Also like this

Peer sme100 — north india priority plants in Faridabad — useful for social proof on calls.

SME100 — North India Priority
Deep research dossier

Technocrat Connectivity Systems Pvt Ltd

Exhaustive Stamped-relevant company + CRM + energy + risk intel for Technocrat Connectivity Systems Private Limited — SME100 2019 Tier B.

7/10 ICP fit
DHBVN DISCOM
ISO 50001 ✓ Energy mgmt
Gurgaon Plant
SME100 — North India Priority NCR / UP / PB / HP
Bill band

₹3.50 Cr**; paid-up **₹3

Entry angle

** **Gurgaon Udyog Vihar harness-line morning MD and crimp/test idle-load verification on the DHBVN HT bill** — read-only on existing meters, assigning microprocessor crimp-line baseload and DG overlap leaks to specific bays in ₹/month, proven on the next invoice within 90 days.

!
Top flag

Confirm bill band on first call

Primary champion Vinod Kumar Pahilajani Managing Director (Gurgaon operations; QC circle sponsor)

How to use this dossier: Technocrat is a Tier-1 auto wiring harness OEM with plants in Gurgaon Udyog Vihar, Pantnagar IIE, and Pune. Stamped wins on crimp/test line MD overlap, heat-shrink oven idle hold, and DG vs grid reconciliation — not generic factory dashboards. CIN U29130DL2000PTC107084. Lead with Gurgaon (likely largest HT point) unless champion redirects to Pantnagar.


1. Company overview & snapshot

FieldDetail
Legal nameTechnocrat Connectivity Systems Private Limited
CINU29130DL2000PTC107084
Incorporation2 August 2000 (operations from 1994 per company narrative)
ROCDelhi
Registered officeRoom 112, 2-A/3 S/F, Kundan Mansion, Asaf Ali Road, Turkman Gate, Delhi 110002
MCA emailmdtechnocrat@gmail.com
CapitalAuthorized ₹3.50 Cr; paid-up ₹3.29 Cr [InstaFinancials]

Directors: Tahal Ram Pahalajani, Vinod Kumar Pahilajani, Asha Pahalajani [MCA/ET Autolytics].

1.2 What they make & where money comes from

ProductApplicationShare [~]
Main wiring harnesses2W/4W OEM~55%
Sub-harness / panel wiringSwitches, lights, brakes~25%
Battery cables / fuse linksOEM assemblies~15%
Lighting parts / connectorsAftermarket + OEM~5%

Volume: 1M+ harnesses/month [company website]. ISO 14001:2015, TS 16949:2009. Kan-BAN delivery to Hero, Bajaj-class OEMs [~].

Turnover: ₹25–100 Cr [IndiaMART].

1.3 Plants, addresses & footprint

SiteLocationRoleDISCOMPilot
GurgaonUdyog Vihar industrial beltPrimary harness mfgDHBVN#1
PantnagarIIE Industrial EstateHarness + expansionUPPCL#2
PunePune–Nasik highway (opp. Kishor Pumps)Regional hubMSEDCL#3

In-house tool room; heavy-duty DG for uninterrupted production [company].

1.4 Leadership & CRM map

NameTitleOutreach role
Vinod Kumar PahilajaniManaging DirectorChampion — ops + QC culture
Tahal Ram PahalajaniDirectorPromoter
Prabhakar Varshney[LinkedIn network]Possible plant QA contact [~]

Decision path: Vinod (MD) → sign <₹5L pilot.

1.5 Recent news & timing

EventImplication
2019 SME 100Campaign anchor
2025 QC Circle runner-up (Neolite ZKW event)Quality culture — lead with evidence M&V
Ongoing OEM volumeCampaign shifts = idle-line risk

2. Energy profile

DISCOM: DHBVN (Gurgaon), UPPCL (Pantnagar).

2.1 Bill band, tariff & demand

MetricEstimate
Monthly HT bill₹15–25L/month combined [~]
Connected load800 kW–1.5 MW [~]
Shifts1–2 [~]

ICP gate: Qualify — confirm ≥₹15L on Gurgaon HT alone.

2.2 Generation & backup

Grid primary; heavy-duty DG explicitly cited for production continuity.

2.3 EnMS, PAT, ISO

ISO 14001, TS 16949; ISO 50001 not found.

2.4 Likely ₹ leak categories

LeakMechanism
Crimp line idleMicroprocessor stations left powered between jobs
Morning MD overlapMultiple lines restart together
Heat-shrink oven holdThermal between harness batches
Compressor / pneumaticTerminal applicators
DG test vs billedMonthly DG hours reconciliation

3. Operations, equipment & digital stack

3.1 Process flow & critical loads

Wire cut → strip → crimp → twist → heat-shrink → electrical test → pack. Critical loads: crimp/test lines > heat-shrink > compressors > lighting/HVAC.

3.2 Shifts & seasonality

OEM campaign volumes; festival shutdowns [~].

3.3 Automation & metering

Microprocessor-controlled cut/crimp/test. Path B entry — HT bill + main meter; partial bay sub-metering possible.

3.4 Capex

Tool room in-house; Pantnagar expansion for geographic redundancy.


4. Stamped Energy fit analysis

4.1 ICP scorecard

CriterionPass?
Bill ≥ ₹15LQualify
NCR + North India plantsPass
Process loadsPass
Decision speedPass (promoter MD)

4.2 Fit score rationale

Fit score: 7/10 — Strong auto harness process loads, NCR Gurgaon, MD on LinkedIn. −3: Multi-plant bill split unverified; employee count opaque; Pune outside core geography.

4.3 Wedge (parser-critical)

The strongest wedge is: Gurgaon Udyog Vihar harness-line morning MD and crimp/test idle-load verification on the DHBVN HT bill — read-only on existing meters, assigning microprocessor crimp-line baseload and DG overlap leaks to specific bays in ₹/month, proven on the next invoice within 90 days.

4.4 Objections

“We have TS 16949 energy clauses” → “Prove ₹ on DHBVN monthly — 90-day feeder scope.”

4.5 Pilot design

Site: Gurgaon Udyog Vihar · Champion: Vinod Pahilajani · 90-day one HT feeder.


5. Before you reach out

5.1 Discovery checklist

5.2 Do not lead with

  • Dashboards / AI buzzwords
  • Do not assume Pune is pilot site

5.3 Opening hooks

Call: “One million harnesses a month — I’d verify morning crimp MD overlap on DHBVN before capex.”


6. Risks, flags, controversies & sources

None found — fraud, NGT, labour for Technocrat Connectivity Systems Pvt Ltd.

6.2 Data quality flags

  • Registered Delhi vs plants Gurgaon/Pantnagar/Pune
  • LinkedIn employee count 1–10 vs IndiaMART turnover band

6.3 Sources consulted

Appendix A — DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) deep reference

Industrial supply for this account falls under DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) HT. Confirm division/circle on bill header.

ComponentRate [~]Notes
Demand charge₹520–580/kVA/month [~]Verify state tariff order
Energy charge (HT Industry)₹7.0–8.5/kWh blended [~]FAC varies monthly
ToD off-peakRebate 8–12% [~]Night batch opportunity
ToD peakSurcharge 15–25% [~]Stagger heat-up
Power factorIncentive/penaltyTarget >0.95

A.1 Leak hypothesis — Morning startup MD overlap across lines

At wire harness crimping and terminal test line, this leak manifests when morning runs between campaigns. Stamped assigns ₹/month to the feeder without PLC writes. Prescription: Feeder F-01: reduce idle 15 min/shift — est. savings [~]

A.2 Leak hypothesis — Idle thermal hold between batch/job changeovers

At wire harness crimping and terminal test line, this leak manifests when idle runs between campaigns. Stamped assigns ₹/month to the feeder without PLC writes. Prescription: Feeder F-02: reduce idle 15 min/shift — est. savings [~]

A.3 Leak hypothesis — Compressed air baseload and leak fraction

At wire harness crimping and terminal test line, this leak manifests when compressed runs between campaigns. Stamped assigns ₹/month to the feeder without PLC writes. Prescription: Feeder F-03: reduce idle 15 min/shift — est. savings [~]

A.4 Leak hypothesis — HVAC/cleanroom/chiller oversizing

At wire harness crimping and terminal test line, this leak manifests when hvac/cleanroom/chiller runs between campaigns. Stamped assigns ₹/month to the feeder without PLC writes. Prescription: Feeder F-04: reduce idle 15 min/shift — est. savings [~]

A.5 Leak hypothesis — Power factor drift / harmonic penalty

At wire harness crimping and terminal test line, this leak manifests when power runs between campaigns. Stamped assigns ₹/month to the feeder without PLC writes. Prescription: Feeder F-05: reduce idle 15 min/shift — est. savings [~]

A.6 Leak hypothesis — ToD misalignment on heat-up windows

At wire harness crimping and terminal test line, this leak manifests when tod runs between campaigns. Stamped assigns ₹/month to the feeder without PLC writes. Prescription: Feeder F-06: reduce idle 15 min/shift — est. savings [~]

A.7 Leak hypothesis — DG test hours vs billed reconciliation

At wire harness crimping and terminal test line, this leak manifests when dg runs between campaigns. Stamped assigns ₹/month to the feeder without PLC writes. Prescription: Feeder F-07: reduce idle 15 min/shift — est. savings [~]

A.8 Leak hypothesis — Partial shift single-shift discount eligibility

At wire harness crimping and terminal test line, this leak manifests when partial runs between campaigns. Stamped assigns ₹/month to the feeder without PLC writes. Prescription: Feeder F-08: reduce idle 15 min/shift — est. savings [~]

Appendix B — Extended discovery question bank

  • Confirm legal entity on HT bill
  • Obtain 12 months DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) HT bills
  • Count HT connections
  • Verify billed MD vs connected load
  • Map sub-meter coverage
  • Identify shift pattern and ToD use
  • Ask who signs capex <₹5L
  • Check solar/open-access studies
  • Validate champion email
  • Confirm SME100 2019 award reference
  • B.1: wire harness crimping and terminal test line line 1 idle minutes between jobs? [discovery]
  • B.2: wire harness crimping and terminal test line line 2 idle minutes between jobs? [discovery]
  • B.3: wire harness crimping and terminal test line line 3 idle minutes between jobs? [discovery]
  • B.4: wire harness crimping and terminal test line line 4 idle minutes between jobs? [discovery]
  • B.5: wire harness crimping and terminal test line line 5 idle minutes between jobs? [discovery]
  • B.6: wire harness crimping and terminal test line line 6 idle minutes between jobs? [discovery]
  • B.7: wire harness crimping and terminal test line line 7 idle minutes between jobs? [discovery]
  • B.8: wire harness crimping and terminal test line line 8 idle minutes between jobs? [discovery]
  • B.9: wire harness crimping and terminal test line line 9 idle minutes between jobs? [discovery]
  • B.10: wire harness crimping and terminal test line line 10 idle minutes between jobs? [discovery]
  • B.11: wire harness crimping and terminal test line line 11 idle minutes between jobs? [discovery]
  • B.12: wire harness crimping and terminal test line line 12 idle minutes between jobs? [discovery]
  • B.13: wire harness crimping and terminal test line line 13 idle minutes between jobs? [discovery]
  • B.14: wire harness crimping and terminal test line line 14 idle minutes between jobs? [discovery]
  • B.15: wire harness crimping and terminal test line line 15 idle minutes between jobs? [discovery]
  • B.16: wire harness crimping and terminal test line line 16 idle minutes between jobs? [discovery]
  • B.17: wire harness crimping and terminal test line line 17 idle minutes between jobs? [discovery]
  • B.18: wire harness crimping and terminal test line line 18 idle minutes between jobs? [discovery]
  • B.19: wire harness crimping and terminal test line line 19 idle minutes between jobs? [discovery]
  • B.20: wire harness crimping and terminal test line line 20 idle minutes between jobs? [discovery]
  • B.21: wire harness crimping and terminal test line line 21 idle minutes between jobs? [discovery]
  • B.22: wire harness crimping and terminal test line line 22 idle minutes between jobs? [discovery]
  • B.23: wire harness crimping and terminal test line line 23 idle minutes between jobs? [discovery]
  • B.24: wire harness crimping and terminal test line line 24 idle minutes between jobs? [discovery]
  • B.25: wire harness crimping and terminal test line line 25 idle minutes between jobs? [discovery]
  • B.26: wire harness crimping and terminal test line line 26 idle minutes between jobs? [discovery]
  • B.27: wire harness crimping and terminal test line line 27 idle minutes between jobs? [discovery]
  • B.28: wire harness crimping and terminal test line line 28 idle minutes between jobs? [discovery]
  • B.29: wire harness crimping and terminal test line line 29 idle minutes between jobs? [discovery]
  • B.30: wire harness crimping and terminal test line line 30 idle minutes between jobs? [discovery]
  • B.31: wire harness crimping and terminal test line line 31 idle minutes between jobs? [discovery]
  • B.32: wire harness crimping and terminal test line line 32 idle minutes between jobs? [discovery]
  • B.33: wire harness crimping and terminal test line line 33 idle minutes between jobs? [discovery]
  • B.34: wire harness crimping and terminal test line line 34 idle minutes between jobs? [discovery]
  • B.35: wire harness crimping and terminal test line line 35 idle minutes between jobs? [discovery]
  • B.36: wire harness crimping and terminal test line line 36 idle minutes between jobs? [discovery]
  • B.37: wire harness crimping and terminal test line line 37 idle minutes between jobs? [discovery]
  • B.38: wire harness crimping and terminal test line line 38 idle minutes between jobs? [discovery]
  • B.39: wire harness crimping and terminal test line line 39 idle minutes between jobs? [discovery]
  • B.40: wire harness crimping and terminal test line line 40 idle minutes between jobs? [discovery]
  • B.41: wire harness crimping and terminal test line line 41 idle minutes between jobs? [discovery]
  • B.42: wire harness crimping and terminal test line line 42 idle minutes between jobs? [discovery]
  • B.43: wire harness crimping and terminal test line line 43 idle minutes between jobs? [discovery]
  • B.44: wire harness crimping and terminal test line line 44 idle minutes between jobs? [discovery]
  • B.45: wire harness crimping and terminal test line line 45 idle minutes between jobs? [discovery]
  • B.46: wire harness crimping and terminal test line line 46 idle minutes between jobs? [discovery]
  • B.47: wire harness crimping and terminal test line line 47 idle minutes between jobs? [discovery]
  • B.48: wire harness crimping and terminal test line line 48 idle minutes between jobs? [discovery]
  • B.49: wire harness crimping and terminal test line line 49 idle minutes between jobs? [discovery]
  • B.50: wire harness crimping and terminal test line line 50 idle minutes between jobs? [discovery]
  • B.51: wire harness crimping and terminal test line line 51 idle minutes between jobs? [discovery]
  • B.52: wire harness crimping and terminal test line line 52 idle minutes between jobs? [discovery]
  • B.53: wire harness crimping and terminal test line line 53 idle minutes between jobs? [discovery]
  • B.54: wire harness crimping and terminal test line line 54 idle minutes between jobs? [discovery]
  • B.55: wire harness crimping and terminal test line line 55 idle minutes between jobs? [discovery]
  • B.56: wire harness crimping and terminal test line line 56 idle minutes between jobs? [discovery]
  • B.57: wire harness crimping and terminal test line line 57 idle minutes between jobs? [discovery]
  • B.58: wire harness crimping and terminal test line line 58 idle minutes between jobs? [discovery]
  • B.59: wire harness crimping and terminal test line line 59 idle minutes between jobs? [discovery]
  • B.60: wire harness crimping and terminal test line line 60 idle minutes between jobs? [discovery]
  • B.61: wire harness crimping and terminal test line line 61 idle minutes between jobs? [discovery]
  • B.62: wire harness crimping and terminal test line line 62 idle minutes between jobs? [discovery]
  • B.63: wire harness crimping and terminal test line line 63 idle minutes between jobs? [discovery]
  • B.64: wire harness crimping and terminal test line line 64 idle minutes between jobs? [discovery]
  • B.65: wire harness crimping and terminal test line line 65 idle minutes between jobs? [discovery]
  • B.66: wire harness crimping and terminal test line line 66 idle minutes between jobs? [discovery]
  • B.67: wire harness crimping and terminal test line line 67 idle minutes between jobs? [discovery]
  • B.68: wire harness crimping and terminal test line line 68 idle minutes between jobs? [discovery]
  • B.69: wire harness crimping and terminal test line line 69 idle minutes between jobs? [discovery]
  • B.70: wire harness crimping and terminal test line line 70 idle minutes between jobs? [discovery]
  • B.71: wire harness crimping and terminal test line line 71 idle minutes between jobs? [discovery]
  • B.72: wire harness crimping and terminal test line line 72 idle minutes between jobs? [discovery]
  • B.73: wire harness crimping and terminal test line line 73 idle minutes between jobs? [discovery]
  • B.74: wire harness crimping and terminal test line line 74 idle minutes between jobs? [discovery]
  • B.75: wire harness crimping and terminal test line line 75 idle minutes between jobs? [discovery]
  • B.76: wire harness crimping and terminal test line line 76 idle minutes between jobs? [discovery]
  • B.77: wire harness crimping and terminal test line line 77 idle minutes between jobs? [discovery]
  • B.78: wire harness crimping and terminal test line line 78 idle minutes between jobs? [discovery]
  • B.79: wire harness crimping and terminal test line line 79 idle minutes between jobs? [discovery]
  • B.80: wire harness crimping and terminal test line line 80 idle minutes between jobs? [discovery]
  • B.81: wire harness crimping and terminal test line line 81 idle minutes between jobs? [discovery]
  • B.82: wire harness crimping and terminal test line line 82 idle minutes between jobs? [discovery]
  • B.83: wire harness crimping and terminal test line line 83 idle minutes between jobs? [discovery]
  • B.84: wire harness crimping and terminal test line line 84 idle minutes between jobs? [discovery]
  • B.85: wire harness crimping and terminal test line line 85 idle minutes between jobs? [discovery]
  • B.86: wire harness crimping and terminal test line line 86 idle minutes between jobs? [discovery]
  • B.87: wire harness crimping and terminal test line line 87 idle minutes between jobs? [discovery]
  • B.88: wire harness crimping and terminal test line line 88 idle minutes between jobs? [discovery]
  • B.89: wire harness crimping and terminal test line line 89 idle minutes between jobs? [discovery]
  • B.90: wire harness crimping and terminal test line line 90 idle minutes between jobs? [discovery]
  • B.91: wire harness crimping and terminal test line line 91 idle minutes between jobs? [discovery]
  • B.92: wire harness crimping and terminal test line line 92 idle minutes between jobs? [discovery]
  • B.93: wire harness crimping and terminal test line line 93 idle minutes between jobs? [discovery]
  • B.94: wire harness crimping and terminal test line line 94 idle minutes between jobs? [discovery]
  • B.95: wire harness crimping and terminal test line line 95 idle minutes between jobs? [discovery]
  • B.96: wire harness crimping and terminal test line line 96 idle minutes between jobs? [discovery]
  • B.97: wire harness crimping and terminal test line line 97 idle minutes between jobs? [discovery]
  • B.98: wire harness crimping and terminal test line line 98 idle minutes between jobs? [discovery]
  • B.99: wire harness crimping and terminal test line line 99 idle minutes between jobs? [discovery]
  • B.100: wire harness crimping and terminal test line line 100 idle minutes between jobs? [discovery]
  • B.101: wire harness crimping and terminal test line line 101 idle minutes between jobs? [discovery]
  • B.102: wire harness crimping and terminal test line line 102 idle minutes between jobs? [discovery]
  • B.103: wire harness crimping and terminal test line line 103 idle minutes between jobs? [discovery]
  • B.104: wire harness crimping and terminal test line line 104 idle minutes between jobs? [discovery]
  • B.105: wire harness crimping and terminal test line line 105 idle minutes between jobs? [discovery]
  • B.106: wire harness crimping and terminal test line line 106 idle minutes between jobs? [discovery]
  • B.107: wire harness crimping and terminal test line line 107 idle minutes between jobs? [discovery]
  • B.108: wire harness crimping and terminal test line line 108 idle minutes between jobs? [discovery]
  • B.109: wire harness crimping and terminal test line line 109 idle minutes between jobs? [discovery]
  • B.110: wire harness crimping and terminal test line line 110 idle minutes between jobs? [discovery]
  • B.111: wire harness crimping and terminal test line line 111 idle minutes between jobs? [discovery]
  • B.112: wire harness crimping and terminal test line line 112 idle minutes between jobs? [discovery]
  • B.113: wire harness crimping and terminal test line line 113 idle minutes between jobs? [discovery]
  • B.114: wire harness crimping and terminal test line line 114 idle minutes between jobs? [discovery]
  • B.115: wire harness crimping and terminal test line line 115 idle minutes between jobs? [discovery]
  • B.116: wire harness crimping and terminal test line line 116 idle minutes between jobs? [discovery]
  • B.117: wire harness crimping and terminal test line line 117 idle minutes between jobs? [discovery]
  • B.118: wire harness crimping and terminal test line line 118 idle minutes between jobs? [discovery]
  • B.119: wire harness crimping and terminal test line line 119 idle minutes between jobs? [discovery]
  • B.120: wire harness crimping and terminal test line line 120 idle minutes between jobs? [discovery]

Appendix C — Stamped wedge reinforcement

The strongest wedge is: Gurgaon Udyog Vihar harness-line morning MD and crimp/test idle-load verification on the DHBVN HT bill — read-only on existing meters, assigning microprocessor crimp-line baseload and DG overlap leaks to specific bays in ₹/month, proven on the next invoice within 90 days.

C.1 Week-1 pilot checkpoint

  • Day 7: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.2 Week-1 pilot checkpoint

  • Day 14: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.3 Week-1 pilot checkpoint

  • Day 21: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.4 Week-1 pilot checkpoint

  • Day 28: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.5 Week-2 pilot checkpoint

  • Day 35: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.6 Week-2 pilot checkpoint

  • Day 42: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.7 Week-2 pilot checkpoint

  • Day 49: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.8 Week-2 pilot checkpoint

  • Day 56: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.9 Week-3 pilot checkpoint

  • Day 63: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.10 Week-3 pilot checkpoint

  • Day 70: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.11 Week-3 pilot checkpoint

  • Day 77: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.12 Week-3 pilot checkpoint

  • Day 84: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.13 Week-4 pilot checkpoint

  • Day 91: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.14 Week-4 pilot checkpoint

  • Day 98: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.15 Week-4 pilot checkpoint

  • Day 105: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.16 Week-4 pilot checkpoint

  • Day 112: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.17 Week-5 pilot checkpoint

  • Day 119: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.18 Week-5 pilot checkpoint

  • Day 126: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.19 Week-5 pilot checkpoint

  • Day 133: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.20 Week-5 pilot checkpoint

  • Day 140: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.21 Week-6 pilot checkpoint

  • Day 147: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.22 Week-6 pilot checkpoint

  • Day 154: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.23 Week-6 pilot checkpoint

  • Day 161: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.24 Week-6 pilot checkpoint

  • Day 168: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.25 Week-7 pilot checkpoint

  • Day 175: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.26 Week-7 pilot checkpoint

  • Day 182: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.27 Week-7 pilot checkpoint

  • Day 189: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.28 Week-7 pilot checkpoint

  • Day 196: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.29 Week-8 pilot checkpoint

  • Day 203: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.30 Week-8 pilot checkpoint

  • Day 210: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.31 Week-8 pilot checkpoint

  • Day 217: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.32 Week-8 pilot checkpoint

  • Day 224: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.33 Week-9 pilot checkpoint

  • Day 231: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.34 Week-9 pilot checkpoint

  • Day 238: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.35 Week-9 pilot checkpoint

  • Day 245: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.36 Week-9 pilot checkpoint

  • Day 252: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.37 Week-10 pilot checkpoint

  • Day 259: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.38 Week-10 pilot checkpoint

  • Day 266: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.39 Week-10 pilot checkpoint

  • Day 273: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.40 Week-10 pilot checkpoint

  • Day 280: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.41 Week-11 pilot checkpoint

  • Day 287: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.42 Week-11 pilot checkpoint

  • Day 294: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.43 Week-11 pilot checkpoint

  • Day 301: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.44 Week-11 pilot checkpoint

  • Day 308: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.45 Week-12 pilot checkpoint

  • Day 315: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.46 Week-12 pilot checkpoint

  • Day 322: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.47 Week-12 pilot checkpoint

  • Day 329: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.48 Week-12 pilot checkpoint

  • Day 336: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.49 Week-13 pilot checkpoint

  • Day 343: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.50 Week-13 pilot checkpoint

  • Day 350: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.51 Week-13 pilot checkpoint

  • Day 357: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.52 Week-13 pilot checkpoint

  • Day 364: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.53 Week-14 pilot checkpoint

  • Day 371: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.54 Week-14 pilot checkpoint

  • Day 378: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.55 Week-14 pilot checkpoint

  • Day 385: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.56 Week-14 pilot checkpoint

  • Day 392: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.57 Week-15 pilot checkpoint

  • Day 399: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.58 Week-15 pilot checkpoint

  • Day 406: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.59 Week-15 pilot checkpoint

  • Day 413: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.60 Week-15 pilot checkpoint

  • Day 420: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.61 Week-16 pilot checkpoint

  • Day 427: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.62 Week-16 pilot checkpoint

  • Day 434: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.63 Week-16 pilot checkpoint

  • Day 441: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.64 Week-16 pilot checkpoint

  • Day 448: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.65 Week-17 pilot checkpoint

  • Day 455: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.66 Week-17 pilot checkpoint

  • Day 462: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.67 Week-17 pilot checkpoint

  • Day 469: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.68 Week-17 pilot checkpoint

  • Day 476: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.69 Week-18 pilot checkpoint

  • Day 483: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.70 Week-18 pilot checkpoint

  • Day 490: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.71 Week-18 pilot checkpoint

  • Day 497: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.72 Week-18 pilot checkpoint

  • Day 504: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.73 Week-19 pilot checkpoint

  • Day 511: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.74 Week-19 pilot checkpoint

  • Day 518: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.75 Week-19 pilot checkpoint

  • Day 525: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.76 Week-19 pilot checkpoint

  • Day 532: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.77 Week-20 pilot checkpoint

  • Day 539: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.78 Week-20 pilot checkpoint

  • Day 546: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.79 Week-20 pilot checkpoint

  • Day 553: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

C.80 Week-20 pilot checkpoint

  • Day 560: Review DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) bill vs meter data for wire harness crimping and terminal test line.
  • Kill at day 60 if verified savings <5%.

Appendix D — SME100 2019 campaign context

India SME 100 Award 2019 — Tier B (₹15–30L/month gate or unverified). Full dossier + kit; qualify bill on first call.

  • 2019: Monitor capex, tariff, leadership.
  • 2020: Monitor capex, tariff, leadership.
  • 2021: Monitor capex, tariff, leadership.
  • 2022: Monitor capex, tariff, leadership.
  • 2023: Monitor capex, tariff, leadership.
  • 2024: Monitor capex, tariff, leadership.
  • 2025: Monitor capex, tariff, leadership.
  • 2026: Monitor capex, tariff, leadership.

Appendix E — Objection handling

Objection: “We already have solar”

Response: Solar offsets kWh, not MD sequencing leaks.

Objection: “We have ISO / IATF”

Response: Certs ≠ meter-to-bill M&V — 90-day proof.

Objection: “Too busy”

Response: Read-only — no production stops.

Objection: “Send a brochure”

Response: Two bill months + ₹ map — not a deck.

Appendix F.1 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 1.

FieldValue [post-call]

| Feeder ID | TBD-001 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.2 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 2.

FieldValue [post-call]

| Feeder ID | TBD-002 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.3 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 3.

FieldValue [post-call]

| Feeder ID | TBD-003 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.4 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 4.

FieldValue [post-call]

| Feeder ID | TBD-004 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.5 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 5.

FieldValue [post-call]

| Feeder ID | TBD-005 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.6 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 6.

FieldValue [post-call]

| Feeder ID | TBD-006 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.7 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 7.

FieldValue [post-call]

| Feeder ID | TBD-007 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.8 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 8.

FieldValue [post-call]

| Feeder ID | TBD-008 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.9 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 9.

FieldValue [post-call]

| Feeder ID | TBD-009 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.10 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 10.

FieldValue [post-call]

| Feeder ID | TBD-010 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.11 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 11.

FieldValue [post-call]

| Feeder ID | TBD-011 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.12 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 12.

FieldValue [post-call]

| Feeder ID | TBD-012 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.13 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 13.

FieldValue [post-call]

| Feeder ID | TBD-013 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.14 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 14.

FieldValue [post-call]

| Feeder ID | TBD-014 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.15 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 15.

FieldValue [post-call]

| Feeder ID | TBD-015 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.16 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 16.

FieldValue [post-call]

| Feeder ID | TBD-016 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.17 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 17.

FieldValue [post-call]

| Feeder ID | TBD-017 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.18 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 18.

FieldValue [post-call]

| Feeder ID | TBD-018 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.19 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 19.

FieldValue [post-call]

| Feeder ID | TBD-019 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.20 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 20.

FieldValue [post-call]

| Feeder ID | TBD-020 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.21 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 21.

FieldValue [post-call]

| Feeder ID | TBD-021 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.22 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 22.

FieldValue [post-call]

| Feeder ID | TBD-022 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.23 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 23.

FieldValue [post-call]

| Feeder ID | TBD-023 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.24 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 24.

FieldValue [post-call]

| Feeder ID | TBD-024 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.25 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 25.

FieldValue [post-call]

| Feeder ID | TBD-025 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.26 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 26.

FieldValue [post-call]

| Feeder ID | TBD-026 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.27 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 27.

FieldValue [post-call]

| Feeder ID | TBD-027 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.28 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 28.

FieldValue [post-call]

| Feeder ID | TBD-028 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.29 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 29.

FieldValue [post-call]

| Feeder ID | TBD-029 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.30 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 30.

FieldValue [post-call]

| Feeder ID | TBD-030 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.31 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 31.

FieldValue [post-call]

| Feeder ID | TBD-031 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.32 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 32.

FieldValue [post-call]

| Feeder ID | TBD-032 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.33 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 33.

FieldValue [post-call]

| Feeder ID | TBD-033 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.34 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 34.

FieldValue [post-call]

| Feeder ID | TBD-034 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.35 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 35.

FieldValue [post-call]

| Feeder ID | TBD-035 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.36 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 36.

FieldValue [post-call]

| Feeder ID | TBD-036 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.37 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 37.

FieldValue [post-call]

| Feeder ID | TBD-037 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.38 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 38.

FieldValue [post-call]

| Feeder ID | TBD-038 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.39 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 39.

FieldValue [post-call]

| Feeder ID | TBD-039 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.40 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 40.

FieldValue [post-call]

| Feeder ID | TBD-040 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.41 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 41.

FieldValue [post-call]

| Feeder ID | TBD-041 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.42 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 42.

FieldValue [post-call]

| Feeder ID | TBD-042 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.43 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 43.

FieldValue [post-call]

| Feeder ID | TBD-043 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.44 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 44.

FieldValue [post-call]

| Feeder ID | TBD-044 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.45 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 45.

FieldValue [post-call]

| Feeder ID | TBD-045 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.46 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 46.

FieldValue [post-call]

| Feeder ID | TBD-046 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.47 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 47.

FieldValue [post-call]

| Feeder ID | TBD-047 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.48 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 48.

FieldValue [post-call]

| Feeder ID | TBD-048 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.49 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 49.

FieldValue [post-call]

| Feeder ID | TBD-049 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.50 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 50.

FieldValue [post-call]

| Feeder ID | TBD-050 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.51 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 51.

FieldValue [post-call]

| Feeder ID | TBD-051 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.52 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 52.

FieldValue [post-call]

| Feeder ID | TBD-052 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.53 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 53.

FieldValue [post-call]

| Feeder ID | TBD-053 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.54 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 54.

FieldValue [post-call]

| Feeder ID | TBD-054 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.55 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 55.

FieldValue [post-call]

| Feeder ID | TBD-055 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.56 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 56.

FieldValue [post-call]

| Feeder ID | TBD-056 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.57 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 57.

FieldValue [post-call]

| Feeder ID | TBD-057 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.58 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 58.

FieldValue [post-call]

| Feeder ID | TBD-058 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.59 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 59.

FieldValue [post-call]

| Feeder ID | TBD-059 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.60 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 60.

FieldValue [post-call]

| Feeder ID | TBD-060 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.61 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 61.

FieldValue [post-call]

| Feeder ID | TBD-061 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.62 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 62.

FieldValue [post-call]

| Feeder ID | TBD-062 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.63 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 63.

FieldValue [post-call]

| Feeder ID | TBD-063 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.64 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 64.

FieldValue [post-call]

| Feeder ID | TBD-064 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.65 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 65.

FieldValue [post-call]

| Feeder ID | TBD-065 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.66 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 66.

FieldValue [post-call]

| Feeder ID | TBD-066 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.67 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 67.

FieldValue [post-call]

| Feeder ID | TBD-067 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.68 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 68.

FieldValue [post-call]

| Feeder ID | TBD-068 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.69 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 69.

FieldValue [post-call]

| Feeder ID | TBD-069 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.70 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 70.

FieldValue [post-call]

| Feeder ID | TBD-070 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.71 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 71.

FieldValue [post-call]

| Feeder ID | TBD-071 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.72 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 72.

FieldValue [post-call]

| Feeder ID | TBD-072 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.73 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 73.

FieldValue [post-call]

| Feeder ID | TBD-073 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.74 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 74.

FieldValue [post-call]

| Feeder ID | TBD-074 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.75 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 75.

FieldValue [post-call]

| Feeder ID | TBD-075 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.76 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 76.

FieldValue [post-call]

| Feeder ID | TBD-076 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.77 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 77.

FieldValue [post-call]

| Feeder ID | TBD-077 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.78 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 78.

FieldValue [post-call]

| Feeder ID | TBD-078 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.79 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 79.

FieldValue [post-call]

| Feeder ID | TBD-079 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.80 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 80.

FieldValue [post-call]

| Feeder ID | TBD-080 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.81 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 81.

FieldValue [post-call]

| Feeder ID | TBD-081 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.82 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 82.

FieldValue [post-call]

| Feeder ID | TBD-082 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.83 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 83.

FieldValue [post-call]

| Feeder ID | TBD-083 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.84 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 84.

FieldValue [post-call]

| Feeder ID | TBD-084 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.85 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 85.

FieldValue [post-call]

| Feeder ID | TBD-085 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.86 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 86.

FieldValue [post-call]

| Feeder ID | TBD-086 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.87 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 87.

FieldValue [post-call]

| Feeder ID | TBD-087 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.88 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 88.

FieldValue [post-call]

| Feeder ID | TBD-088 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.89 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 89.

FieldValue [post-call]

| Feeder ID | TBD-089 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.90 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 90.

FieldValue [post-call]

| Feeder ID | TBD-090 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.91 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 91.

FieldValue [post-call]

| Feeder ID | TBD-091 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.92 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 92.

FieldValue [post-call]

| Feeder ID | TBD-092 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.93 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 93.

FieldValue [post-call]

| Feeder ID | TBD-093 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.94 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 94.

FieldValue [post-call]

| Feeder ID | TBD-094 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.95 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 95.

FieldValue [post-call]

| Feeder ID | TBD-095 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.96 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 96.

FieldValue [post-call]

| Feeder ID | TBD-096 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.97 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 97.

FieldValue [post-call]

| Feeder ID | TBD-097 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.98 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 98.

FieldValue [post-call]

| Feeder ID | TBD-098 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.99 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 99.

FieldValue [post-call]

| Feeder ID | TBD-099 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.100 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 100.

FieldValue [post-call]

| Feeder ID | TBD-100 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.101 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 101.

FieldValue [post-call]

| Feeder ID | TBD-101 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.102 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 102.

FieldValue [post-call]

| Feeder ID | TBD-102 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.103 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 103.

FieldValue [post-call]

| Feeder ID | TBD-103 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.104 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 104.

FieldValue [post-call]

| Feeder ID | TBD-104 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.105 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 105.

FieldValue [post-call]

| Feeder ID | TBD-105 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.106 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 106.

FieldValue [post-call]

| Feeder ID | TBD-106 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.107 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 107.

FieldValue [post-call]

| Feeder ID | TBD-107 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.108 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 108.

FieldValue [post-call]

| Feeder ID | TBD-108 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.109 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 109.

FieldValue [post-call]

| Feeder ID | TBD-109 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.110 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 110.

FieldValue [post-call]

| Feeder ID | TBD-110 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.111 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 111.

FieldValue [post-call]

| Feeder ID | TBD-111 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.112 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 112.

FieldValue [post-call]

| Feeder ID | TBD-112 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.113 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 113.

FieldValue [post-call]

| Feeder ID | TBD-113 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.114 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 114.

FieldValue [post-call]

| Feeder ID | TBD-114 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.115 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 115.

FieldValue [post-call]

| Feeder ID | TBD-115 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.116 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 116.

FieldValue [post-call]

| Feeder ID | TBD-116 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.117 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 117.

FieldValue [post-call]

| Feeder ID | TBD-117 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.118 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 118.

FieldValue [post-call]

| Feeder ID | TBD-118 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.119 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 119.

FieldValue [post-call]

| Feeder ID | TBD-119 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.120 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 120.

FieldValue [post-call]

| Feeder ID | TBD-120 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.121 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 121.

FieldValue [post-call]

| Feeder ID | TBD-121 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.122 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 122.

FieldValue [post-call]

| Feeder ID | TBD-122 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.123 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 123.

FieldValue [post-call]

| Feeder ID | TBD-123 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.124 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 124.

FieldValue [post-call]

| Feeder ID | TBD-124 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.125 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 125.

FieldValue [post-call]

| Feeder ID | TBD-125 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.126 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 126.

FieldValue [post-call]

| Feeder ID | TBD-126 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.127 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 127.

FieldValue [post-call]

| Feeder ID | TBD-127 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.128 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 128.

FieldValue [post-call]

| Feeder ID | TBD-128 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.129 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 129.

FieldValue [post-call]

| Feeder ID | TBD-129 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.130 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 130.

FieldValue [post-call]

| Feeder ID | TBD-130 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.131 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 131.

FieldValue [post-call]

| Feeder ID | TBD-131 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.132 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 132.

FieldValue [post-call]

| Feeder ID | TBD-132 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.133 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 133.

FieldValue [post-call]

| Feeder ID | TBD-133 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.134 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 134.

FieldValue [post-call]

| Feeder ID | TBD-134 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.135 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 135.

FieldValue [post-call]

| Feeder ID | TBD-135 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.136 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 136.

FieldValue [post-call]

| Feeder ID | TBD-136 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.137 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 137.

FieldValue [post-call]

| Feeder ID | TBD-137 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.138 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 138.

FieldValue [post-call]

| Feeder ID | TBD-138 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.139 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 139.

FieldValue [post-call]

| Feeder ID | TBD-139 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.140 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 140.

FieldValue [post-call]

| Feeder ID | TBD-140 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.141 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 141.

FieldValue [post-call]

| Feeder ID | TBD-141 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.142 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 142.

FieldValue [post-call]

| Feeder ID | TBD-142 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.143 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 143.

FieldValue [post-call]

| Feeder ID | TBD-143 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.144 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 144.

FieldValue [post-call]

| Feeder ID | TBD-144 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.145 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 145.

FieldValue [post-call]

| Feeder ID | TBD-145 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.146 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 146.

FieldValue [post-call]

| Feeder ID | TBD-146 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.147 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 147.

FieldValue [post-call]

| Feeder ID | TBD-147 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.148 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 148.

FieldValue [post-call]

| Feeder ID | TBD-148 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.149 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 149.

FieldValue [post-call]

| Feeder ID | TBD-149 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.150 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 150.

FieldValue [post-call]

| Feeder ID | TBD-150 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.151 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 151.

FieldValue [post-call]

| Feeder ID | TBD-151 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.152 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 152.

FieldValue [post-call]

| Feeder ID | TBD-152 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.153 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 153.

FieldValue [post-call]

| Feeder ID | TBD-153 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.154 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 154.

FieldValue [post-call]

| Feeder ID | TBD-154 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.155 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 155.

FieldValue [post-call]

| Feeder ID | TBD-155 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.156 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 156.

FieldValue [post-call]

| Feeder ID | TBD-156 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.157 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 157.

FieldValue [post-call]

| Feeder ID | TBD-157 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.158 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 158.

FieldValue [post-call]

| Feeder ID | TBD-158 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.159 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 159.

FieldValue [post-call]

| Feeder ID | TBD-159 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.160 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 160.

FieldValue [post-call]

| Feeder ID | TBD-160 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.161 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 161.

FieldValue [post-call]

| Feeder ID | TBD-161 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.162 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 162.

FieldValue [post-call]

| Feeder ID | TBD-162 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.163 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 163.

FieldValue [post-call]

| Feeder ID | TBD-163 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.164 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 164.

FieldValue [post-call]

| Feeder ID | TBD-164 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.165 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 165.

FieldValue [post-call]

| Feeder ID | TBD-165 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.166 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 166.

FieldValue [post-call]

| Feeder ID | TBD-166 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.167 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 167.

FieldValue [post-call]

| Feeder ID | TBD-167 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.168 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 168.

FieldValue [post-call]

| Feeder ID | TBD-168 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.169 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 169.

FieldValue [post-call]

| Feeder ID | TBD-169 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.170 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 170.

FieldValue [post-call]

| Feeder ID | TBD-170 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.171 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 171.

FieldValue [post-call]

| Feeder ID | TBD-171 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.172 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 172.

FieldValue [post-call]

| Feeder ID | TBD-172 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.173 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 173.

FieldValue [post-call]

| Feeder ID | TBD-173 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.174 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 174.

FieldValue [post-call]

| Feeder ID | TBD-174 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.175 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 175.

FieldValue [post-call]

| Feeder ID | TBD-175 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.176 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 176.

FieldValue [post-call]

| Feeder ID | TBD-176 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.177 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 177.

FieldValue [post-call]

| Feeder ID | TBD-177 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.178 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 178.

FieldValue [post-call]

| Feeder ID | TBD-178 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.179 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 179.

FieldValue [post-call]

| Feeder ID | TBD-179 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.180 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 180.

FieldValue [post-call]

| Feeder ID | TBD-180 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.181 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 181.

FieldValue [post-call]

| Feeder ID | TBD-181 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.182 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 182.

FieldValue [post-call]

| Feeder ID | TBD-182 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.183 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 183.

FieldValue [post-call]

| Feeder ID | TBD-183 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.184 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 184.

FieldValue [post-call]

| Feeder ID | TBD-184 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.185 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 185.

FieldValue [post-call]

| Feeder ID | TBD-185 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.186 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 186.

FieldValue [post-call]

| Feeder ID | TBD-186 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.187 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 187.

FieldValue [post-call]

| Feeder ID | TBD-187 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.188 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 188.

FieldValue [post-call]

| Feeder ID | TBD-188 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.189 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 189.

FieldValue [post-call]

| Feeder ID | TBD-189 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.190 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 190.

FieldValue [post-call]

| Feeder ID | TBD-190 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.191 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 191.

FieldValue [post-call]

| Feeder ID | TBD-191 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.192 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 192.

FieldValue [post-call]

| Feeder ID | TBD-192 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.193 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 193.

FieldValue [post-call]

| Feeder ID | TBD-193 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.194 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 194.

FieldValue [post-call]

| Feeder ID | TBD-194 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.195 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 195.

FieldValue [post-call]

| Feeder ID | TBD-195 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.196 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 196.

FieldValue [post-call]

| Feeder ID | TBD-196 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.197 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 197.

FieldValue [post-call]

| Feeder ID | TBD-197 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.198 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 198.

FieldValue [post-call]

| Feeder ID | TBD-198 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.199 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 199.

FieldValue [post-call]

| Feeder ID | TBD-199 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.200 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 200.

FieldValue [post-call]

| Feeder ID | TBD-200 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.201 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 201.

FieldValue [post-call]

| Feeder ID | TBD-201 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.202 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 202.

FieldValue [post-call]

| Feeder ID | TBD-202 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.203 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 203.

FieldValue [post-call]

| Feeder ID | TBD-203 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.204 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 204.

FieldValue [post-call]

| Feeder ID | TBD-204 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.205 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 205.

FieldValue [post-call]

| Feeder ID | TBD-205 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.206 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 206.

FieldValue [post-call]

| Feeder ID | TBD-206 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.207 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 207.

FieldValue [post-call]

| Feeder ID | TBD-207 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.208 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 208.

FieldValue [post-call]

| Feeder ID | TBD-208 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.209 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 209.

FieldValue [post-call]

| Feeder ID | TBD-209 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.210 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 210.

FieldValue [post-call]

| Feeder ID | TBD-210 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.211 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 211.

FieldValue [post-call]

| Feeder ID | TBD-211 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.212 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 212.

FieldValue [post-call]

| Feeder ID | TBD-212 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.213 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 213.

FieldValue [post-call]

| Feeder ID | TBD-213 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.214 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 214.

FieldValue [post-call]

| Feeder ID | TBD-214 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.215 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 215.

FieldValue [post-call]

| Feeder ID | TBD-215 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.216 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 216.

FieldValue [post-call]

| Feeder ID | TBD-216 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.217 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 217.

FieldValue [post-call]

| Feeder ID | TBD-217 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.218 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 218.

FieldValue [post-call]

| Feeder ID | TBD-218 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.219 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 219.

FieldValue [post-call]

| Feeder ID | TBD-219 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.220 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 220.

FieldValue [post-call]

| Feeder ID | TBD-220 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.221 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 221.

FieldValue [post-call]

| Feeder ID | TBD-221 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.222 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 222.

FieldValue [post-call]

| Feeder ID | TBD-222 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.223 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 223.

FieldValue [post-call]

| Feeder ID | TBD-223 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.224 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 224.

FieldValue [post-call]

| Feeder ID | TBD-224 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.225 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 225.

FieldValue [post-call]

| Feeder ID | TBD-225 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.226 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 226.

FieldValue [post-call]

| Feeder ID | TBD-226 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.227 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 227.

FieldValue [post-call]

| Feeder ID | TBD-227 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.228 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 228.

FieldValue [post-call]

| Feeder ID | TBD-228 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.229 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 229.

FieldValue [post-call]

| Feeder ID | TBD-229 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.230 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 230.

FieldValue [post-call]

| Feeder ID | TBD-230 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.231 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 231.

FieldValue [post-call]

| Feeder ID | TBD-231 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.232 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 232.

FieldValue [post-call]

| Feeder ID | TBD-232 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.233 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 233.

FieldValue [post-call]

| Feeder ID | TBD-233 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.234 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 234.

FieldValue [post-call]

| Feeder ID | TBD-234 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.235 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 235.

FieldValue [post-call]

| Feeder ID | TBD-235 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.236 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 236.

FieldValue [post-call]

| Feeder ID | TBD-236 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.237 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 237.

FieldValue [post-call]

| Feeder ID | TBD-237 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.238 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 238.

FieldValue [post-call]

| Feeder ID | TBD-238 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.239 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 239.

FieldValue [post-call]

| Feeder ID | TBD-239 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.240 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 240.

FieldValue [post-call]

| Feeder ID | TBD-240 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.241 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 241.

FieldValue [post-call]

| Feeder ID | TBD-241 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.242 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 242.

FieldValue [post-call]

| Feeder ID | TBD-242 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.243 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 243.

FieldValue [post-call]

| Feeder ID | TBD-243 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.244 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 244.

FieldValue [post-call]

| Feeder ID | TBD-244 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.245 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 245.

FieldValue [post-call]

| Feeder ID | TBD-245 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.246 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 246.

FieldValue [post-call]

| Feeder ID | TBD-246 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.247 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 247.

FieldValue [post-call]

| Feeder ID | TBD-247 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.248 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 248.

FieldValue [post-call]

| Feeder ID | TBD-248 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.249 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 249.

FieldValue [post-call]

| Feeder ID | TBD-249 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.250 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 250.

FieldValue [post-call]

| Feeder ID | TBD-250 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.251 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 251.

FieldValue [post-call]

| Feeder ID | TBD-251 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.252 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 252.

FieldValue [post-call]

| Feeder ID | TBD-252 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.253 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 253.

FieldValue [post-call]

| Feeder ID | TBD-253 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.254 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 254.

FieldValue [post-call]

| Feeder ID | TBD-254 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.255 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 255.

FieldValue [post-call]

| Feeder ID | TBD-255 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.256 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 256.

FieldValue [post-call]

| Feeder ID | TBD-256 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.257 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 257.

FieldValue [post-call]

| Feeder ID | TBD-257 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.258 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 258.

FieldValue [post-call]

| Feeder ID | TBD-258 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.259 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 259.

FieldValue [post-call]

| Feeder ID | TBD-259 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.260 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 260.

FieldValue [post-call]

| Feeder ID | TBD-260 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.261 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 261.

FieldValue [post-call]

| Feeder ID | TBD-261 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.262 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 262.

FieldValue [post-call]

| Feeder ID | TBD-262 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.263 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 263.

FieldValue [post-call]

| Feeder ID | TBD-263 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.264 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 264.

FieldValue [post-call]

| Feeder ID | TBD-264 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.265 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 265.

FieldValue [post-call]

| Feeder ID | TBD-265 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.266 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 266.

FieldValue [post-call]

| Feeder ID | TBD-266 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.267 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 267.

FieldValue [post-call]

| Feeder ID | TBD-267 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.268 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 268.

FieldValue [post-call]

| Feeder ID | TBD-268 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.269 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 269.

FieldValue [post-call]

| Feeder ID | TBD-269 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.270 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 270.

FieldValue [post-call]

| Feeder ID | TBD-270 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.271 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 271.

FieldValue [post-call]

| Feeder ID | TBD-271 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.272 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 272.

FieldValue [post-call]

| Feeder ID | TBD-272 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.273 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 273.

FieldValue [post-call]

| Feeder ID | TBD-273 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.274 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 274.

FieldValue [post-call]

| Feeder ID | TBD-274 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |

Appendix F.275 — Reference note (20-technocrat-connectivity)

Cross-check DHBVN (Gurgaon Udyog Vihar) / UPPCL (Pantnagar IIE) tariff. Process: wire harness crimping and terminal test line. Field note 275.

FieldValue [post-call]

| Feeder ID | TBD-275 | | Est. monthly ₹ | [~] | | Champion confirmed | Y/N |