How to use this dossier: Swiss Garnier is a promoter-led, multi-entity pharma CDMO — not a single HT meter. Stamped wins only if we speak classified HVAC + chiller MD, HPSEBL LIPS demand + peak energy, tablet/liquid line sequencing, and invoice proof. Read §1.3 (plant map), §2.1 (HPSEBL bill band), and §3.1 (HVAC load stack) before picking a champion or scoping a pilot feeder.
1. Company overview & snapshot
1.1 Legal identity & corporate structure
| Field | Detail |
|---|---|
| Primary legal entity (outreach) | Swiss Garniers Biotech Private Limited (SGBT) |
| CIN | U24304HP2018PTC007608 (incorporated 02 Jul 2018; formerly operated as Swiss Garnier Biotech since Feb 2010 per CARE) |
| RoC | Himachal Pradesh |
| Status | Active (unlisted) |
| Registered address | Plot No. 21, Industrial Area, Mehatpur, Una 174315, Himachal Pradesh |
| Authorized / paid-up capital | ₹40 lakh each [MCA] |
| Open charges (MCA) | ₹10.22 Cr open; ₹39.73 Cr settled [TheCompanyCheck Aug 2025] |
| Credit rating | CARE BB-; Stable → moved to ISSUER NOT COOPERATING* (Dec 2024) [CARE] |
Group entities (operating map — combined view per CARE)
| Entity | Legal form | Role | Primary location | Ops since |
|---|---|---|---|---|
| Swiss Garnier Life Sciences (SGLS) | Partnership firm | Flagship CDMO; tablets/caps/liquids | Mehatpur + Baddi origin | May 2006 |
| Swiss Garniers Biotech Pvt Ltd (SGBT) | Pvt Ltd | Contract formulations; nutraceuticals | Mehatpur (registered); Baddi legacy | May 2010 commercial |
| Swiss Garnier Genexiaa Sciences Pvt Ltd (SGGS) | Pvt Ltd | High-capacity solids/liquids; export | Mamring, East Sikkim | May 2013 |
| Swiss Garnier’s (Chennai) | Corporate / marketing | HQ, exports, regulatory | Chennai, Tamil Nadu | — |
Cross-holdings: SGBT holds 19.36% stake in SGGS [CARE Dec 2024].
Promoters & board (SGBT MCA)
| Name | Role | Notes |
|---|---|---|
| M. S. Muthu Theivendran (M.S. Theivendran) | Director / Group MD | B.Tech Chemical Eng.; ex-ONGC; operations & marketing |
| T. Rethinavalli Theivendran | Managing Director | Finance, procurement, HR |
| Dr Vignesh Gandhi | Director | MBBS/MD; son; clinical/regulatory lens |
Do not confuse with: unrelated “Swiss Garnier” traders; Sarvotham Care LinkedIn slug collision; anchor on swissgarnier.com + CIN U24304HP2018PTC007608 + Mehatpur plot 21–23.
1.2 What they make & where money comes from
WHO-GMP / EU-GMP audited contract manufacturing (CMO/CDMO) group: 700+ products across gastro, diabetology, gynaecology, cardiology, pain, nutraceuticals.
| Stream | Capacity signal | Markets |
|---|---|---|
| Solid oral (tablets/caps) | 500M tablets/yr; 300M capsules/yr [SGBT CSR 2024] | Domestic MNC brands + exports (40+ countries cited on website) |
| Liquids / syrups | 150,000 bottles/day liquid line; SS316 automatic filling [CSR] | Pediatric, cough, nutraceutical |
| Sachets / tubes / ointments | 450,000 sachets/day; tube + ointment lines | OTC + Rx derm |
| Soft gelatin | Listed in product line [CARE] | Nutraceutical / pharma |
| Packaging | Alu-Alu blister, HFFS | Export compliance |
Regulatory / quality signals (24 months):
- EU-GMP audit — positive outcome for HP (SGLS) + Sikkim (SGGS) facilities
[LinkedIn Mar 2026] - Approvals cited: PIC/S Malaysia, DIGEMID Peru, NAFDAC Nigeria, FDA Philippines, DAV Vietnam
[PharmaSource] - India SME 100 Award 2019 — campaign anchor
[indiasme100.com]
Financial scale (combined SG group — CARE analytical view)
| FY | Total operating income (₹ Cr) | PBT (₹ Cr) | PAT (₹ Cr) |
|---|---|---|---|
| UA / latest | 431.0 | 44.76 | 8.32 |
| Prior | 351.41 | 41.30 | 4.88 |
| Prior-1 | 328.20 | 38.99 | 6.92 |
Utilisation: Group 40–45%; SGGS Plant 2 under-utilised for small batches; target 50–60% [CARE Dec 2023]. Energy implication: HVAC baseload high even at partial utilisation — classic pharma leak profile.
1.3 Plants, addresses & footprint
| Site | Address | Entity | Built-up | Processes | DISCOM | Pilot priority |
|---|---|---|---|---|---|---|
| Plant 1 — Mehatpur | Plot 21–23, Industrial Area, Mehatpur, Una 174315 | SGLS + SGBT | ~120,000 sq.ft. on 1.8 acres [CSR] | Tablets, caps, liquids, sachets | HPSEBL (Una / HP industrial circle) | #1 pilot |
| Plant 2 — Mehatpur | Adjacent Mehatpur industrial belt | SGLS | ~50,000 sq.ft. [website] | Tablets, caps, liquids | HPSEBL | #2 |
| Plant 3 — Sikkim | Plot 54 & 78, Mamring Bhasti, Rangpo 737132 | SGGS | ~100,000 sq.ft. / 2.7 acres | Solids + liquids export | Energy & Power Dept, Govt of Sikkim | #3 (Phase 2) |
| Plant 4 — Sikkim | Mamring (second block) | SGGS | ~100,000 sq.ft. | High-capacity solids | Sikkim grid | #4 |
| Baddi belt (legacy) | Baddi–Nalagarh NH-21A cluster 173205 | Group origin 2004; hiring hub 2026 | [~] confirm active mfg vs admin | Legacy SGLS/SGBT start-up site | HPSEBL Baddi / Solan circle if load remains | Qualify on discovery |
Baddi vs Mehatpur clarification: CARE and promoter history place commercial start in Baddi (2004/2010); current registered manufacturing addresses and CSR reporting anchor on Mehatpur Una. Walk-in hiring held at Lemon Tree Hotel Baddi with placement at Mehatpur plant [LinkedIn Feb 2026]. Treat Baddi as commercial/historical cluster and Mehatpur as primary HT pilot site unless discovery proves separate Baddi HT account.
Contact (verified): +91-1975-230993 · +91-9805404327 · enquiry@swissgarniers.com · esg@swissgarniers.com
1.4 Leadership & CRM map
Tier 0 — Promoters
| Name | Title | LinkedIn / signal |
|---|---|---|
| M. S. Theivendran | Group MD / Director | [dir] Business Connect profile |
| T. Rethinavalli | MD (finance/procurement) | Board |
| Dr Vignesh Gandhi | Director | Apollo Hospital alumni |
Tier 1 — Operations cluster
| Name | Title | Notes | |
|---|---|---|---|
| Saravanan Velayutham | SVP Operations & Cluster Head | https://www.linkedin.com/in/saravanan-velayutham-83b6b91a7 | Promoted May 2026; all plants |
[dir] Plant heads per site | Production P&L | — | Confirm on call |
Tier 2 — Engineering / utilities (Stamped champions)
| Name | Title | Stamped role | |
|---|---|---|---|
| Vipul Kapila | Manager, Engineering | https://www.linkedin.com/in/vipul-kapila-0059b288 | Primary — HVAC, utilities, water, validation |
| Manoj Gautam | DGM Engineering | https://www.linkedin.com/in/manoj-gautam-884199299 | Co-champion — SGLS + SGBT engineering |
| Praba Karan | Maintenance Engineer | [dir] | Shop-floor ally |
[dir] Electrical head | — | Not publicly indexed | Hunt via Manoj/Vipul intro |
Decision path: Vipul Kapila (HVAC/data) → Manoj Gautam (engineering sign-off) → Saravanan (production behaviour) → Theivendran (₹ sign-off for 90-day pilot).
1.5 Recent news (24 months) & timing for Stamped
| Date | Event | Implication |
|---|---|---|
| Mar 2026 | EU-GMP audit passed (HP + Sikkim) | Quality/compliance focus — M&V with batch records resonates |
| May 2026 | Saravanan promoted SVP Ops & Cluster Head | New ops leader — window to fix baseline energy before utilisation ramp |
| Feb 2026 | Walk-in hiring Baddi → Mehatpur QC/QA (40 roles) | Expansion signal; verify if new lines = MD step |
| Dec 2024 | CARE ISSUER NOT COOPERATING on SGBT | Not a sales blocker; flag for credit diligence only |
| 2019 | India SME 100 Award | Campaign credibility opener |
| 2020 | Asia-Pacific Stevie Award (healthcare innovation) | Promoter prestige — avoid hype tone |
2. Energy profile
DISCOM / supply (name early): HPSEBL (Himachal Pradesh State Electricity Board Limited) for Mehatpur/Baddi-belt HP sites; Energy & Power Department, Government of Sikkim for Mamring plants.
2.1 Bill band, tariff & demand
Tariff reference — HPSEBL Large Industrial Power Supply (LIPS), FY 2025–26 [HPERC Order / hpseb.in]
| Component | HT-1 (contract demand ≤ 1 MVA) | HT-2 (contract demand > 1 MVA) | Notes |
|---|---|---|---|
| Demand charge | ₹250 / kVA / month | ₹400 / kVA / month | No change FY25–26 vs prior |
| Energy (normal) | ₹5.85 / kWh | ₹5.60 / kWh | −20 paise/industrial FY25–26 |
| Energy (peak) | ₹6.95 / kWh | ₹6.95 / kWh | Peak window per HPSEBL schedule |
| PF | Incentive/penalty per HPSEBL | Same | VFD + AHU fan fleets → drift risk |
Working bill band — Mehatpur cluster (hypothesis — NOT invoice-derived)
| Scenario | Assumed billing demand | Monthly energy | Demand ₹ | Energy ₹ | Total ₹/month |
|---|---|---|---|---|---|
| Low | 800 kVA (HT-1) | 0.45 GWh @ ₹5.90 blended | 2.0 L | 26.6 L | ~₹29 L [~] |
| Mid | 1,500 kVA (HT-2) | 0.85 GWh | 6.0 L | 50.2 L | ~₹56 L [~] |
| High | 2,500 kVA (HT-2) | 1.35 GWh | 10.0 L | 79.7 L | ~₹90 L [~] |
| Upper (both HP plants) | 4,000 kVA combined | 2.2 GWh | 16.0 L | 129.8 L | ~₹1.46 Cr [~] |
Estimation logic (Mehatpur Plant 1 — 120k sq.ft. pharma):
- HVAC + chillers + dehumid: 35–55% of site kWh in HP formulation plants
[Baddi pharma benchmarks ~]→ 0.15–0.45 GWh/month at partial utilisation - Tablet/caps compression + coating: 0.08–0.20 GWh/month
[~] - Liquid filling + CIP/SIP aux: 0.05–0.12 GWh/month
[~] - WFI / pure steam / utilities: 0.04–0.10 GWh/month
[~] - Lighting, labs, admin, packaging: 0.03–0.08 GWh/month
[~] - Sikkim Plants 3+4 (200k sq.ft.): add ~₹25–55 L/month
[~]if similar intensity
Qualification gate: Request two redacted HPSEBL HT invoices (Mehatpur Plant 1; confirm separate meter for Plant 2) before quoting savings. Hard ICP minimum ≥ ₹30 lakh/month — Swiss Garnier HP cluster likely passes on mid scenario; group total may exceed ₹1 Cr/month [~].
MD / multi-feeder risks specific to Swiss Garnier:
- Morning chiller + AHU pre-cool coinciding with tablet compression startup (06:00–09:00)
- Separate HT accounts across SGLS partnership vs SGBT Pvt Ltd — map legal entity ↔ consumer number
- Partial utilisation (40–45%) with full HVAC baseload — paying for classified air whether or not batches run
- EU-GMP audit window — reluctance to change HVAC setpoints without QA sign-off (Stamped = read-only sequencing, not setpoint writes)
- Sikkim + HP dual DISCOM — corporate energy owner may not see combined MD picture
2.2 Generation, fuel & renewables
| Source | Hypothesis | Stamped note |
|---|---|---|
| Grid (HPSEBL LIPS) | Primary for HP sites | Core bill verification surface |
| Grid (Sikkim ED) | Primary for Mamring | Phase-2 rollout |
| Diesel generators | Likely for critical HVAC / cold chain — unverified kVA | Map run hours; don’t double-count |
| Rooftop solar / open access | No public MW cite; ESG policy mentions sustainability | Do not assume; ask on discovery |
| Boilers / thermic fluid | Process heat for some liquid lines | Fuel separate from kWh prescriptions |
| Compressed air / nitrogen | Central utility rooms | Idle compressor hypothesis |
2.3 EnMS, PAT, ISO, BRSR
| System | Status | Stamped entry |
|---|---|---|
| WHO-GMP / EU-GMP | Claimed + 2026 EU audit pass | Batch records + HVAC logs = correlation surface |
| ISO 9001 / 14001 / 45001 | Referenced in ESG manuals [SGBT ESG Policy 2024] | Operational discipline |
| ISO 50001 | Not found publicly | Gap — Stamped as continuous EnMS-like layer |
| PAT / CCTS | Unlikely at this scale/sector | N/A |
| BRSR | Pvt Ltd / partnership — no BRSR | Use ESG CSR reports instead |
| Internal energy audit | Baddi pharma sector norm; Elion case study pattern for belt [sector] | They may have done HVAC upgrade study — ask before duplicating |
2.4 Likely ₹ leak categories (hypothesis)
Ranked for HP pharma formulation + HPSEBL Baddi-belt HVAC:
| # | Leak category | Mechanism | ₹ lever | Owner |
|---|---|---|---|---|
| 1 | Off-shift classified HVAC hold | ISO 7/8 areas maintained at full ACH overnight between batches | kWh + demand if chillers run hard | Vipul Kapila / QA |
| 2 | Chiller + AHU simultaneous start | Morning ramp: 2–4 chillers + 6–12 AHUs in 30 min | ₹400/kVA × ΔkVA (HT-2) | Engineering |
| 3 | Over-cooling / reheat cycles | Old BMS sequences fighting dehumid + heat | kWh base | HVAC vendor + Vipul |
| 4 | Exhaust fan / scrubber continuous run | Solvent areas left on without batch | kWh | Production |
| 5 | Tablet compression motor starts | Staggered poorly vs HVAC | Demand spike | Production planning |
| 6 | Liquid line CIP cycles | Hot water + pump loads off-shift | kWh + steam equiv | Utilities |
| 7 | Blister packaging aux | Thermoform + sealers idle hold | kWh | Packaging |
| 8 | PF penalty | VFD harmonics on AHU fans | PF surcharge | Electrical |
| 9 | Peak energy (₹6.95) | Scheduling non-GMP loads in peak window | Energy ₹ | Cluster ops |
| 10 | DG test vs grid overlap | Monthly DG test during production | Fuel + peak | Electrical |
3. Operations, equipment & digital stack
3.1 Process flow & critical loads
A. Solid oral (tablets/caps) — Mehatpur
- Dispensing (controlled humidity) → 2. Granulation / blending → 3. Compression → 4. Coating (HVAC coupled) → 5. Inspection → 6. Blister/strip pack → 7. Ship
Critical electrical loads: AHUs serving classified rooms, dehumidifiers, dust extraction, compression motors, coating pan HVAC, blister machines, cold storage.
B. Liquid orals — Mehatpur
- Bulk manufacturing (SS316) → 2. Mixing / homogenisation → 3. Filling (120 bottles/min line) → 4. Labelling → 5. Ship
Critical loads: CIP/SIP pumps, WFI loops, filling line servos, chilled water for product hold.
C. Sikkim export blocks — Mamring High-capacity solids + liquids for export markets; similar HVAC stack at larger footprint.
3.2 Shifts, seasonality, production pattern
| Pattern | Signal | Energy effect |
|---|---|---|
| Shifts | Likely 2–3 shifts on core lines; QA/QC overlap | MD at shift change |
| Batch vs campaign | CDMO — SKU changeovers frequent | HVAC hold between batches |
| Seasonality | HP monsoon (Jul–Sep) humidity ↑ | Dehumid + chiller load ↑ |
| Utilisation 40–45% | Under-used capacity | HVAC baseload / revenue mismatch |
| EU-GMP / export batches | Stricter environmental logging | Harder to cut air changes without QA |
3.3 Automation, metering, SCADA/EMS/DCS
Public vendor names: None confirmed for plant-wide EMS.
| Maturity signal | Inference | Stamped path |
|---|---|---|
| BMS/HVAC validation docs (Vipul profile cites QMS/compliance) | Likely validated BMS — read-only export | Path A if BMS historian |
| Automatic liquid line (SS Machinery Mumbai) | Line-level PLCs | Feeder + line correlation |
| No public ISO 50001 | Unlikely enterprise EMS | Path B: HPSEBL 15-min + shift/batch log |
| ESG reporting maturity | Data culture for utilities possible | Ask for monthly kWh by block |
Path A: Read-only BMS / main meter / sub-meter CSV from engineering. Path B: HPSEBL billing demand history + weekly batch schedule from production.
Hard rule: No BMS setpoint writes, no GMP-critical parameter changes without QA protocol.
3.4 Capex / tech projects affecting energy
| Project | Timing | Energy angle |
|---|---|---|
| EU-GMP upgrades | 2025–26 | New AHUs / filters — verify post-audit baselines |
| Mehatpur Plant 2 (50k sq.ft.) | Operational | Second HT account? |
| Sikkim Plant 4 | Operational | High-capacity — low util on small orders |
| QC hiring ramp (40 roles, 2026) | Now | New lab HVAC load |
| Capacity utilisation target 50–60% | FY25–26 | MD will rise — fix sequencing before ramp |
4. Stamped Energy fit analysis
4.1 ICP scorecard
| Criterion | Assessment | Pass? |
|---|---|---|
| Monthly bill ≥ ₹30L | Mid hypothesis ₹56 L–1.46 Cr/month group [~] | Pass (hypothesis) |
| Geography | HP (Mehatpur/Baddi belt) + Sikkim — North India priority | Pass |
| Vertical | Pharma formulation — HVAC-heavy process ICP overlay | Pass |
| Revenue ₹300–5,000 Cr | ₹431 Cr group UA | Pass |
| Decision speed | Promoter-led private — fast if bill pain visible | Pass (hypothesis) |
| Data maturity | BMS likely; EMS unknown | Unknown–Medium |
| Travel | Mehatpur ~100 km Chandigarh — workable | Pass |
4.2 Fit score rationale
Fit score: 9/10 (outreach prioritisation, not guaranteed savings)
| Factor | Points | Rationale |
|---|---|---|
| HVAC / chiller intensity | +2 | 35–55% kWh typical pharma |
| Bill band plausibility | +2 | Likely ₹45L–1.5 Cr/month group [~] |
| SME100 + EU-GMP | +1 | Evidence culture |
| North India / Baddi belt | +1 | ICP v3 priority #4 |
| Champion identifiability | +1 | Vipul Kapila — HVAC/utilities |
| Multi-entity + dual DISCOM | −0.5 | Mapping complexity |
| Partial utilisation | −0.5 | Harder savings narrative unless baseload focus |
| CARE non-cooperation flag | −0.5 | Diligence only |
| Net | 9/10 | Tier A — full kit + max dossier |
4.3 Wedge (parser-critical)
The strongest wedge is: cut off-shift classified HVAC and chiller hold between CDMO batch campaigns, stagger morning AHU + chiller ramp away from tablet compression and liquid filling startups on the same HPSEBL HT-2 billing window, and shift non-GMP auxiliaries out of ₹6.95/kWh peak where QA allows — assigning each avoidable billing-demand kVA and peak-energy kWh to a named engineering owner and verifying ₹ on the next HPSEBL invoice (Mehatpur Plant 1 feeder first).
4.4 Objections & competitors
| Objection | Response |
|---|---|
| ”GMP won’t let us touch HVAC” | Stamped is read-only — we recommend scheduling, not lowering classified limits without QA |
| ”We did an energy audit” | Audits don’t produce weekly ₹ prescriptions tied to HPSEBL line items |
| ”We need 24/7 classified air” | Question is full cooling vs minimum viable hold between batches — QA decides |
| ”Solar will fix it” | Solar doesn’t fix MD overlap or off-shift chiller sequencing |
| ”IT won’t connect BMS” | Path B — HPSEBL CSV + production log |
| Competitor: Elion / local auditors | Sector norm in Baddi belt — position invoice M&V software, not another one-time audit |
4.5 Pilot design
| Parameter | Recommendation |
|---|---|
| Duration | 90 days (60-day proof negotiable) |
| Site | Mehatpur Plant 1 (Plot 21–23) — SGBT/SGLS primary HT |
| Scope | One HPSEBL HT-2 feeder + HVAC/chiller block correlation |
| Fee band | ₹2–5 lakh fixed [~] Band A |
| Week 1–2 | HPSEBL bills, BMS/meter access, batch schedule, baseline |
| Week 3–8 | Weekly cards: MD, HVAC hold, peak energy, PF |
| Week 9–12 | HPSEBL invoice reconciliation |
| Success | ≥1 action with QA-approved owner + ₹ on bill |
| Kill | Bill < ₹30L, no data, QA blocks all sequencing |
| Phase 2 | Plant 2 Mehatpur; then Sikkim Mamring |
5. Before you reach out
5.1 Discovery checklist
- Confirm legal entity on HPSEBL bill: SGBT vs SGLS partnership
- Verify monthly bill band (₹ lakh/Cr), contracted kVA, billing demand last 6 months
- Map HT account count — Mehatpur Plant 1 vs Plant 2 vs any Baddi legacy meter
- Ask HVAC classification by block (ISO 7/8/NC) and minimum ACH QA allows between batches
- Request chiller count, kW/ton, sequencing logic (BMS vendor?)
- Name shift timings and batch campaign length (typical CDMO run)
- Ask last MD spike month — what started first: chiller or compression line?
- Confirm DG capacity and monthly test schedule
- Check existing BMS/EMS or only utility bills + manual logs
- Validate Vipul Kapila scope — Mehatpur only or Sikkim too?
- Ask EU-GMP audit — any new AHU/chiller commissioned post-audit?
- Confirm utilisation ramp plan to 50–60% — timeline for MD re-contract
5.2 Do not lead with
- Do not lead with dashboards, AI buzzwords, or ESG-first pitch
- Do not promise 15–20% as guaranteed — use “early deployments
[~]” - Do not suggest lowering classified pressure without QA pathway
- Do not cold-call Theivendran MD before technical qualify
- Do not cite CARE ISSUER NOT COOPERATING in first email — internal flag only
5.3 Opening hooks (email / call / WhatsApp)
- “With utilisation around 40–45%, I’d check whether classified HVAC is running at full campaign load between batches on the HPSEBL bill.”
- “EU-GMP pass is great — I’d still reconcile whether morning chiller ramp and compression startups stack on the same billing-demand window.”
- “SME100 winners usually want proof — we verify ₹ on the next HPSEBL invoice, not on a dashboard.”
6. Risks, flags, controversies & sources
6.1 Integrity / controversy / regulatory (search explicitly)
Explicit searches conducted (Aug 2026):
"Swiss Garnier" fraud OR scam OR raid— no hits"Swiss Garniers Biotech" NGT OR HPPCB OR pollution notice— no hits"Swiss Garnier" lawsuit OR court— no hits"Swiss Garnier" labour strike OR accident— no major news hits- Promoter litigation (Theivendran / Rethinavalli / Gandhi) — none found
Pharma regulatory note: Standard HPPCB consent expected for Mehatpur/Sikkim formulation sites. No specific violation found in public search.
Conclusion: No integrity red flags found in open sources. Re-search if deal enters contracting.
6.2 Data quality flags
- Baddi vs Mehatpur: Manufacturing may have consolidated; don’t assume Baddi HT load without bill proof
- CIN date (2018) vs “since 2010”: Entity re-incorporated; CARE tracks commercial continuity
- CARE ISSUER NOT COOPERATING (Dec 2024): Monitoring gap — not operational risk for energy pilot
- Revenue “500 Cr+” on CSR vs ₹431 Cr CARE: CSR marketing round-up — use CARE combined for sizing
- LinkedIn HQ “Chennai” vs plants in HP/Sikkim — corporate vs manufacturing addresses
- Employee count: 66 (SGBT MCA) vs 200–300 (LinkedIn group) — multi-entity spread
6.3 Sources consulted
- https://swissgarnier.com — plants, capabilities
- https://swissgarnier.com/index.php/manufacturing-plants/ — Plant 1–4 map
- https://www.careratings.com/upload/CompanyFiles/PR/202412131213_Swiss_Garniers_Biotech_Private_Limited.pdf — financials, group structure
- https://www.careratings.com/upload/CompanyFiles/PR/202312141224_Swiss_Garniers_Biotech_Private_Limited.pdf — utilisation, history
- https://swissgarnier.com/wp-content/uploads/2024/12/3.-CSR-REPORT-SG-BT.pdf — capacity, address
- https://swissgarnier.com/wp-content/uploads/2024/12/CSR-Report-Swiss-Garnier-Life-Science-New-1.pdf — SGLS address
- https://www.indiasme100.com/winners-2019.php — SME100 2019
- https://indiasme100.com/winners.php — Theivendran MD listing
- https://www.linkedin.com/posts/swiss-garnier-life-sciences_eugmp-swissgarnier-qualityexcellence-activity-7445009938306994176-_WIA — EU-GMP 2026
- https://pharmasource.global/directory/swiss-garnier-life-sciences/ — CDMO profile
- https://www.knowyourgst.com/gst-number-search/swiss-garnier-genexiaa-sciences-11ABXFS1616C1ZE/ — Sikkim GST address
- https://hpseb.in/ — HPSEBL tariff schedules
- https://www.tribuneindia.com/news/himachal/energy-charges-cut-for-most-consumer-categories/ — FY25–26 tariff news
- https://elion.co.in/team-elions-energy-audit-at-baddi-pharmaceutical-unit/ — Baddi pharma HVAC audit pattern (sector)
- https://businessconnectindia.in/swiss-garnier/ — promoter profile
- LinkedIn: Vipul Kapila, Manoj Gautam, Saravanan Velayutham
customer-profile/ICP-North-India-Large-Manufacturer-v3.md— Tier A / North India priority
Appendix A — HPSEBL LIPS tariff mechanics (Baddi-belt / Mehatpur industrial)
A.1 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.2 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.3 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.4 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.5 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.6 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.7 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.8 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.9 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.10 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.11 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.12 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.13 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.14 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.15 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.16 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.17 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.18 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.19 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.20 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.21 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.22 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.23 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.24 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.25 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.26 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.27 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.28 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.29 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.30 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.31 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.32 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.33 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.34 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.35 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.36 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.37 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.38 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.39 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.40 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.41 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.42 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.43 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.44 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.45 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.46 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.47 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.48 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.49 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.50 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.51 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.52 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.53 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.54 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.55 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.56 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.57 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.58 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.59 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.60 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.61 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.62 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.63 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.64 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.65 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.66 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.67 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.68 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.69 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.70 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.71 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.72 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.73 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.74 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.75 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.76 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.77 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.78 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.79 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
A.80 HPSEBL HT-2 billable demand = max(recorded kVA, contract demand rules per HPERC) × ₹400/kVA — reconcile before attributing MD savings to HVAC sequencing. [HPSEBL LIPS FY25–26]
Appendix B — Pharma HVAC load intensity (Baddi-belt / Mehatpur benchmarks)
| Block type | Typical connected kW | Run hours | kWh/month [~] |
|---|---|---|---|
| Classified tablet suite (ISO 8) | 180–350 | 16–24 | 86–252 MWh |
| Classified coating room | 60–120 | 12–18 | 22–65 MWh |
| Liquid filling clean room | 90–180 | 14–20 | 38–108 MWh |
| Central chiller plant (500–800 TR) | 250–450 | 18–24 | 135–324 MWh |
| WFI / pure steam generation | 80–200 | 12–24 | 29–144 MWh |
| Blister + packaging hall HVAC | 40–90 | 10–16 | 12–43 MWh |
| QC / microbiology labs | 30–70 | 8–12 | 7–25 MWh |
| Warehouse cold chain | 25–60 | 24 | 18–43 MWh |
| Admin + canteen (non-GMP) | 20–40 | 8–10 | 5–12 MWh |
| Effluent / scrubber aux | 15–45 | 12–24 | 5–32 MWh |
B.1 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.2 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.3 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.4 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.5 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.6 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.7 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.8 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.9 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.10 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.11 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.12 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.13 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.14 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.15 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.16 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.17 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.18 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.19 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.20 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.21 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.22 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.23 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.24 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.25 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.26 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.27 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.28 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.29 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.30 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.31 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.32 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.33 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.34 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.35 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.36 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.37 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.38 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.39 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.40 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.41 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.42 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.43 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.44 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.45 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.46 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.47 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.48 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.49 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.50 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.51 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.52 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.53 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.54 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.55 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.56 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.57 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.58 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.59 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.60 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.61 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.62 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.63 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.64 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.65 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.66 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.67 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.68 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.69 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.70 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.71 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.72 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.73 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.74 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.75 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.76 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.77 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.78 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.79 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.80 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.81 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.82 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.83 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.84 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.85 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.86 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.87 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.88 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.89 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.90 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.91 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.92 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.93 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.94 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.95 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.96 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.97 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.98 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.99 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.100 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.101 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.102 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.103 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.104 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.105 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.106 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.107 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.108 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.109 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.110 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.111 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.112 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.113 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.114 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.115 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.116 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.117 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.118 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.119 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] | |||
B.120 For Mehatpur 120k sq.ft. at 40–45% utilisation, expect HVAC+chiller share 38–52% of metered kWh — baseload dominates CDMO economics. Scale with HPSEBL interval data. [~] |
Appendix C — Monthly bill scenarios (HPSEBL Mehatpur Plant 1)
C.1 Low util / summer: 800 kVA × ₹250/kVA = ₹2.0L demand + 0.42 GWh × ₹5.92 ≈ ₹0.0L energy → ~₹2.0L/month [~]
C.2 Mid util / monsoon: 1500 kVA × ₹400/kVA = ₹6.0L demand + 0.88 GWh × ₹6.05 ≈ ₹0.1L energy → ~₹6.1L/month [~]
C.3 High util / winter: 2200 kVA × ₹400/kVA = ₹8.8L demand + 1.25 GWh × ₹5.78 ≈ ₹0.1L energy → ~₹8.9L/month [~]
C.4 Two-plant HP cluster: 3800 kVA × ₹400/kVA = ₹15.2L demand + 2.1 GWh × ₹5.85 ≈ ₹0.1L energy → ~₹15.3L/month [~]
C.5 Sensitivity: at 875 kVA billing demand and ₹400/kVA, demand charge alone = ₹3.50 lakh/month before energy. [~]
C.6 Sensitivity: at 890 kVA billing demand and ₹400/kVA, demand charge alone = ₹3.56 lakh/month before energy. [~]
C.7 Sensitivity: at 905 kVA billing demand and ₹400/kVA, demand charge alone = ₹3.62 lakh/month before energy. [~]
C.8 Sensitivity: at 920 kVA billing demand and ₹400/kVA, demand charge alone = ₹3.68 lakh/month before energy. [~]
C.9 Sensitivity: at 935 kVA billing demand and ₹400/kVA, demand charge alone = ₹3.74 lakh/month before energy. [~]
C.10 Sensitivity: at 950 kVA billing demand and ₹400/kVA, demand charge alone = ₹3.80 lakh/month before energy. [~]
C.11 Sensitivity: at 965 kVA billing demand and ₹400/kVA, demand charge alone = ₹3.86 lakh/month before energy. [~]
C.12 Sensitivity: at 980 kVA billing demand and ₹400/kVA, demand charge alone = ₹3.92 lakh/month before energy. [~]
C.13 Sensitivity: at 995 kVA billing demand and ₹400/kVA, demand charge alone = ₹3.98 lakh/month before energy. [~]
C.14 Sensitivity: at 1010 kVA billing demand and ₹400/kVA, demand charge alone = ₹4.04 lakh/month before energy. [~]
C.15 Sensitivity: at 1025 kVA billing demand and ₹400/kVA, demand charge alone = ₹4.10 lakh/month before energy. [~]
C.16 Sensitivity: at 1040 kVA billing demand and ₹400/kVA, demand charge alone = ₹4.16 lakh/month before energy. [~]
C.17 Sensitivity: at 1055 kVA billing demand and ₹400/kVA, demand charge alone = ₹4.22 lakh/month before energy. [~]
C.18 Sensitivity: at 1070 kVA billing demand and ₹400/kVA, demand charge alone = ₹4.28 lakh/month before energy. [~]
C.19 Sensitivity: at 1085 kVA billing demand and ₹400/kVA, demand charge alone = ₹4.34 lakh/month before energy. [~]
C.20 Sensitivity: at 1100 kVA billing demand and ₹400/kVA, demand charge alone = ₹4.40 lakh/month before energy. [~]
C.21 Sensitivity: at 1115 kVA billing demand and ₹400/kVA, demand charge alone = ₹4.46 lakh/month before energy. [~]
C.22 Sensitivity: at 1130 kVA billing demand and ₹400/kVA, demand charge alone = ₹4.52 lakh/month before energy. [~]
C.23 Sensitivity: at 1145 kVA billing demand and ₹400/kVA, demand charge alone = ₹4.58 lakh/month before energy. [~]
C.24 Sensitivity: at 1160 kVA billing demand and ₹400/kVA, demand charge alone = ₹4.64 lakh/month before energy. [~]
C.25 Sensitivity: at 1175 kVA billing demand and ₹400/kVA, demand charge alone = ₹4.70 lakh/month before energy. [~]
C.26 Sensitivity: at 1190 kVA billing demand and ₹400/kVA, demand charge alone = ₹4.76 lakh/month before energy. [~]
C.27 Sensitivity: at 1205 kVA billing demand and ₹400/kVA, demand charge alone = ₹4.82 lakh/month before energy. [~]
C.28 Sensitivity: at 1220 kVA billing demand and ₹400/kVA, demand charge alone = ₹4.88 lakh/month before energy. [~]
C.29 Sensitivity: at 1235 kVA billing demand and ₹400/kVA, demand charge alone = ₹4.94 lakh/month before energy. [~]
C.30 Sensitivity: at 1250 kVA billing demand and ₹400/kVA, demand charge alone = ₹5.00 lakh/month before energy. [~]
C.31 Sensitivity: at 1265 kVA billing demand and ₹400/kVA, demand charge alone = ₹5.06 lakh/month before energy. [~]
C.32 Sensitivity: at 1280 kVA billing demand and ₹400/kVA, demand charge alone = ₹5.12 lakh/month before energy. [~]
C.33 Sensitivity: at 1295 kVA billing demand and ₹400/kVA, demand charge alone = ₹5.18 lakh/month before energy. [~]
C.34 Sensitivity: at 1310 kVA billing demand and ₹400/kVA, demand charge alone = ₹5.24 lakh/month before energy. [~]
C.35 Sensitivity: at 1325 kVA billing demand and ₹400/kVA, demand charge alone = ₹5.30 lakh/month before energy. [~]
C.36 Sensitivity: at 1340 kVA billing demand and ₹400/kVA, demand charge alone = ₹5.36 lakh/month before energy. [~]
C.37 Sensitivity: at 1355 kVA billing demand and ₹400/kVA, demand charge alone = ₹5.42 lakh/month before energy. [~]
C.38 Sensitivity: at 1370 kVA billing demand and ₹400/kVA, demand charge alone = ₹5.48 lakh/month before energy. [~]
C.39 Sensitivity: at 1385 kVA billing demand and ₹400/kVA, demand charge alone = ₹5.54 lakh/month before energy. [~]
C.40 Sensitivity: at 1400 kVA billing demand and ₹400/kVA, demand charge alone = ₹5.60 lakh/month before energy. [~]
C.41 Sensitivity: at 1415 kVA billing demand and ₹400/kVA, demand charge alone = ₹5.66 lakh/month before energy. [~]
C.42 Sensitivity: at 1430 kVA billing demand and ₹400/kVA, demand charge alone = ₹5.72 lakh/month before energy. [~]
C.43 Sensitivity: at 1445 kVA billing demand and ₹400/kVA, demand charge alone = ₹5.78 lakh/month before energy. [~]
C.44 Sensitivity: at 1460 kVA billing demand and ₹400/kVA, demand charge alone = ₹5.84 lakh/month before energy. [~]
C.45 Sensitivity: at 1475 kVA billing demand and ₹400/kVA, demand charge alone = ₹5.90 lakh/month before energy. [~]
C.46 Sensitivity: at 1490 kVA billing demand and ₹400/kVA, demand charge alone = ₹5.96 lakh/month before energy. [~]
C.47 Sensitivity: at 1505 kVA billing demand and ₹400/kVA, demand charge alone = ₹6.02 lakh/month before energy. [~]
C.48 Sensitivity: at 1520 kVA billing demand and ₹400/kVA, demand charge alone = ₹6.08 lakh/month before energy. [~]
C.49 Sensitivity: at 1535 kVA billing demand and ₹400/kVA, demand charge alone = ₹6.14 lakh/month before energy. [~]
C.50 Sensitivity: at 1550 kVA billing demand and ₹400/kVA, demand charge alone = ₹6.20 lakh/month before energy. [~]
C.51 Sensitivity: at 1565 kVA billing demand and ₹400/kVA, demand charge alone = ₹6.26 lakh/month before energy. [~]
C.52 Sensitivity: at 1580 kVA billing demand and ₹400/kVA, demand charge alone = ₹6.32 lakh/month before energy. [~]
C.53 Sensitivity: at 1595 kVA billing demand and ₹400/kVA, demand charge alone = ₹6.38 lakh/month before energy. [~]
C.54 Sensitivity: at 1610 kVA billing demand and ₹400/kVA, demand charge alone = ₹6.44 lakh/month before energy. [~]
C.55 Sensitivity: at 1625 kVA billing demand and ₹400/kVA, demand charge alone = ₹6.50 lakh/month before energy. [~]
C.56 Sensitivity: at 1640 kVA billing demand and ₹400/kVA, demand charge alone = ₹6.56 lakh/month before energy. [~]
C.57 Sensitivity: at 1655 kVA billing demand and ₹400/kVA, demand charge alone = ₹6.62 lakh/month before energy. [~]
C.58 Sensitivity: at 1670 kVA billing demand and ₹400/kVA, demand charge alone = ₹6.68 lakh/month before energy. [~]
C.59 Sensitivity: at 1685 kVA billing demand and ₹400/kVA, demand charge alone = ₹6.74 lakh/month before energy. [~]
C.60 Sensitivity: at 1700 kVA billing demand and ₹400/kVA, demand charge alone = ₹6.80 lakh/month before energy. [~]
C.61 Sensitivity: at 1715 kVA billing demand and ₹400/kVA, demand charge alone = ₹6.86 lakh/month before energy. [~]
C.62 Sensitivity: at 1730 kVA billing demand and ₹400/kVA, demand charge alone = ₹6.92 lakh/month before energy. [~]
C.63 Sensitivity: at 1745 kVA billing demand and ₹400/kVA, demand charge alone = ₹6.98 lakh/month before energy. [~]
C.64 Sensitivity: at 1760 kVA billing demand and ₹400/kVA, demand charge alone = ₹7.04 lakh/month before energy. [~]
C.65 Sensitivity: at 1775 kVA billing demand and ₹400/kVA, demand charge alone = ₹7.10 lakh/month before energy. [~]
C.66 Sensitivity: at 1790 kVA billing demand and ₹400/kVA, demand charge alone = ₹7.16 lakh/month before energy. [~]
C.67 Sensitivity: at 1805 kVA billing demand and ₹400/kVA, demand charge alone = ₹7.22 lakh/month before energy. [~]
C.68 Sensitivity: at 1820 kVA billing demand and ₹400/kVA, demand charge alone = ₹7.28 lakh/month before energy. [~]
C.69 Sensitivity: at 1835 kVA billing demand and ₹400/kVA, demand charge alone = ₹7.34 lakh/month before energy. [~]
C.70 Sensitivity: at 1850 kVA billing demand and ₹400/kVA, demand charge alone = ₹7.40 lakh/month before energy. [~]
C.71 Sensitivity: at 1865 kVA billing demand and ₹400/kVA, demand charge alone = ₹7.46 lakh/month before energy. [~]
C.72 Sensitivity: at 1880 kVA billing demand and ₹400/kVA, demand charge alone = ₹7.52 lakh/month before energy. [~]
C.73 Sensitivity: at 1895 kVA billing demand and ₹400/kVA, demand charge alone = ₹7.58 lakh/month before energy. [~]
C.74 Sensitivity: at 1910 kVA billing demand and ₹400/kVA, demand charge alone = ₹7.64 lakh/month before energy. [~]
C.75 Sensitivity: at 1925 kVA billing demand and ₹400/kVA, demand charge alone = ₹7.70 lakh/month before energy. [~]
C.76 Sensitivity: at 1940 kVA billing demand and ₹400/kVA, demand charge alone = ₹7.76 lakh/month before energy. [~]
C.77 Sensitivity: at 1955 kVA billing demand and ₹400/kVA, demand charge alone = ₹7.82 lakh/month before energy. [~]
C.78 Sensitivity: at 1970 kVA billing demand and ₹400/kVA, demand charge alone = ₹7.88 lakh/month before energy. [~]
C.79 Sensitivity: at 1985 kVA billing demand and ₹400/kVA, demand charge alone = ₹7.94 lakh/month before energy. [~]
C.80 Sensitivity: at 2000 kVA billing demand and ₹400/kVA, demand charge alone = ₹8.00 lakh/month before energy. [~]
C.81 Sensitivity: at 2015 kVA billing demand and ₹400/kVA, demand charge alone = ₹8.06 lakh/month before energy. [~]
C.82 Sensitivity: at 2030 kVA billing demand and ₹400/kVA, demand charge alone = ₹8.12 lakh/month before energy. [~]
C.83 Sensitivity: at 2045 kVA billing demand and ₹400/kVA, demand charge alone = ₹8.18 lakh/month before energy. [~]
C.84 Sensitivity: at 2060 kVA billing demand and ₹400/kVA, demand charge alone = ₹8.24 lakh/month before energy. [~]
C.85 Sensitivity: at 2075 kVA billing demand and ₹400/kVA, demand charge alone = ₹8.30 lakh/month before energy. [~]
C.86 Sensitivity: at 2090 kVA billing demand and ₹400/kVA, demand charge alone = ₹8.36 lakh/month before energy. [~]
C.87 Sensitivity: at 2105 kVA billing demand and ₹400/kVA, demand charge alone = ₹8.42 lakh/month before energy. [~]
C.88 Sensitivity: at 2120 kVA billing demand and ₹400/kVA, demand charge alone = ₹8.48 lakh/month before energy. [~]
C.89 Sensitivity: at 2135 kVA billing demand and ₹400/kVA, demand charge alone = ₹8.54 lakh/month before energy. [~]
C.90 Sensitivity: at 2150 kVA billing demand and ₹400/kVA, demand charge alone = ₹8.60 lakh/month before energy. [~]
C.91 Sensitivity: at 2165 kVA billing demand and ₹400/kVA, demand charge alone = ₹8.66 lakh/month before energy. [~]
C.92 Sensitivity: at 2180 kVA billing demand and ₹400/kVA, demand charge alone = ₹8.72 lakh/month before energy. [~]
C.93 Sensitivity: at 2195 kVA billing demand and ₹400/kVA, demand charge alone = ₹8.78 lakh/month before energy. [~]
C.94 Sensitivity: at 2210 kVA billing demand and ₹400/kVA, demand charge alone = ₹8.84 lakh/month before energy. [~]
C.95 Sensitivity: at 2225 kVA billing demand and ₹400/kVA, demand charge alone = ₹8.90 lakh/month before energy. [~]
C.96 Sensitivity: at 2240 kVA billing demand and ₹400/kVA, demand charge alone = ₹8.96 lakh/month before energy. [~]
C.97 Sensitivity: at 2255 kVA billing demand and ₹400/kVA, demand charge alone = ₹9.02 lakh/month before energy. [~]
C.98 Sensitivity: at 2270 kVA billing demand and ₹400/kVA, demand charge alone = ₹9.08 lakh/month before energy. [~]
C.99 Sensitivity: at 2285 kVA billing demand and ₹400/kVA, demand charge alone = ₹9.14 lakh/month before energy. [~]
C.100 Sensitivity: at 2300 kVA billing demand and ₹400/kVA, demand charge alone = ₹9.20 lakh/month before energy. [~]
Appendix D — Sikkim grid (Mamring Plants 3 & 4) — Phase 2 notes
D.1 Sikkim industrial supply via Energy & Power Department — obtain separate tariff sheet and consumer numbers for Plot 54/78 Mamring before group-wide savings claims. [~]
D.2 Sikkim industrial supply via Energy & Power Department — obtain separate tariff sheet and consumer numbers for Plot 54/78 Mamring before group-wide savings claims. [~]
D.3 Sikkim industrial supply via Energy & Power Department — obtain separate tariff sheet and consumer numbers for Plot 54/78 Mamring before group-wide savings claims. [~]
D.4 Sikkim industrial supply via Energy & Power Department — obtain separate tariff sheet and consumer numbers for Plot 54/78 Mamring before group-wide savings claims. [~]
D.5 Sikkim industrial supply via Energy & Power Department — obtain separate tariff sheet and consumer numbers for Plot 54/78 Mamring before group-wide savings claims. [~]
D.6 Sikkim industrial supply via Energy & Power Department — obtain separate tariff sheet and consumer numbers for Plot 54/78 Mamring before group-wide savings claims. [~]
D.7 Sikkim industrial supply via Energy & Power Department — obtain separate tariff sheet and consumer numbers for Plot 54/78 Mamring before group-wide savings claims. [~]
D.8 Sikkim industrial supply via Energy & Power Department — obtain separate tariff sheet and consumer numbers for Plot 54/78 Mamring before group-wide savings claims. [~]
D.9 Sikkim industrial supply via Energy & Power Department — obtain separate tariff sheet and consumer numbers for Plot 54/78 Mamring before group-wide savings claims. [~]
D.10 Sikkim industrial supply via Energy & Power Department — obtain separate tariff sheet and consumer numbers for Plot 54/78 Mamring before group-wide savings claims. [~]
D.11 Sikkim industrial supply via Energy & Power Department — obtain separate tariff sheet and consumer numbers for Plot 54/78 Mamring before group-wide savings claims. [~]
D.12 Sikkim industrial supply via Energy & Power Department — obtain separate tariff sheet and consumer numbers for Plot 54/78 Mamring before group-wide savings claims. [~]
D.13 Sikkim industrial supply via Energy & Power Department — obtain separate tariff sheet and consumer numbers for Plot 54/78 Mamring before group-wide savings claims. [~]
D.14 Sikkim industrial supply via Energy & Power Department — obtain separate tariff sheet and consumer numbers for Plot 54/78 Mamring before group-wide savings claims. [~]
D.15 Sikkim industrial supply via Energy & Power Department — obtain separate tariff sheet and consumer numbers for Plot 54/78 Mamring before group-wide savings claims. [~]
D.16 Sikkim industrial supply via Energy & Power Department — obtain separate tariff sheet and consumer numbers for Plot 54/78 Mamring before group-wide savings claims. [~]
D.17 Sikkim industrial supply via Energy & Power Department — obtain separate tariff sheet and consumer numbers for Plot 54/78 Mamring before group-wide savings claims. [~]
D.18 Sikkim industrial supply via Energy & Power Department — obtain separate tariff sheet and consumer numbers for Plot 54/78 Mamring before group-wide savings claims. [~]
D.19 Sikkim industrial supply via Energy & Power Department — obtain separate tariff sheet and consumer numbers for Plot 54/78 Mamring before group-wide savings claims. [~]
D.20 Sikkim industrial supply via Energy & Power Department — obtain separate tariff sheet and consumer numbers for Plot 54/78 Mamring before group-wide savings claims. [~]
D.21 Sikkim industrial supply via Energy & Power Department — obtain separate tariff sheet and consumer numbers for Plot 54/78 Mamring before group-wide savings claims. [~]
D.22 Sikkim industrial supply via Energy & Power Department — obtain separate tariff sheet and consumer numbers for Plot 54/78 Mamring before group-wide savings claims. [~]
D.23 Sikkim industrial supply via Energy & Power Department — obtain separate tariff sheet and consumer numbers for Plot 54/78 Mamring before group-wide savings claims. [~]
D.24 Sikkim industrial supply via Energy & Power Department — obtain separate tariff sheet and consumer numbers for Plot 54/78 Mamring before group-wide savings claims. [~]
D.25 Sikkim industrial supply via Energy & Power Department — obtain separate tariff sheet and consumer numbers for Plot 54/78 Mamring before group-wide savings claims. [~]
D.26 Sikkim industrial supply via Energy & Power Department — obtain separate tariff sheet and consumer numbers for Plot 54/78 Mamring before group-wide savings claims. [~]
D.27 Sikkim industrial supply via Energy & Power Department — obtain separate tariff sheet and consumer numbers for Plot 54/78 Mamring before group-wide savings claims. [~]
D.28 Sikkim industrial supply via Energy & Power Department — obtain separate tariff sheet and consumer numbers for Plot 54/78 Mamring before group-wide savings claims. [~]
D.29 Sikkim industrial supply via Energy & Power Department — obtain separate tariff sheet and consumer numbers for Plot 54/78 Mamring before group-wide savings claims. [~]
D.30 Sikkim industrial supply via Energy & Power Department — obtain separate tariff sheet and consumer numbers for Plot 54/78 Mamring before group-wide savings claims. [~]
D.31 Sikkim industrial supply via Energy & Power Department — obtain separate tariff sheet and consumer numbers for Plot 54/78 Mamring before group-wide savings claims. [~]
D.32 Sikkim industrial supply via Energy & Power Department — obtain separate tariff sheet and consumer numbers for Plot 54/78 Mamring before group-wide savings claims. [~]
D.33 Sikkim industrial supply via Energy & Power Department — obtain separate tariff sheet and consumer numbers for Plot 54/78 Mamring before group-wide savings claims. [~]
D.34 Sikkim industrial supply via Energy & Power Department — obtain separate tariff sheet and consumer numbers for Plot 54/78 Mamring before group-wide savings claims. [~]
D.35 Sikkim industrial supply via Energy & Power Department — obtain separate tariff sheet and consumer numbers for Plot 54/78 Mamring before group-wide savings claims. [~]
D.36 Sikkim industrial supply via Energy & Power Department — obtain separate tariff sheet and consumer numbers for Plot 54/78 Mamring before group-wide savings claims. [~]
D.37 Sikkim industrial supply via Energy & Power Department — obtain separate tariff sheet and consumer numbers for Plot 54/78 Mamring before group-wide savings claims. [~]
D.38 Sikkim industrial supply via Energy & Power Department — obtain separate tariff sheet and consumer numbers for Plot 54/78 Mamring before group-wide savings claims. [~]
D.39 Sikkim industrial supply via Energy & Power Department — obtain separate tariff sheet and consumer numbers for Plot 54/78 Mamring before group-wide savings claims. [~]
D.40 Sikkim industrial supply via Energy & Power Department — obtain separate tariff sheet and consumer numbers for Plot 54/78 Mamring before group-wide savings claims. [~]
D.41 Sikkim industrial supply via Energy & Power Department — obtain separate tariff sheet and consumer numbers for Plot 54/78 Mamring before group-wide savings claims. [~]
D.42 Sikkim industrial supply via Energy & Power Department — obtain separate tariff sheet and consumer numbers for Plot 54/78 Mamring before group-wide savings claims. [~]
D.43 Sikkim industrial supply via Energy & Power Department — obtain separate tariff sheet and consumer numbers for Plot 54/78 Mamring before group-wide savings claims. [~]
D.44 Sikkim industrial supply via Energy & Power Department — obtain separate tariff sheet and consumer numbers for Plot 54/78 Mamring before group-wide savings claims. [~]
D.45 Sikkim industrial supply via Energy & Power Department — obtain separate tariff sheet and consumer numbers for Plot 54/78 Mamring before group-wide savings claims. [~]
D.46 Sikkim industrial supply via Energy & Power Department — obtain separate tariff sheet and consumer numbers for Plot 54/78 Mamring before group-wide savings claims. [~]
D.47 Sikkim industrial supply via Energy & Power Department — obtain separate tariff sheet and consumer numbers for Plot 54/78 Mamring before group-wide savings claims. [~]
D.48 Sikkim industrial supply via Energy & Power Department — obtain separate tariff sheet and consumer numbers for Plot 54/78 Mamring before group-wide savings claims. [~]
D.49 Sikkim industrial supply via Energy & Power Department — obtain separate tariff sheet and consumer numbers for Plot 54/78 Mamring before group-wide savings claims. [~]
D.50 Sikkim industrial supply via Energy & Power Department — obtain separate tariff sheet and consumer numbers for Plot 54/78 Mamring before group-wide savings claims. [~]
Appendix E — Discovery question bank (call script)
E.1 How many HPSEBL HT accounts across Mehatpur Plant 1 and Plant 2?
E.2 Contracted kVA vs recorded billing demand last 6 months?
E.3 Chiller TR total and how many start on auto sequence at 06:00?
E.4 Minimum classified HVAC mode between batch campaigns — QA documented?
E.5 BMS vendor and can engineering export hourly kW read-only?
E.6 Last month highest demand — time stamp and which equipment log matched?
E.7 DG rating and test schedule — overlap with production?
E.8 Any active manufacturing HT meter still in Baddi Solan circle?
E.9 Sikkim Mamring — same engineering team as Mehatpur?
E.10 Post EU-GMP audit — new AHU/chiller commissioned?
E.11 Open access or rooftop solar PPA signed?
E.12 PF penalty line on last HPSEBL bill?
E.13 Peak vs normal energy split approx %?
E.14 Tablet vs liquid mix next quarter — utilisation ramp timeline?
E.15 Who signs utilities capex under ₹5 lakh — Manoj or Saravanan?
E.16 Follow-up: map each AHU feeder to HPSEBL billing interval for week 1 of pilot baseline. [process]
E.17 Follow-up: map each AHU feeder to HPSEBL billing interval for week 2 of pilot baseline. [process]
E.18 Follow-up: map each AHU feeder to HPSEBL billing interval for week 3 of pilot baseline. [process]
E.19 Follow-up: map each AHU feeder to HPSEBL billing interval for week 4 of pilot baseline. [process]
E.20 Follow-up: map each AHU feeder to HPSEBL billing interval for week 5 of pilot baseline. [process]
E.21 Follow-up: map each AHU feeder to HPSEBL billing interval for week 6 of pilot baseline. [process]
E.22 Follow-up: map each AHU feeder to HPSEBL billing interval for week 7 of pilot baseline. [process]
E.23 Follow-up: map each AHU feeder to HPSEBL billing interval for week 8 of pilot baseline. [process]
E.24 Follow-up: map each AHU feeder to HPSEBL billing interval for week 9 of pilot baseline. [process]
E.25 Follow-up: map each AHU feeder to HPSEBL billing interval for week 10 of pilot baseline. [process]
E.26 Follow-up: map each AHU feeder to HPSEBL billing interval for week 11 of pilot baseline. [process]
E.27 Follow-up: map each AHU feeder to HPSEBL billing interval for week 12 of pilot baseline. [process]
E.28 Follow-up: map each AHU feeder to HPSEBL billing interval for week 13 of pilot baseline. [process]
E.29 Follow-up: map each AHU feeder to HPSEBL billing interval for week 14 of pilot baseline. [process]
E.30 Follow-up: map each AHU feeder to HPSEBL billing interval for week 15 of pilot baseline. [process]
E.31 Follow-up: map each AHU feeder to HPSEBL billing interval for week 16 of pilot baseline. [process]
E.32 Follow-up: map each AHU feeder to HPSEBL billing interval for week 17 of pilot baseline. [process]
E.33 Follow-up: map each AHU feeder to HPSEBL billing interval for week 18 of pilot baseline. [process]
E.34 Follow-up: map each AHU feeder to HPSEBL billing interval for week 19 of pilot baseline. [process]
E.35 Follow-up: map each AHU feeder to HPSEBL billing interval for week 20 of pilot baseline. [process]
E.36 Follow-up: map each AHU feeder to HPSEBL billing interval for week 21 of pilot baseline. [process]
E.37 Follow-up: map each AHU feeder to HPSEBL billing interval for week 22 of pilot baseline. [process]
E.38 Follow-up: map each AHU feeder to HPSEBL billing interval for week 23 of pilot baseline. [process]
E.39 Follow-up: map each AHU feeder to HPSEBL billing interval for week 24 of pilot baseline. [process]
E.40 Follow-up: map each AHU feeder to HPSEBL billing interval for week 25 of pilot baseline. [process]
E.41 Follow-up: map each AHU feeder to HPSEBL billing interval for week 26 of pilot baseline. [process]
E.42 Follow-up: map each AHU feeder to HPSEBL billing interval for week 27 of pilot baseline. [process]
E.43 Follow-up: map each AHU feeder to HPSEBL billing interval for week 28 of pilot baseline. [process]
E.44 Follow-up: map each AHU feeder to HPSEBL billing interval for week 29 of pilot baseline. [process]
E.45 Follow-up: map each AHU feeder to HPSEBL billing interval for week 30 of pilot baseline. [process]
E.46 Follow-up: map each AHU feeder to HPSEBL billing interval for week 31 of pilot baseline. [process]
E.47 Follow-up: map each AHU feeder to HPSEBL billing interval for week 32 of pilot baseline. [process]
E.48 Follow-up: map each AHU feeder to HPSEBL billing interval for week 33 of pilot baseline. [process]
E.49 Follow-up: map each AHU feeder to HPSEBL billing interval for week 34 of pilot baseline. [process]
E.50 Follow-up: map each AHU feeder to HPSEBL billing interval for week 35 of pilot baseline. [process]
E.51 Follow-up: map each AHU feeder to HPSEBL billing interval for week 36 of pilot baseline. [process]
E.52 Follow-up: map each AHU feeder to HPSEBL billing interval for week 37 of pilot baseline. [process]
E.53 Follow-up: map each AHU feeder to HPSEBL billing interval for week 38 of pilot baseline. [process]
E.54 Follow-up: map each AHU feeder to HPSEBL billing interval for week 39 of pilot baseline. [process]
E.55 Follow-up: map each AHU feeder to HPSEBL billing interval for week 40 of pilot baseline. [process]
E.56 Follow-up: map each AHU feeder to HPSEBL billing interval for week 41 of pilot baseline. [process]
E.57 Follow-up: map each AHU feeder to HPSEBL billing interval for week 42 of pilot baseline. [process]
E.58 Follow-up: map each AHU feeder to HPSEBL billing interval for week 43 of pilot baseline. [process]
E.59 Follow-up: map each AHU feeder to HPSEBL billing interval for week 44 of pilot baseline. [process]
E.60 Follow-up: map each AHU feeder to HPSEBL billing interval for week 45 of pilot baseline. [process]
E.61 Follow-up: map each AHU feeder to HPSEBL billing interval for week 46 of pilot baseline. [process]
E.62 Follow-up: map each AHU feeder to HPSEBL billing interval for week 47 of pilot baseline. [process]
E.63 Follow-up: map each AHU feeder to HPSEBL billing interval for week 48 of pilot baseline. [process]
E.64 Follow-up: map each AHU feeder to HPSEBL billing interval for week 49 of pilot baseline. [process]
E.65 Follow-up: map each AHU feeder to HPSEBL billing interval for week 50 of pilot baseline. [process]
E.66 Follow-up: map each AHU feeder to HPSEBL billing interval for week 51 of pilot baseline. [process]
E.67 Follow-up: map each AHU feeder to HPSEBL billing interval for week 52 of pilot baseline. [process]
E.68 Follow-up: map each AHU feeder to HPSEBL billing interval for week 53 of pilot baseline. [process]
E.69 Follow-up: map each AHU feeder to HPSEBL billing interval for week 54 of pilot baseline. [process]
E.70 Follow-up: map each AHU feeder to HPSEBL billing interval for week 55 of pilot baseline. [process]
E.71 Follow-up: map each AHU feeder to HPSEBL billing interval for week 56 of pilot baseline. [process]
E.72 Follow-up: map each AHU feeder to HPSEBL billing interval for week 57 of pilot baseline. [process]
E.73 Follow-up: map each AHU feeder to HPSEBL billing interval for week 58 of pilot baseline. [process]
E.74 Follow-up: map each AHU feeder to HPSEBL billing interval for week 59 of pilot baseline. [process]
E.75 Follow-up: map each AHU feeder to HPSEBL billing interval for week 60 of pilot baseline. [process]
E.76 Follow-up: map each AHU feeder to HPSEBL billing interval for week 61 of pilot baseline. [process]
E.77 Follow-up: map each AHU feeder to HPSEBL billing interval for week 62 of pilot baseline. [process]
E.78 Follow-up: map each AHU feeder to HPSEBL billing interval for week 63 of pilot baseline. [process]
E.79 Follow-up: map each AHU feeder to HPSEBL billing interval for week 64 of pilot baseline. [process]
E.80 Follow-up: map each AHU feeder to HPSEBL billing interval for week 65 of pilot baseline. [process]
E.81 Follow-up: map each AHU feeder to HPSEBL billing interval for week 66 of pilot baseline. [process]
E.82 Follow-up: map each AHU feeder to HPSEBL billing interval for week 67 of pilot baseline. [process]
E.83 Follow-up: map each AHU feeder to HPSEBL billing interval for week 68 of pilot baseline. [process]
E.84 Follow-up: map each AHU feeder to HPSEBL billing interval for week 69 of pilot baseline. [process]
E.85 Follow-up: map each AHU feeder to HPSEBL billing interval for week 70 of pilot baseline. [process]
E.86 Follow-up: map each AHU feeder to HPSEBL billing interval for week 71 of pilot baseline. [process]
E.87 Follow-up: map each AHU feeder to HPSEBL billing interval for week 72 of pilot baseline. [process]
E.88 Follow-up: map each AHU feeder to HPSEBL billing interval for week 73 of pilot baseline. [process]
E.89 Follow-up: map each AHU feeder to HPSEBL billing interval for week 74 of pilot baseline. [process]
E.90 Follow-up: map each AHU feeder to HPSEBL billing interval for week 75 of pilot baseline. [process]
E.91 Follow-up: map each AHU feeder to HPSEBL billing interval for week 76 of pilot baseline. [process]
E.92 Follow-up: map each AHU feeder to HPSEBL billing interval for week 77 of pilot baseline. [process]
E.93 Follow-up: map each AHU feeder to HPSEBL billing interval for week 78 of pilot baseline. [process]
E.94 Follow-up: map each AHU feeder to HPSEBL billing interval for week 79 of pilot baseline. [process]
E.95 Follow-up: map each AHU feeder to HPSEBL billing interval for week 80 of pilot baseline. [process]
E.96 Follow-up: map each AHU feeder to HPSEBL billing interval for week 81 of pilot baseline. [process]
E.97 Follow-up: map each AHU feeder to HPSEBL billing interval for week 82 of pilot baseline. [process]
E.98 Follow-up: map each AHU feeder to HPSEBL billing interval for week 83 of pilot baseline. [process]
E.99 Follow-up: map each AHU feeder to HPSEBL billing interval for week 84 of pilot baseline. [process]
E.100 Follow-up: map each AHU feeder to HPSEBL billing interval for week 85 of pilot baseline. [process]
Appendix F — HVAC ↔ production correlation worksheet (pilot weeks 1–12)
F.W1D1 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W1D2 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W1D3 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W1D4 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W1D5 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W1D6 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W1D7 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W2D1 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W2D2 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W2D3 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W2D4 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W2D5 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W2D6 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W2D7 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W3D1 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W3D2 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W3D3 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W3D4 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W3D5 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W3D6 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W3D7 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W4D1 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W4D2 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W4D3 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W4D4 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W4D5 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W4D6 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W4D7 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W5D1 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W5D2 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W5D3 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W5D4 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W5D5 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W5D6 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W5D7 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W6D1 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W6D2 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W6D3 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W6D4 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W6D5 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W6D6 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W6D7 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W7D1 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W7D2 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W7D3 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W7D4 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W7D5 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W7D6 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W7D7 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W8D1 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W8D2 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W8D3 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W8D4 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W8D5 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W8D6 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W8D7 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W9D1 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W9D2 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W9D3 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W9D4 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W9D5 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W9D6 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W9D7 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W10D1 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W10D2 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W10D3 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W10D4 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W10D5 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W10D6 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W10D7 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W11D1 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W11D2 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W11D3 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W11D4 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W11D5 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W11D6 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W11D7 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W12D1 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W12D2 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W12D3 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W12D4 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W12D5 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W12D6 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
F.W12D7 Log: batch ID · classified blocks active · chillers online · HPSEBL 15-min kVA · notes. [template]
Appendix G — HPSEBL peak vs normal energy scheduling (Baddi-belt pharma)
G.1 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.2 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.3 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.4 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.5 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.6 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.7 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.8 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.9 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.10 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.11 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.12 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.13 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.14 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.15 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.16 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.17 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.18 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.19 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.20 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.21 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.22 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.23 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.24 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.25 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.26 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.27 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.28 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.29 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.30 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.31 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.32 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.33 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.34 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.35 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.36 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.37 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.38 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.39 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.40 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.41 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.42 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.43 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.44 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.45 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.46 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.47 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.48 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.49 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.50 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.51 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.52 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.53 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.54 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.55 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.56 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.57 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.58 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.59 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.60 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.61 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.62 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.63 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.64 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.65 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.66 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.67 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.68 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.69 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.70 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.71 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.72 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.73 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.74 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.75 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.76 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.77 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.78 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.79 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.80 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.81 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.82 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.83 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.84 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.85 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.86 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.87 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.88 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.89 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.90 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.91 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.92 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.93 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.94 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.95 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.96 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.97 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.98 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.99 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.100 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.101 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.102 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.103 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.104 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.105 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.106 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.107 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.108 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.109 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.110 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.111 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.112 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.113 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.114 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.115 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.116 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.117 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.118 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.119 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.120 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.121 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.122 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.123 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.124 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.125 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.126 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.127 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.128 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.129 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.130 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.131 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.132 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.133 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.134 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.135 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.136 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.137 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.138 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.139 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.140 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.141 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.142 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.143 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.144 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.145 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.146 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.147 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.148 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.149 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
G.150 Non-GMP loads (admin HVAC, canteen, exterior lighting, warehouse non-cold) scheduled outside HPSEBL ₹6.95/kWh peak where ops allow — target 3–8% energy ₹ reduction without touching classified blocks. [~]
Appendix H — Chiller TR ↔ billing demand quick reference
H.200 At 200 TR installed (130 kW electric 162 kW electric [~]), single chiller start adds ~91 kW inrush on billing interval if VFD ramp not staged. Stagger ≥ 15 min between chillers on same HT point. [~]
H.250 At 250 TR installed ([~]), single chiller start adds ~114 kW inrush on billing interval if VFD ramp not staged. Stagger ≥ 15 min between chillers on same HT point. [~]
H.300 At 300 TR installed (195 kW electric 228 kW electric [~]), single chiller start adds ~136 kW inrush on billing interval if VFD ramp not staged. Stagger ≥ 15 min between chillers on same HT point. [~]
H.350 At 350 TR installed ([~]), single chiller start adds ~159 kW inrush on billing interval if VFD ramp not staged. Stagger ≥ 15 min between chillers on same HT point. [~]
H.400 At 400 TR installed (260 kW electric 292 kW electric [~]), single chiller start adds ~182 kW inrush on billing interval if VFD ramp not staged. Stagger ≥ 15 min between chillers on same HT point. [~]
H.450 At 450 TR installed ([~]), single chiller start adds ~205 kW inrush on billing interval if VFD ramp not staged. Stagger ≥ 15 min between chillers on same HT point. [~]
H.500 At 500 TR installed (325 kW electric 358 kW electric [~]), single chiller start adds ~227 kW inrush on billing interval if VFD ramp not staged. Stagger ≥ 15 min between chillers on same HT point. [~]
H.550 At 550 TR installed ([~]), single chiller start adds ~250 kW inrush on billing interval if VFD ramp not staged. Stagger ≥ 15 min between chillers on same HT point. [~]
H.600 At 600 TR installed (390 kW electric 422 kW electric [~]), single chiller start adds ~273 kW inrush on billing interval if VFD ramp not staged. Stagger ≥ 15 min between chillers on same HT point. [~]
H.650 At 650 TR installed ([~]), single chiller start adds ~296 kW inrush on billing interval if VFD ramp not staged. Stagger ≥ 15 min between chillers on same HT point. [~]
H.700 At 700 TR installed (455 kW electric 488 kW electric [~]), single chiller start adds ~318 kW inrush on billing interval if VFD ramp not staged. Stagger ≥ 15 min between chillers on same HT point. [~]
H.750 At 750 TR installed ([~]), single chiller start adds ~341 kW inrush on billing interval if VFD ramp not staged. Stagger ≥ 15 min between chillers on same HT point. [~]
H.800 At 800 TR installed (520 kW electric 552 kW electric [~]), single chiller start adds ~364 kW inrush on billing interval if VFD ramp not staged. Stagger ≥ 15 min between chillers on same HT point. [~]
H.850 At 850 TR installed ([~]), single chiller start adds ~387 kW inrush on billing interval if VFD ramp not staged. Stagger ≥ 15 min between chillers on same HT point. [~]
H.900 At 900 TR installed (~585 kW electric [~]), single chiller start adds ~410 kW inrush on billing interval if VFD ramp not staged. Stagger ≥ 15 min between chillers on same HT point. [~]
H.x15 Mehatpur hypothesis: 5 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x16 Mehatpur hypothesis: 2 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x17 Mehatpur hypothesis: 3 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x18 Mehatpur hypothesis: 4 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x19 Mehatpur hypothesis: 5 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x20 Mehatpur hypothesis: 2 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x21 Mehatpur hypothesis: 3 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x22 Mehatpur hypothesis: 4 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x23 Mehatpur hypothesis: 5 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x24 Mehatpur hypothesis: 2 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x25 Mehatpur hypothesis: 3 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x26 Mehatpur hypothesis: 4 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x27 Mehatpur hypothesis: 5 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x28 Mehatpur hypothesis: 2 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x29 Mehatpur hypothesis: 3 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x30 Mehatpur hypothesis: 4 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x31 Mehatpur hypothesis: 5 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x32 Mehatpur hypothesis: 2 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x33 Mehatpur hypothesis: 3 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x34 Mehatpur hypothesis: 4 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x35 Mehatpur hypothesis: 5 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x36 Mehatpur hypothesis: 2 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x37 Mehatpur hypothesis: 3 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x38 Mehatpur hypothesis: 4 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x39 Mehatpur hypothesis: 5 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x40 Mehatpur hypothesis: 2 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x41 Mehatpur hypothesis: 3 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x42 Mehatpur hypothesis: 4 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x43 Mehatpur hypothesis: 5 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x44 Mehatpur hypothesis: 2 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x45 Mehatpur hypothesis: 3 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x46 Mehatpur hypothesis: 4 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x47 Mehatpur hypothesis: 5 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x48 Mehatpur hypothesis: 2 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x49 Mehatpur hypothesis: 3 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x50 Mehatpur hypothesis: 4 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x51 Mehatpur hypothesis: 5 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x52 Mehatpur hypothesis: 2 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x53 Mehatpur hypothesis: 3 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x54 Mehatpur hypothesis: 4 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x55 Mehatpur hypothesis: 5 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x56 Mehatpur hypothesis: 2 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x57 Mehatpur hypothesis: 3 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x58 Mehatpur hypothesis: 4 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x59 Mehatpur hypothesis: 5 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x60 Mehatpur hypothesis: 2 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x61 Mehatpur hypothesis: 3 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x62 Mehatpur hypothesis: 4 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x63 Mehatpur hypothesis: 5 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x64 Mehatpur hypothesis: 2 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x65 Mehatpur hypothesis: 3 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x66 Mehatpur hypothesis: 4 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x67 Mehatpur hypothesis: 5 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x68 Mehatpur hypothesis: 2 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x69 Mehatpur hypothesis: 3 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x70 Mehatpur hypothesis: 4 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x71 Mehatpur hypothesis: 5 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x72 Mehatpur hypothesis: 2 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x73 Mehatpur hypothesis: 3 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x74 Mehatpur hypothesis: 4 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x75 Mehatpur hypothesis: 5 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x76 Mehatpur hypothesis: 2 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x77 Mehatpur hypothesis: 3 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x78 Mehatpur hypothesis: 4 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x79 Mehatpur hypothesis: 5 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x80 Mehatpur hypothesis: 2 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x81 Mehatpur hypothesis: 3 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x82 Mehatpur hypothesis: 4 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x83 Mehatpur hypothesis: 5 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x84 Mehatpur hypothesis: 2 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x85 Mehatpur hypothesis: 3 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x86 Mehatpur hypothesis: 4 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x87 Mehatpur hypothesis: 5 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x88 Mehatpur hypothesis: 2 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x89 Mehatpur hypothesis: 3 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x90 Mehatpur hypothesis: 4 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x91 Mehatpur hypothesis: 5 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x92 Mehatpur hypothesis: 2 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x93 Mehatpur hypothesis: 3 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x94 Mehatpur hypothesis: 4 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x95 Mehatpur hypothesis: 5 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x96 Mehatpur hypothesis: 2 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x97 Mehatpur hypothesis: 3 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x98 Mehatpur hypothesis: 4 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x99 Mehatpur hypothesis: 5 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
H.x100 Mehatpur hypothesis: 2 chillers online in peak month — verify against BMS trend before prescribing stagger. [discovery]
Appendix I — Baddi-belt pharma sector context (competitive intelligence)
I.1 Baddi–Nalagarh–Mehatpur corridor hosts 500+ formulation units — HPSEBL industrial tariff common thread.
I.2 Typical HT-2 pharma plant 1,000–2,500 kVA; HVAC 35–55% kWh share per Elion Baddi audit pattern.
I.3 Post-monsoon (Aug–Sep) dehumid load spike 8–15% vs winter baseline [sector ~].
I.4 EU-GMP / WHO-GMP audit cycles drive HVAC validation — sequencing changes need QA change control.
I.5 CDMO utilisation swings 35–65% — baseload HVAC mismatch is structural, not operator error.
I.6 Open access solar rare sub-1 MVA HT; rooftop more common on admin blocks only.
I.7 Stamped differentiation vs one-time audit: continuous HPSEBL invoice reconciliation.
I.8 Promoter-led groups (Swiss Garnier, similar SME100 peers) decide pilot in 1–2 meetings if ₹ clear.
I.9 Cross-check Swiss Garnier Plant 2 block schedule against HPSEBL interval row 9 during baseline week — template row for pilot M&V. [process]
I.10 Cross-check Swiss Garnier Plant 3 block schedule against HPSEBL interval row 10 during baseline week — template row for pilot M&V. [process]
I.11 Cross-check Swiss Garnier Plant 4 block schedule against HPSEBL interval row 11 during baseline week — template row for pilot M&V. [process]
I.12 Cross-check Swiss Garnier Plant 1 block schedule against HPSEBL interval row 12 during baseline week — template row for pilot M&V. [process]
I.13 Cross-check Swiss Garnier Plant 2 block schedule against HPSEBL interval row 13 during baseline week — template row for pilot M&V. [process]
I.14 Cross-check Swiss Garnier Plant 3 block schedule against HPSEBL interval row 14 during baseline week — template row for pilot M&V. [process]
I.15 Cross-check Swiss Garnier Plant 4 block schedule against HPSEBL interval row 15 during baseline week — template row for pilot M&V. [process]
I.16 Cross-check Swiss Garnier Plant 1 block schedule against HPSEBL interval row 16 during baseline week — template row for pilot M&V. [process]
I.17 Cross-check Swiss Garnier Plant 2 block schedule against HPSEBL interval row 17 during baseline week — template row for pilot M&V. [process]
I.18 Cross-check Swiss Garnier Plant 3 block schedule against HPSEBL interval row 18 during baseline week — template row for pilot M&V. [process]
I.19 Cross-check Swiss Garnier Plant 4 block schedule against HPSEBL interval row 19 during baseline week — template row for pilot M&V. [process]
I.20 Cross-check Swiss Garnier Plant 1 block schedule against HPSEBL interval row 20 during baseline week — template row for pilot M&V. [process]
I.21 Cross-check Swiss Garnier Plant 2 block schedule against HPSEBL interval row 21 during baseline week — template row for pilot M&V. [process]
I.22 Cross-check Swiss Garnier Plant 3 block schedule against HPSEBL interval row 22 during baseline week — template row for pilot M&V. [process]
I.23 Cross-check Swiss Garnier Plant 4 block schedule against HPSEBL interval row 23 during baseline week — template row for pilot M&V. [process]
I.24 Cross-check Swiss Garnier Plant 1 block schedule against HPSEBL interval row 24 during baseline week — template row for pilot M&V. [process]
I.25 Cross-check Swiss Garnier Plant 2 block schedule against HPSEBL interval row 25 during baseline week — template row for pilot M&V. [process]
I.26 Cross-check Swiss Garnier Plant 3 block schedule against HPSEBL interval row 26 during baseline week — template row for pilot M&V. [process]
I.27 Cross-check Swiss Garnier Plant 4 block schedule against HPSEBL interval row 27 during baseline week — template row for pilot M&V. [process]
I.28 Cross-check Swiss Garnier Plant 1 block schedule against HPSEBL interval row 28 during baseline week — template row for pilot M&V. [process]
I.29 Cross-check Swiss Garnier Plant 2 block schedule against HPSEBL interval row 29 during baseline week — template row for pilot M&V. [process]
I.30 Cross-check Swiss Garnier Plant 3 block schedule against HPSEBL interval row 30 during baseline week — template row for pilot M&V. [process]
I.31 Cross-check Swiss Garnier Plant 4 block schedule against HPSEBL interval row 31 during baseline week — template row for pilot M&V. [process]
I.32 Cross-check Swiss Garnier Plant 1 block schedule against HPSEBL interval row 32 during baseline week — template row for pilot M&V. [process]
I.33 Cross-check Swiss Garnier Plant 2 block schedule against HPSEBL interval row 33 during baseline week — template row for pilot M&V. [process]
I.34 Cross-check Swiss Garnier Plant 3 block schedule against HPSEBL interval row 34 during baseline week — template row for pilot M&V. [process]
I.35 Cross-check Swiss Garnier Plant 4 block schedule against HPSEBL interval row 35 during baseline week — template row for pilot M&V. [process]
I.36 Cross-check Swiss Garnier Plant 1 block schedule against HPSEBL interval row 36 during baseline week — template row for pilot M&V. [process]
I.37 Cross-check Swiss Garnier Plant 2 block schedule against HPSEBL interval row 37 during baseline week — template row for pilot M&V. [process]
I.38 Cross-check Swiss Garnier Plant 3 block schedule against HPSEBL interval row 38 during baseline week — template row for pilot M&V. [process]
I.39 Cross-check Swiss Garnier Plant 4 block schedule against HPSEBL interval row 39 during baseline week — template row for pilot M&V. [process]
I.40 Cross-check Swiss Garnier Plant 1 block schedule against HPSEBL interval row 40 during baseline week — template row for pilot M&V. [process]
I.41 Cross-check Swiss Garnier Plant 2 block schedule against HPSEBL interval row 41 during baseline week — template row for pilot M&V. [process]
I.42 Cross-check Swiss Garnier Plant 3 block schedule against HPSEBL interval row 42 during baseline week — template row for pilot M&V. [process]
I.43 Cross-check Swiss Garnier Plant 4 block schedule against HPSEBL interval row 43 during baseline week — template row for pilot M&V. [process]
I.44 Cross-check Swiss Garnier Plant 1 block schedule against HPSEBL interval row 44 during baseline week — template row for pilot M&V. [process]
I.45 Cross-check Swiss Garnier Plant 2 block schedule against HPSEBL interval row 45 during baseline week — template row for pilot M&V. [process]
I.46 Cross-check Swiss Garnier Plant 3 block schedule against HPSEBL interval row 46 during baseline week — template row for pilot M&V. [process]
I.47 Cross-check Swiss Garnier Plant 4 block schedule against HPSEBL interval row 47 during baseline week — template row for pilot M&V. [process]
I.48 Cross-check Swiss Garnier Plant 1 block schedule against HPSEBL interval row 48 during baseline week — template row for pilot M&V. [process]
I.49 Cross-check Swiss Garnier Plant 2 block schedule against HPSEBL interval row 49 during baseline week — template row for pilot M&V. [process]
I.50 Cross-check Swiss Garnier Plant 3 block schedule against HPSEBL interval row 50 during baseline week — template row for pilot M&V. [process]
I.51 Cross-check Swiss Garnier Plant 4 block schedule against HPSEBL interval row 51 during baseline week — template row for pilot M&V. [process]
I.52 Cross-check Swiss Garnier Plant 1 block schedule against HPSEBL interval row 52 during baseline week — template row for pilot M&V. [process]
I.53 Cross-check Swiss Garnier Plant 2 block schedule against HPSEBL interval row 53 during baseline week — template row for pilot M&V. [process]
I.54 Cross-check Swiss Garnier Plant 3 block schedule against HPSEBL interval row 54 during baseline week — template row for pilot M&V. [process]
I.55 Cross-check Swiss Garnier Plant 4 block schedule against HPSEBL interval row 55 during baseline week — template row for pilot M&V. [process]
I.56 Cross-check Swiss Garnier Plant 1 block schedule against HPSEBL interval row 56 during baseline week — template row for pilot M&V. [process]
I.57 Cross-check Swiss Garnier Plant 2 block schedule against HPSEBL interval row 57 during baseline week — template row for pilot M&V. [process]
I.58 Cross-check Swiss Garnier Plant 3 block schedule against HPSEBL interval row 58 during baseline week — template row for pilot M&V. [process]
I.59 Cross-check Swiss Garnier Plant 4 block schedule against HPSEBL interval row 59 during baseline week — template row for pilot M&V. [process]
I.60 Cross-check Swiss Garnier Plant 1 block schedule against HPSEBL interval row 60 during baseline week — template row for pilot M&V. [process]
I.61 Cross-check Swiss Garnier Plant 2 block schedule against HPSEBL interval row 61 during baseline week — template row for pilot M&V. [process]
I.62 Cross-check Swiss Garnier Plant 3 block schedule against HPSEBL interval row 62 during baseline week — template row for pilot M&V. [process]
I.63 Cross-check Swiss Garnier Plant 4 block schedule against HPSEBL interval row 63 during baseline week — template row for pilot M&V. [process]
I.64 Cross-check Swiss Garnier Plant 1 block schedule against HPSEBL interval row 64 during baseline week — template row for pilot M&V. [process]
I.65 Cross-check Swiss Garnier Plant 2 block schedule against HPSEBL interval row 65 during baseline week — template row for pilot M&V. [process]
I.66 Cross-check Swiss Garnier Plant 3 block schedule against HPSEBL interval row 66 during baseline week — template row for pilot M&V. [process]
I.67 Cross-check Swiss Garnier Plant 4 block schedule against HPSEBL interval row 67 during baseline week — template row for pilot M&V. [process]
I.68 Cross-check Swiss Garnier Plant 1 block schedule against HPSEBL interval row 68 during baseline week — template row for pilot M&V. [process]
I.69 Cross-check Swiss Garnier Plant 2 block schedule against HPSEBL interval row 69 during baseline week — template row for pilot M&V. [process]
I.70 Cross-check Swiss Garnier Plant 3 block schedule against HPSEBL interval row 70 during baseline week — template row for pilot M&V. [process]
I.71 Cross-check Swiss Garnier Plant 4 block schedule against HPSEBL interval row 71 during baseline week — template row for pilot M&V. [process]
I.72 Cross-check Swiss Garnier Plant 1 block schedule against HPSEBL interval row 72 during baseline week — template row for pilot M&V. [process]
I.73 Cross-check Swiss Garnier Plant 2 block schedule against HPSEBL interval row 73 during baseline week — template row for pilot M&V. [process]
I.74 Cross-check Swiss Garnier Plant 3 block schedule against HPSEBL interval row 74 during baseline week — template row for pilot M&V. [process]
I.75 Cross-check Swiss Garnier Plant 4 block schedule against HPSEBL interval row 75 during baseline week — template row for pilot M&V. [process]
I.76 Cross-check Swiss Garnier Plant 1 block schedule against HPSEBL interval row 76 during baseline week — template row for pilot M&V. [process]
I.77 Cross-check Swiss Garnier Plant 2 block schedule against HPSEBL interval row 77 during baseline week — template row for pilot M&V. [process]
I.78 Cross-check Swiss Garnier Plant 3 block schedule against HPSEBL interval row 78 during baseline week — template row for pilot M&V. [process]
I.79 Cross-check Swiss Garnier Plant 4 block schedule against HPSEBL interval row 79 during baseline week — template row for pilot M&V. [process]
I.80 Cross-check Swiss Garnier Plant 1 block schedule against HPSEBL interval row 80 during baseline week — template row for pilot M&V. [process]
I.81 Cross-check Swiss Garnier Plant 2 block schedule against HPSEBL interval row 81 during baseline week — template row for pilot M&V. [process]
I.82 Cross-check Swiss Garnier Plant 3 block schedule against HPSEBL interval row 82 during baseline week — template row for pilot M&V. [process]
I.83 Cross-check Swiss Garnier Plant 4 block schedule against HPSEBL interval row 83 during baseline week — template row for pilot M&V. [process]
I.84 Cross-check Swiss Garnier Plant 1 block schedule against HPSEBL interval row 84 during baseline week — template row for pilot M&V. [process]
I.85 Cross-check Swiss Garnier Plant 2 block schedule against HPSEBL interval row 85 during baseline week — template row for pilot M&V. [process]
I.86 Cross-check Swiss Garnier Plant 3 block schedule against HPSEBL interval row 86 during baseline week — template row for pilot M&V. [process]
I.87 Cross-check Swiss Garnier Plant 4 block schedule against HPSEBL interval row 87 during baseline week — template row for pilot M&V. [process]
I.88 Cross-check Swiss Garnier Plant 1 block schedule against HPSEBL interval row 88 during baseline week — template row for pilot M&V. [process]
I.89 Cross-check Swiss Garnier Plant 2 block schedule against HPSEBL interval row 89 during baseline week — template row for pilot M&V. [process]
I.90 Cross-check Swiss Garnier Plant 3 block schedule against HPSEBL interval row 90 during baseline week — template row for pilot M&V. [process]
I.91 Cross-check Swiss Garnier Plant 4 block schedule against HPSEBL interval row 91 during baseline week — template row for pilot M&V. [process]
I.92 Cross-check Swiss Garnier Plant 1 block schedule against HPSEBL interval row 92 during baseline week — template row for pilot M&V. [process]
I.93 Cross-check Swiss Garnier Plant 2 block schedule against HPSEBL interval row 93 during baseline week — template row for pilot M&V. [process]
I.94 Cross-check Swiss Garnier Plant 3 block schedule against HPSEBL interval row 94 during baseline week — template row for pilot M&V. [process]
I.95 Cross-check Swiss Garnier Plant 4 block schedule against HPSEBL interval row 95 during baseline week — template row for pilot M&V. [process]
I.96 Cross-check Swiss Garnier Plant 1 block schedule against HPSEBL interval row 96 during baseline week — template row for pilot M&V. [process]
I.97 Cross-check Swiss Garnier Plant 2 block schedule against HPSEBL interval row 97 during baseline week — template row for pilot M&V. [process]
I.98 Cross-check Swiss Garnier Plant 3 block schedule against HPSEBL interval row 98 during baseline week — template row for pilot M&V. [process]
I.99 Cross-check Swiss Garnier Plant 4 block schedule against HPSEBL interval row 99 during baseline week — template row for pilot M&V. [process]
I.100 Cross-check Swiss Garnier Plant 1 block schedule against HPSEBL interval row 100 during baseline week — template row for pilot M&V. [process]
I.101 Cross-check Swiss Garnier Plant 2 block schedule against HPSEBL interval row 101 during baseline week — template row for pilot M&V. [process]
I.102 Cross-check Swiss Garnier Plant 3 block schedule against HPSEBL interval row 102 during baseline week — template row for pilot M&V. [process]
I.103 Cross-check Swiss Garnier Plant 4 block schedule against HPSEBL interval row 103 during baseline week — template row for pilot M&V. [process]
I.104 Cross-check Swiss Garnier Plant 1 block schedule against HPSEBL interval row 104 during baseline week — template row for pilot M&V. [process]
I.105 Cross-check Swiss Garnier Plant 2 block schedule against HPSEBL interval row 105 during baseline week — template row for pilot M&V. [process]
I.106 Cross-check Swiss Garnier Plant 3 block schedule against HPSEBL interval row 106 during baseline week — template row for pilot M&V. [process]
I.107 Cross-check Swiss Garnier Plant 4 block schedule against HPSEBL interval row 107 during baseline week — template row for pilot M&V. [process]
I.108 Cross-check Swiss Garnier Plant 1 block schedule against HPSEBL interval row 108 during baseline week — template row for pilot M&V. [process]
I.109 Cross-check Swiss Garnier Plant 2 block schedule against HPSEBL interval row 109 during baseline week — template row for pilot M&V. [process]
I.110 Cross-check Swiss Garnier Plant 3 block schedule against HPSEBL interval row 110 during baseline week — template row for pilot M&V. [process]
I.111 Cross-check Swiss Garnier Plant 4 block schedule against HPSEBL interval row 111 during baseline week — template row for pilot M&V. [process]
I.112 Cross-check Swiss Garnier Plant 1 block schedule against HPSEBL interval row 112 during baseline week — template row for pilot M&V. [process]
I.113 Cross-check Swiss Garnier Plant 2 block schedule against HPSEBL interval row 113 during baseline week — template row for pilot M&V. [process]
I.114 Cross-check Swiss Garnier Plant 3 block schedule against HPSEBL interval row 114 during baseline week — template row for pilot M&V. [process]
I.115 Cross-check Swiss Garnier Plant 4 block schedule against HPSEBL interval row 115 during baseline week — template row for pilot M&V. [process]
I.116 Cross-check Swiss Garnier Plant 1 block schedule against HPSEBL interval row 116 during baseline week — template row for pilot M&V. [process]
I.117 Cross-check Swiss Garnier Plant 2 block schedule against HPSEBL interval row 117 during baseline week — template row for pilot M&V. [process]
I.118 Cross-check Swiss Garnier Plant 3 block schedule against HPSEBL interval row 118 during baseline week — template row for pilot M&V. [process]
I.119 Cross-check Swiss Garnier Plant 4 block schedule against HPSEBL interval row 119 during baseline week — template row for pilot M&V. [process]
I.120 Cross-check Swiss Garnier Plant 1 block schedule against HPSEBL interval row 120 during baseline week — template row for pilot M&V. [process]
I.121 Cross-check Swiss Garnier Plant 2 block schedule against HPSEBL interval row 121 during baseline week — template row for pilot M&V. [process]
I.122 Cross-check Swiss Garnier Plant 3 block schedule against HPSEBL interval row 122 during baseline week — template row for pilot M&V. [process]
I.123 Cross-check Swiss Garnier Plant 4 block schedule against HPSEBL interval row 123 during baseline week — template row for pilot M&V. [process]
I.124 Cross-check Swiss Garnier Plant 1 block schedule against HPSEBL interval row 124 during baseline week — template row for pilot M&V. [process]
I.125 Cross-check Swiss Garnier Plant 2 block schedule against HPSEBL interval row 125 during baseline week — template row for pilot M&V. [process]
I.126 Cross-check Swiss Garnier Plant 3 block schedule against HPSEBL interval row 126 during baseline week — template row for pilot M&V. [process]
I.127 Cross-check Swiss Garnier Plant 4 block schedule against HPSEBL interval row 127 during baseline week — template row for pilot M&V. [process]
I.128 Cross-check Swiss Garnier Plant 1 block schedule against HPSEBL interval row 128 during baseline week — template row for pilot M&V. [process]
I.129 Cross-check Swiss Garnier Plant 2 block schedule against HPSEBL interval row 129 during baseline week — template row for pilot M&V. [process]
I.130 Cross-check Swiss Garnier Plant 3 block schedule against HPSEBL interval row 130 during baseline week — template row for pilot M&V. [process]
I.131 Cross-check Swiss Garnier Plant 4 block schedule against HPSEBL interval row 131 during baseline week — template row for pilot M&V. [process]
I.132 Cross-check Swiss Garnier Plant 1 block schedule against HPSEBL interval row 132 during baseline week — template row for pilot M&V. [process]
I.133 Cross-check Swiss Garnier Plant 2 block schedule against HPSEBL interval row 133 during baseline week — template row for pilot M&V. [process]
I.134 Cross-check Swiss Garnier Plant 3 block schedule against HPSEBL interval row 134 during baseline week — template row for pilot M&V. [process]
I.135 Cross-check Swiss Garnier Plant 4 block schedule against HPSEBL interval row 135 during baseline week — template row for pilot M&V. [process]
I.136 Cross-check Swiss Garnier Plant 1 block schedule against HPSEBL interval row 136 during baseline week — template row for pilot M&V. [process]
I.137 Cross-check Swiss Garnier Plant 2 block schedule against HPSEBL interval row 137 during baseline week — template row for pilot M&V. [process]
I.138 Cross-check Swiss Garnier Plant 3 block schedule against HPSEBL interval row 138 during baseline week — template row for pilot M&V. [process]
I.139 Cross-check Swiss Garnier Plant 4 block schedule against HPSEBL interval row 139 during baseline week — template row for pilot M&V. [process]
I.140 Cross-check Swiss Garnier Plant 1 block schedule against HPSEBL interval row 140 during baseline week — template row for pilot M&V. [process]
I.141 Cross-check Swiss Garnier Plant 2 block schedule against HPSEBL interval row 141 during baseline week — template row for pilot M&V. [process]
I.142 Cross-check Swiss Garnier Plant 3 block schedule against HPSEBL interval row 142 during baseline week — template row for pilot M&V. [process]
I.143 Cross-check Swiss Garnier Plant 4 block schedule against HPSEBL interval row 143 during baseline week — template row for pilot M&V. [process]
I.144 Cross-check Swiss Garnier Plant 1 block schedule against HPSEBL interval row 144 during baseline week — template row for pilot M&V. [process]
I.145 Cross-check Swiss Garnier Plant 2 block schedule against HPSEBL interval row 145 during baseline week — template row for pilot M&V. [process]
I.146 Cross-check Swiss Garnier Plant 3 block schedule against HPSEBL interval row 146 during baseline week — template row for pilot M&V. [process]
I.147 Cross-check Swiss Garnier Plant 4 block schedule against HPSEBL interval row 147 during baseline week — template row for pilot M&V. [process]
I.148 Cross-check Swiss Garnier Plant 1 block schedule against HPSEBL interval row 148 during baseline week — template row for pilot M&V. [process]
I.149 Cross-check Swiss Garnier Plant 2 block schedule against HPSEBL interval row 149 during baseline week — template row for pilot M&V. [process]
I.150 Cross-check Swiss Garnier Plant 3 block schedule against HPSEBL interval row 150 during baseline week — template row for pilot M&V. [process]
I.151 Cross-check Swiss Garnier Plant 4 block schedule against HPSEBL interval row 151 during baseline week — template row for pilot M&V. [process]
I.152 Cross-check Swiss Garnier Plant 1 block schedule against HPSEBL interval row 152 during baseline week — template row for pilot M&V. [process]
I.153 Cross-check Swiss Garnier Plant 2 block schedule against HPSEBL interval row 153 during baseline week — template row for pilot M&V. [process]
I.154 Cross-check Swiss Garnier Plant 3 block schedule against HPSEBL interval row 154 during baseline week — template row for pilot M&V. [process]
I.155 Cross-check Swiss Garnier Plant 4 block schedule against HPSEBL interval row 155 during baseline week — template row for pilot M&V. [process]
I.156 Cross-check Swiss Garnier Plant 1 block schedule against HPSEBL interval row 156 during baseline week — template row for pilot M&V. [process]
I.157 Cross-check Swiss Garnier Plant 2 block schedule against HPSEBL interval row 157 during baseline week — template row for pilot M&V. [process]
I.158 Cross-check Swiss Garnier Plant 3 block schedule against HPSEBL interval row 158 during baseline week — template row for pilot M&V. [process]
I.159 Cross-check Swiss Garnier Plant 4 block schedule against HPSEBL interval row 159 during baseline week — template row for pilot M&V. [process]
I.160 Cross-check Swiss Garnier Plant 1 block schedule against HPSEBL interval row 160 during baseline week — template row for pilot M&V. [process]
I.161 Cross-check Swiss Garnier Plant 2 block schedule against HPSEBL interval row 161 during baseline week — template row for pilot M&V. [process]
I.162 Cross-check Swiss Garnier Plant 3 block schedule against HPSEBL interval row 162 during baseline week — template row for pilot M&V. [process]
I.163 Cross-check Swiss Garnier Plant 4 block schedule against HPSEBL interval row 163 during baseline week — template row for pilot M&V. [process]
I.164 Cross-check Swiss Garnier Plant 1 block schedule against HPSEBL interval row 164 during baseline week — template row for pilot M&V. [process]
I.165 Cross-check Swiss Garnier Plant 2 block schedule against HPSEBL interval row 165 during baseline week — template row for pilot M&V. [process]
I.166 Cross-check Swiss Garnier Plant 3 block schedule against HPSEBL interval row 166 during baseline week — template row for pilot M&V. [process]
I.167 Cross-check Swiss Garnier Plant 4 block schedule against HPSEBL interval row 167 during baseline week — template row for pilot M&V. [process]
I.168 Cross-check Swiss Garnier Plant 1 block schedule against HPSEBL interval row 168 during baseline week — template row for pilot M&V. [process]
I.169 Cross-check Swiss Garnier Plant 2 block schedule against HPSEBL interval row 169 during baseline week — template row for pilot M&V. [process]
I.170 Cross-check Swiss Garnier Plant 3 block schedule against HPSEBL interval row 170 during baseline week — template row for pilot M&V. [process]
I.171 Cross-check Swiss Garnier Plant 4 block schedule against HPSEBL interval row 171 during baseline week — template row for pilot M&V. [process]
I.172 Cross-check Swiss Garnier Plant 1 block schedule against HPSEBL interval row 172 during baseline week — template row for pilot M&V. [process]
I.173 Cross-check Swiss Garnier Plant 2 block schedule against HPSEBL interval row 173 during baseline week — template row for pilot M&V. [process]
I.174 Cross-check Swiss Garnier Plant 3 block schedule against HPSEBL interval row 174 during baseline week — template row for pilot M&V. [process]
I.175 Cross-check Swiss Garnier Plant 4 block schedule against HPSEBL interval row 175 during baseline week — template row for pilot M&V. [process]
I.176 Cross-check Swiss Garnier Plant 1 block schedule against HPSEBL interval row 176 during baseline week — template row for pilot M&V. [process]
I.177 Cross-check Swiss Garnier Plant 2 block schedule against HPSEBL interval row 177 during baseline week — template row for pilot M&V. [process]
I.178 Cross-check Swiss Garnier Plant 3 block schedule against HPSEBL interval row 178 during baseline week — template row for pilot M&V. [process]
I.179 Cross-check Swiss Garnier Plant 4 block schedule against HPSEBL interval row 179 during baseline week — template row for pilot M&V. [process]
I.180 Cross-check Swiss Garnier Plant 1 block schedule against HPSEBL interval row 180 during baseline week — template row for pilot M&V. [process]
I.181 Cross-check Swiss Garnier Plant 2 block schedule against HPSEBL interval row 181 during baseline week — template row for pilot M&V. [process]
I.182 Cross-check Swiss Garnier Plant 3 block schedule against HPSEBL interval row 182 during baseline week — template row for pilot M&V. [process]
I.183 Cross-check Swiss Garnier Plant 4 block schedule against HPSEBL interval row 183 during baseline week — template row for pilot M&V. [process]
I.184 Cross-check Swiss Garnier Plant 1 block schedule against HPSEBL interval row 184 during baseline week — template row for pilot M&V. [process]
I.185 Cross-check Swiss Garnier Plant 2 block schedule against HPSEBL interval row 185 during baseline week — template row for pilot M&V. [process]
I.186 Cross-check Swiss Garnier Plant 3 block schedule against HPSEBL interval row 186 during baseline week — template row for pilot M&V. [process]
I.187 Cross-check Swiss Garnier Plant 4 block schedule against HPSEBL interval row 187 during baseline week — template row for pilot M&V. [process]
I.188 Cross-check Swiss Garnier Plant 1 block schedule against HPSEBL interval row 188 during baseline week — template row for pilot M&V. [process]
I.189 Cross-check Swiss Garnier Plant 2 block schedule against HPSEBL interval row 189 during baseline week — template row for pilot M&V. [process]
I.190 Cross-check Swiss Garnier Plant 3 block schedule against HPSEBL interval row 190 during baseline week — template row for pilot M&V. [process]
I.191 Cross-check Swiss Garnier Plant 4 block schedule against HPSEBL interval row 191 during baseline week — template row for pilot M&V. [process]
I.192 Cross-check Swiss Garnier Plant 1 block schedule against HPSEBL interval row 192 during baseline week — template row for pilot M&V. [process]
I.193 Cross-check Swiss Garnier Plant 2 block schedule against HPSEBL interval row 193 during baseline week — template row for pilot M&V. [process]
I.194 Cross-check Swiss Garnier Plant 3 block schedule against HPSEBL interval row 194 during baseline week — template row for pilot M&V. [process]
I.195 Cross-check Swiss Garnier Plant 4 block schedule against HPSEBL interval row 195 during baseline week — template row for pilot M&V. [process]
I.196 Cross-check Swiss Garnier Plant 1 block schedule against HPSEBL interval row 196 during baseline week — template row for pilot M&V. [process]
I.197 Cross-check Swiss Garnier Plant 2 block schedule against HPSEBL interval row 197 during baseline week — template row for pilot M&V. [process]
I.198 Cross-check Swiss Garnier Plant 3 block schedule against HPSEBL interval row 198 during baseline week — template row for pilot M&V. [process]
I.199 Cross-check Swiss Garnier Plant 4 block schedule against HPSEBL interval row 199 during baseline week — template row for pilot M&V. [process]
I.200 Cross-check Swiss Garnier Plant 1 block schedule against HPSEBL interval row 200 during baseline week — template row for pilot M&V. [process]
Appendix J — Stamped 90-day pilot milestone checklist
J.1 Day 0: Signed NDA + HPSEBL bill collection (6 months)
J.2 Day 3: HT consumer number ↔ plant block map confirmed
J.3 Day 7: BMS/meter read-only export path or Path B agreed
J.4 Day 14: Baseline MD + HVAC hold hours documented
J.5 Day 21: First weekly prescription card delivered
J.6 Day 30: QA sign-off on one sequencing recommendation
J.7 Day 45: Mid-pilot HPSEBL demand compare vs baseline
J.8 Day 60: Production-normalised savings draft
J.9 Day 75: Second HPSEBL bill received post-actions
J.10 Day 90: Invoice reconciliation report + rollout decision
J.11 Week 1 review: assign owner for prescription #1 · verify on HPSEBL. [pilot]
J.12 Week 1 review: assign owner for prescription #2 · verify on HPSEBL. [pilot]
J.13 Week 1 review: assign owner for prescription #3 · verify on HPSEBL. [pilot]
J.14 Week 2 review: assign owner for prescription #4 · verify on HPSEBL. [pilot]
J.15 Week 2 review: assign owner for prescription #5 · verify on HPSEBL. [pilot]
J.16 Week 2 review: assign owner for prescription #6 · verify on HPSEBL. [pilot]
J.17 Week 2 review: assign owner for prescription #7 · verify on HPSEBL. [pilot]
J.18 Week 2 review: assign owner for prescription #8 · verify on HPSEBL. [pilot]
J.19 Week 2 review: assign owner for prescription #9 · verify on HPSEBL. [pilot]
J.20 Week 2 review: assign owner for prescription #10 · verify on HPSEBL. [pilot]
J.21 Week 3 review: assign owner for prescription #11 · verify on HPSEBL. [pilot]
J.22 Week 3 review: assign owner for prescription #12 · verify on HPSEBL. [pilot]
J.23 Week 3 review: assign owner for prescription #13 · verify on HPSEBL. [pilot]
J.24 Week 3 review: assign owner for prescription #14 · verify on HPSEBL. [pilot]
J.25 Week 3 review: assign owner for prescription #15 · verify on HPSEBL. [pilot]
J.26 Week 3 review: assign owner for prescription #16 · verify on HPSEBL. [pilot]
J.27 Week 3 review: assign owner for prescription #17 · verify on HPSEBL. [pilot]
J.28 Week 4 review: assign owner for prescription #18 · verify on HPSEBL. [pilot]
J.29 Week 4 review: assign owner for prescription #19 · verify on HPSEBL. [pilot]
J.30 Week 4 review: assign owner for prescription #20 · verify on HPSEBL. [pilot]
J.31 Week 4 review: assign owner for prescription #21 · verify on HPSEBL. [pilot]
J.32 Week 4 review: assign owner for prescription #22 · verify on HPSEBL. [pilot]
J.33 Week 4 review: assign owner for prescription #23 · verify on HPSEBL. [pilot]
J.34 Week 4 review: assign owner for prescription #24 · verify on HPSEBL. [pilot]
J.35 Week 5 review: assign owner for prescription #25 · verify on HPSEBL. [pilot]
J.36 Week 5 review: assign owner for prescription #26 · verify on HPSEBL. [pilot]
J.37 Week 5 review: assign owner for prescription #27 · verify on HPSEBL. [pilot]
J.38 Week 5 review: assign owner for prescription #28 · verify on HPSEBL. [pilot]
J.39 Week 5 review: assign owner for prescription #29 · verify on HPSEBL. [pilot]
J.40 Week 5 review: assign owner for prescription #30 · verify on HPSEBL. [pilot]
J.41 Week 5 review: assign owner for prescription #31 · verify on HPSEBL. [pilot]
J.42 Week 6 review: assign owner for prescription #32 · verify on HPSEBL. [pilot]
J.43 Week 6 review: assign owner for prescription #33 · verify on HPSEBL. [pilot]
J.44 Week 6 review: assign owner for prescription #34 · verify on HPSEBL. [pilot]
J.45 Week 6 review: assign owner for prescription #35 · verify on HPSEBL. [pilot]
J.46 Week 6 review: assign owner for prescription #36 · verify on HPSEBL. [pilot]
J.47 Week 6 review: assign owner for prescription #37 · verify on HPSEBL. [pilot]
J.48 Week 6 review: assign owner for prescription #38 · verify on HPSEBL. [pilot]
J.49 Week 7 review: assign owner for prescription #39 · verify on HPSEBL. [pilot]
J.50 Week 7 review: assign owner for prescription #40 · verify on HPSEBL. [pilot]
J.51 Week 7 review: assign owner for prescription #41 · verify on HPSEBL. [pilot]
J.52 Week 7 review: assign owner for prescription #42 · verify on HPSEBL. [pilot]
J.53 Week 7 review: assign owner for prescription #43 · verify on HPSEBL. [pilot]
J.54 Week 7 review: assign owner for prescription #44 · verify on HPSEBL. [pilot]
J.55 Week 7 review: assign owner for prescription #45 · verify on HPSEBL. [pilot]
J.56 Week 8 review: assign owner for prescription #46 · verify on HPSEBL. [pilot]
J.57 Week 8 review: assign owner for prescription #47 · verify on HPSEBL. [pilot]
J.58 Week 8 review: assign owner for prescription #48 · verify on HPSEBL. [pilot]
J.59 Week 8 review: assign owner for prescription #49 · verify on HPSEBL. [pilot]
J.60 Week 8 review: assign owner for prescription #50 · verify on HPSEBL. [pilot]
J.61 Week 8 review: assign owner for prescription #51 · verify on HPSEBL. [pilot]
J.62 Week 8 review: assign owner for prescription #52 · verify on HPSEBL. [pilot]
J.63 Week 9 review: assign owner for prescription #53 · verify on HPSEBL. [pilot]
J.64 Week 9 review: assign owner for prescription #54 · verify on HPSEBL. [pilot]
J.65 Week 9 review: assign owner for prescription #55 · verify on HPSEBL. [pilot]
J.66 Week 9 review: assign owner for prescription #56 · verify on HPSEBL. [pilot]
J.67 Week 9 review: assign owner for prescription #57 · verify on HPSEBL. [pilot]
J.68 Week 9 review: assign owner for prescription #58 · verify on HPSEBL. [pilot]
J.69 Week 9 review: assign owner for prescription #59 · verify on HPSEBL. [pilot]
J.70 Week 10 review: assign owner for prescription #60 · verify on HPSEBL. [pilot]
J.71 Week 10 review: assign owner for prescription #61 · verify on HPSEBL. [pilot]
J.72 Week 10 review: assign owner for prescription #62 · verify on HPSEBL. [pilot]
J.73 Week 10 review: assign owner for prescription #63 · verify on HPSEBL. [pilot]
J.74 Week 10 review: assign owner for prescription #64 · verify on HPSEBL. [pilot]
J.75 Week 10 review: assign owner for prescription #65 · verify on HPSEBL. [pilot]
J.76 Week 10 review: assign owner for prescription #66 · verify on HPSEBL. [pilot]
J.77 Week 11 review: assign owner for prescription #67 · verify on HPSEBL. [pilot]
J.78 Week 11 review: assign owner for prescription #68 · verify on HPSEBL. [pilot]
J.79 Week 11 review: assign owner for prescription #69 · verify on HPSEBL. [pilot]
J.80 Week 11 review: assign owner for prescription #70 · verify on HPSEBL. [pilot]
J.81 Week 11 review: assign owner for prescription #71 · verify on HPSEBL. [pilot]
J.82 Week 11 review: assign owner for prescription #72 · verify on HPSEBL. [pilot]
J.83 Week 11 review: assign owner for prescription #73 · verify on HPSEBL. [pilot]
J.84 Week 12 review: assign owner for prescription #74 · verify on HPSEBL. [pilot]
J.85 Week 12 review: assign owner for prescription #75 · verify on HPSEBL. [pilot]
J.86 Week 12 review: assign owner for prescription #76 · verify on HPSEBL. [pilot]
J.87 Week 12 review: assign owner for prescription #77 · verify on HPSEBL. [pilot]
J.88 Week 12 review: assign owner for prescription #78 · verify on HPSEBL. [pilot]
J.89 Week 12 review: assign owner for prescription #79 · verify on HPSEBL. [pilot]
J.90 Week 12 review: assign owner for prescription #80 · verify on HPSEBL. [pilot]
J.91 Week 13 review: assign owner for prescription #81 · verify on HPSEBL. [pilot]
J.92 Week 13 review: assign owner for prescription #82 · verify on HPSEBL. [pilot]
J.93 Week 13 review: assign owner for prescription #83 · verify on HPSEBL. [pilot]
J.94 Week 13 review: assign owner for prescription #84 · verify on HPSEBL. [pilot]
J.95 Week 13 review: assign owner for prescription #85 · verify on HPSEBL. [pilot]
J.96 Week 13 review: assign owner for prescription #86 · verify on HPSEBL. [pilot]
J.97 Week 13 review: assign owner for prescription #87 · verify on HPSEBL. [pilot]
J.98 Week 14 review: assign owner for prescription #88 · verify on HPSEBL. [pilot]
J.99 Week 14 review: assign owner for prescription #89 · verify on HPSEBL. [pilot]
J.100 Week 14 review: assign owner for prescription #90 · verify on HPSEBL. [pilot]
J.101 Week 14 review: assign owner for prescription #91 · verify on HPSEBL. [pilot]
J.102 Week 14 review: assign owner for prescription #92 · verify on HPSEBL. [pilot]
J.103 Week 14 review: assign owner for prescription #93 · verify on HPSEBL. [pilot]
J.104 Week 14 review: assign owner for prescription #94 · verify on HPSEBL. [pilot]
J.105 Week 15 review: assign owner for prescription #95 · verify on HPSEBL. [pilot]
J.106 Week 15 review: assign owner for prescription #96 · verify on HPSEBL. [pilot]
J.107 Week 15 review: assign owner for prescription #97 · verify on HPSEBL. [pilot]
J.108 Week 15 review: assign owner for prescription #98 · verify on HPSEBL. [pilot]
J.109 Week 15 review: assign owner for prescription #99 · verify on HPSEBL. [pilot]
J.110 Week 15 review: assign owner for prescription #100 · verify on HPSEBL. [pilot]