Also like this

Peer faridabad visit plants in Faridabad — useful for social proof on calls.

Faridabad Visit
Deep research dossier

Brassoforge

Individual company diligence for Brassoforge: identity, plant, scale, process, energy fit, contacts and evidence gaps.

6/10 ICP fit
DHBVN DISCOM
ISO 50001 ✓ Energy mgmt
Faridabad Plant
Faridabad Visit DHBVN / Ballabgarh belt
₹
Bill band

≥ ₹30L/mo (Band A)

→
Entry angle

non-ferrous forge and finishing load per part, with press and heat-treatment sequencing, scoped to one legal DHBVN consumer and verified against the plant's own production context.

!
Top flag

Confirm bill band on first call

Primary champion Dheeraj Bhatia Managing Director / partner path; also MD at Bhatia Alloy Forgings — confirm which legal meter owns Plot 181

1. Company overview & snapshot

This file covers Brassoforge only. It does not use another Sector 24 company’s revenue, equipment, contacts or electricity estimate as a substitute. The evidenced plant is Plot 181, Sector 24, Faridabad 121005. Public sources describe the operation as aluminium, brass and copper forging, machining, finishing and subassemblies.

The legal/entity record must be reconfirmed from GST/MCA before outreach or contracting. Public scale evidence is Separate entity revenue not verified. Where the source is a directory, it proves a listing, not current production. The DHBVN consumer name must match the contracting entity.

1.2 What they make & where money comes from

The operating evidence points to aluminium, brass and copper forging, machining, finishing and subassemblies. Revenue depends on manufactured components or industrial equipment rather than a software/service activity, subject to the entity-risk noted in section 6.

1.2a Scale, MSME status & trade

FieldIndividual finding
Revenue / scaleSeparate entity revenue not verified
MSME classVerify from current Udyam/MCA evidence
EmployeesNot used unless stated by a source
Import intensityUnknown; ask about machine, control and spare imports
Export shareUnknown unless the cited source states export status

1.3 Plants, addresses & footprint

The scoped site is Plot 181, Sector 24, Faridabad 121005. No other address is merged into this estimate. Confirm whether it is a factory, warehouse, office or related entity; whether plots share a transformer; and which site performs each process.

1.4 Leadership & CRM map — three champion types

TypeIndividual contact
P&L / billDheeraj Bhatia — Managing Director / partner path; also MD at Bhatia Alloy Forgings
Maintenance / E&IMaintenance / HT actor — search unconfirmed
Production / lineProduction / forge actor — search unconfirmed

Primary route: dheeraj@brassoforge.com (published — confirm) with fallback info@brassoforge.com (verified — company site). Keep Plot 181 on its own DHBVN consumer; do not merge this file with 56-bhatia-alloy-forgings.

1.5 Recent news and timing

No material company-specific expansion or leadership trigger was relied on unless present in the source ledger. The live timing test is operational: current monthly bill, recent equipment additions, shift pattern and whether the plant can approve a bounded proof.

2. Energy profile

DISCOM / supply: DHBVN is the working Sector 24 assumption. Confirm the consumer account and tariff on the bill.

2.1 Bill band, tariff & demand

Working plant estimate: ₹8–25L/month [~]. This is not verified. It is a process-and-scale hypothesis for qualification. Request two recent bills and check sanctioned demand, recorded MD, ToD, PF, penalties and all separate meters.

2.2 Generation, fuel & renewables

No company-specific captive generation, solar, open-access or fuel split is assumed. Ask about DG backup, rooftop solar and whether thermal equipment is electric, gas or oil-fired.

2.3 EnMS, PAT, ISO, BRSR

No ISO 50001, PAT or BRSR claim is made without a cited public source. Quality certification does not prove plant energy metering. Ask what meter/SCADA exports are available.

2.4 Likely rupee leak categories

  • Non-ferrous forge and finishing load per part, with press and heat-treatment sequencing.
  • Compressor, extraction, cooling or hydraulic idle load during confirmed production gaps.
  • Maximum-demand coincidence at shift start.
  • Machine or furnace support loads that continue between batches.
  • PF and ToD opportunities visible on the actual bill.

3. Operations, equipment & digital stack

3.1 Process flow & critical loads

Publicly evidenced equipment/process: forge, machining, chemical/mechanical treatment, finishing, testing and assembly under one roof. The likely critical loads follow that process, but no machine count or OEM is added unless the source states it.

3.1a Machine inventory

ClassEvidence
Core production equipmentforge, machining, chemical/mechanical treatment, finishing, testing and assembly under one roof
Heat treatment / meltConfirm per site
CNC / VMCConfirm count and productive/idle states
Press / weldConfirm rating, shift and shared incomer
Compressors / utilitiesConfirm feeder and controls

3.2 Shifts, seasonality and production pattern

Shift count and product mix are unknown. Any baseline must use the plant’s own output measure: tonnes, strokes, machine hours, batches or equivalent components.

3.3 Automation, metering, SCADA/EMS/DCS

No named EMS/SCADA vendor was found unless stated in the source. Start with bills and interval data, then add read-only machine or feeder exports. No PLC writes belong in the proof.

3.4 Capex / tech projects affecting energy

Ask which lines were commissioned, moved or rebuilt in the last 24 months. New equipment and ramp-up periods need separate baselines.

4. Stamped Energy fit analysis

4.1 ICP scorecard

GateResult
Captive Sector 24 manufacturingVerify from plant evidence
Revenue targetSeparate entity revenue not verified
Monthly bill target₹8–25L/month [~] — unverified
Process relevancealuminium, brass and copper forging, machining, finishing and subassemblies
Named decision pathPartial; see §1.4

4.2 Fit score rationale

6/10. The score reflects only this company. The main deduction is: relationship with Bhatia Alloy and Plot 181 Bharat Enterprises must be resolved before outreach.

4.3 Wedge

The strongest wedge is: non-ferrous forge and finishing load per part, with press and heat-treatment sequencing, scoped to one legal DHBVN consumer and verified against the plant’s own production context.

4.4 Objections & competitors

“We already monitor” is answered with assigned rupee actions and verification with evidence. “The bill is too small” is a valid kill condition. Internal maintenance, one-time audits and OEM dashboards are alternatives; Stamped should proceed only when it adds a closed execution loop.

4.5 Pilot design

Two bills → meter and process map → one controllable feeder or event class → 60-Day Proof only if the bill supports ROI. Success is one production-cleared action with defensible evidence. Kill when the unit is not captive manufacturing, the bill is below the commercial floor, or no data/champion exists.

4.6 Concern scores

ConcernScoreOwner
Energy / bill5P&L champion
Maintenance / utilities6Maintenance actor
Production / dispatch6Production actor
Overall efficiency6Plant Head / owner

4.7 Pitch sketches

P&L: Verify the bill first. If the rupee opportunity cannot repay a small proof, stop.

Maintenance: Start with one equipment or utility action the team can execute without new hardware.

Production: No recommendation changes the schedule unless output, quality and dispatch remain protected.

5. Before you reach out

5.1 Discovery checklist

  • Confirm legal name, GSTIN and active factory.
  • Obtain two DHBVN bills.
  • Confirm process and machine inventory.
  • Map the incomer and top feeders.
  • Name maintenance and production owners.
  • Choose the correct production-normalisation metric.
  • Confirm data export and change-control limits.

5.2 Do not lead with

  • Do not lead with AI, ESG, dashboards or a savings guarantee.
  • Do not borrow facts from neighbouring Sector 24 companies.
  • Do not send to invalid.example; find a real contact first.
  • Do not price before the bill gate.

5.3 Opening hooks

“Before any proposal, can we verify the legal entity, two bills and whether non-ferrous forge and finishing load per part, with press and heat-treatment sequencing is visible on one meter?”

6. Risks, flags & sources

6.1 Integrity / controversy / regulatory

No material company-specific controversy was found in the limited public-source pass unless stated below. This is not legal clearance. Search again for the exact legal name plus NGT, HSPCB, fraud, lawsuit, insolvency, labour and tax before active outreach.

6.2 Data quality flags

  • Relationship with bhatia alloy and plot 181 bharat enterprises must be resolved before outreach.
  • Bill band is estimated, not invoice-derived.
  • Unnamed contacts remain search tasks, not invented people.
  • Directory evidence may be stale; gate verification is required.

6.3 Sources consulted