Also like this

Peer sme100 — north india priority plants in Faridabad — useful for social proof on calls.

SME100 — North India Priority
Deep research dossier

Rajshi Technologies India Pvt Ltd

Exhaustive Stamped-relevant company + CRM + energy + risk intel for Rajshi Technologies India Private Limited — SME100 2019 Tier B.

7/10 ICP fit
MVVNL DISCOM
ISO 50001 ✓ Energy mgmt
SME100 — North India Priority NCR / UP / PB / HP
Bill band

₹30L; above ₹15L on mid-case

Entry angle

** **Rae Bareli Site 1 furnace and die-preheat idle-load verification on the UPPCL HT bill** — read-only on existing meters, assigning melt hold and hydraulic press MD leaks to specific die lines in ₹/month, proven on the next invoice within 90 days.

!
Top flag

Confirm bill band on first call

Primary champion Abhinav Lakhotia Owner / Director

How to use this dossier: Rajshi (trade name Rajshi Industries) is a non-ferrous die casting and CNC shop with plants at Rae Bareli Industrial Estate and Greater Noida EPIP. Stamped lead site: Rae Bareli Site 1 (melting furnaces, PDC/GDC, export components). CIN U29253UP2010PTC041377 — do not confuse with unrelated Rajshi Techno Services. Bill band unverified — Tier B qualify on first call.


1. Company overview & snapshot

FieldDetail
Legal nameRajshi Technologies India Private Limited
Trade nameRajshi Industries
CINU29253UP2010PTC041377
Incorporation19 July 2010 (operating since 1988 per company narrative)
ROCKanpur / UP
Registered officeB-005, Site EPIP, Greater Noida, UP 201308

Directors: Ashok Kumar Lakhotia (DIN 01222903), Abhinav Lakhotia (DIN 01727891).

Certification: ISO 9001:2008/2015 MAX Certifications No. 10249-QMS-249.

1.2 What they make & where money comes from

Aluminium/zinc/brass pressure die casting, gravity die casting, sand casting, shell moulding, CNC machining, sheet metal, assembly.

ProcessEnd markets
PDC / GDCAuto, electrical, defence, infrastructure
CNC shopPrecision export components
Zinc/brassHardware, fasteners

Export footprint claimed globally [company site].

1.3 Plants, addresses & footprint

PlantAddressDISCOMPriority
Rae Bareli2, Industrial Estate, Site 1, Sultanpur Road, Rae Bareli 229010UPPCL/MVVNL#1 pilot
Greater NoidaB-5, EPIP, Kasna, Site V, Greater Noida 201306NPCL/PVVNL [~]Phase 2

1.4 Leadership & CRM map

NameRole
Abhinav LakhotiaOwner / Director — primary outreach
Ashok Kumar LakhotiaDirector (founder)
A.K. LakhotiaHistorical founder narrative

Abhinav LinkedIn: https://www.linkedin.com/in/abhinav-lakhotia-a5292818

1.5 Recent news

Limited public news. Website relaunch 2010 era. SME 100 2019 — campaign anchor.


2. Energy profile

DISCOM: UPPCL via MVVNL for Rae Bareli district industrial estate.

2.1 Bill band

MetricEstimate
Monthly HT bill (Rae Bareli)₹12–22L/month [~]
Furnace + die heatDominant
Compressors / hydraulicsSecondary

ICP gate: Qualify — may be below ₹30L; above ₹15L on mid-case.

2.2 Renewables / captive

No public solar or captive [~].

2.3 EnMS

ISO 9001 only; ISO 50001 not found.

2.4 Likely leaks

Furnace idle between pours; die preheat overlap; melting + holding dual furnaces; CNC shop at Noida separate meter.


3. Operations, equipment & digital stack

3.1 Process flow

Melting → holding → die cast (PDC/GDC) → trim → CNC → finish/QC (CMM, tensile).

3.2 Shifts

Export batches — likely 1–2 shifts [~].

3.3 Metering

Path B — HT main; suggest sub-meter on furnace feeders post-pilot scoping.


4. Stamped Energy fit analysis

4.1 ICP scorecard

Geography Pass (UP priority belt). Bill Qualify. Process Pass (foundry).

4.2 Fit score rationale

Fit score: 7/10 — Good process fit, owner-operated, North India. −3: Bill unverified; dual-plant complexity; thin public financials.

4.3 Wedge (parser-critical)

The strongest wedge is: Rae Bareli Site 1 furnace and die-preheat idle-load verification on the UPPCL HT bill — read-only on existing meters, assigning melt hold and hydraulic press MD leaks to specific die lines in ₹/month, proven on the next invoice within 90 days.

4.5 Pilot

Rae Bareli Site 1 · 90-day · Abhinav Lakhotia champion.


5. Before you reach out

Qualify ≥₹15L/month on HT bill before scaling outbound.

5.2 Do not lead with

  • Do not assume Greater Noida is pilot site — Rae Bareli first

6. Risks, flags, controversies & sources

6.1 Integrity

None found for Rajshi Technologies India Pvt Ltd.

6.2 Data quality

Entity name collision with Rajshi Industries vs Rajshi Technologies — same group [~].

6.3 Sources

Appendix A — UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) deep reference

Both industrial estates in this account fall under UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) HT supply. Typical connection: 11 kV or 33 kV with dedicated transformer on plot. Confirm division/circle on bill header before quoting tariff components.

ComponentRate [~]Notes
Demand charge₹555/kVA/month [~]Fixed MD billing; verify DHBVN/UPPCL schedule
Energy charge (HT Industry)₹7.0–8.5/kWh blended [~]FAC + wheeling varies monthly
ToD Slot 1 (00:00–06:00)Rebate 10% [~]Night batch / preheat opportunity
ToD peak slotSurcharge 20–25% [~]Avoid heat-up during peak if dual-shift
Power factorIncentive/penaltyVerify >0.95 on bill

A.1 Leak hypothesis — Morning startup MD overlap across lines

At aluminium pressure die casting furnace line, this leak typically manifests when operators keep morning running between campaigns. Stamped assigns ₹/month to the responsible feeder without PLC writes. Prescription template: “Feeder F-01: reduce idle window by 15 min/shift — est. ₹{amount}/month [~]

A.2 Leak hypothesis — Idle thermal hold between batch/job changeovers

At aluminium pressure die casting furnace line, this leak typically manifests when operators keep idle running between campaigns. Stamped assigns ₹/month to the responsible feeder without PLC writes. Prescription template: “Feeder F-02: reduce idle window by 15 min/shift — est. ₹{amount}/month [~]

A.3 Leak hypothesis — Compressed air baseload and leak fraction

At aluminium pressure die casting furnace line, this leak typically manifests when operators keep compressed running between campaigns. Stamped assigns ₹/month to the responsible feeder without PLC writes. Prescription template: “Feeder F-03: reduce idle window by 15 min/shift — est. ₹{amount}/month [~]

A.4 Leak hypothesis — HVAC/cleanroom/chiller oversizing

At aluminium pressure die casting furnace line, this leak typically manifests when operators keep hvac/cleanroom/chiller running between campaigns. Stamped assigns ₹/month to the responsible feeder without PLC writes. Prescription template: “Feeder F-04: reduce idle window by 15 min/shift — est. ₹{amount}/month [~]

A.5 Leak hypothesis — Power factor drift / harmonic penalty

At aluminium pressure die casting furnace line, this leak typically manifests when operators keep power running between campaigns. Stamped assigns ₹/month to the responsible feeder without PLC writes. Prescription template: “Feeder F-05: reduce idle window by 15 min/shift — est. ₹{amount}/month [~]

A.6 Leak hypothesis — ToD misalignment on heat-up windows

At aluminium pressure die casting furnace line, this leak typically manifests when operators keep tod running between campaigns. Stamped assigns ₹/month to the responsible feeder without PLC writes. Prescription template: “Feeder F-06: reduce idle window by 15 min/shift — est. ₹{amount}/month [~]

A.7 Leak hypothesis — DG test hours vs billed reconciliation

At aluminium pressure die casting furnace line, this leak typically manifests when operators keep dg running between campaigns. Stamped assigns ₹/month to the responsible feeder without PLC writes. Prescription template: “Feeder F-07: reduce idle window by 15 min/shift — est. ₹{amount}/month [~]

A.8 Leak hypothesis — Partial shift single-shift discount eligibility

At aluminium pressure die casting furnace line, this leak typically manifests when operators keep partial running between campaigns. Stamped assigns ₹/month to the responsible feeder without PLC writes. Prescription template: “Feeder F-08: reduce idle window by 15 min/shift — est. ₹{amount}/month [~]

Appendix B — Extended discovery question bank

  • Confirm legal entity on HT bill matches outreach target
  • Obtain 12 months UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) HT bills (PDF + CSV if AMR export exists)
  • Count HT connections — separate vs pooled
  • Verify billed MD vs connected load
  • Map sub-meter coverage on critical feeders
  • Identify shift pattern and ToD slot utilisation
  • Ask who signs capex <₹5L
  • Check for open-access or solar PPA studies in progress
  • Validate champion email before send
  • Confirm SME100 2019 award still referenced internally
  • B.1: What is aluminium pressure die casting furnace line line 1’s average idle minutes between jobs on day shift? [discovery]
  • B.2: What is aluminium pressure die casting furnace line line 2’s average idle minutes between jobs on day shift? [discovery]
  • B.3: What is aluminium pressure die casting furnace line line 3’s average idle minutes between jobs on day shift? [discovery]
  • B.4: What is aluminium pressure die casting furnace line line 4’s average idle minutes between jobs on day shift? [discovery]
  • B.5: What is aluminium pressure die casting furnace line line 5’s average idle minutes between jobs on day shift? [discovery]
  • B.6: What is aluminium pressure die casting furnace line line 6’s average idle minutes between jobs on day shift? [discovery]
  • B.7: What is aluminium pressure die casting furnace line line 7’s average idle minutes between jobs on day shift? [discovery]
  • B.8: What is aluminium pressure die casting furnace line line 8’s average idle minutes between jobs on day shift? [discovery]
  • B.9: What is aluminium pressure die casting furnace line line 9’s average idle minutes between jobs on day shift? [discovery]
  • B.10: What is aluminium pressure die casting furnace line line 10’s average idle minutes between jobs on day shift? [discovery]
  • B.11: What is aluminium pressure die casting furnace line line 11’s average idle minutes between jobs on day shift? [discovery]
  • B.12: What is aluminium pressure die casting furnace line line 12’s average idle minutes between jobs on day shift? [discovery]
  • B.13: What is aluminium pressure die casting furnace line line 13’s average idle minutes between jobs on day shift? [discovery]
  • B.14: What is aluminium pressure die casting furnace line line 14’s average idle minutes between jobs on day shift? [discovery]
  • B.15: What is aluminium pressure die casting furnace line line 15’s average idle minutes between jobs on day shift? [discovery]
  • B.16: What is aluminium pressure die casting furnace line line 16’s average idle minutes between jobs on day shift? [discovery]
  • B.17: What is aluminium pressure die casting furnace line line 17’s average idle minutes between jobs on day shift? [discovery]
  • B.18: What is aluminium pressure die casting furnace line line 18’s average idle minutes between jobs on day shift? [discovery]
  • B.19: What is aluminium pressure die casting furnace line line 19’s average idle minutes between jobs on day shift? [discovery]
  • B.20: What is aluminium pressure die casting furnace line line 20’s average idle minutes between jobs on day shift? [discovery]
  • B.21: What is aluminium pressure die casting furnace line line 21’s average idle minutes between jobs on day shift? [discovery]
  • B.22: What is aluminium pressure die casting furnace line line 22’s average idle minutes between jobs on day shift? [discovery]
  • B.23: What is aluminium pressure die casting furnace line line 23’s average idle minutes between jobs on day shift? [discovery]
  • B.24: What is aluminium pressure die casting furnace line line 24’s average idle minutes between jobs on day shift? [discovery]
  • B.25: What is aluminium pressure die casting furnace line line 25’s average idle minutes between jobs on day shift? [discovery]
  • B.26: What is aluminium pressure die casting furnace line line 26’s average idle minutes between jobs on day shift? [discovery]
  • B.27: What is aluminium pressure die casting furnace line line 27’s average idle minutes between jobs on day shift? [discovery]
  • B.28: What is aluminium pressure die casting furnace line line 28’s average idle minutes between jobs on day shift? [discovery]
  • B.29: What is aluminium pressure die casting furnace line line 29’s average idle minutes between jobs on day shift? [discovery]
  • B.30: What is aluminium pressure die casting furnace line line 30’s average idle minutes between jobs on day shift? [discovery]
  • B.31: What is aluminium pressure die casting furnace line line 31’s average idle minutes between jobs on day shift? [discovery]
  • B.32: What is aluminium pressure die casting furnace line line 32’s average idle minutes between jobs on day shift? [discovery]
  • B.33: What is aluminium pressure die casting furnace line line 33’s average idle minutes between jobs on day shift? [discovery]
  • B.34: What is aluminium pressure die casting furnace line line 34’s average idle minutes between jobs on day shift? [discovery]
  • B.35: What is aluminium pressure die casting furnace line line 35’s average idle minutes between jobs on day shift? [discovery]
  • B.36: What is aluminium pressure die casting furnace line line 36’s average idle minutes between jobs on day shift? [discovery]
  • B.37: What is aluminium pressure die casting furnace line line 37’s average idle minutes between jobs on day shift? [discovery]
  • B.38: What is aluminium pressure die casting furnace line line 38’s average idle minutes between jobs on day shift? [discovery]
  • B.39: What is aluminium pressure die casting furnace line line 39’s average idle minutes between jobs on day shift? [discovery]
  • B.40: What is aluminium pressure die casting furnace line line 40’s average idle minutes between jobs on day shift? [discovery]
  • B.41: What is aluminium pressure die casting furnace line line 41’s average idle minutes between jobs on day shift? [discovery]
  • B.42: What is aluminium pressure die casting furnace line line 42’s average idle minutes between jobs on day shift? [discovery]
  • B.43: What is aluminium pressure die casting furnace line line 43’s average idle minutes between jobs on day shift? [discovery]
  • B.44: What is aluminium pressure die casting furnace line line 44’s average idle minutes between jobs on day shift? [discovery]
  • B.45: What is aluminium pressure die casting furnace line line 45’s average idle minutes between jobs on day shift? [discovery]
  • B.46: What is aluminium pressure die casting furnace line line 46’s average idle minutes between jobs on day shift? [discovery]
  • B.47: What is aluminium pressure die casting furnace line line 47’s average idle minutes between jobs on day shift? [discovery]
  • B.48: What is aluminium pressure die casting furnace line line 48’s average idle minutes between jobs on day shift? [discovery]
  • B.49: What is aluminium pressure die casting furnace line line 49’s average idle minutes between jobs on day shift? [discovery]
  • B.50: What is aluminium pressure die casting furnace line line 50’s average idle minutes between jobs on day shift? [discovery]
  • B.51: What is aluminium pressure die casting furnace line line 51’s average idle minutes between jobs on day shift? [discovery]
  • B.52: What is aluminium pressure die casting furnace line line 52’s average idle minutes between jobs on day shift? [discovery]
  • B.53: What is aluminium pressure die casting furnace line line 53’s average idle minutes between jobs on day shift? [discovery]
  • B.54: What is aluminium pressure die casting furnace line line 54’s average idle minutes between jobs on day shift? [discovery]
  • B.55: What is aluminium pressure die casting furnace line line 55’s average idle minutes between jobs on day shift? [discovery]
  • B.56: What is aluminium pressure die casting furnace line line 56’s average idle minutes between jobs on day shift? [discovery]
  • B.57: What is aluminium pressure die casting furnace line line 57’s average idle minutes between jobs on day shift? [discovery]
  • B.58: What is aluminium pressure die casting furnace line line 58’s average idle minutes between jobs on day shift? [discovery]
  • B.59: What is aluminium pressure die casting furnace line line 59’s average idle minutes between jobs on day shift? [discovery]
  • B.60: What is aluminium pressure die casting furnace line line 60’s average idle minutes between jobs on day shift? [discovery]
  • B.61: What is aluminium pressure die casting furnace line line 61’s average idle minutes between jobs on day shift? [discovery]
  • B.62: What is aluminium pressure die casting furnace line line 62’s average idle minutes between jobs on day shift? [discovery]
  • B.63: What is aluminium pressure die casting furnace line line 63’s average idle minutes between jobs on day shift? [discovery]
  • B.64: What is aluminium pressure die casting furnace line line 64’s average idle minutes between jobs on day shift? [discovery]
  • B.65: What is aluminium pressure die casting furnace line line 65’s average idle minutes between jobs on day shift? [discovery]
  • B.66: What is aluminium pressure die casting furnace line line 66’s average idle minutes between jobs on day shift? [discovery]
  • B.67: What is aluminium pressure die casting furnace line line 67’s average idle minutes between jobs on day shift? [discovery]
  • B.68: What is aluminium pressure die casting furnace line line 68’s average idle minutes between jobs on day shift? [discovery]
  • B.69: What is aluminium pressure die casting furnace line line 69’s average idle minutes between jobs on day shift? [discovery]
  • B.70: What is aluminium pressure die casting furnace line line 70’s average idle minutes between jobs on day shift? [discovery]
  • B.71: What is aluminium pressure die casting furnace line line 71’s average idle minutes between jobs on day shift? [discovery]
  • B.72: What is aluminium pressure die casting furnace line line 72’s average idle minutes between jobs on day shift? [discovery]
  • B.73: What is aluminium pressure die casting furnace line line 73’s average idle minutes between jobs on day shift? [discovery]
  • B.74: What is aluminium pressure die casting furnace line line 74’s average idle minutes between jobs on day shift? [discovery]
  • B.75: What is aluminium pressure die casting furnace line line 75’s average idle minutes between jobs on day shift? [discovery]
  • B.76: What is aluminium pressure die casting furnace line line 76’s average idle minutes between jobs on day shift? [discovery]
  • B.77: What is aluminium pressure die casting furnace line line 77’s average idle minutes between jobs on day shift? [discovery]
  • B.78: What is aluminium pressure die casting furnace line line 78’s average idle minutes between jobs on day shift? [discovery]
  • B.79: What is aluminium pressure die casting furnace line line 79’s average idle minutes between jobs on day shift? [discovery]
  • B.80: What is aluminium pressure die casting furnace line line 80’s average idle minutes between jobs on day shift? [discovery]
  • B.81: What is aluminium pressure die casting furnace line line 81’s average idle minutes between jobs on day shift? [discovery]
  • B.82: What is aluminium pressure die casting furnace line line 82’s average idle minutes between jobs on day shift? [discovery]
  • B.83: What is aluminium pressure die casting furnace line line 83’s average idle minutes between jobs on day shift? [discovery]
  • B.84: What is aluminium pressure die casting furnace line line 84’s average idle minutes between jobs on day shift? [discovery]
  • B.85: What is aluminium pressure die casting furnace line line 85’s average idle minutes between jobs on day shift? [discovery]
  • B.86: What is aluminium pressure die casting furnace line line 86’s average idle minutes between jobs on day shift? [discovery]
  • B.87: What is aluminium pressure die casting furnace line line 87’s average idle minutes between jobs on day shift? [discovery]
  • B.88: What is aluminium pressure die casting furnace line line 88’s average idle minutes between jobs on day shift? [discovery]
  • B.89: What is aluminium pressure die casting furnace line line 89’s average idle minutes between jobs on day shift? [discovery]
  • B.90: What is aluminium pressure die casting furnace line line 90’s average idle minutes between jobs on day shift? [discovery]
  • B.91: What is aluminium pressure die casting furnace line line 91’s average idle minutes between jobs on day shift? [discovery]
  • B.92: What is aluminium pressure die casting furnace line line 92’s average idle minutes between jobs on day shift? [discovery]
  • B.93: What is aluminium pressure die casting furnace line line 93’s average idle minutes between jobs on day shift? [discovery]
  • B.94: What is aluminium pressure die casting furnace line line 94’s average idle minutes between jobs on day shift? [discovery]
  • B.95: What is aluminium pressure die casting furnace line line 95’s average idle minutes between jobs on day shift? [discovery]
  • B.96: What is aluminium pressure die casting furnace line line 96’s average idle minutes between jobs on day shift? [discovery]
  • B.97: What is aluminium pressure die casting furnace line line 97’s average idle minutes between jobs on day shift? [discovery]
  • B.98: What is aluminium pressure die casting furnace line line 98’s average idle minutes between jobs on day shift? [discovery]
  • B.99: What is aluminium pressure die casting furnace line line 99’s average idle minutes between jobs on day shift? [discovery]
  • B.100: What is aluminium pressure die casting furnace line line 100’s average idle minutes between jobs on day shift? [discovery]
  • B.101: What is aluminium pressure die casting furnace line line 101’s average idle minutes between jobs on day shift? [discovery]
  • B.102: What is aluminium pressure die casting furnace line line 102’s average idle minutes between jobs on day shift? [discovery]
  • B.103: What is aluminium pressure die casting furnace line line 103’s average idle minutes between jobs on day shift? [discovery]
  • B.104: What is aluminium pressure die casting furnace line line 104’s average idle minutes between jobs on day shift? [discovery]
  • B.105: What is aluminium pressure die casting furnace line line 105’s average idle minutes between jobs on day shift? [discovery]
  • B.106: What is aluminium pressure die casting furnace line line 106’s average idle minutes between jobs on day shift? [discovery]
  • B.107: What is aluminium pressure die casting furnace line line 107’s average idle minutes between jobs on day shift? [discovery]
  • B.108: What is aluminium pressure die casting furnace line line 108’s average idle minutes between jobs on day shift? [discovery]
  • B.109: What is aluminium pressure die casting furnace line line 109’s average idle minutes between jobs on day shift? [discovery]
  • B.110: What is aluminium pressure die casting furnace line line 110’s average idle minutes between jobs on day shift? [discovery]
  • B.111: What is aluminium pressure die casting furnace line line 111’s average idle minutes between jobs on day shift? [discovery]
  • B.112: What is aluminium pressure die casting furnace line line 112’s average idle minutes between jobs on day shift? [discovery]
  • B.113: What is aluminium pressure die casting furnace line line 113’s average idle minutes between jobs on day shift? [discovery]
  • B.114: What is aluminium pressure die casting furnace line line 114’s average idle minutes between jobs on day shift? [discovery]
  • B.115: What is aluminium pressure die casting furnace line line 115’s average idle minutes between jobs on day shift? [discovery]
  • B.116: What is aluminium pressure die casting furnace line line 116’s average idle minutes between jobs on day shift? [discovery]
  • B.117: What is aluminium pressure die casting furnace line line 117’s average idle minutes between jobs on day shift? [discovery]
  • B.118: What is aluminium pressure die casting furnace line line 118’s average idle minutes between jobs on day shift? [discovery]
  • B.119: What is aluminium pressure die casting furnace line line 119’s average idle minutes between jobs on day shift? [discovery]
  • B.120: What is aluminium pressure die casting furnace line line 120’s average idle minutes between jobs on day shift? [discovery]

Appendix C — Stamped wedge reinforcement

The strongest wedge is: Rae Bareli Site 1 furnace and die-preheat idle-load verification on the UPPCL HT bill — read-only on existing meters, assigning melt hold and hydraulic press MD leaks to specific die lines in ₹/month, proven on the next invoice within 90 days.

C.1 Week-1 pilot checkpoint

  • Day 7: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.2 Week-1 pilot checkpoint

  • Day 14: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.3 Week-1 pilot checkpoint

  • Day 21: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.4 Week-1 pilot checkpoint

  • Day 28: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.5 Week-2 pilot checkpoint

  • Day 35: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.6 Week-2 pilot checkpoint

  • Day 42: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.7 Week-2 pilot checkpoint

  • Day 49: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.8 Week-2 pilot checkpoint

  • Day 56: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.9 Week-3 pilot checkpoint

  • Day 63: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.10 Week-3 pilot checkpoint

  • Day 70: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.11 Week-3 pilot checkpoint

  • Day 77: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.12 Week-3 pilot checkpoint

  • Day 84: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.13 Week-4 pilot checkpoint

  • Day 91: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.14 Week-4 pilot checkpoint

  • Day 98: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.15 Week-4 pilot checkpoint

  • Day 105: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.16 Week-4 pilot checkpoint

  • Day 112: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.17 Week-5 pilot checkpoint

  • Day 119: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.18 Week-5 pilot checkpoint

  • Day 126: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.19 Week-5 pilot checkpoint

  • Day 133: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.20 Week-5 pilot checkpoint

  • Day 140: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.21 Week-6 pilot checkpoint

  • Day 147: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.22 Week-6 pilot checkpoint

  • Day 154: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.23 Week-6 pilot checkpoint

  • Day 161: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.24 Week-6 pilot checkpoint

  • Day 168: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.25 Week-7 pilot checkpoint

  • Day 175: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.26 Week-7 pilot checkpoint

  • Day 182: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.27 Week-7 pilot checkpoint

  • Day 189: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.28 Week-7 pilot checkpoint

  • Day 196: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.29 Week-8 pilot checkpoint

  • Day 203: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.30 Week-8 pilot checkpoint

  • Day 210: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.31 Week-8 pilot checkpoint

  • Day 217: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.32 Week-8 pilot checkpoint

  • Day 224: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.33 Week-9 pilot checkpoint

  • Day 231: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.34 Week-9 pilot checkpoint

  • Day 238: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.35 Week-9 pilot checkpoint

  • Day 245: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.36 Week-9 pilot checkpoint

  • Day 252: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.37 Week-10 pilot checkpoint

  • Day 259: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.38 Week-10 pilot checkpoint

  • Day 266: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.39 Week-10 pilot checkpoint

  • Day 273: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.40 Week-10 pilot checkpoint

  • Day 280: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.41 Week-11 pilot checkpoint

  • Day 287: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.42 Week-11 pilot checkpoint

  • Day 294: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.43 Week-11 pilot checkpoint

  • Day 301: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.44 Week-11 pilot checkpoint

  • Day 308: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.45 Week-12 pilot checkpoint

  • Day 315: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.46 Week-12 pilot checkpoint

  • Day 322: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.47 Week-12 pilot checkpoint

  • Day 329: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.48 Week-12 pilot checkpoint

  • Day 336: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.49 Week-13 pilot checkpoint

  • Day 343: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.50 Week-13 pilot checkpoint

  • Day 350: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.51 Week-13 pilot checkpoint

  • Day 357: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.52 Week-13 pilot checkpoint

  • Day 364: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.53 Week-14 pilot checkpoint

  • Day 371: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.54 Week-14 pilot checkpoint

  • Day 378: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.55 Week-14 pilot checkpoint

  • Day 385: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.56 Week-14 pilot checkpoint

  • Day 392: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.57 Week-15 pilot checkpoint

  • Day 399: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.58 Week-15 pilot checkpoint

  • Day 406: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.59 Week-15 pilot checkpoint

  • Day 413: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.60 Week-15 pilot checkpoint

  • Day 420: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.61 Week-16 pilot checkpoint

  • Day 427: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.62 Week-16 pilot checkpoint

  • Day 434: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.63 Week-16 pilot checkpoint

  • Day 441: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.64 Week-16 pilot checkpoint

  • Day 448: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.65 Week-17 pilot checkpoint

  • Day 455: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.66 Week-17 pilot checkpoint

  • Day 462: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.67 Week-17 pilot checkpoint

  • Day 469: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.68 Week-17 pilot checkpoint

  • Day 476: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.69 Week-18 pilot checkpoint

  • Day 483: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.70 Week-18 pilot checkpoint

  • Day 490: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.71 Week-18 pilot checkpoint

  • Day 497: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.72 Week-18 pilot checkpoint

  • Day 504: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.73 Week-19 pilot checkpoint

  • Day 511: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.74 Week-19 pilot checkpoint

  • Day 518: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.75 Week-19 pilot checkpoint

  • Day 525: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.76 Week-19 pilot checkpoint

  • Day 532: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.77 Week-20 pilot checkpoint

  • Day 539: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.78 Week-20 pilot checkpoint

  • Day 546: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.79 Week-20 pilot checkpoint

  • Day 553: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

C.80 Week-20 pilot checkpoint

  • Day 560: Review UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) bill line items vs meter interval data for aluminium pressure die casting furnace line feeder scope.
  • Kill criterion at day 60 if verified savings <5% with full data access.

Appendix D — SME100 2019 campaign context

India SME 100 Award 2019 cohort — Tier B band (₹15–30L/month bill gate or unverified). Outreach policy: full dossier + kit; qualify bill on first call before active outbound scale.

  • 2019: Monitor capex, tariff true-up, and leadership changes affecting energy budget.
  • 2020: Monitor capex, tariff true-up, and leadership changes affecting energy budget.
  • 2021: Monitor capex, tariff true-up, and leadership changes affecting energy budget.
  • 2022: Monitor capex, tariff true-up, and leadership changes affecting energy budget.
  • 2023: Monitor capex, tariff true-up, and leadership changes affecting energy budget.
  • 2024: Monitor capex, tariff true-up, and leadership changes affecting energy budget.
  • 2025: Monitor capex, tariff true-up, and leadership changes affecting energy budget.
  • 2026: Monitor capex, tariff true-up, and leadership changes affecting energy budget.

Appendix E — Objection handling scripts

Objection: “We already have solar”

Response: Bill-first baseline — solar offsets energy kWh, not MD sequencing leaks.

Objection: “We have ISO / IATF”

Response: Quality certs ≠ continuous meter-to-bill M&V — 90-day proof on one feeder.

Objection: “Too busy with production”

Response: Read-only — no production stops; prescriptions are shift-scheduling levers.

Objection: “Send a brochure”

Response: We send two bill months + one-page ₹ map — not a product deck.

Appendix F.1 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 1 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-001 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.2 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 2 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-002 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.3 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 3 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-003 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.4 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 4 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-004 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.5 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 5 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-005 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.6 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 6 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-006 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.7 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 7 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-007 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.8 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 8 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-008 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.9 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 9 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-009 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.10 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 10 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-010 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.11 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 11 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-011 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.12 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 12 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-012 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.13 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 13 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-013 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.14 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 14 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-014 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.15 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 15 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-015 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.16 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 16 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-016 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.17 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 17 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-017 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.18 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 18 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-018 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.19 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 19 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-019 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.20 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 20 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-020 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.21 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 21 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-021 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.22 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 22 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-022 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.23 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 23 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-023 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.24 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 24 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-024 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.25 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 25 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-025 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.26 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 26 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-026 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.27 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 27 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-027 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.28 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 28 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-028 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.29 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 29 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-029 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.30 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 30 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-030 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.31 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 31 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-031 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.32 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 32 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-032 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.33 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 33 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-033 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.34 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 34 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-034 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.35 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 35 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-035 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.36 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 36 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-036 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.37 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 37 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-037 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.38 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 38 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-038 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.39 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 39 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-039 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.40 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 40 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-040 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.41 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 41 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-041 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.42 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 42 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-042 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.43 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 43 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-043 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.44 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 44 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-044 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.45 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 45 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-045 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.46 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 46 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-046 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.47 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 47 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-047 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.48 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 48 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-048 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.49 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 49 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-049 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.50 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 50 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-050 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.51 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 51 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-051 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.52 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 52 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-052 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.53 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 53 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-053 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.54 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 54 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-054 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.55 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 55 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-055 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.56 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 56 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-056 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.57 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 57 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-057 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.58 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 58 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-058 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.59 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 59 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-059 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.60 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 60 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-060 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.61 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 61 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-061 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.62 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 62 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-062 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.63 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 63 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-063 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.64 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 64 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-064 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.65 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 65 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-065 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.66 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 66 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-066 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.67 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 67 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-067 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.68 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 68 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-068 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.69 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 69 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-069 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.70 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 70 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-070 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.71 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 71 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-071 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.72 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 72 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-072 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.73 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 73 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-073 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.74 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 74 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-074 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.75 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 75 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-075 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.76 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 76 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-076 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.77 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 77 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-077 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.78 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 78 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-078 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.79 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 79 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-079 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.80 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 80 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-080 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.81 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 81 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-081 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.82 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 82 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-082 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.83 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 83 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-083 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.84 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 84 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-084 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.85 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 85 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-085 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.86 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 86 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-086 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.87 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 87 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-087 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.88 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 88 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-088 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.89 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 89 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-089 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.90 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 90 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-090 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.91 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 91 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-091 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.92 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 92 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-092 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.93 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 93 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-093 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.94 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 94 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-094 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.95 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 95 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-095 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.96 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 96 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-096 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.97 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 97 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-097 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.98 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 98 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-098 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.99 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 99 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-099 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.100 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 100 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-100 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.101 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 101 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-101 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.102 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 102 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-102 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.103 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 103 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-103 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.104 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 104 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-104 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.105 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 105 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-105 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.106 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 106 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-106 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.107 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 107 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-107 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.108 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 108 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-108 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.109 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 109 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-109 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.110 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 110 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-110 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.111 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 111 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-111 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.112 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 112 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-112 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.113 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 113 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-113 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.114 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 114 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-114 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.115 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 115 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-115 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.116 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 116 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-116 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.117 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 117 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-117 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.118 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 118 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-118 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.119 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 119 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-119 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.120 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 120 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-120 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.121 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 121 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-121 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.122 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 122 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-122 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.123 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 123 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-123 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.124 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 124 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-124 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.125 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 125 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-125 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.126 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 126 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-126 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.127 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 127 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-127 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.128 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 128 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-128 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.129 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 129 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-129 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.130 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 130 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-130 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.131 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 131 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-131 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.132 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 132 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-132 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.133 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 133 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-133 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.134 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 134 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-134 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.135 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 135 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-135 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.136 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 136 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-136 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.137 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 137 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-137 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.138 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 138 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-138 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.139 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 139 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-139 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.140 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 140 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-140 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.141 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 141 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-141 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.142 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 142 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-142 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.143 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 143 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-143 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.144 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 144 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-144 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.145 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 145 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-145 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.146 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 146 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-146 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.147 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 147 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-147 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.148 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 148 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-148 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.149 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 149 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-149 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.150 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 150 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-150 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.151 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 151 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-151 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.152 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 152 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-152 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.153 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 153 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-153 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.154 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 154 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-154 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.155 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 155 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-155 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.156 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 156 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-156 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.157 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 157 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-157 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.158 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 158 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-158 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.159 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 159 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-159 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.160 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 160 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-160 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.161 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 161 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-161 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.162 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 162 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-162 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |

Appendix F.163 — Reference note (18-rajshi-technologies)

Cross-check UPPCL / MVVNL (Uttar Pradesh Power Corporation Ltd) tariff order effective date before customer calls. Process anchor: aluminium pressure die casting furnace line. Line 163 placeholder for field notes post-discovery.

FieldValue [post-call]

| Feeder ID | TBD-163 |

| Est. monthly kWh | [~] |

| Est. monthly ₹ | [~] |

| Champion confirmed | Y/N |