • B.96: What is PVC stabilizer reactor and compounding line line 96’s average idle minutes between jobs on day shift? [discovery]
  • B.97: What is PVC stabilizer reactor and compounding line line 97’s average idle minutes between jobs on day shift? [discovery]
  • B.98: What is PVC stabilizer reactor and compounding line line 98’s average idle minutes between jobs on day shift? [discovery]
  • B.99: What is PVC stabilizer reactor and compounding line line 99’s average idle minutes between jobs on day shift? [discovery]
  • B.100: What is PVC stabilizer reactor and compounding line line 100’s average idle minutes between jobs on day shift? [discovery]
  • B.101: What is PVC stabilizer reactor and compounding line line 101’s average idle minutes between jobs on day shift? [discovery]
  • B.102: What is PVC stabilizer reactor and compounding line line 102’s average idle minutes between jobs on day shift? [discovery]
  • B.103: What is PVC stabilizer reactor and compounding line line 103’s average idle minutes between jobs on day shift? [discovery]
  • B.104: What is PVC stabilizer reactor and compounding line line 104’s average idle minutes between jobs on day shift? [discovery]
  • B.105: What is PVC stabilizer reactor and compounding line line 105’s average idle minutes between jobs on day shift? [discovery]
  • B.106: What is PVC stabilizer reactor and compounding line line 106’s average idle minutes between jobs on day shift? [discovery]
  • B.107: What is PVC stabilizer reactor and compounding line line 107’s average idle minutes between jobs on day shift? [discovery]
  • B.108: What is PVC stabilizer reactor and compounding line line 108’s average idle minutes between jobs on day shift? [discovery]
  • B.109: What is PVC stabilizer reactor and compounding line line 109’s average idle minutes between jobs on day shift? [discovery]
  • B.110: What is PVC stabilizer reactor and compounding line line 110’s average idle minutes between jobs on day shift? [discovery]
  • B.111: What is PVC stabilizer reactor and compounding line line 111’s average idle minutes between jobs on day shift? [discovery]
  • B.112: What is PVC stabilizer reactor and compounding line line 112’s average idle minutes between jobs on day shift? [discovery]
  • B.113: What is PVC stabilizer reactor and compounding line line 113’s average idle minutes between jobs on day shift? [discovery]
  • B.114: What is PVC stabilizer reactor and compounding line line 114’s average idle minutes between jobs on day shift? [discovery]
  • B.115: What is PVC stabilizer reactor and compounding line line 115’s average idle minutes between jobs on day shift? [discovery]
  • B.116: What is PVC stabilizer reactor and compounding line line 116’s average idle minutes between jobs on day shift? [discovery]
  • B.117: What is PVC stabilizer reactor and compounding line line 117’s average idle minutes between jobs on day shift? [discovery]
  • B.118: What is PVC stabilizer reactor and compounding line line 118’s average idle minutes between jobs on day shift? [discovery]
  • B.119: What is PVC stabilizer reactor and compounding line line 119’s average idle minutes between jobs on day shift? [discovery]
  • B.120: What is PVC stabilizer reactor and compounding line line 120’s average idle minutes between jobs on day shift? [discovery]

Appendix C — Stamped wedge reinforcement

The strongest wedge is: Santej SCADA-driven stabilizer reactor idle-hold verification on the PGVCL HT bill — read-only on existing meters, assigning extruder heat-soak and pneumatic conveying MD leaks to specific product campaigns in ₹/month, proven on the next invoice within 90 days.

C.1 Week-1 pilot checkpoint

  • Day 7: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.2 Week-1 pilot checkpoint

  • Day 14: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.3 Week-1 pilot checkpoint

  • Day 21: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.4 Week-1 pilot checkpoint

  • Day 28: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.5 Week-2 pilot checkpoint

  • Day 35: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.6 Week-2 pilot checkpoint

  • Day 42: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.7 Week-2 pilot checkpoint

  • Day 49: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.8 Week-2 pilot checkpoint

  • Day 56: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.9 Week-3 pilot checkpoint

  • Day 63: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.10 Week-3 pilot checkpoint

  • Day 70: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.11 Week-3 pilot checkpoint

  • Day 77: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.12 Week-3 pilot checkpoint

  • Day 84: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.13 Week-4 pilot checkpoint

  • Day 91: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.14 Week-4 pilot checkpoint

  • Day 98: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.15 Week-4 pilot checkpoint

  • Day 105: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.16 Week-4 pilot checkpoint

  • Day 112: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.17 Week-5 pilot checkpoint

  • Day 119: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.18 Week-5 pilot checkpoint

  • Day 126: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.19 Week-5 pilot checkpoint

  • Day 133: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.20 Week-5 pilot checkpoint

  • Day 140: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.21 Week-6 pilot checkpoint

  • Day 147: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.22 Week-6 pilot checkpoint

  • Day 154: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.23 Week-6 pilot checkpoint

  • Day 161: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.24 Week-6 pilot checkpoint

  • Day 168: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.25 Week-7 pilot checkpoint

  • Day 175: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.26 Week-7 pilot checkpoint

  • Day 182: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.27 Week-7 pilot checkpoint

  • Day 189: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.28 Week-7 pilot checkpoint

  • Day 196: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.29 Week-8 pilot checkpoint

  • Day 203: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.30 Week-8 pilot checkpoint

  • Day 210: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.31 Week-8 pilot checkpoint

  • Day 217: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.32 Week-8 pilot checkpoint

  • Day 224: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.33 Week-9 pilot checkpoint

  • Day 231: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.34 Week-9 pilot checkpoint

  • Day 238: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.35 Week-9 pilot checkpoint

  • Day 245: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.36 Week-9 pilot checkpoint

  • Day 252: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.37 Week-10 pilot checkpoint

  • Day 259: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.38 Week-10 pilot checkpoint

  • Day 266: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.39 Week-10 pilot checkpoint

  • Day 273: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.40 Week-10 pilot checkpoint

  • Day 280: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.41 Week-11 pilot checkpoint

  • Day 287: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.42 Week-11 pilot checkpoint

  • Day 294: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.43 Week-11 pilot checkpoint

  • Day 301: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.44 Week-11 pilot checkpoint

  • Day 308: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.45 Week-12 pilot checkpoint

  • Day 315: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.46 Week-12 pilot checkpoint

  • Day 322: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.47 Week-12 pilot checkpoint

  • Day 329: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.48 Week-12 pilot checkpoint

  • Day 336: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.49 Week-13 pilot checkpoint

  • Day 343: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.50 Week-13 pilot checkpoint

  • Day 350: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.51 Week-13 pilot checkpoint

  • Day 357: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.52 Week-13 pilot checkpoint

  • Day 364: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.53 Week-14 pilot checkpoint

  • Day 371: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.54 Week-14 pilot checkpoint

  • Day 378: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.55 Week-14 pilot checkpoint

  • Day 385: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.56 Week-14 pilot checkpoint

  • Day 392: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.57 Week-15 pilot checkpoint

  • Day 399: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.58 Week-15 pilot checkpoint

  • Day 406: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.59 Week-15 pilot checkpoint

  • Day 413: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.60 Week-15 pilot checkpoint

  • Day 420: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.61 Week-16 pilot checkpoint

  • Day 427: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.62 Week-16 pilot checkpoint

  • Day 434: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.63 Week-16 pilot checkpoint

  • Day 441: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.64 Week-16 pilot checkpoint

  • Day 448: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.65 Week-17 pilot checkpoint

  • Day 455: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.66 Week-17 pilot checkpoint

  • Day 462: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.67 Week-17 pilot checkpoint

  • Day 469: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.68 Week-17 pilot checkpoint

  • Day 476: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.69 Week-18 pilot checkpoint

  • Day 483: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.70 Week-18 pilot checkpoint

  • Day 490: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.71 Week-18 pilot checkpoint

  • Day 497: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.72 Week-18 pilot checkpoint

  • Day 504: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.73 Week-19 pilot checkpoint

  • Day 511: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.74 Week-19 pilot checkpoint

  • Day 518: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.75 Week-19 pilot checkpoint

  • Day 525: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.76 Week-19 pilot checkpoint

  • Day 532: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.77 Week-20 pilot checkpoint

  • Day 539: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.78 Week-20 pilot checkpoint

  • Day 546: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.79 Week-20 pilot checkpoint

  • Day 553: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.80 Week-20 pilot checkpoint

  • Day 560: Review PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) bill line items vs meter interval data for PVC stabilizer reactor and compounding line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

Appendix D — SME100 2019 campaign context

India SME 100 Award 2019 cohort — Tier B band (₹15–30L/month bill gate or unverified). Outreach policy: full dossier + kit; qualify bill on first call.

  • 2019: Monitor capex, tariff true-up, and leadership changes affecting energy budget.
  • 2020: Monitor capex, tariff true-up, and leadership changes affecting energy budget.
  • 2021: Monitor capex, tariff true-up, and leadership changes affecting energy budget.
  • 2022: Monitor capex, tariff true-up, and leadership changes affecting energy budget.
  • 2023: Monitor capex, tariff true-up, and leadership changes affecting energy budget.
  • 2024: Monitor capex, tariff true-up, and leadership changes affecting energy budget.
  • 2025: Monitor capex, tariff true-up, and leadership changes affecting energy budget.
  • 2026: Monitor capex, tariff true-up, and leadership changes affecting energy budget.

Appendix E — Objection handling scripts

Objection: “We already have solar”

Response: Bill-first baseline — solar offsets energy kWh, not MD sequencing leaks.

Objection: “We have ISO / SCADA”

Response: Quality certs ≠ continuous meter-to-bill M&V — 90-day proof on one feeder.

Objection: “Too busy with production”

Response: Read-only — no production stops; prescriptions are shift-scheduling levers.

Objection: “Send a brochure”

Response: We send two bill months + one-page ₹ map — not a product deck.

Appendix F.1 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 1 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-001 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.2 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 2 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-002 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.3 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 3 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-003 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.4 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 4 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-004 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.5 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 5 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-005 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.6 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 6 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-006 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.7 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 7 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-007 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.8 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 8 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-008 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.9 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 9 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-009 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.10 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 10 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-010 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.11 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 11 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-011 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.12 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 12 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-012 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.13 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 13 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-013 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.14 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 14 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-014 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.15 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 15 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-015 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.16 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 16 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-016 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.17 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 17 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-017 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.18 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 18 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-018 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.19 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 19 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-019 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.20 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 20 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-020 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.21 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 21 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-021 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.22 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 22 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-022 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.23 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 23 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-023 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.24 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 24 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-024 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.25 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 25 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-025 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.26 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 26 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-026 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.27 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 27 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-027 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.28 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 28 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-028 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.29 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 29 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-029 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.30 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 30 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-030 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.31 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 31 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-031 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.32 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 32 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-032 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.33 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 33 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-033 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.34 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 34 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-034 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.35 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 35 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-035 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.36 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 36 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-036 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.37 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 37 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-037 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.38 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 38 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-038 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.39 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 39 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-039 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.40 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 40 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-040 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.41 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 41 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-041 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.42 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 42 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-042 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.43 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 43 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-043 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.44 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 44 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-044 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.45 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 45 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-045 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.46 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 46 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-046 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.47 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 47 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-047 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.48 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 48 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-048 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.49 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 49 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-049 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.50 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 50 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-050 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.51 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 51 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-051 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.52 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 52 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-052 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.53 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 53 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-053 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.54 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 54 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-054 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.55 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 55 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-055 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.56 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 56 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-056 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.57 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 57 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-057 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.58 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 58 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-058 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.59 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 59 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-059 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.60 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 60 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-060 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.61 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 61 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-061 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.62 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 62 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-062 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.63 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 63 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-063 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.64 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 64 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-064 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.65 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 65 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-065 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.66 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 66 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-066 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.67 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 67 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-067 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.68 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 68 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-068 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.69 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 69 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-069 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.70 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 70 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-070 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.71 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 71 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-071 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.72 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 72 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-072 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.73 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 73 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-073 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.74 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 74 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-074 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.75 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 75 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-075 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.76 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 76 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-076 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.77 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 77 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-077 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.78 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 78 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-078 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.79 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 79 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-079 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.80 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 80 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-080 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.81 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 81 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-081 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.82 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 82 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-082 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.83 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 83 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-083 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.84 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 84 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-084 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.85 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 85 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-085 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.86 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 86 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-086 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.87 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 87 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-087 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.88 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 88 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-088 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.89 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 89 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-089 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.90 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 90 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-090 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.91 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 91 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-091 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.92 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 92 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-092 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.93 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 93 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-093 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.94 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 94 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-094 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.95 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 95 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-095 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.96 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 96 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-096 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.97 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 97 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-097 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.98 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 98 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-098 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.99 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 99 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-099 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.100 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 100 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-100 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.101 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 101 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-101 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.102 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 102 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-102 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.103 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 103 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-103 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.104 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 104 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-104 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.105 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 105 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-105 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.106 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 106 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-106 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.107 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 107 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-107 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.108 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 108 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-108 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.109 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 109 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-109 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.110 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 110 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-110 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.111 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 111 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-111 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.112 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 112 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-112 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.113 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 113 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-113 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.114 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 114 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-114 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.115 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 115 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-115 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.116 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 116 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-116 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.117 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 117 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-117 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.118 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 118 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-118 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.119 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 119 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-119 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.120 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 120 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-120 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.121 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 121 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-121 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.122 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 122 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-122 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.123 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 123 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-123 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.124 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 124 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-124 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.125 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 125 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-125 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.126 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 126 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-126 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.127 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 127 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-127 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.128 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 128 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-128 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.129 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 129 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-129 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.130 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 130 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-130 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.131 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 131 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-131 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.132 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 132 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-132 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.133 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 133 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-133 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.134 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 134 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-134 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.135 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 135 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-135 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.136 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 136 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-136 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.137 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 137 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-137 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.138 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 138 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-138 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.139 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 139 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-139 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.140 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 140 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-140 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.141 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 141 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-141 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.142 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 142 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-142 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.143 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 143 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-143 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.144 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 144 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-144 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.145 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 145 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-145 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.146 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 146 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-146 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.147 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 147 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-147 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.148 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 148 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-148 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.149 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 149 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-149 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.150 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 150 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-150 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.151 — Reference note (30-faith-industries)

Cross-check PGVCL / MGVCL (Paschim Gujarat Vij / Madhya Gujarat Vij) tariff order effective date before customer calls. Process anchor: PVC stabilizer reactor and compounding line. Line 151 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-151 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |