Also like this

Peer faridabad visit plants in Faridabad — useful for social proof on calls.

Faridabad Visit
Deep research dossier

Imperial Auto Industries Ltd

Individual diligence for Imperial Auto Plot 120 rubber/hose plant: process, energy fit and contacts.

8/10 ICP fit
DHBVN DISCOM
ISO 50001 ✓ Energy mgmt
Faridabad Plant
Faridabad Visit DHBVN / Ballabgarh belt
₹
Bill band

≥ ₹30L/mo (Band A)

→
Entry angle

extrusion, curing support and compressors on the Plot 120 consumer, scoped to one legal DHBVN consumer and verified against the plant's own production context.

!
Top flag

Confirm bill band on first call

Primary champion Amit Sharma Rubber Division Plant Head — production, PPC and maintenance remit

1. Company overview & snapshot

This file covers Imperial Auto Industries Ltd — Plot 120 / Plant 81 only. Company FY25 ₹3,291.68 Cr is not the Sector 24 bill.

Unlisted / group manufacturer. Confirm GSTIN and DHBVN consumer for Plot 120. Do not contract on another Imperial plant’s meter.

1.2 What they make & where money comes from

Rubber hoses and fluid-transmission components. Sector 24 is described as Plant 81.

1.2a Scale, MSME status & trade

FieldIndividual finding
Revenue / scale₹3,291.68 Cr FY25 company
MSME classNot MSME
EmployeesCompany-wide; plant TBD
Import intensityUnknown
Export shareGlobal manufacturing group; plant mix unknown

1.3 Plants, addresses & footprint

Plot 120, Sector 24, Faridabad. Other Imperial plants are out of this estimate.

1.4 Leadership & CRM map — three champion types

TypeIndividual contact
P&L / billAmit Sharma — Rubber Division Plant Head
Maintenance / E&ISame remit claimed on LinkedIn; still map the shift in-charge
Production / linePPC sits with Amit’s public remit; named deputy unconfirmed

No public personal email found.

1.5 Recent news and timing

Use the Plot 120 bill, not a group win.

2. Energy profile

DISCOM / supply: DHBVN.

2.1 Bill band, tariff & demand

Working Plot 120 estimate: ₹12–35L/month [~]. Band A possible if curing support is electric and utilisation is high.

2.2 Generation, fuel & renewables

Curing may be steam/oil. Ask. Do not put boiler fuel on the DHBVN line.

2.3 EnMS, PAT, ISO, BRSR

No ISO 50001 claim here.

2.4 Likely rupee leak categories

  • Extruder and curing-support coincidence.
  • Compressors and chillers.
  • Idle ovens or booths.

3. Operations, equipment & digital stack

3.1 Process flow & critical loads

Compound → extrude → cure → assemble. Electrical intensity depends on cure energy.

3.1a Machine inventory

ClassEvidence
Core production equipmentRubber extrusion / hose lines [~]
Heat treatment / meltCuring; fuel vs electric unconfirmed
CNC / VMCNot primary
Press / weldNot primary
Compressors / utilitiesLikely material

3.2 Shifts, seasonality and production pattern

Unknown. Normalise by metres or pieces.

3.3 Automation, metering, SCADA/EMS/DCS

No named EMS. Start with bills.

3.4 Capex / tech projects affecting energy

Ask which lines were added in 24 months.

4. Stamped Energy fit analysis

4.1 ICP scorecard

GateResult
Captive Sector 24 manufacturingPass — Plot 120
Revenue targetCompany in band; plant TBD
Monthly bill target₹12–35L/month [~]
Process relevanceRubber process
Named decision pathAmit Sharma

4.2 Fit score rationale

8/10. Real process plant. Deductions: no public email; cure fuel unconfirmed; group/plant mix.

4.3 Wedge

The strongest wedge is: extrusion, curing support and compressors on the Plot 120 consumer, scoped to one legal DHBVN consumer and verified against the plant’s own production context.

4.4 Objections & competitors

Group energy team. Answer with one Faridabad meter.

4.5 Pilot design

Two bills → map electric vs steam → one compressor or extruder event class.

4.6 Concern scores

ConcernScoreOwner
Energy / bill7Amit Sharma
Maintenance / utilities8Amit / utilities
Production / dispatch8PPC
Overall efficiency8Plant Head

4.7 Pitch sketches

P&L: Plot 120 meter only.

Maintenance: Compressor or idle-cure action.

Production: No hose-line stop.

5. Before you reach out

5.1 Discovery checklist

  • Confirm Plot 120 occupancy.
  • Two DHBVN bills.
  • Electric vs steam on cure.

5.2 Do not lead with

  • Do not quote ₹3,291 Cr as the plant bill.
  • Do not send invalid.example.

5.3 Opening hooks

“Before any proposal, can we verify two Plot 120 bills and whether extrusion and curing support own the DHBVN peak?”

6. Risks, flags & sources

6.1 Integrity / controversy / regulatory

No plant-specific controversy in the limited pass.

6.2 Data quality flags

  • No public personal email.
  • Company revenue ≠ plant bill.

6.3 Sources consulted