Depth bar: Band A / strategic NCR account — target 2,000–4,000+ words. Use
[~]for estimates. Do not invent bill numbers or court outcomes. Proof language: verified with evidence (never lead with “next DISCOM bill”).
1. Company overview & snapshot
Yohee Auto India is in the 2026-08-ncr-20l-plus visit book because the scoped NCR HT meter is estimated at ₹12–22L/month [~] (campaign bill sheet: ≥₹20L = Borderline, confidence Low). Auto components — verify process on site (stamp/weld/machining likely). OEM/Tier-2 — verify.
Public scale signals: Thin public disclosure; Manesar auto-component SME/mid; treat as qualification call not Tier-1 book. Process energy story in one line: Unknown until visit — assume discrete mfg MD + compressed air until proven.
Stamped entry is plant-scoped 60-Day Proof on one HT consumer — not group EMS RFP, not solar EPC, not dashboard theatre.
1.1 Legal identity & corporate structure
| Field | Detail |
|---|---|
| Legal name | Yohee Auto India Pvt Ltd |
| CIN | verify MCA |
| Listing / ownership | Private |
| GST (NCR) | verify |
| Website | search / IndiaMART listings |
| Phone | qualify |
Confirm the exact billing legal name on the DISCOM invoice before NDA. Group subsidiaries and JVs often share campuses but not meters.
1.2 What they make & where money comes from
Auto components — verify process on site (stamp/weld/machining likely). Revenue and programme mix: Thin public disclosure; Manesar auto-component SME/mid; treat as qualification call not Tier-1 book. End markets: OEM/Tier-2 — verify. Export vs domestic mix is typically OEM-programme driven in this cohort [~]. Capacity and utilisation must be taken from plant leadership — do not invent MTPA figures.
For Stamped, money comes from avoidable MD, idle thermal/electrical hold, compressor baseload, and PF drift on the scoped meter — not from abstract “energy intensity of the sector.”
1.3 Plants, addresses & footprint
| Site | Address | DISCOM | Pilot? |
|---|---|---|---|
| Manesar (SEED — unverified) | IMT Manesar — plot not confirmed Aug 2026 | DHBVN [~] | Qualify on visit |
| Alternate entities (NOT Yohee) | See §6.2 — Viney Auto, Maa Rukmani Devi Auto, Coyeh Service | — | Do not merge |
Plant map note (Aug 2026 diligence): yoheeauto.com NXDOMAIN / HTTP 500; no MCA exact match for “Yohee Auto India Private Limited”; no LinkedIn company page. Campaign seed may be typo or dormant MSME. Field action: gate sign photograph, GSTIN plaque, two DHBVN bills before any Band A commercial quote. If legal name differs, update CRM slug — do not force-fit seed spelling.
Recommended pilot: None until qualified — first HT consumer confirmed on invoice with Yohee (or corrected) legal name.
1.4 Leadership & CRM map
| Person | Role | Notes |
|---|---|---|
| TBD — Plant Head | Primary champion target | Search: Yohee Auto Manesar |
| Plant Electrical / Utilities | Technical co-owner | Interval data + APFC / feeder map |
| CS / Investor relations | Routing only | info@yoheeauto.com |
| CFO / Commercial | Commercial close | After technical owner exists |
Decision path for a 90-day pilot: Plant Head sponsors → Electrical confirms meter + data path → Finance/CS for NDA and two redacted bills → kill if bill below gate or no owner.
1.5 Recent news (24 months) & timing for Stamped
Use latest AR/BRSR/investor deck for RE, EnMS, and capacity notes (Thin public disclosure; Manesar auto-component SME/mid; treat as qualification call not Tier-1 book). Timing implication: if solar or ISO 50001 is already public, lead with remaining grid import attribution, not another RE pitch. If expansion or M&A is live, baselines are unstable — shorten proof scope to one feeder and normalise to production.
Campaign visit action from bill sheet: Qualify or learning.
2. Energy profile
DISCOM / supply (name early): Primary NCR assumption DHBVN [~] — confirm on invoice header and circle. Never average multi-state plants into one “company bill.”
2.1 Bill band, tariff & demand
Corrected estimate (canonical NCR sheet):
| Field | Value |
|---|---|
| NCR plant / meter scope | Manesar |
Bill / month [~] | ₹12–22L |
| ≥ ₹20L? | Borderline |
| Confidence | Low |
| Visit action | Qualify or learning |
| Source | outreach/extras/2026-08-ncr-20l-plus/bill-qualification-sheet.md |
Request two redacted HT invoices: sanctioned load (kVA/kW), billing demand, energy charges, PF/reactive, ToD if any, solar/open-access credit lines. Mark every pre-invoice figure [~]. If borderline (Daewon/PPAP/Yohee), qualification is the first meeting, not a fee proposal.
2.2 Generation, fuel & renewables
Ask explicitly: rooftop solar kW, captive/group captive, open access/PPA, DG hours, PNG/FO for melt or boilers. Many accounts in this campaign already have RE on the books — Stamped’s job is grid import after RE, not competing with CleanMax/EPC.
2.3 EnMS, PAT, ISO, BRSR
Listed names often publish BRSR energy lines and sometimes ISO 50001. Private JV plants may have Japanese/Korean parent EnMS habits without public certificates. Treat data maturity as unknown-to-medium until Path A/B is proven: interval export vs CSV + production log.
2.4 Likely ₹ leak categories (hypothesis)
Tied to Unknown until visit — assume discrete mfg MD + compressed air until proven.:
- Shift-start / batch-start MD coincidence on the largest electrical assets.
- Idle hold — ovens, barrels, melt, AHUs, cure, foam, or heaters left at temperature without product.
- Compressed air and cooling baseload through breaks.
- PF / APFC drift on aging banks.
- Post-solar dispatch — flexible loads not aligned to generation or ToD windows.
These are hypotheses for discovery, not accusations.
3. Operations, equipment & digital stack
3.1 Process flow & critical loads
Build on-site: inbound → primary process → finishing → QA → dispatch. Critical loads for this account class: Unknown until visit — assume discrete mfg MD + compressed air until proven. Map which assets create billing demand vs which only accumulate kWh.
3.2 Shifts, seasonality, production pattern
Most NCR auto plants are multi-shift discrete manufacturing aligned to OEM calendars [~]. Normalise any savings claim to parts/shots/tonnes — a lower bill during OEM shutdown is not proof.
3.3 Automation, metering, SCADA/EMS/DCS
No plantwide EMS vendor assumed unless independently sourced. Path A: read-only interval/historian export. Path B: meter CSV + production event log. Hard no: PLC writes, recipe changes, remote control.
3.4 Capex / tech projects affecting energy
Ask last-24-month: new lines, VFDs, solar, compressor replacement, paint-shop upgrades, M&A integration. Post-capex, Stamped verifies operating use of the asset against expected bill lines — does not claim capex credit.
4. Stamped Energy fit analysis
4.1 ICP scorecard
| Criterion | Result |
|---|---|
| Geography (NCR) | Pass — Manesar |
| Vertical | Auto components (thin public profile) |
| Bill ≥ ₹20L/month (scoped meter) | Borderline [~] — confirm on invoice |
| Bill ≥ ₹30L (Band A commercial floor) | See band ₹12–22L — may be pass/borderline |
| Decision speed | Medium–slow if listed/enterprise; faster if plant P&L owns utilities |
| Data maturity | Unknown–medium until export proven |
| HT / process intensity | Driven by: Unknown until visit — assume discrete mfg MD + compressed air until proven. |
4.2 Fit score rationale
Fit score: 6/10. Strengths: Geographic fill for Manesar week if bill clears. Deductions: Bill likely below gate; thin data; low confidence. Score is outreach priority, not a savings guarantee.
4.3 Wedge (parser-critical)
The strongest wedge is: only if invoice ≥₹20L — else courtesy discovery; no fake Band A claim.
4.4 Objections & competitors
- “We already have solar / ISO 50001 / EMS” → Stamped optimises remaining controllable ₹ lines with owners and evidence.
- “Talk to corporate IT / procurement” → plant-scoped 60-Day Proof with kill criteria; escalate only after plant owner exists.
- Internal CI / TPM team → additive loss categories, not replacement of their programme.
- Hardware vendors (VFD, compressor, furnace OEM) → Stamped stays read-only software prescriptions.
4.5 Pilot design
Site: one HT from §1.3. 90 days: Weeks 1–2 bills + meter validation; Weeks 3–8 weekly prescription cards; Weeks 9–12 evidence ledger vs normalised production. Success: ≥1 owned action with execution evidence and defensible ₹ movement verified with evidence. Kill: bill below gate, no data, no owner, or unstable ops without normalisation.
5. Before you reach out
5.1 Discovery checklist
- Confirm legal entity, plant address, DISCOM consumer number, HT/EHT tariff.
- Two redacted invoices — demand, energy, PF, RE credits.
- Champion route: TBD — Plant Head.
- Largest MD event last quarter — when, what started, who owns it.
- Idle hold candidates for this process: Unknown until visit — assume discrete mfg MD + compressed air until proven.
- Existing EMS/SCADA export path (Path A vs B).
- Solar/captive context before tariff-smart talk.
- Production normalisation proxy (parts / tonnes / shots).
- IT/OT approval for read-only data.
- Success metric tied to bill lines, not dashboard KPIs.
- Account questions: (1) Exact address + GST? (2) Last 3 months HT bill? (3) Process? (4) Decision maker?
5.2 Do not lead with
- Dashboards, AI buzzwords, ESG-first pitch.
- “Verify on the next DISCOM bill” as hero line — use verified with evidence; DISCOM confirm optional backup.
- Group multi-plant rollout on day one.
- Solar EPC, furnace retrofit, or PLC control offers.
- Wrong entity / wrong city (see §6.2 flags).
5.3 Opening hooks (email / call / WhatsApp)
Hook: process-specific MD/idle problem at Manesar with ₹ attached, read-only, 20 minutes + two bills for 60-Day Proof. Ask who owns the HT bill. Keep BehHuman: specific, short, no “delve/robust/seamless.”
6. Risks, flags, controversies & sources
6.1 Integrity / controversy / regulatory (search explicitly)
Search terms used: “Yohee Auto India” / “Yohee Auto India Pvt Ltd” + NGT, PCB, pollution, lawsuit, fraud, labour dispute, tax raid, 2024–2026.
Result: none found — very thin public footprint; absence of news ≠ clearance.
Do not allege. Cite only sourced items. Re-check immediately before outreach.
6.2 Data quality flags
- Bill band is kVA/meter estimate until invoices arrive.
- Champion LinkedIn/email may be TBD or routing-only.
- Multi-entity campuses (Sandhar/Daewon/Lumax/Okaya/Mankind) — lock billing name.
- Campaign label errors possible (Craftsman Manesar vs Faridabad; PPAP Manesar vs Noida; Daewon TN vs Manesar Daewha).
- Process details contain informed inference where public disclosure is thin.
6.3 Sources consulted
- Campaign bill qualification sheet + plant footprint index (Aug 2026).
- Company website / LinkedIn / AR-BRSR / investor decks where public.
- Lead research files where indexed: —.
- HSPCB/UPPCB/MCA/GST aggregators as available.
- News sweep for controversies (limited; not legal clearance).
6.4 Evidence discipline
Separate verified public facts, directional operating hypotheses, and commercial estimates. After contact: (1) entity+invoice, (2) two bills, (3) top three load events, (4) production constraints, (5) smallest controllable boundary. No PLC writes. Adverse news treated proportionately.
7. Visit-week operating notes (depth)
Lead with bill qualification. Kill if <₹15L.
Keep the week tight: one meter, two bills, one WhatsApp owner, then decide. If the plant pivots to another state or sister company, acknowledge and still ask for the NCR invoice — you are in NCR this week.
Multi-plot storytelling before proof is how enterprise-shaped accounts stall. Politely refuse group scope until one Proof lands.
Bring a one-page economics sheet: fee band, expected lever classes (MD / idle / PF), verification method (verified with evidence), kill rules. Finance-literate sponsors prefer clean stop conditions.
Mobile hygiene: prefer email/WhatsApp intro before cold-calling promoter mobiles scraped from directories.
Post-visit fields to capture: exact HT consumer number; bill ₹ last 3 months; solar credit lines; champion name; EMS vendor if any; whether sister plants share incomers.
8. Process conversation map
Walk the champion through: (1) Exact address + GST? (2) Last 3 months HT bill? (3) Process? (4) Decision maker?
Those answers tell you whether Stamped has an electrical lever this week or whether the site is mostly fuel/steam theatre, validated-HVAC locked, or below bill gate.
If they claim “we never idle,” ask for utilisation or batch logs anyway — stories and interval demand often disagree. The disagreement is the opening, not an accusation.
Commercial close: single-meter 60-Day Proof, plant stays in control, read-only, verified with evidence. End by booking who sends the two DISCOM PDFs — name and deadline on a shared note.
If hardware contractors offer quotes in the room, decline scope creep: Stamped does not sell VFDs, furnaces, or compressors.
Generated for Stamped outreach campaign 2026-08-ncr-20l-plus. Estimates marked [~]. Not legal advice.
Appendix A — Gate qualify script (2 minutes)
“Good morning — we’re mapping IMT Manesar HT accounts. Is this Yohee Auto India Private Limited? What plot number? Who handles the DHBVN electricity bill? Is monthly HT roughly ₹20 lakh or more? If not this company, what is the registered name on your board?” Record answers; photo GST plaque if permitted; leave if no manufacturing.
Appendix B — Entity collision table (do not merge)
| Name | Plot | Notes |
|---|---|---|
| DY Auto India | 31 Sec 4 | Korean wiper motors — verified |
| MM Auto Industries | 192A Sec 4 | Springs — verified |
| Yoauto Pvt Ltd | Jaipur | Unrelated |
| Ningbo Yohe China | — | Export supplier — unrelated |
| Yohee Auto India | Unknown | Seed unverified |
Appendix C — If confirmed — refresh checklist
Update kit champion, CIN, GSTIN, plot, process, bill scan, fit score, index.md, re-run validator, consider Band B if bill ₹12–18L. If bill ≥₹20L and stamp/weld/HPDC confirmed — upgrade to full Band A kit tone.
Appendix D — Opportunity cost on Manesar day
Confirmed campaign neighbours same visit: 01 Machino, 06 Lumax Auto, 16 Lumax Industries, 07 Craftsman. Yohee gets ≤15 min gate stop unless user supplies map pin. Do not Apollo enrich until entity live.
Appendix E — Search log Aug 2026
yoheeauto.com NXDOMAIN; no IndiaMART exact match; no LinkedIn company page; phonetic variants Yohii/Yo He unverified. Campaign info@yoheeauto.com do not mailto until MX exists.
Appendix F — Band B economics if bill confirms low
If HT bill ₹12–18L but process fit good: offer Band B 60-Day at reduced fee with explicit kill at day 30 if no MD headroom. Stamped commercial ≥₹30L Band A floor for standard pricing still fails — document honest framing to owner. Learning value: Manesar SME reference only.
Appendix G — Update plant-footprint-index when resolved
If dropped: strike row 20 or mark verify-failed. If confirmed: add plot, GSTIN, CIN, revised bill band. Sync dedup-seed-list.md footnote to prevent re-seed next campaign batch without GST proof.
Appendix H — Integrity search (entity-dependent)
No promoter search possible without legal identity. Ningbo Yohe China export listings are not this account — do not merge in CRM. Yoauto Jaipur — separate company — do not call.
Appendix I — Campaign index alignment
Index row 20 score 4/10; fit tag qualify-on-visit. Excluded from Tier-1 visit book until gate confirms entity. User may replace slug with verified Manesar HT account from dedup pass — coordinate prospect_id and file rename if swapped.
Appendix J — Closing qualify summary
Fit 4/10 — entity unverified, bill borderline ₹12–22L Low confidence. yoheeauto.com dead. Do not mass outreach. Gate script only on optional Manesar stop. If confirmed ≥₹20L, refresh kit and score. If fail, drop from ₹20L+ index. Collisions: DY Auto, MM Auto, Yoauto Jaipur. No Apollo credits. Campaign learning slot — not Tier-1 visit book.
Appendix K — Plant footprint table (qualify state)
| Site | Address | Status | DISCOM | Bill [~] | Notes |
|---|---|---|---|---|---|
| Yohee Auto (seed) | IMT Manesar plot TBD | Unverified | DHBVN? | ₹12–22L | Borderline |
| DY Auto (collision) | Plot 31 Sec 4 | Verified other co. | DHBVN | Unknown | Not Yohee |
| MM Auto (collision) | Plot 192A Sec 4 | Verified other co. | DHBVN | Unknown | Not Yohee |
Source: bill-qualification-sheet row 20; DNS NXDOMAIN yoheeauto.com Aug 2026; web search no MCA match.